Primary and secondary beam connecting joint suitable for steel structure
By setting high-strength bolts and stiffener ribs in the main and secondary beam connection nodes of the steel structure, the problem of failure to consider the influence of eccentric bending moment in traditional connections is solved, and the shear strength and construction efficiency are improved.
Patent Information
- Application Number
- CN202420400221.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-02
AI Technical Summary
When calculating bolt connections between traditional H-shaped steel beams and H-shaped steel beam webs, the additional bending moment effect caused by eccentricity is not fully considered, resulting in insufficient design value of the bolt's shear bearing capacity.
Design a primary and secondary beam connection node suitable for steel structures, adopt H-shaped steel main beam web and secondary beam web, and set the first and second stiffening ribs on the sides of the main beam web, and connect them with high-strength bolts. , 6 rows and 3 rows of 18 high-strength bolts are formed to increase shear strength, and the number of connecting plates is reduced through the rapid connection between the second stiffening rib plate and the web of the secondary beam.
The shear strength of the connecting node is improved by about 50%, and the actual load-bearing capacity exceeds that of traditional nodes. At the same time, the use of steel components and construction difficulty are reduced, and the construction efficiency is improved.
Smart Images

Figure CN222044456U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a primary and secondary beam connection node suitable for steel structures. Background Art
[0002] Steel structure has the characteristics of high degree of prefabrication and assembly, easy to achieve production standardization and structural componentization, suitable for promoting the industrialization of construction. In addition, steel has the advantages of energy saving, emission reduction and recyclability. The use of steel structure in buildings can reduce the load on the ecological environment. Compared with traditional concrete components, steel structure is light in weight, strong in strength and low in price, which is conducive to reducing the foundation cost, and has excellent seismic performance. The main and secondary beam connection nodes are the most important nodes in the prefabricated steel structure system, which directly affects the construction speed and degree of assembly of the structure.
[0003] In the process of realizing the utility model, the inventors found that there are at least the following problems in this technology: when calculating the bolts and welds of the traditional H-beam and H-beam web bolt connection, in addition to considering the shear force at the end of the secondary beam, the influence of the additional bending moment caused by eccentricity should also be considered, thereby increasing the design value of the shear bearing capacity of the bolts. Utility Model Content
[0004] In order to improve the bolt connection between the H-beam and the web of the H-beam mentioned above, in addition to considering the shear force at the end of the secondary beam, the influence of the additional bending moment caused by eccentricity should also be considered when calculating the bolts and welds, thereby improving the design value of the shear bearing capacity of the bolts. The utility model provides a main and secondary beam connection node suitable for steel structures.
[0005] The utility model provides a primary and secondary beam connection node suitable for steel structures, which adopts the following technical solution:
[0006] A main-secondary beam connection node suitable for a steel structure comprises an H-shaped steel main beam web and an H-shaped steel secondary beam web, wherein the top and bottom of the H-shaped steel main beam web are both connected to an H-shaped steel main beam flange plate, the left side of the H-shaped steel main beam web is connected to a first stiffening rib plate, the right side of the H-shaped steel main beam web is connected to a second stiffening rib plate, one end of the second stiffening rib plate away from the H-shaped steel main beam web extends out of the H-shaped steel main beam flange plate and is connected to the top of the H-shaped steel secondary beam web, the left end of the H-shaped steel secondary beam web is fitted and connected to the right side wall of the H-shaped steel main beam web, high-strength bolts are arranged at the connection between the second stiffening rib plate and the H-shaped steel secondary beam web, and the top and bottom of the H-shaped steel secondary beam web are both connected to the H-shaped steel secondary beam flange plate.
[0007] By adopting the above technical solution, 18 high-strength bolts are arranged in 6 rows and 3 columns, so that the shear strength of the connection node is increased by about 50%, and the actual bearing capacity is greater than that of the traditional main and secondary beam connection node. At the same time, the right end of the second stiffening rib plate extends out and is connected to the web of the H-shaped steel secondary beam through high-strength bolts, acting as a connecting plate, reducing the number of connecting plates, reducing the amount of steel components, reducing construction difficulty, and improving construction efficiency.
[0008] Optionally, the two groups of H-beam main beam flange plates are symmetrically distributed about the center of the H-beam main beam web plate, and the two groups of H-beam main beam flange plates and the H-beam main beam web plate form an integrated welded structure.
[0009] By adopting the above technical solution, the connection between the flange plate of the H-shaped steel main beam and the web plate of the H-shaped steel main beam is made more firm.
[0010] Optionally, the two groups of H-beam secondary beam flange plates are symmetrically distributed about the center of the H-beam secondary beam web plate, and the two groups of H-beam secondary beam flange plates and the H-beam secondary beam web plate form an integrated welded structure.
[0011] By adopting the above technical solution, the connection between the web plate of the H-shaped steel secondary beam and the flange plate of the H-shaped steel secondary beam is made stronger.
[0012] Optionally, the thickness of the first stiffening rib plate and the second stiffening rib plate is greater than or equal to 2 mm than the thickness of the H-beam main beam flange plate.
[0013] By adopting the above technical solution, the strength and rigidity of the web of the H-shaped steel main beam are increased to ensure the bearing capacity and safety of the node.
[0014] Optionally, the number of the high-strength bolts is 18, arranged in 6 rows and 3 columns.
[0015] By adopting the above technical solution, the shear strength of the connection node is increased by about 50%, the actual bearing capacity is greater than the traditional main and secondary beam connection node, and the strength of the connection node is improved.
[0016] Optionally, screw holes matching the high-strength bolts are provided on the second stiffening rib plate and the web plate of the H-shaped steel secondary beam.
[0017] By adopting the above technical solution, the second stiffening rib plate and the web plate of the H-shaped steel secondary beam can be quickly connected by high-strength bolts, thereby facilitating the assembly and connection of the main and secondary beams.
[0018] In summary, the present invention has at least one of the following beneficial effects:
[0019] By setting 18 high-strength bolts in 6 rows and 3 columns, the shear strength of the connection node is increased by about 50%, and the actual bearing capacity is greater than the traditional main and secondary beam connection node. At the same time, the right end of the second stiffening rib plate extends out and is connected to the web of the H-shaped steel secondary beam through high-strength bolts, acting as a connecting plate, reducing the number of connecting plates, reducing the amount of steel components, reducing construction difficulty, and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 This is a front view structural schematic diagram of the utility model;
[0022] Figure 2 It is a schematic diagram of the top structure of the utility model.
[0023] In the figure: 1. H-shaped steel main beam flange plate; 2. H-shaped steel main beam web plate; 3. First stiffening rib plate; 4. Second stiffening rib plate; 5. High-strength bolts; 6. H-shaped steel secondary beam web plate; 7. H-shaped steel secondary beam flange plate. DETAILED DESCRIPTION
[0024] The following is combined with Figure 1-2 The utility model is described in further detail.
[0025] Please refer to the attached figure in the instruction manual Figure 1 and Figure 2 The utility model provides an embodiment: a main-secondary beam connection node suitable for steel structure, including an H-shaped steel main beam web 2 and an H-shaped steel secondary beam web 6, the top and bottom of the H-shaped steel main beam web 2 are fixedly connected with an H-shaped steel main beam flange plate 1, two groups of H-shaped steel main beam flange plates 1 are symmetrically distributed about the center of the H-shaped steel main beam web 2, and an integrated welding structure is formed between the two groups of H-shaped steel main beam flange plates 1 and the H-shaped steel main beam web 2. Thereby, the H-shaped steel main beam flange plate 1 and the H-shaped steel main beam web 2 are more firmly connected.
[0026] Please refer to the attached figure in the instruction manual Figure 1 and Figure 2The left side of the H-beam web 2 is fixedly connected with the first stiffening rib 3, and the right side of the H-beam web 2 is fixedly connected with the second stiffening rib 4. The thickness of the first stiffening rib 3 and the second stiffening rib 4 is greater than or equal to 2 mm thicker than the thickness of the H-beam flange 1. In order to increase the strength and rigidity of the H-beam web 2 to ensure the bearing capacity and safety of the node,
[0027] Please refer to the attached figure in the instruction manual Figure 1 The end of the second stiffening rib plate 4 away from the H-beam main beam web plate 2 extends out of the H-beam main beam flange plate 1 and is connected to the top of the H-beam secondary beam web plate 6. The left end of the H-beam secondary beam web plate 6 is connected to the right side wall of the H-beam main beam web plate 2. High-strength bolts 5 are provided at the connection between the second stiffening rib plate 4 and the H-beam secondary beam web plate 6. There are 18 high-strength bolts 5 arranged in 6 rows and 3 columns. The shear strength of the connection node is increased by about 50%, and the actual bearing capacity is greater than that of the traditional main and secondary beam connection node, which improves the strength of the connection node.
[0028] Please refer to the attached figure in the instruction manual Figure 1 and Figure 2 The second stiffening rib plate 4 and the H-beam secondary beam web plate 6 are both provided with screw holes that match the high-strength bolts 5. Thus, the second stiffening rib plate 4 and the H-beam secondary beam web plate 6 can be quickly connected by the high-strength bolts 5, thereby facilitating the assembly and connection of the main and secondary beams.
[0029] Please refer to the attached figure in the instruction manual Figure 1 and Figure 2 The top and bottom of the H-beam secondary beam web 6 are connected with the H-beam secondary beam flange plate 7, and the two groups of H-beam secondary beam flange plates 7 are symmetrically distributed about the center of the H-beam secondary beam web 6. The two groups of H-beam secondary beam flange plates 7 and the H-beam secondary beam web 6 form an integrated welding structure. Therefore, the connection between the H-beam secondary beam web 6 and the H-beam secondary beam flange plate 7 is more firm.
[0030] Working principle: When in use, the H-beam main beam web 2 is hoisted, and the H-beam main beam flange plate 1 is first welded to the top and bottom of the H-beam main beam web 2, and then the first stiffening rib plate 3 and the second stiffening rib plate 4 are respectively welded and fixed to the H-beam main beam web 2, and the second stiffening rib plate 4 and the H-beam secondary beam web 6 are fixed by high-strength bolts 5, and the left end of the H-beam secondary beam web 6 is fit-connected to the right end of the H-beam main beam web 2, and then the H-beam secondary beam flange plate 7 is welded to the top and bottom of the H-beam secondary beam web 6, and 18 high-strength bolts 5 are arranged in 6 rows and 3 columns, so that the shear strength of the connection node is increased by about 50%, and the actual bearing capacity is greater than that of the traditional main-secondary beam connection node. At the same time, the right end of the second stiffening rib plate 4 extends out and is connected to the H-beam secondary beam web 6 by high-strength bolts 5, acting as a connecting plate, reducing the number of connecting plates, reducing the amount of steel components, reducing construction difficulty, and improving construction efficiency.
[0031] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A main-secondary beam connection node suitable for a steel structure, comprising an H-shaped steel main beam web (2) and an H-shaped steel secondary beam web (6), characterized in that: The top and bottom of the H-beam main beam web (2) are both connected to the H-beam main beam flange plate (1), the left side of the H-beam main beam web (2) is connected to the first stiffening rib plate (3), the right side of the H-beam main beam web (2) is connected to the second stiffening rib plate (4), one end of the second stiffening rib plate (4) away from the H-beam main beam web (2) extends out of the H-beam main beam flange plate (1) and is connected to the top of the H-beam secondary beam web (6), the left end of the H-beam secondary beam web (6) is fitted and connected to the right side wall of the H-beam main beam web (2), high-strength bolts (5) are provided at the connection between the second stiffening rib plate (4) and the H-beam secondary beam web (6), and the top and bottom of the H-beam secondary beam web (6) are both connected to the H-beam secondary beam flange plate (7).
2. A primary and secondary beam connection node suitable for a steel structure according to claim 1, characterized in that: The two groups of H-shaped steel main beam flange plates (1) are symmetrically distributed about the center of the H-shaped steel main beam web plate (2), and the two groups of H-shaped steel main beam flange plates (1) and the H-shaped steel main beam web plate (2) form an integrated welded structure.
3. The primary and secondary beam connection node applicable to a steel structure according to claim 1, characterized in that: The two groups of H-beam secondary beam flange plates (7) are symmetrically distributed about the center of the H-beam secondary beam web plate (6), and the two groups of H-beam secondary beam flange plates (7) and the H-beam secondary beam web plate (6) form an integrated welded structure.
4. The primary and secondary beam connection node suitable for steel structure according to claim 1, characterized in that: The thickness of the first stiffening rib plate (3) and the second stiffening rib plate (4) is greater than or equal to 2 mm greater than the thickness of the H-shaped steel main beam flange plate (1).
5. The primary and secondary beam connection node suitable for steel structure according to claim 1, characterized in that: The number of the high-strength bolts (5) is 18, arranged in 6 rows and 3 columns.