Dry-type connection ALC wall body

By adopting a combined structure of right-angle connecting frames and connectors in the ALC wall, the existing dry connection is insufficient, the connection stability and the service life of the building are improved, and the construction and restoration process is simplified.

CN222044593UActive Publication Date: 2024-11-22ZHEJIANG TAIYI GREEN BUILDING IND DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420685861.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-22
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

The connection stability of existing dry-connected ALC walls is insufficient, which affects the overall connection effect of the building. It is difficult to repair after a strong earthquake, so it is impossible to fully utilize the advantages of rapid construction of prefabricated concrete structures.

Method used

The combination structure of right-angle connecting frame and connector is adopted, including right-angle connecting frame, connecting bolts, elastic filling blocks and expansion sleeves. Through the matching of right-angle connecting frame and the give way slot and the installation of connectors, the first ALC wall and the first ALC wall are realized. Stable connection between two ALC walls.

Benefits of technology

It improves the connection stability between walls, extends the service life of the building, and simplifies the construction and post-seismic restoration process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044593U_ABST
    Figure CN222044593U_ABST
Patent Text Reader

Abstract

The utility model provides a dry-type connection ALC wall body, and belongs to the technical field of ALC wall bodies. The dry type connection ALC wall body is adopted. The first ALC wall body and the second ALC wall body are perpendicularly arranged to form a right angle, a right-angle connecting frame is arranged at the bottom connecting position of the first ALC wall body and the second ALC wall body, and the first ALC wall body and the second ALC wall body are each provided with a first receding groove and a second receding groove which are matched with the right-angle connecting frame. A mounting groove is formed in the second ALC wall body, a connecting piece is arranged in the mounting groove, and the connecting piece is connected with the first ALC wall body. Through the arrangement of the right-angle connecting frame, the connection between the first ALC wall body and the second ALC wall body is more stable, so that the stability of the connection between the whole walls is improved, and the service life of an assembled building is longer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of ALC walls, and in particular to a dry-connected ALC wall. Background Art

[0002] ALC (Autoclaved Lightweight Concrete) panels are also called autoclaved lightweight aerated concrete partition panels. They are lightweight, have good fireproof and soundproof properties, are green and environmentally friendly, economical, and easy to construct. ALC wall panels need to be fixed during use. Generally, the connections for spliced ​​buildings are divided into wet connections and dry connections. Among them, the dry connection methods that are widely used in engineering projects mainly include sleeve grouting connection, grout anchor connection, and sleeve extrusion connection. Most of the existing dry connection methods require on-site wet operations or other on-site operations. Although they can ensure that their node performance is similar to that of cast-in-place concrete nodes, this type of connection cannot fully utilize the advantages of rapid construction and installation of prefabricated concrete structures. On the other hand, traditional dry-connected concrete structures have the disadvantage of dispersed damage under strong earthquakes, making post-earthquake repairs more difficult and not conducive to rapid post-earthquake repairs.

[0003] For example, a PC plate type concrete villa component assembly connection structure disclosed in China Publication No. CN219196251U can connect and fix two PC concrete plates by setting a steel plate box and connecting bolts, but the connection stability between the two walls is not enough, which affects the connection effect of the two walls. Utility Model Content

[0004] In order to make up for the above shortcomings, the present application provides a dry-type connected ALC wall, which aims to improve the problem that the connection stability between the two walls is insufficient, affecting the connection effect of the two walls.

[0005] An embodiment of the present application provides a dry-type connected ALC wall, including a first ALC wall and a second ALC wall.

[0006] The first ALC wall and the second ALC wall are respectively arranged vertically to form a right angle, a right-angle connecting frame is arranged at the bottom connection of the first ALC wall and the second ALC wall, and the first ALC wall and the second ALC wall are both provided with a first make way groove and a second make way groove matching the right-angle connecting frame, an installation groove is arranged inside the second ALC wall, a connecting piece is arranged inside the installation groove, and the connecting piece is connected to the first ALC wall.

[0007] In a specific implementation manner, the installation groove is filled with an elastic filling block, and the elastic filling block is provided with a slot that matches the connecting piece.

[0008] In a specific embodiment, a connecting groove matching with the connecting piece is formed on the first ALC wall.

[0009] In a specific embodiment, the connecting member includes a screw body, an expansion sleeve and a pull-out head, the pull-out head is fixedly connected to the screw rod end of the screw body, and the screw body and the pull-out head are located inside the expansion sleeve.

[0010] In a specific embodiment, the expansion sleeve includes an expansion tube and an expansion joint, and the expansion joint is arranged at the lower end of the expansion tube.

[0011] In a specific embodiment, the head of the pull-head is an arc-shaped tube structure.

[0012] In a specific embodiment, two side surfaces of the right-angle connecting frame are horizontally aligned with the side walls of the first ALC wall and the second ALC wall, respectively.

[0013] In a specific embodiment, the right-angle connecting frame is provided with connecting bolts, and at least two of the connecting bolts are respectively connected to the first ALC wall and the second ALC wall.

[0014] Beneficial effect: By setting the right-angle connecting frame, the connection between the first ALC wall and the second ALC wall is more stable, thereby improving the stability of the connection between the entire walls, thereby extending the service life of the assembled building. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions of the implementation methods of the present application, the drawings required for use in the implementation methods will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a schematic diagram of the structure of the dry-type connected ALC wall from a first perspective provided in an embodiment of the present application;

[0017] Figure 2 A schematic diagram of the structure of a dry-type ALC wall from a second perspective provided in an embodiment of the present application;

[0018] Figure 3 An exploded view of a dry-connected ALC wall provided for an embodiment of the present application;

[0019] Figure 4 A schematic diagram of the connection relationship between the first ALC wall and the second ALC wall provided in an embodiment of the present application;

[0020] Figure 5 A schematic diagram of the connector structure provided for an embodiment of the present application;

[0021] Figure 6 A schematic diagram of the structure of a right-angle connecting frame provided in an embodiment of the present application;

[0022] Figure 7 This is an enlarged view of point A in Figure 4 provided in the implementation manner of the present application.

[0023] In the figure: 1-first ALC wall; 11-first clearance groove; 2-second ALC wall; 21-second clearance groove; 3-right-angle connecting frame; 31-connecting bolt; 5-installation groove; 6-connecting piece; 61-screw body; 62-expansion sleeve; 63-pull head; 7-elastic filling block; 8-connecting groove. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application.

[0025] See also Figure 1-Figure 7 The present application provides a dry-type connected ALC wall, including a first ALC wall 1 and a second ALC wall 2.

[0026] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 , the first ALC wall 1 and the second ALC wall 2 are respectively arranged vertically to form a right angle, a right angle connecting frame 3 is arranged at the bottom connection of the first ALC wall 1 and the second ALC wall 2, and the first ALC wall 1 and the second ALC wall 2 are both provided with a first clearance groove 11 and a second clearance groove 21 matched with the right angle connecting frame 3, and a mounting groove 5 is arranged inside the second ALC wall 2, and a connecting member 6 is arranged inside the mounting groove 5, and the connecting member 6 is connected to the first ALC wall 1. Among them, the first ALC wall 1 and the second ALC wall 2 are connected. During installation, the first ALC wall 1 is moved to be arranged vertically with the second ALC wall 2, and then the right angle connecting frame 3 is clamped on the first clearance groove 11 and the second clearance groove 21, and then fixed by the connecting bolt 31, and then the connecting member 6 is connected to the first ALC wall 1 and the second ALC wall 2 through the mounting groove 5, so that the connection of the first ALC wall 1 and the second ALC wall 2 can be realized. By providing the right-angle connecting frame 3, the connection between the first ALC wall 1 and the second ALC wall 2 is made more stable, thereby improving the stability of the connection between the entire walls, thereby extending the service life of the assembled building.

[0027] In this embodiment, the first ALC wall 1 and the second ALC wall 2 are porous concrete products made of silica sand, cement, and lime as the main raw materials, reinforced by rust-proof steel bars, and cured under high temperature, high pressure, and steam. They have excellent sound insulation and sound absorption properties, and have good thermal insulation properties; their light weight is 0.5, which is 1 / 4 of that of ordinary concrete, greatly reducing the deadweight of the wall and the foundation cost of the building.

[0028] In this embodiment, the installation groove 5 is filled with an elastic filling block 7, and the elastic filling block 7 is provided with a slot that matches the connector 6. The installation groove 5 can be blocked by the elastic filling block 7, and because it is elastically arranged, it will not fall off the wall, and can be tightly engaged with the connector 6, making the entire wall more beautiful.

[0029] In the specific setting, a connecting groove 8 that matches with the connecting piece 6 is opened on the first ALC wall 1. The connecting piece 6 includes a screw body 61, an expansion sleeve 62 and a pull-out head 63. The pull-out head 63 is fixedly connected to the screw end of the screw body 61, and the screw body 61 and the pull-out head 63 are located inside the expansion sleeve 62. The expansion sleeve 62 includes an expansion tube and an expansion joint, and the expansion joint is arranged at the lower end of the expansion tube. The head of the pull-out head 63 is an arc-shaped tube structure. Among them, during installation, the connecting piece 6 is placed into the installation groove 5, and then the entire device is passed through the installation groove 5 and extended to the inside of the connecting groove 8, and then the screw body 61 is rotated to make the pull-out head 63 move forward. When moving, the pull-out head 63 will squeeze the expansion joint set on the expansion sleeve 62, so that the expansion sleeve 62 expands and presses against the inside of the connecting groove 8, so that the connecting piece 6 connects the first ALC wall 1 and the second ALC wall 2. The connection piece 6 provides a good connection effect between the first ALC wall 1 and the second ALC wall 2 and is environmentally friendly and low-consumption.

[0030] In this embodiment, the two side surfaces of the right angle connecting frame 3 are horizontally aligned with the side walls of the first ALC wall 1 and the second ALC wall 2. The horizontal alignment makes the connection between the right angle connecting frame 3 and the first ALC wall 1 and the second ALC wall 2 more beautiful without protruding parts.

[0031] Specifically, the right-angle connecting frame 3 is provided with connecting bolts 31, and at least two connecting bolts 31 are respectively connected to the first ALC wall 1 and the second ALC wall 2. The right-angle connecting frame 3 is connected to the bottom of the first ALC wall 1 and the second ALC wall 2 through at least two connecting bolts 31, thereby increasing the stability of the connection between the first ALC wall 1 and the second ALC wall 2.

[0032] The Dry Connect ALC Wall Working Principle:

[0033] The first ALC wall 1 and the second ALC wall 2 are connected. During installation, the first ALC wall 1 is moved to be vertically arranged with the second ALC wall 2, and then the right-angle connecting frame 3 is clamped on the first clearance groove 11 and the second clearance groove 21, and then fixed by connecting bolts 31, and then the connecting member 6 is connected to the first ALC wall 1 and the second ALC wall 2 through the installation groove 5, so as to realize the connection between the first ALC wall 1 and the second ALC wall 2. Through the setting of the right-angle connecting frame 3, the connection between the first ALC wall 1 and the second ALC wall 2 is more stable, thereby improving the stability of the connection between the entire wall, and further extending the service life of the assembled building.

[0034] The above description is only an embodiment of the present application and is not intended to limit the scope of protection of the present application. For those skilled in the art, the present application may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.

Claims

1. A dry-connected ALC wall, characterized in that: include A first ALC wall (1) and a second ALC wall (2), wherein the first ALC wall (1) and the second ALC wall (2) are respectively arranged vertically to form a right angle, a right angle connecting frame (3) is arranged at the bottom connection of the first ALC wall (1) and the second ALC wall (2), and the first ALC wall (1) and the second ALC wall (2) are both provided with a first clearance groove (11) and a second clearance groove (21) which are matched with the right angle connecting frame (3), and an installation groove (5) is arranged inside the second ALC wall (2), a connecting piece (6) is arranged inside the installation groove (5), and the connecting piece (6) is connected to the first ALC wall (1).

2. A dry-connected ALC wall according to claim 1, characterized in that: The installation groove (5) is filled with an elastic filling block (7), and the elastic filling block (7) is provided with a slot that matches the connecting piece (6).

3. A dry-connected ALC wall according to claim 1, characterized in that: The first ALC wall (1) is provided with a connection groove (8) which matches the connection piece (6).

4. A dry-connected ALC wall according to claim 1, characterized in that: The connecting member (6) comprises a screw body (61), an expansion sleeve (62) and a pull-out head (63); the pull-out head (63) is fixedly connected to the screw rod end of the screw body (61); and the screw body (61) and the pull-out head (63) are both located inside the expansion sleeve (62).

5. A dry-connected ALC wall according to claim 4, characterized in that: The expansion sleeve (62) comprises an expansion tube and an expansion joint, wherein the expansion joint is arranged at the lower end of the expansion tube.

6. A dry-connected ALC wall according to claim 4, characterized in that: The head of the pull-out head (63) is an arc-shaped tube structure.

7. A dry-connected ALC wall according to claim 1, characterized in that: The two side surfaces of the right-angle connecting frame (3) are horizontally aligned with the side walls of the first ALC wall (1) and the second ALC wall (2), respectively.

8. A dry-connected ALC wall according to claim 1, characterized in that: The right-angle connecting frame (3) is provided with connecting bolts (31), and at least two of the connecting bolts (31) are respectively connected to the first ALC wall (1) and the second ALC wall (2).