Novel stand column anchoring structure applied to distributed handrail
Through the assembly technology of post-mounted anchor bolts and prefabricated standard sections with fold-line arrangement, the problems of large number of anchor bolts and installation difficulty in distributed railing anchor structures are solved, and the workload of on-site welding and drilling is reduced, and construction efficiency is improved. The effect of concrete pouring quality.
Patent Information
- Application Number
- CN202323510232.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-21
AI Technical Summary
In the anchor structure of existing distributed railings, the number of anchor bolts is large and the installation is difficult, resulting in large welding and drilling workloads, high labor costs, and complex construction, making it difficult to ensure the quality of concrete pouring.
The rear anchor bolts are arranged in a fold-line style, and the steel base plate, railing columns and beams are prefabricated as standard sections. After factory welding, the on-site assembly is reduced to the on-site welding and drilling workload. The prefabricated construction model is adopted to simplify the construction process and pass The slotted hole technology of steel base plate flexibly adjusts the anchor bolt position.
Significantly reduce the number of anchor points, reduce labor costs, improve construction efficiency, simplify construction processes, ensure the quality of concrete pouring, reduce on-site welding and drilling workload, and achieve more flexible construction operations.
Smart Images

Figure CN222044772U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building structures, in particular to a novel column anchoring structure applied to distributed railings. Background Art
[0002] Guardrails are important components of buildings (structures) and have the functions of enclosure, separation, protection and decoration. Guardrails usually consist of three parts: columns, railings / railings, and handrails. They are widely used in open areas such as stairs, platforms, terraces, corridors and patios. The "Technical Standard for Building Guardrails" JGJ / T470-2019 points out that guardrails should be structurally designed, and the connection between the guardrail columns and the main concrete structure should adopt embedded parts, and its anchor bearing capacity should be greater than the component bearing capacity; in terms of structure, there should be no less than 2 anchor bolts at each column, the anchor bolt diameter should not be less than 8mm, and the anchor plate thickness should not be less than 6mm. The anchor connection should have sufficient rigidity, the displacement of the top of the guardrail column under the design load should not be greater than 30mm, the anchor connection should not be loose or fall off, and the residual deflection after unloading should not be greater than 1 / 1000 of the height of the guardrail.
[0003] According to the size of the column spacing and the structural stress characteristics, guardrails can be divided into two categories: centralized and distributed. The top load of the former centralized railing is transmitted to the dispersed columns through the beam (handrail), and then transmitted to the column bottom anchor node through the column. The common column spacing is 1.0m to 1.5m; the top load of the latter distributed railing is directly transmitted to the column bottom anchor node through the dense columns, and the common column spacing is ≤300mm. For transparent guardrails directly facing the air, the building requires that the net spacing of the vertical bars of the railing should not be greater than 110mm. If distributed railings are used, the net distance of the railing columns should not be greater than 110mm. At this time, the embedded parts at the bottom of the column are dense and the number of anchor bars is large. Page E22 of the atlas "Stair Railings and Balusters (I)" 15J403-1 gives detailed drawings of embedded parts of guardrail columns, where embedded parts M1 and M8 are used for distributed railings with column spacing ≤300mm. Embedded part M8 is a long strip embedded part, arranged along the length of the railing, with an anchor plate thickness of 6mm, an anchor bar diameter of 8mm, and an anchor bar spacing of 60mm.
[0004] For distributed railings with a net column distance of ≤110mm, the embedded M8 anchor node method adopted in Atlas 15J403-1 has the following disadvantages: 1) The anchor bar spacing is small and the number is large, so the welding workload between the anchor bars and the embedded parts is large; 2) The anchor plate thickness is small, the long strip anchor plate is flexible, the embedded parts are difficult to install and position, and are easily disturbed during concrete pouring; 3) After the embedded parts are embedded, the dense railing columns need to be welded to the embedded steel plates, and the on-site welding workload is large; 4) Construction units generally construct the railings and their embedded parts later, and do not embed them in advance. If the anchor bar arrangement method of Atlas M8 is used for post-anchor connection (planted bars or anchor bolt connection), the on-site drilling workload is large, the labor cost is too high, and the large number and denseness make it impossible to avoid the main structure's load-bearing steel bars, making implementation difficult. Utility Model Content
[0005] Based on the above description, the utility model provides a new column anchoring structure applied to distributed railings to solve the problem that the anchor bolts arranged in the prior art are large in number and difficult to install.
[0006] The technical solution of the utility model to solve the above technical problems is as follows:
[0007] A new column anchoring structure applied to distributed railings, comprising:
[0008] A steel base plate, placed on the concrete structure, with slots cut into it;
[0009] The railing posts are connected vertically to the steel base plate at equal distances;
[0010] The crossbeam is set on the top of the railing posts;
[0011] The post-installed anchor bolts are implanted into the concrete structure through the slots and are arranged along a zigzag line on both sides of the railing columns.
[0012] On the basis of the above technical solution, the present invention can also be improved as follows.
[0013] Furthermore, the distances between the post-anchor bolts and adjacent railing columns on both sides are the same, and the connecting line of adjacent post-anchor bolts passes through the center point of the railing column.
[0014] Furthermore, the direction in which the railing is extended is defined as the longitudinal direction, and the spacing between adjacent post-installed anchor bolts in the longitudinal direction is greater than 60 mm.
[0015] Furthermore, the thickness of the steel base plate is 1 / 12 of the distance between the diagonal lines of adjacent post-installed anchor bolts.
[0016] Furthermore, the railing columns, steel bottom plates and cross beams are formed into a welded structure in which unit lengths are welded in a factory as standard sections, and the standard sections are welded on site.
[0017] Furthermore, the post-installed anchor bolt is fixed with a sleeve nut on the steel base plate, and a pad is provided between the nut and the steel base plate.
[0018] Furthermore, the longitudinal dimension of the pad is 35 mm, and the transverse dimension of the pad is 25 mm.
[0019] Furthermore, the edge of the steel base plate is extended outward by 25 mm in the transverse direction from the rear anchor bolts on both sides.
[0020] Compared with the prior art, the technical solution of this application has the following beneficial technical effects:
[0021] The utility model proposes a new column anchoring node and a complete solution for distributed railings, which greatly reduces the workload of on-site welding and drilling, and adopts an assembled construction method to improve construction efficiency.
[0022] 1) The post-installed anchor bolts are arranged in a broken line shape, and the anchor bolt spacing is twice the spacing of the railing columns. Compared with the anchor bar spacing of 60mm in Atlas 15J403-1, the number of anchor points can be greatly reduced (by about 66.7%), the drilling workload can be reduced, the labor cost can be saved, and the on-site implementation is more convenient;
[0023] 2) An assembled construction model is adopted. The steel base plate, railing columns and beams are welded and manufactured in the factory. The standard railing sections prefabricated in the factory are assembled on-site and fixed to the main concrete structure through anchor bolts, reducing the workload of on-site welding.
[0024] 3) By adopting the post-anchoring technology of anchor bolts, there is no need to take complicated embedded parts positioning and fixing measures during the civil construction stage, which simplifies the construction process and is conducive to ensuring the pouring and vibration quality of concrete projects.
[0025] 4) The steel base plate slotting technology is adopted to facilitate the drilling of anchor holes. The position of the anchor holes can be flexibly adjusted according to the site conditions to avoid the main structure steel bars, making the construction operation more flexible. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a plan view of the bottom structure of the guardrail of the utility model;
[0027] Figure 2 It is a cross-sectional view of the protective railing of the utility model;
[0028] Figure 3 It is a longitudinal section view of the protective railing of the utility model;
[0029] Figure 4 It is a detailed drawing of the slot holes of the steel bottom plate of the utility model;
[0030] Figure 5It is a detailed drawing of the steel pad of the utility model;
[0031] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0032] 1. Main concrete structure; 2. Anchor bolts; 3. Steel base plate; 4. Pad; 5. Column; 6. Beam; 7. Building surface layer; 8. Standard section cutting position of railing. DETAILED DESCRIPTION
[0033] In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. Embodiments of the present application are provided in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.
[0034] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.
[0035] It will be appreciated that spatial relationship terms such as "under," "beneath," "below," "under," "above," "above," etc., may be used herein to describe the relationship of an element or feature shown in the figures to other elements or features. It will be appreciated that, in addition to the orientations shown in the figures, spatial relationship terms also include different orientations of the device in use and operation. For example, if the device in the accompanying drawings is flipped, an element or feature described as "under other elements" or "under it" or "under it" will be oriented as being "above" the other elements or features. Thus, the exemplary terms "under" and "under" may include both upper and lower orientations. In addition, the device may also include additional orientations (e.g., rotated 90 degrees or other orientations), and the spatial descriptors used herein are interpreted accordingly.
[0036] It should be noted that when an element is considered to be "connected" to another element, it can be directly connected to the other element, or connected to the other element through an intermediate element. The "connection" in the following embodiments should be understood as "electrical connection", "communication connection", etc. if the connected circuits, modules, units, etc. have electrical signals or data transmission between each other.
[0037] When used herein, the singular forms "a", "an", and "said / the" may also include plural forms, unless the context clearly indicates otherwise. It should also be understood that the terms "include / comprise" or "have" etc. specify the presence of stated features, wholes, steps, operations, components, parts or combinations thereof, but do not exclude the possibility of the presence or addition of one or more other features, wholes, steps, operations, components, parts or combinations thereof.
[0038] like Figure 1-5 A new type of column 5 anchoring structure applied to distributed railings is shown, comprising a steel base plate 3, railing columns 5, a crossbeam 6 and a post-anchor bolt 2. The steel base plate 3 is laid flat as a base, and railing columns 5 are arranged equidistantly on the steel base plate 3. A crossbeam 6 is provided on the top of the railing column 5 as a handrail. The railing column 5, the steel base plate 3 and the crossbeam 6 are welded together in unit length, and the prefabricated parts facilitate subsequent installation work. The steel base plate 3 is laid on the concrete structure, and a slot is opened on the steel base plate 3. The post-anchor bolt 2 inserted into the concrete structure is inserted into the slot, and the post-anchor bolt 2 is arranged on both sides of the railing column 5 along a zigzag line.
[0039] like Figure 1 As shown, the distance between the post-anchor bolts 2 and the adjacent railing columns 5 on both sides is the same, and the connecting line of the adjacent post-anchor bolts 2 passes through the center point of the railing column 5. The direction of railing extension is defined as the longitudinal direction, and the direction perpendicular to the longitudinal direction is the transverse direction. The post-anchor bolts 2 are fixed in the main concrete structure 1 by the post-anchoring technology. The post-anchor bolts 2 are arranged in a broken line shape, and the longitudinal spacing along the railing is 2s, and the transverse spacing along the railing is a. The dimension a should not be less than 60mm, and the diagonal spacing between adjacent anchor bolts 2 is L.
[0040] The steel bottom plate 3 is placed on the main concrete structure 1. The top surface of the main concrete structure 1 is required to be flat and dense. The steel bottom plate 3 is tightly fitted to the main concrete structure 1 by tightening the nuts of the post-installed anchor bolts 2. Slots are provided on the steel bottom plate 3. The short dimension of the slot is the nominal diameter d of the anchor bolt 2 + 4.0 mm, and the long dimension is 22 mm. See the attached Figure 4 The thickness of the steel bottom plate 3 is L / 12, the width is w=a+2c, and c is 25mm. A 5mm thick steel pad 4 is set between the steel bottom plate 3 and the nut of the post-anchor bolt 2. The pad 4 has a longitudinal dimension of 35mm and a transverse dimension of 25mm. A standard circular hole is opened in the center of the plate, and the hole diameter is the nominal diameter of the anchor bolt 2 d+1.0mm. See the attached Figure 5 The railing posts 5 are connected to the top surface of the steel bottom plate 3 by welding. The longitudinal spacing of the posts 5 along the railing is s, and the net distance is ≤110mm. The welding between the posts 5 and the steel bottom plate 3 is factory welding.
[0041] Figure 2In the embodiment, the railing beam 6 is welded to the column 5 in the factory, and the height of the column 5 is H≤1.2m; the width b of the main concrete structure 1 should not be less than 200mm, and the thickness h should not be less than 300mm, so as to meet the fixing requirements of the anchor bolt 2. The top surface of the main concrete structure 1 is provided with a building surface layer 7 with a thickness of f, usually f = 50mm, and the specific details are detailed in the engineering design.
[0042] Figure 3 In the figure, the reserved railing posts 5a are reserved at intervals of 2.0m to 3.0m along the longitudinal direction of the railing. 8 in the figure is a schematic diagram of the cutting position of the standard section of the railing. The cutting position is directly opposite to the center line of the railing. The steel bottom plate 3 and the railing cross beam 6 are cut at this position and then welded together on site. The reserved railing posts 5a are welded to the steel bottom plate 3 and the railing cross beam 6 on site.
[0043] The specific implementation of the application of the utility model can be divided into two stages: factory prefabrication and on-site installation.
[0044] (I) Factory prefabrication stage
[0045] (1) According to the design drawings, the railing is divided into several standard sections along the longitudinal direction. The length of each standard section is controlled at 2.0m to 3.0m, and the cutting position is opposite to the center line of a certain railing column 5.
[0046] (2) According to the design drawings, slots are opened in the steel bottom plate 3, and a single-sided groove is opened at the end of the steel bottom plate 3 of each standard section.
[0047] (3) The railing posts 5 of each standard section are welded to the cross beam 6 and the steel base plate 3.
[0048] (4) According to the design drawings, the steel pad 4 is processed and manufactured, and a standard round hole is opened.
[0049] (II) On-site installation stage
[0050] (1) First, cast and maintain the main concrete structure 1, and trim the surface of the base concrete to ensure that the surface is flat and dense;
[0051] (2) Mark and locate the two anchor points on site according to the design drawings, and drill and clean the holes;
[0052] (3) Carry out the construction of post-installed anchor bolts 2, plant anchor bolts 2 or screws, and perform on-site non-destructive testing of the pull-out bearing capacity in accordance with the specifications.
[0053] (4) After the post-anchor bolts 2 have passed the on-site inspection, the standard section railings are installed and tightened in sections. The welded standard section of the railings is fixed to the main concrete structure 1 by tightening the nuts of the post-anchor bolts 2;
[0054] (5) The standard sections of the railings that have been installed and tightened are welded together. First, the top crossbeam 6 and the bottom steel base plate 3 are butt-welded on site, and then the reserved railing columns 5a are connected to the top crossbeam 6 and the bottom steel base plate 3 by fillet welds.
[0055] (6) Finally, the building surface layer 7 is constructed, and 20 mm thick cement mortar is applied around the rear anchor bolt 2 to prevent the nut from loosening.
[0056] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A new column anchoring structure applied to distributed railings, characterized in that: include: A steel base plate, placed on the concrete structure, with slots cut into it; The railing posts are connected vertically to the steel base plate at equal distances; The crossbeam is set on the top of the railing posts; The post-installed anchor bolts are implanted into the concrete structure through the slots and are arranged along a zigzag line on both sides of the railing columns.
2. According to claim 1, a new column anchoring structure applied to distributed railings is characterized in that: The distances between the post-anchor bolts and adjacent railing columns on both sides are the same, and the connecting line of adjacent post-anchor bolts passes through the center point of the railing columns.
3. According to claim 2, a new column anchoring structure applied to distributed railings is characterized in that: The direction in which the railing is extended is defined as the longitudinal direction, and the spacing between adjacent post-installed anchor bolts in the longitudinal direction is greater than 60 mm.
4. According to claim 2, a new column anchoring structure applied to distributed railings is characterized in that: The thickness of the steel base plate is 1 / 12 of the distance between the adjacent post-installed anchors.
5. According to claim 1, a new column anchoring structure applied to distributed railings is characterized in that: The railing columns, steel bottom plates and cross beams are formed into a welded structure in which unit lengths are welded in factories as standard sections, and the standard sections are welded on site.
6. The novel column anchoring structure applied to distributed railings according to claim 1 is characterized in that: The post-installed anchor bolt is sleeved with a nut and fixed to a steel bottom plate, and a pad is provided between the nut and the steel bottom plate.
7. A novel column anchoring structure applied to distributed railings according to claim 6, characterized in that: The dimension of the pad in the longitudinal direction is 35 mm, and the dimension of the pad in the transverse direction is 25 mm.
8. The novel column anchoring structure applied to distributed railings according to claim 2 is characterized in that: The edge of the steel bottom plate extends outward by 25 mm in the transverse direction from the rear anchor bolts on both sides.