Concrete spreader for constructional engineering
By designing multi-group branch feed pipelines and automatic adjustment structures in the concrete fabric machine, the problems of low casting efficiency and damage to the steel bar structure in the prior art are solved, and efficient large-area construction and structural stability are achieved.
Patent Information
- Application Number
- CN202420500036.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-15
AI Technical Summary
The existing concrete fabric machines are inefficient when pouring in large areas, and the installation of multiple fabric machines can easily lead to depression and deformation of the steel bar structure, affecting the mechanical characteristics of the concrete.
A new type of fabric machine including hollow columns, feeding up pipes, beam frames, rotary seats, material separation structures and counterweight adjustment structures was designed. By setting up separate material parts and end material parts, multiple branch material transportation is realized. The flexibly sets the pipe and the counterweight adjustment is achieved through the motor driving the gears and the slide rails.
The casting efficiency is improved, the damage of the steel bar structure is avoided when multiple fabric machines are installed, and the construction of large-area working faces is realized, and the equipment load is reduced through automatic adjustment of the structure.
Smart Images

Figure CN222045077U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering machinery, in particular to a concrete placing machine for construction engineering. Background Art
[0002] As an auxiliary equipment of concrete pump, the concrete placing boom is connected to the pump body through a standard delivery pipe, so as to quickly and accurately deliver concrete to the pouring part of the working surface.
[0003] For example, in the patent document with patent announcement number CN218758827U, a concrete placing machine is disclosed, which includes a concrete placing machine body, a hose connected to the pipe on the concrete placing machine body, the hose is located on one side of the concrete placing machine body, and also includes a support mechanism for construction personnel to control the movement of the bottom end of the hose; the support mechanism includes a discharge assembly, a handheld assembly and a connecting assembly, the discharge assembly is connected to the bottom end flange of the hose through the connecting assembly, and the handheld assembly is arranged on the discharge assembly. According to the prior art documents, the concrete placing machine has only one pipeline channel for pumping concrete, and the pouring efficiency is low. Therefore, when the pouring range is large, the pouring workers need to work for a long time to complete the pouring. However, since the concrete placing machine needs to be placed above the steel bar formwork, if multiple concrete placing machines are set to work at the same time, it is easy to cause the steel bar working surface to have different degrees of concave deformation, thereby adversely affecting the mechanical characteristics of the concrete structure.
[0004] To this end, the utility model optimizes and improves the efficiency of concrete placing booms in the prior art, and hereby proposes a new concrete placing boom that can flexibly increase the number of pumping pipelines to better solve the problems in the prior art. Utility Model Content
[0005] The utility model is to solve one of the above technical problems, and the technical scheme adopted is: a concrete placing machine for construction engineering, comprising a hollow column, a material delivery riser is penetrated in the internal space of the hollow column, the lower end of the material delivery riser is used to communicate with the external pump machine material delivery pipe, and also comprises a horizontally arranged beam frame, a swivel seat is fixedly connected to the middle part of the bottom surface of the beam frame, the upper end of the hollow column is movably inserted into the interior of the swivel seat, a mounting hole is vertically opened at a corresponding position in the middle of the beam frame, a rotating connecting piece is provided in the corresponding mounting hole above the top of the material delivery riser, the upper end of the material delivery riser extends into the interior of the mounting hole, a main material delivery piece is provided at the top of the right end of the beam frame along its length direction, a material distribution structure is provided on the right side of the beam frame, and a terminal material delivery piece is provided on the right side of the material distribution structure, the inner cavities at the corresponding positions of the main material delivery piece, the material distribution structure and the terminal material delivery piece are connected in series in sequence, and a counterweight adjustment structure is provided at the left end of the beam frame.
[0006] In any of the above schemes, it is preferred that the material distribution structure comprises a plurality of material distribution and feeding parts connected in series end to end;
[0007] The material distribution and feeding member comprises a connecting beam, and first connecting plates are fixedly connected to the outer walls of the left and right ends of the connecting beam, and a tee is fixedly connected to the top of the connecting beam, and a through hole is vertically opened in the middle of the connecting beam, and the lower end of the branch pipe of the tee passes through the through hole and is connected to the upper end flange of the first flexible material distribution pipe, and the other two ends of the tee are respectively arranged horizontally toward the two ends of the connecting beam;
[0008] The first connecting plates corresponding to two adjacent connecting beams are fixedly connected by bolts, and the adjacent two tees are connected by end flanges at corresponding ends;
[0009] A second connecting plate is fixedly connected to the outer wall of the right end of the beam frame, and the second connecting plate is fixedly connected to the first connecting plate at the left end of the connecting beam at the corresponding position through bolts. The right end of the main material feeding member is fixedly connected to the left end of the tee at the corresponding position and the two are internally connected.
[0010] In any of the above schemes, it is preferred that the end material conveying member includes a beam head, a third connecting plate is fixedly connected to the outer wall of the left end of the beam head, the third connecting plate is fixedly connected to the first connecting plate at the right end of the connecting beam at a corresponding position through bolts, and a first bent pipe is fixedly connected to the top of the beam head, one end of the first bent pipe is connected to the right end flange of the tee at the corresponding position, and the other end of the first bent pipe is connected to the upper end flange of a vertically arranged second flexible material distribution pipe.
[0011] In any of the above schemes, it is preferred that the rotating connecting member includes a sleeve, the outer wall of the sleeve is fixedly connected to the inner wall of the mounting hole, an annular groove is opened in the middle of the inner wall of the sleeve, an annular rotating block is fixedly sleeved on the outer wall of the upper end of the material conveying riser, the upper end of the material conveying riser is movably inserted into the interior of the sleeve, the annular rotating block is movably engaged in the annular groove, the top of the sleeve is fixedly connected to the inner end of the main material conveying member and the two are internally communicated.
[0012] In any of the above schemes, it is preferred that the main material conveying member includes a second bent pipe, the inner end of the second bent pipe is fixedly connected to the top of the sleeve and the two are internally communicated, the main material conveying pipe is fixedly connected to the top of the beam frame, the outer end of the second bent pipe is connected to the left end flange of the main material conveying pipe, and the right end of the main material conveying pipe is connected to the left end flange of the tee at the corresponding position.
[0013] In any of the above schemes, it is preferred that the counterweight adjustment structure includes an installation box, the left end of the beam frame passes through the upper part of the installation box, a motor is fixedly connected to the inside of the installation box, a gear is fixedly sleeved on the end of the motor shaft of the motor, a rack is fixedly connected to the bottom of the beam frame along its length direction, the gear is meshingly connected to the rack, a plurality of slide rails are fixedly connected to the top of the beam frame along its length direction, a plurality of slide grooves are opened on the top inner wall of the installation box, each of the slide rails is respectively clamped in the slide groove at the corresponding position, and a counterweight block is fixedly installed on the top of the installation box.
[0014] In any of the above schemes, preferably, a limiting disc is fixedly sleeved on the upper end of the hollow column, an annular limiting groove is opened on the inner wall of the swivel seat, and the limiting disc is movably engaged in the annular limiting groove.
[0015] In any of the above solutions, preferably, a plurality of legs are fixedly connected to the lower end of the hollow column at intervals.
[0016] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0017] 1. The utility model sets one or two branch feed pieces between the main feed piece and the terminal feed piece, so that multiple groups of flexible branch feed pipes can be set on one concrete placing machine. When dealing with the pouring condition of a large-area working surface, multiple groups of pouring workers can pour different areas at the same time, thereby improving the pouring efficiency and avoiding the problem of easily damaging the steel structure by setting up multiple concrete placing machines.
[0018] 2. The utility model drives the gear to rotate through a motor, and through the meshing connection between the gear and the rack, and the sliding cooperation connection between the slide rail and the slide groove, the installation box and the counterweight block can be automatically translated along the length direction of the beam frame, so that the counterweight can be flexibly and automatically adjusted according to the number of feed parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solution of the specific implementation of the utility model, the following will briefly introduce the drawings required for the specific implementation. In all the drawings, similar elements or components are generally identified by similar reference numerals. In the drawings, each element or component is not necessarily drawn according to the actual scale.
[0020] Figure 1 It is a structural schematic diagram of the utility model of the material placing machine in the front view direction.
[0021] Figure 2 It is a partial structural schematic diagram of the material placing machine of the utility model.
[0022] Figure 3It is a cross-sectional view of the counterweight adjustment structure of the utility model when viewed from the side.
[0023] Figure 4 for Figure 1 A partial enlarged view of point A in the middle.
[0024] Figure 5 It is a cross-sectional view of the sleeve of the utility model.
[0025] In the figure, 1. hollow column; 2. support foot; 3. feed pipe; 4. beam frame; 5. swivel seat; 6. mounting hole; 7. connecting beam; 8. tee; 9. through hole; 10. first flexible material distribution pipe; 11. first connecting plate; 12. second connecting plate; 13. beam head; 14. third connecting plate; 15. first elbow; 16. second flexible material distribution pipe; 17. sleeve; 18. annular groove; 19. annular rotating block; 20. second elbow; 21. main feed pipe; 22. mounting box; 23. motor; 24. gear; 25. rack; 26. slide rail; 27. slide groove; 28. counterweight; 29. limit disc; 30. annular limit groove; 31. fixing buckle; 32. clamp. DETAILED DESCRIPTION
[0026] The following is a detailed description of the embodiments of the technical solution of the utility model in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the utility model, and are therefore only used as examples, and cannot be used to limit the scope of protection of the utility model. Figure 1-Figure 5 as shown in .
[0027] A concrete placing machine for construction engineering comprises a hollow column 1, in the inner space of which a feed riser 3 is provided, the lower end of which is used to communicate with an external pump feed pipe, and a horizontally arranged beam frame 4, the middle part of the bottom surface of which is fixedly connected with a swivel seat 5, the upper end of the hollow column 1 is movably inserted into the inside of the swivel seat 5, a mounting hole 6 is vertically opened at a corresponding position in the middle of the beam frame 4, a rotating connecting piece is provided in the corresponding mounting hole 6 above the top of the feed riser 3, the upper end of the feed riser 3 extends into the inside of the mounting hole 6, a main feed piece is provided at the top of the right end of the beam frame 4 along its length direction, a material distribution structure is provided on the right side of the beam frame 4, and a terminal feed piece is provided on the right side of the material distribution structure, the inner cavities at the corresponding positions of the main feed piece, the material distribution structure and the terminal feed piece are connected in series in sequence, and a counterweight adjustment structure is provided at the left end of the beam frame 4.
[0028] The feed riser 3 is fixedly installed inside the hollow column 1 by fixing the buckle 31, and the upper and lower ends of the feed riser 3 extend out of the upper and lower end openings of the hollow column 1 respectively, and the swivel seat 5 is welded to the bottom of the beam frame 4. Under the active connection relationship between the hollow column 1 and the swivel seat 5, the beam frame 4 can freely rotate in the horizontal direction around the axial direction of the hollow column 1, thereby driving the main feed piece to rotate. The lower end of the feed riser 3 is connected to the feed pipe flange of the pump machine, and its upper end is movably connected to the inner end of the main feed piece through a rotating connector. Under the action of the rotating connector, not only can the end of the feed riser 3 and the end of the main feed piece rotate relative to each other, but also the pump machine can pump concrete into the main feed piece through the feed riser 3 in the working state, and then continue to pump it to the material distribution structure and the inside of the terminal feed piece, thereby realizing the division of a main feed pipeline into multiple branch feed pipelines, thereby adapting to the pouring work of a large-area working surface.
[0029] According to the actual working conditions, the number of branch material delivery pipelines of the material distribution structure can be adjusted. In order to ensure the balance at both ends of the beam 4, reduce the radial load of the hollow column 1, and make the coordinated rotation of the hollow column 1 and the beam 4 smoother, a counterweight adjustment structure with a movable position is set at the left end of the beam 4, so as to flexibly adjust the counterweight.
[0030] In any of the above schemes, it is preferred that the material distribution structure comprises a plurality of material distribution and feeding parts connected in series end to end;
[0031] The material distribution and feeding member comprises a connecting beam 7, on the outer walls of the left and right ends of the connecting beam 7, first connecting plates 11 are fixedly connected, a tee 8 is fixedly connected above the connecting beam 7, a through hole 9 is vertically opened in the middle of the connecting beam 7, the lower end of the branch pipe of the tee 8 passes through the through hole 9 and is connected to the upper end flange of the first flexible material distribution pipe 10, and the other two ends of the tee 8 are respectively arranged horizontally toward the two ends of the connecting beam 7;
[0032] The first connecting plates 11 corresponding to two adjacent connecting beams 7 are fixedly connected by bolts, and the adjacent two tees 8 are connected by end flanges at corresponding ends;
[0033] A second connecting plate 12 is fixedly connected to the outer wall of the right end of the beam frame 4, and the second connecting plate 12 is fixedly connected to the first connecting plate 11 at the left end of the connecting beam 7 at the corresponding position by bolts. The right end of the main feeding member is fixedly connected to the left end of the tee 8 at the corresponding position and the two are internally connected.
[0034] The utility model can be provided with a separate feed member, the left end of the connecting beam 7 of the feed member is abutted against the right end of the beam frame 4, and the first connecting plate 11 and the second connecting plate 12 at the corresponding position are fixedly connected by bolts, so as to realize the connection between the connecting beam 7 and the beam frame 4. At the same time, the left end of the tee 8 is fixedly connected to the right end of the main feed member and the two are internally connected, and the lower end of the tee 8 is connected to the upper end flange of the first flexible feed pipe 10. Further, the right end of the connecting beam 7 and the right end of the tee 8 are respectively fixedly connected to the corresponding positions of the left end of the terminal feed member. In this way, when the pump is working, the concrete is transported to the inside of the tee 8 through the feed riser 3 and the main feed member, and then a part of the concrete is poured into the area on one side of the working surface through the first flexible feed pipe 10, and the other part of the concrete enters the inside of the terminal feed member and is poured into the area on the other side of the working surface through it, and the simultaneous construction of a large range of working surfaces is completed through two branch feed pipelines.
[0035] The utility model can also set two material distribution parts at the same time, and the connecting beams 7 of the two material distribution parts are connected in sequence. At the same time, by connecting the first connecting plates 11 at the corresponding ends of the two, the fixed connection of the left and right connecting beams 7 is realized, and the corresponding ends of the two three-way pipes 8 are flange-connected, and the lower ends of the two three-way pipes 8 are fixedly installed with the first flexible material distribution pipe 10 by flange connection. The left end of the left connecting beam 7 is abutted against the right end of the beam frame 4, and the first connecting plate 11 and the second connecting plate 12 at the corresponding position are fixedly connected by bolts, and the left end of the left three-way pipe 8 is fixedly connected to the right end of the main material distribution part and the two are internally connected. The right end of the right connecting beam 7 and the right end of the three-way pipe 8 are respectively fixedly connected to the corresponding positions of the left end of the terminal material distribution part. In this way, when the pump is working, concrete passes through the two first flexible material distribution pipes 10 in sequence and is poured into different areas of the working surface through the two, and then the remaining concrete is poured into other areas through the terminal material distribution part, so that the simultaneous construction of a large range of working surfaces is completed through three branch material distribution pipelines.
[0036] In any of the above schemes, it is preferred that the end material feeding member includes a beam head 13, and a third connecting plate 14 is fixedly connected to the outer wall of the left end of the beam head 13, and the third connecting plate 14 is fixedly connected to the first connecting plate 11 at the right end of the connecting beam 7 at the corresponding position through bolts, and a first bent pipe 15 is fixedly connected to the top of the beam head 13, one end of the first bent pipe 15 is connected to the right end flange of the tee 8 at the corresponding position, and the other end of the first bent pipe 15 is connected to the upper end flange of a vertically arranged second flexible distribution pipe 16.
[0037] When there is only one material distribution member, the left end of the beam head 13 abuts against the right end of the connecting beam 7, and when there are two material distribution members, the left end of the beam head 13 abuts against the right end of the connecting beam 7 located on the right side. The corresponding first connecting plate 11 is fixedly connected to the third connecting plate 14 by bolts, so as to realize the fixed connection between the beam head 13 and the connecting beam 7.
[0038] After passing through the main material conveying member and the tee 8 in sequence, the concrete enters the first elbow 15 and then continues to enter the interior of the second flexible distribution pipe 16 , and is poured onto the working surface through the second flexible distribution pipe 16 .
[0039] In any of the above schemes, it is preferred that the rotating connecting member includes a sleeve 17, the outer wall of the sleeve 17 is fixedly connected to the inner wall of the mounting hole 6, an annular groove 18 is opened in the middle of the inner wall of the sleeve 17, an annular rotating block 19 is fixedly sleeved on the outer wall of the upper end of the material conveying riser 3, the upper end of the material conveying riser 3 is movably inserted into the interior of the sleeve 17, the annular rotating block 19 is movably engaged in the annular groove 18, the top of the sleeve 17 is fixedly connected to the inner end of the main material conveying member and the two are internally communicated.
[0040] The upper end of the feed riser 3 is movably inserted into the sleeve 17, and the annular rotating block 19 is movably engaged in the annular clamping groove 18. At the same time, the top of the sleeve 17 is fixedly connected to the inner end of the main feed piece and the insides of the two are connected. In this way, under the cooperative connection between the annular rotating block 19 and the annular clamping groove 18, when the beam 4 rotates, the feed riser 3 can rotate in the sleeve 17, and at the same time, concrete can enter the main feed piece from the feed riser 3 through the sleeve 17.
[0041] In any of the above schemes, it is preferred that the main material conveying member includes a second curved pipe 20, the inner end of the second curved pipe 20 is fixedly connected to the top of the sleeve 17 and the two are internally connected, a main material conveying pipe 21 is fixedly connected to the top of the beam 4, the outer end of the second curved pipe 20 is connected to the left end flange of the main material conveying pipe 21, and the right end of the main material conveying pipe 21 is connected to the left end flange of the tee 8 at the corresponding position.
[0042] The main material delivery pipe 21 is fixedly installed on the right side of the beam frame 4 through the clamp 32 , and the sleeve 17 is fixedly connected to the main material delivery pipe 21 through the second bent pipe 20 .
[0043] When one material delivery member is provided, the right end of the main material delivery pipe 21 is connected to the left end flange of the tee 8; when two material delivery members are provided, the right end of the main material delivery pipe 21 is connected to the left end flange of the tee 8 on the left.
[0044] In any of the above schemes, it is preferred that the counterweight adjustment structure includes an installation box 22, the left end of the beam 4 passes through the upper part of the installation box 22, a motor 23 is fixedly connected inside the installation box 22, a gear 24 is fixedly sleeved on the end of the motor shaft of the motor 23, a rack 25 is fixedly connected to the bottom of the beam 4 along its length direction, the gear 24 is meshingly connected with the rack 25, a plurality of slide rails 26 are fixedly connected to the top of the beam 4 along its length direction, a plurality of slide grooves 27 are opened on the top inner wall of the installation box 22, each of the slide rails 26 is respectively clamped in the slide groove 27 at the corresponding position, and a counterweight block 28 is fixedly installed on the top of the installation box 22.
[0045] Under the cooperation and connection of the slide rail 26 and the slide slot 27, the installation box 22 can move horizontally along the beam frame 4, thereby driving the counterweight block 28 to move horizontally. The motor 23 is in operation, and its motor shaft drives the key-connected gear 24 to rotate. Since the gear 24 is meshed with the rack 25, the installation box 22 can be automatically moved, thereby completing the automatic adjustment of the counterweight.
[0046] In any of the above schemes, preferably, a limiting disc 29 is fixedly sleeved on the upper end of the hollow column 1 , an annular limiting groove 30 is opened on the inner wall of the swivel seat 5 , and the limiting disc 29 is movably engaged in the annular limiting groove 30 .
[0047] The limiting disc 29 is an annular structure, which is engaged and clamped in the annular limiting groove 30. When the beam frame 4 rotates, the limiting disc 29 rotates inside the annular limiting groove 30. Through the matching connection between the limiting disc 29 and the annular limiting groove 30, the hollow column 1 can be prevented from falling off from the rotating seat 5, ensuring the firmness of the structure.
[0048] In any of the above solutions, it is preferred that a plurality of legs 2 are fixedly connected to the lower end of the hollow column 1 at intervals.
[0049] The supporting legs 2 are evenly spaced and are used to provide support.
[0050] Specific working principle:
[0051] When the utility model is provided with a distribution and feeding unit, the operator turns on the pump, and the concrete passes through the feed riser 3, the sleeve 17, the second elbow 20 and the main feed pipe 21 in sequence and enters the tee 8. Under the action of the tee 8, a part of the concrete is poured into the area on one side of the working surface by the pouring workers through the first flexible distribution pipe 10, while the other part of the concrete enters the first elbow 15 and is poured into the area on the other side of the working surface by the pouring workers through the second flexible distribution pipe 16. In this way, under the action of two groups of pouring workers, different areas can be poured at the same time to complete the construction of a large-area pouring working surface.
[0052] When it is necessary to add a feeder unit according to the actual situation, the motor 23 is turned on. Driven by the motor 23, the installation box 22 and the counterweight block 28 are horizontally displaced along the beam frame 4 until the counterweights on the left and right sides of the beam frame 4 are appropriate, and then the pump is turned on to repeat the conveying operation. Concrete is conveyed by the main feeder pipe 21 and sequentially enters the two end-to-end tees 8. At the same time, two groups of pouring workers control the corresponding first flexible feeder pipes 10 to pour concrete into different areas. The remaining concrete is poured into other areas of the working surface by the pouring workers through the second flexible feeder pipe 16. In this way, under the action of three groups of pouring workers, different areas can be poured at the same time.
[0053] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.
[0054] The matters not described in detail in the present invention are all known technologies to those skilled in the art.
Claims
1. A concrete placing machine for construction engineering, comprising a hollow column (1), wherein a material delivery riser (3) is provided through the inner space of the hollow column (1), wherein the lower end of the material delivery riser (3) is used to communicate with an external pump delivery pipe, and wherein: It also includes a horizontally arranged beam frame (4), a swivel seat (5) is fixedly connected to the middle of the bottom surface of the beam frame (4), the upper end of the hollow column (1) is movably inserted into the interior of the swivel seat (5), a mounting hole (6) is vertically opened at a corresponding position in the middle of the beam frame (4), a rotating connecting piece is provided in the corresponding mounting hole (6) above the top of the material conveying riser (3), the upper end of the material conveying riser (3) extends into the interior of the mounting hole (6), a main material conveying piece is provided at the top of the right end of the beam frame (4) along its length direction, a material distribution structure is provided on the right side of the beam frame (4), and a terminal material conveying piece is provided on the right side of the material distribution structure, the inner cavities at the corresponding positions of the main material conveying piece, the material distribution structure and the terminal material conveying piece are connected in series in sequence, and a counterweight adjustment structure is provided at the left end of the beam frame (4).
2. A concrete placing boom for construction engineering according to claim 1, characterized in that: The material distribution structure comprises a plurality of material distribution and feeding parts connected in series end to end; The material distribution and feeding member comprises a connecting beam (7), first connecting plates (11) are fixedly connected to the outer walls of the left and right ends of the connecting beam (7), a tee (8) is fixedly connected above the connecting beam (7), a through hole (9) is vertically opened in the middle of the connecting beam (7), the lower end of the branch pipe of the tee (8) passes through the through hole (9) and is connected to the upper end flange of the first flexible material distribution pipe (10), and the other two ends of the tee (8) are respectively arranged horizontally toward the two ends of the connecting beam (7); The first connecting plates (11) corresponding to two adjacent connecting beams (7) are fixedly connected by bolts, and the adjacent two tees (8) are connected by end flanges at corresponding ends; A second connecting plate (12) is fixedly connected to the outer wall of the right end of the beam frame (4); the second connecting plate (12) is fixedly connected to the first connecting plate (11) at the left end of the connecting beam (7) at a corresponding position by bolts; the right end of the main material feeding member is fixedly connected to the left end of the tee (8) at a corresponding position and the two are internally connected.
3. A concrete placing boom for construction engineering according to claim 2, characterized in that: The terminal material conveying member comprises a beam head (13), a third connecting plate (14) is fixedly connected to the outer wall of the left end of the beam head (13), the third connecting plate (14) is fixedly connected to the first connecting plate (11) at the right end of the connecting beam (7) at a corresponding position by bolts, a first curved pipe (15) is fixedly connected to the top of the beam head (13), one end of the first curved pipe (15) is connected to the right end flange of the tee (8) at the corresponding position, and the other end of the first curved pipe (15) is connected to the upper end flange of a second flexible material distribution pipe (16) arranged vertically.
4. A concrete placing boom for construction engineering according to claim 3, characterized in that: The rotating connecting member comprises a sleeve (17), the outer wall of the sleeve (17) is fixedly connected to the inner wall of the mounting hole (6), an annular groove (18) is provided in the middle of the inner wall of the sleeve (17), an annular rotating block (19) is fixedly sleeved on the outer wall of the upper end of the material conveying riser (3), the upper end of the material conveying riser (3) is movably inserted into the interior of the sleeve (17), the annular rotating block (19) is movably clamped in the annular groove (18), and the top of the sleeve (17) is fixedly connected to the inner end of the main material conveying member and the interiors of the two are connected.
5. A concrete placing boom for construction engineering according to claim 4, characterized in that: The main material conveying member comprises a second curved pipe (20), the inner end of the second curved pipe (20) is fixedly connected to the top of the sleeve (17) and the two are internally connected, a main material conveying pipe (21) is fixedly connected to the top of the beam frame (4), the outer end of the second curved pipe (20) is connected to the left end flange of the main material conveying pipe (21), and the right end of the main material conveying pipe (21) is connected to the left end flange of the tee (8) at a corresponding position.
6. A concrete placing boom for construction engineering according to claim 5, characterized in that: The counterweight adjustment structure comprises an installation box (22), the left end of the beam frame (4) passes through the upper part of the installation box (22), a motor (23) is fixedly connected inside the installation box (22), a gear (24) is fixedly sleeved on the end of the motor shaft of the motor (23), a rack (25) is fixedly connected to the bottom of the beam frame (4) along its length direction, the gear (24) is meshingly connected with the rack (25), a plurality of slide rails (26) are fixedly connected to the top of the beam frame (4) along its length direction, a plurality of slide grooves (27) are opened on the inner wall of the top of the installation box (22), each of the slide rails (26) is respectively clamped in the slide groove (27) at a corresponding position, and a counterweight block (28) is fixedly installed on the top of the installation box (22).
7. A concrete placing boom for construction engineering according to claim 6, characterized in that: A limiting disc (29) is fixedly sleeved on the upper end of the hollow column (1), an annular limiting groove (30) is provided on the inner wall of the swivel seat (5), and the limiting disc (29) is movably engaged in the annular limiting groove (30).
8. The concrete placing boom for construction engineering according to claim 7, characterized in that: A plurality of supporting legs (2) are fixedly connected at intervals to the lower end of the hollow column (1).
