Double-layer steel arch frame applied to emergency parking strip of tunnel with extremely high ground stress
By using a double-layer I-steel arch frame and locking foot conduit structure in extremely high ground stress tunnels, combined with concrete layers, the problem of surrounding rock deformation is solved, the stability of surrounding rock and the strength of support structure is improved, and rapid assembly is achieved 与拆卸。
Patent Information
- Application Number
- CN202420718936.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-09
AI Technical Summary
In the construction of extremely high-level stress tunnels, soft rock tunnels are prone to surrounding rock deformation during construction due to poor surrounding rock load capacity, and the existing technology is difficult to effectively solve the problems of such stress redistribution and surrounding rock deformation.
The double-layer I-shaped steel arch structure is adopted, and a double-layer I-shaped steel frame arranged equidistantly along the tunnel extension direction, and a small locking foot conduit and locking foot steel pipe are installed on its oblique upper part and lower part, combining the initial spray concrete layer and The concrete layer is molded to enhance the stability of the surrounding rock and constrain the displacement of the arch, and to change the deformation of the surrounding rock.
It effectively prevents the deformation of the surrounding rock, enhances the stability of the surrounding rock and the strength of the support structure, reduces the difficulty of production and manufacturing, and realizes rapid assembly and disassembly.
Smart Images

Figure CN222045800U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tunnel construction, and in particular to a double-layer steel arch frame used in emergency parking strips of extremely high ground stress tunnels. Background Art
[0002] Among the many tunnel support construction schemes, tunnel arch construction is the most important for tunnel safety. The tunnel arch itself has a certain strength, can resist bending, and has a hard texture. After the tunnel arch is completed, the working environment in the tunnel will be significantly improved. The tunnel arch is generally assembled from multiple arch segments to form a whole, and the arch segments are generally prefabricated in the factory according to the tunnel design size.
[0003] During the construction of tunnels with extremely high ground stress, low-strength soft rock tunnels are prone to surrounding rock deformation due to the poor bearing capacity of the surrounding rock itself, which leads to serious stress redistribution during the construction process. Utility Model Content
[0004] In order to solve or partially solve the problems existing in the related art, the present application provides a double-layer arch frame applied to the emergency parking strip of a tunnel with extremely high ground stress.
[0005] To achieve the above objectives, this application is implemented through the following technical solutions:
[0006] A double-layer steel arch frame applied to an emergency parking strip of an extremely high ground stress tunnel, the double-layer steel arch frame applied to an emergency parking strip of an extremely high ground stress tunnel comprising: a plurality of double-layer I-beam frames equidistantly arranged along the extension direction of the tunnel;
[0007] The double-layer I-beam frame is an arched structure. A plurality of small locking foot guide tubes are arranged on both sides of the upper inclined part of the double-layer I-beam frame, and a plurality of small locking foot guide tubes and locking foot steel pipes are arranged on both sides of the lower part of the double-layer I-beam frame.
[0008] Optionally, the double-layer I-beam frame includes three A units symmetrically arranged at the top, two D units symmetrically arranged at the bottom, four B units, two C units and two E units symmetrically arranged between the A units and the D units in sequence.
[0009] Optionally, the connection points of the two adjacent A units, the two adjacent B units, the two adjacent D units, the A unit and the B unit, and the D unit and the E unit are respectively connected and fixed by an A joint;
[0010] The connection between the B unit and the C unit is fixed by the B joint;
[0011] The inner side of the C unit and the upper end of the E unit are connected and fixed via a D joint, and the lower end of the C unit is connected and fixed via a C joint.
[0012] Optionally, the A joint, B joint, C joint and D joint all include joint steel plates and locking bolts, the joint steel plates are respectively welded to the connection points of each unit, and two adjacent groups of joint steel plates are fixed by locking bolts.
[0013] Optionally, the B joint also includes a first longitudinal channel steel arranged between two adjacent groups of joint steel plates, and the joint steel plate of the B joint and the first longitudinal channel steel are fixed by locking bolts; the C joint also includes a second longitudinal channel steel, and the joint steel plate of the C joint and the second longitudinal channel steel are fixed by locking bolts.
[0014] Optionally, a plurality of longitudinal connecting ribs and longitudinal connecting I-beams are arranged between the two adjacent double-layer I-beam frames, a plurality of connecting sleeves are arranged on both sides of the double-layer I-beam frame, the longitudinal connecting ribs are fixed to the double-layer I-beam frame through the connecting sleeves, and the longitudinal connecting I-beam is fixed to the double-layer I-beam frame by welding.
[0015] Optionally, a first primary sprayed concrete layer is arranged on the outer side of the double-layer I-beam frame, a protective layer is arranged on the inner side, a cast concrete layer is arranged on the inner side of the protective layer, and a second primary sprayed concrete layer is arranged between the double-layer I-beam frames.
[0016] Optionally, the locking foot small conduit is arranged at the A joint and the B joint on both sides of the inclined upper part of the double-layer I-beam frame, and the locking foot steel pipe is arranged at the B joint on both sides of the lower part of the double-layer I-beam frame.
[0017] The beneficial effects of the present application are as follows: the present application supports the surrounding rock by setting up a double-layer I-beam frame, and supports the double-layer I-beam frame by setting up small locking foot guide tubes and locking foot steel pipes. After grouting, the stability of the loose and weak surrounding rock and the adhesion between the small locking foot guide tubes, locking foot steel pipes and the surrounding rock are enhanced, thereby restraining the displacement of the double-layer steel arch frame, changing the deformation of the surrounding rock, and effectively preventing deformation of the surrounding rock.
[0018] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The above and other objects, features and advantages of the present application will become more apparent through a more detailed description of exemplary embodiments of the present application in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present application.
[0020] Figure 1 It is a schematic diagram of the overall structure of this application;
[0021] Figure 2 A and B connector connection diagram of this application;
[0022] Figure 3 It is the A connector connection diagram of this application;
[0023] Figure 4 It is the B connector connection diagram of this application;
[0024] Figure 5 It is the C-connector connection diagram of this application;
[0025] Figure 6 It is the D-connector connection diagram of this application;
[0026] Figure 7 It is the elevation view of the double-layer I-beam frame of the present application;
[0027] Figure 8 This is a large-scale drawing of the longitudinal connecting reinforcement of this application.
[0028] Figure numerals: 1 double-layer I-beam frame, 2 locking foot small guide tube, 3 locking foot steel pipe, 4A unit, 5B unit, 6C unit, 7D unit, 8E unit, 9A joint, 10B joint, 11C joint, 12D joint, 13 joint steel plate, 14 locking bolt, 15 first longitudinal channel steel, 16 longitudinal connecting ribs, 17 connecting sleeve, 18 first initial sprayed concrete layer, 19 protective layer, 20 cast-in-place concrete layer, 21 double-layer I-beam, 22 longitudinal connecting I-beam, 23 second initial sprayed concrete layer, 151 second longitudinal channel steel. DETAILED DESCRIPTION
[0029] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0030] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0031] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific situation.
[0032] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0033] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples" or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0034] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
[0035] The above description is only an optional embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
[0036] In order to make the purpose, technical solutions and beneficial effects of the present application clearer, the preferred embodiments of the present application will be described in detail below in conjunction with the accompanying drawings to facilitate understanding by technical personnel.
[0037] Example:
[0038] See also Figure 1 A double-layer steel arch frame applied to an emergency parking strip of a tunnel with extremely high ground stress, the arch frame applied to an emergency parking strip of a tunnel with extremely high ground stress comprises: a plurality of double-layer I-beam frames 1 arranged equidistantly along the extension direction of the tunnel;
[0039] The double-layer I-beam frame 1 is an arch structure. A plurality of small locking foot guide tubes 2 are arranged on both sides of the upper inclined part of the double-layer I-beam frame 1 , and a plurality of small locking foot guide tubes 2 and locking foot steel pipes 3 are arranged on both sides of the lower part of the double-layer I-beam frame 1 .
[0040] Specifically, the vertical angle between the locking foot small guide tube 2, the locking foot steel tube 3 and the double-layer I-beam frame 1 is 30°. The locking foot small guide tube 2 and the locking foot steel tube 3 are provided to support the loose rock strata. After grouting, the stability of the loose and weak surrounding rock and the adhesion between the locking foot small guide tube 2, the locking foot steel tube 3 and the surrounding rock are enhanced, thereby restraining the displacement of the double-layer steel arch frame, changing the deformation of the surrounding rock, and effectively preventing deformation of the surrounding rock.
[0041] The double-layer I-beam frame 1 includes three A units 4 symmetrically arranged at the top, two D units 7 symmetrically arranged at the bottom, four B units 5 symmetrically arranged between the A units 4 and the D units 7 , two C units 6 and two E units 8 symmetrically arranged in sequence.
[0042] Each section unit can be manufactured in advance according to the tunnel size, and then transported to the tunnel for assembly. Multiple sections of units are connected to form a fully enclosed arched steel frame. By decomposing the arched steel frame into multiple units, the difficulty of producing and manufacturing the double-layer I-beam frame 1 is effectively reduced while ensuring the support stability.
[0043] See also Figure 1 , Figure 2 and Figure 3 , the two adjacent A units 4, the two adjacent B units 5, the two adjacent D units 7, the connection points of the A unit 4 and the B unit 5, and the D unit 7 and the E unit 8 are respectively connected and fixed by an A joint 9;
[0044] By such arrangement, two adjacent A units 4, two adjacent B units 5, two adjacent D units 7, A unit 4 and B unit 5, D unit 7 and E unit 8 are respectively connected to form a supporting whole, thereby enhancing the stability of the structure.
[0045] See also Figure 1 and Figure 4 , the connection between the B unit 5 and the C unit 6 is connected and fixed by a B joint 10;
[0046] Such arrangement enables the B unit 5 and the C unit 6 to be connected to form a supporting whole, thereby enhancing the stability of the structure.
[0047] See also Figure 1 , Figure 5 and Figure 6 The inner side of the C unit 6 and the upper end of the E unit 8 are connected and fixed via a D joint 12, and the lower end of the C unit 6 is connected and fixed via a C joint 11.
[0048] Such arrangement enables the C unit 6 and the E unit 8 to be connected to form a supporting whole, thereby enhancing the stability of the structure.
[0049] The A joint 9 , B joint 10 , C joint 11 and D joint 12 all include joint steel plates 13 and locking bolts 14 . The joint steel plates 13 are respectively welded to the connection points of each unit, and two adjacent groups of joint steel plates 13 are fixed by locking bolts 14 .
[0050] The steel frame at D joint 12 is directly welded to the steel base plate. All welds should be full and free of cold welds and sand holes.
[0051] By providing a plurality of joints with locking bolts 14, each unit can be quickly assembled and disassembled. In addition, in the conventional technology, the double-layer I-beam 21 is bent into an arched support steel frame to provide initial support for the tunnel. This method will change the stress performance of the double-layer I-beam 21 and is difficult to process. After the double-layer I-beam frame 1 is decomposed into a plurality of units and connected by joints, the force transmission path is clear, which is convenient for calculation and easy for processing.
[0052] See also Figure 4 and Figure 5 The B joint 10 also includes a first longitudinal channel steel 15 arranged between two adjacent groups of joint steel plates 13, and the joint steel plates 13 and the first longitudinal channel steel 15 of the B joint 10 are fixed by locking bolts 14; the C joint 11 also includes a second longitudinal channel steel 151, and the joint steel plates 13 and the second longitudinal channel steel 151 of the C joint 11 are fixed by locking bolts 14.
[0053] By arranging the first longitudinal channel steel 15 between two adjacent sets of joint steel plates 13, the two sets of joint steel plates 13 are prevented from being misaligned and the bearing area of the arch frame is increased, thereby reducing the sinking of the arch frame and the deformation of the surrounding rock.
[0054] By arranging the second longitudinal channel steel 151 at the bottom of the C joint 11, the bearing force area of the arch frame is increased, thereby reducing the sinking amount of the arch frame and the deformation amount of the surrounding rock.
[0055] See also Figure 8 A plurality of longitudinal connecting ribs 16 and longitudinal connecting I-beams 22 are arranged between the two adjacent double-layer I-beam frames 1, and a plurality of connecting sleeves 17 are arranged on both sides of the double-layer I-beam frame 1, and the longitudinal connecting ribs 16 are fixed to the double-layer I-beam frame 1 through the connecting sleeves 17.
[0056] Specifically, each unit of the double-layer I-beam frame 1 is welded by double-layer I-beams 21, connecting steel plates, etc., and the weld height hf at the joint is 7mm. The double-layer I-beam 21 is constructed in two times. The I-beam of the first construction has a pressure-releasing effect, which changes the stress deformation problem of the overall double-layer I-beam frame 1; the longitudinal connecting I-beams 22 between the arch frames improve the uneven stress problem between the arch frames; the units are connected by locking bolts 14, and the first longitudinal channel steel 15, the second longitudinal channel steel 151, and the steel plate at the arch foot and the side wall foot connect the steel frame into a whole. The double-layer I-beam frame C unit 6 and E unit 7 need to be connected as a whole outside the hole. A longitudinal connecting I-beam 22 is set at the position of the inner and outer steel arch frame A joint 9 and B joint 10 for longitudinal connection, and the adjacent steel frames are connected by longitudinal connecting ribs 16. The outer arch frame has a circumferential spacing of 0.5m, and the inner arch frame has a circumferential spacing of 1m, which are arranged crosswise along the inner and outer longitudinal directions of the steel frame. By arranging a plurality of connecting sleeves 17 on both sides of the double-layer I-beam frame 1, the longitudinal connecting ribs 16 are fixed to the double-layer I-beam frame 1 through the connecting sleeves 17, so as to realize the connection between adjacent double-layer I-beam frames 1 and improve the strength and stability of the overall supporting structure.
[0057] See also Figure 7 The outer side of the double-layer I-beam frame 1 is provided with a first primary sprayed concrete layer 18 , the inner side is provided with a protective layer 19 , the inner side of the protective layer 19 is provided with a cast concrete layer 20 , and a second primary sprayed concrete layer 23 is provided between the double-layer I-beam frames 1 .
[0058] Specifically, the double-layer I-beam frame 1 is erected after the first initial sprayed concrete layer 18 of about 4 cm is sprayed. After the first layer of I-beams is erected, the initial sprayed concrete layer is sprayed. After a certain period of time, the second layer of I-beams is erected, and then the last second initial sprayed concrete layer 23 is sprayed, with a thickness of not less than 2 cm. During construction, each steel frame is positioned using radial positioning steel bars to ensure the installation quality of the steel frame. Among them, the steel frames of unit A 4, unit B 5, and unit C 6 are set with two positioning steel bars, each with two positioning steel bars, each 800 mm long, and the steel frame of the inverted arch does not need to be set;
[0059] The size of the side wall and arch steel frame is calculated based on the 5cm construction error and half of the reserved deformation. The inverted arch only considers the 5cm construction error. The double-layer I-beam steel frame 1 must be in close contact with the initial sprayed concrete. The gap is tightly embedded with pads. Each unit is counted as 1 location. Each location uses one No. 1 pad and two No. 2 pads. The number and location of pads can be adjusted according to the actual situation during construction. The unit length can be adjusted according to the actual situation during construction, and the joint position can be adjusted accordingly, but the joint should not be set at the center of the arch. Each unit of the steel frame is prefabricated outside the cave and assembled inside the cave.
[0060] By setting the first initial sprayed concrete layer 18 on the outer side of the double-layer I-beam frame 1, the exposed surrounding rock can be sealed as early as possible, the deformation of the surrounding rock can be limited, and the bearing capacity of the surrounding rock itself can be improved. The arch frame and the initial sprayed concrete are constructed in two stages, which increases the adaptability of the double-layer arch frame to the deformation of the surrounding rock. The cast concrete layer 20 is used to further reinforce the support and enhance the support strength of the tunnel. At the same time, an installation platform is provided for the installation of drainage systems, communications, lighting and other facilities.
[0061] The locking foot small conduit 2 is arranged at the A joint 9 and the B joint 10 on both sides of the upper inclined part of the double-layer I-beam frame 1, and the locking foot steel pipe 3 is arranged at the B joint 10 on both sides of the lower part of the double-layer I-beam frame 1.
[0062] Specifically, the steel frame feet must be placed on a solid foundation, and the base must be reinforced with concrete if necessary. Four 4.5m long steel bars should be installed at the A joint 9 on each side of the arch waist of the outer arch frame. Two 4.5m long small tubes are provided at the lock foot small tube 2 and the B joint 10. 2 small locking tubes and 2 4.5m long Locking foot steel pipe 3; 4 4.5m long steel pipes are installed at the A joint 9 and B joint 10 on each side of the inner arch frame. Lock foot small catheter 2;
[0063] In summary, the present application sets up a double-layer I-beam frame 1 to support the surrounding rock. The present application sets up a small locking foot guide tube 2 and a locking foot steel tube 3 to support the double-layer I-beam frame 1. After grouting, the stability of the loose and weak surrounding rock and the adhesion between the small locking foot guide tube 2, the locking foot steel tube 3 and the surrounding rock are enhanced, thereby constraining the displacement of the double-layer steel arch frame, changing the deformation of the surrounding rock, and effectively preventing the deformation of the surrounding rock. The arch frame and the initial spraying of concrete are constructed twice, which increases the adaptability of the double-layer arch frame to the deformation of the surrounding rock; the present application decomposes the arch steel frame into multiple units, so that on the premise of ensuring the support stability, the production and manufacturing difficulty of the double-layer I-beam frame 1 is effectively reduced; the present application sets up multiple joints with locking bolts 14, so that each unit can be quickly assembled and disassembled.
[0064] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solution of the present application rather than to limit it. Although the present application has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present application; the dimensions of the drawings are not related to the specific objects, and the dimensions of the objects can be changed arbitrarily.
Claims
1. A double-layer steel arch frame used for emergency parking strips in extremely high ground stress tunnels, characterized in that: The double-layer steel arch frame applied to the emergency parking strip of the extremely high ground stress tunnel comprises: a plurality of double-layer I-beam frames (1) arranged at equal distances along the extension direction of the tunnel; the double-layer I-beam frame (1) is an arch structure, a plurality of small locking foot guide tubes (2) are arranged on both sides of the upper inclined part of the double-layer I-beam frame (1), and a plurality of small locking foot guide tubes (2) and locking foot steel pipes (3) are arranged on both sides of the lower part of the double-layer I-beam frame (1); The double-layer I-beam frame (1) comprises three A units (4) symmetrically arranged at the top, two D units (7) symmetrically arranged at the bottom, four B units (5), two C units (6) and two E units (8) symmetrically arranged in sequence between the A units (4) and the D units (7); The connection points of the two adjacent A units (4), the two adjacent B units (5), the two adjacent D units (7), the A unit (4) and the B unit (5), and the D unit (7) and the E unit (8) are respectively connected and fixed via an A joint (9); The connection between the B unit (5) and the C unit (6) is connected and fixed via a B joint (10); The inner side of the C unit (6) and the upper end of the E unit (8) are connected and fixed via a D joint (12), and the lower end of the C unit (6) is connected and fixed via a C joint (11); The A joint (9), B joint (10), C joint (11) and D joint (12) all include joint steel plates (13) and locking bolts (14); the joint steel plates (13) are respectively welded to the connection points of each unit; two adjacent groups of joint steel plates (13) are fixed by locking bolts (14); and by providing a plurality of joints with locking bolts (14), each unit can be quickly assembled and disassembled; The B joint (10) further comprises a first longitudinal channel steel (15) arranged between two adjacent groups of joint steel plates (13); the joint steel plates (13) of the B joint (10) and the first longitudinal channel steel (15) are fixed by locking bolts (14); the first longitudinal channel steel (15) is used to prevent the two groups of joint steel plates (13) from being misaligned and to increase the supporting force area of the arch frame, so as to reduce the amount of arch frame sinking; the C joint (11) further comprises a second longitudinal channel steel (151); the joint steel plates (13) of the C joint (11) and the second longitudinal channel steel (151) are fixed by locking bolts (14); the second longitudinal channel steel (151) is used to increase the supporting force area of the arch frame, so as to reduce the amount of arch frame sinking; A plurality of longitudinal connecting ribs (16) and longitudinal connecting I-beams (22) are arranged between two adjacent double-layer I-beam frames (1), a plurality of connecting sleeves (17) are arranged on both sides of the double-layer I-beam frame (1), the longitudinal connecting ribs (16) are fixed to the double-layer I-beam frame (1) through the connecting sleeves (17), and the longitudinal connecting I-beams (22) are fixed to the double-layer I-beam frame (1) through welding, so as to improve the strength and stability of the overall support structure.
2. The double-layer steel arch frame applied to the emergency parking strip of the extremely high ground stress tunnel as claimed in claim 1, characterized in that: The double-layer I-beam frame (1) is provided with a first primary sprayed concrete layer (18) on the outer side, a protective layer (19) on the inner side, a cast concrete layer (20) on the inner side of the protective layer (19), and a second primary sprayed concrete layer (23) is provided between the double-layer I-beam frames (1).
3. The double-layer steel arch frame applied to the emergency parking strip of extremely high ground stress tunnel as claimed in claim 1, characterized in that: The locking foot small conduit (2) is arranged at the A joint (9) and the B joint (10) on both sides of the oblique upper part of the double-layer I-beam frame (1), and the locking foot steel pipe (3) is arranged at the B joint (10) on both sides of the lower part of the double-layer I-beam frame (1).
