Gas leakage prevention plugging device of gas pipe for replacing front valve of gas meter
By using the gas pipe air leakage sealer with airbag ball and internal threaded joint during the process of replacing the gas meter front valve, the problem of gas dissipation is solved, which significantly reduces safety risks and operation difficulty, and improves replacement efficiency and safety.
Patent Information
- Application Number
- CN202421348433.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-06-13
AI Technical Summary
During the process of replacing the gas meter front valve, the lack of effective cutting or sealing devices leads to dissipation of the gas, which increases safety hazards and operation difficulty, and the dispersed gas may cause flash explosions or affect the health of the operators.
A gas pipe air leakage sealer for replacing the front valve of the gas meter is designed, including a gas bag ball at one end of the hard pipe fitting. When the air bag ball is not inflated, the outer diameter is smaller than the inner diameter of the gas pipe, and the outer diameter after inflation is greater than the inner diameter. , combined with internal threaded joints and check valves, realize air sealing and inflation control, ensuring reduced gas dissipation during replacement.
It significantly reduces the amount of gas dissipation, reduces the safety risks of replacement operations, improves operation safety and leakage detection efficiency, and avoids the impact of gas accumulation on personnel health.
Smart Images

Figure CN222047042U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gas pipeline maintenance, in particular to a gas pipe anti-leakage plugging device used for replacing a front valve of a gas meter. Background Art
[0002] During the current maintenance of residential pipelines in the gas industry, when replacing the pre-meter valve and adjacent parts of the pipeline, since most of the residential gas inlet pipes currently lack effective cutting devices or sealing devices from the user's pre-meter valve, some gas will inevitably escape during the removal and installation of the pre-meter valve during the replacement of the pre-meter valve. The amount of gas escaped is related to factors such as pipeline pressure and the operating speed of the operators, but it will inevitably lead to a certain amount of gas accumulation in the space around the disassembly and installation site, which is prone to safety hazards, especially in some users' homes that are often surrounded by cabinets and have poor ventilation.
[0003] This places high demands on gas operators. First of all, they need to be fully prepared before maintenance and replacement. For example, they need to use experience to determine whether the disassembly and assembly process will be blocked by other pipes or objects, so as to do the obstacle removal work in advance and prepare the pre-meter valve to be installed (in traditional operations, in order to facilitate the rapid disassembly and assembly of the pre-meter valve and reduce the blocking steps, the pre-meter valve is generally connected to the adjacent section of pipe fittings and installed as a whole).
[0004] Secondly, during the disassembly and assembly process, the actions need to be quick and accurate. After removing the old meter front valve, the new meter front valve should be installed smoothly until it is tightened. This requires a certain level of proficiency. In order to avoid inconvenience in installation or the risk of gas leakage, it is sometimes necessary to remove the old raw tape at the thread mouth and other impurities in the pipeline, which further increases the amount of gas that escapes and increases safety hazards. In more serious cases, if the operator has a weak sense of safety, insufficient skills, and does not achieve good ventilation or does not move quickly enough, a large amount of gas that escapes can easily spread and contact the ignition source, causing a flash explosion and leading to a safety accident.
[0005] In addition, excessive inhalation of dissipated gas can sometimes cause physical discomfort to operators, and frequent inhalation of impurities in the blown pipes can also affect the health of operators to a certain extent. After the operation is completed, it is generally still necessary to ventilate for a long time to eliminate the risk of gas accumulation and accurately complete subsequent leak detection and other steps.
[0006] Therefore, how to effectively reduce the amount of gas that escapes during the process of replacing the front valve of the gas meter becomes a technical problem that technical personnel in this field urgently need to solve. Utility Model Content
[0007] In view of the above-mentioned defects of the prior art, the utility model provides a gas pipe anti-leakage plugger for replacing the front valve of the gas meter. The purpose is to minimize the amount of leaked gas during the process of replacing the front valve of the gas meter, significantly reduce and even eliminate the safety risks of the replacement operation as much as possible.
[0008] To achieve the above-mentioned purpose, the utility model discloses a gas pipe anti-leakage plugging device for replacing a front valve of a gas meter, comprising an air bag ball for plugging the gas pipe;
[0009] The airbag ball is arranged at one end of a hard tube;
[0010] The outer diameter of the airbag ball when not inflated and the outer diameter of the hard pipe are both smaller than the inner diameter of the gas pipe of the gas meter front valve to be replaced and the through diameter of the valve core of the gas meter front valve;
[0011] The outer diameter of the airbag after inflation is larger than the inner diameter of the gas pipe;
[0012] The outer side of the hard pipe is provided with an internal thread joint that can move along the length direction of the hard pipe;
[0013] The internal thread joint and the outer wall of the hard pipe are in an airtight state, and the axis of the internal thread is collinear with the axis of the hard pipe;
[0014] The internal thread of the internal thread joint matches the external thread of the front valve of the gas meter;
[0015] The other end of the hard pipe is connected to the inflation device through a one-way valve.
[0016] Preferably, the airbag ball and the hard tube are detachably connected; and one end of the hard tube where the airbag ball is arranged is provided with a groove for installing the airbag ball.
[0017] Preferably, the hard pipe fitting and the one-way valve are connected via a pagoda adapter.
[0018] More preferably, one end of the hard pipe connected to the pagoda adapter is an internal thread with a diameter of 3.175 mm, and one end of the pagoda adapter connected to the hard pipe is an external thread with a diameter of 3.175 mm and a length of 10 mm, and the thread specifications are both M30x1.5;
[0019] The hard pipe fitting and the pagoda adapter are sealed with a J-shaped gasket.
[0020] More preferably, sealing grease is applied between the J-shaped gasket and the hard pipe fitting.
[0021] More preferably, the specification of the one-way valve is 8 mm.
[0022] Preferably, the internal threaded joint and the hard pipe are sealed by a sealing gasket.
[0023] Preferably, the hard pipe has a length of 15 cm to 20 cm and is made of stainless steel.
[0024] Beneficial effects of the utility model:
[0025] The utility model can reduce the amount of gas dissipated to a minimum during the process of replacing the front valve of the gas meter, and significantly reduce or even eliminate the safety risk of the replacement operation as much as possible.
[0026] The utility model has a small size and can avoid a large amount of gas from escaping when replacing the front valve of the gas meter, significantly reducing the operation risk, ensuring operation safety, reducing operation difficulty, and improving leak detection efficiency.
[0027] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 A three-dimensional structural schematic diagram of an embodiment of the utility model is shown.
[0029] Figure 2 A schematic diagram of the three-dimensional structure from another viewing angle in one embodiment of the utility model is shown.
[0030] Figure 3 A schematic structural diagram of an embodiment of the utility model with a one-way valve at one end is shown.
[0031] Figure 4 A schematic structural diagram of an embodiment of the utility model with an air bag ball at one end is shown.
[0032] Figure 5 A schematic diagram of the longitudinal cross-section structure of an embodiment of the utility model is shown.
[0033] Figure 6 A schematic diagram of the explosion structure of a one-way valve in one embodiment of the utility model is shown.
[0034] Figure 7 A schematic diagram showing a state of an airbag ball after being inflated according to an embodiment of the utility model is shown. DETAILED DESCRIPTION
[0035] Example
[0036] like Figures 1 to 7 As shown, a gas pipe anti-leakage plugging device for replacing a front valve of a gas meter comprises an air bag ball 1 for plugging a gas pipe.
[0037] The airbag ball 1 is arranged at one end of a hard tube 2;
[0038] The outer diameter of the airbag ball 1 when not inflated and the outer diameter of the hard pipe 2 are both smaller than the inner diameter of the gas pipe of the gas meter front valve 7 to be replaced and the through diameter of the valve core of the gas meter front valve 7;
[0039] The outer diameter of the airbag ball 1 after inflation is larger than the inner diameter of the gas pipe;
[0040] An internal threaded joint 4 is sleeved on the outside of the hard pipe 2 and can move along the length direction of the hard pipe 2;
[0041] The internal thread joint 4 and the outer wall of the hard pipe 2 are in an airtight state, and the axis of the internal thread is collinear with the axis of the hard pipe 2;
[0042] The internal thread of the internal thread connector 4 matches the external thread of the front valve 7 of the gas meter;
[0043] The other end of the hard pipe 2 is connected to the inflation device through a one-way valve 6 .
[0044] In some embodiments, the airbag ball 1 and the hard tube 2 are detachably connected; one end of the hard tube 2 where the airbag ball 1 is arranged is provided with a groove for installing the airbag ball 1.
[0045] In practical applications, the airbag ball 1 and the hard tube 2 are detachably connected so that they can be easily replaced at any time.
[0046] In some embodiments, the hard pipe 2 and the one-way valve 6 are connected via a pagoda adapter 5 .
[0047] In some embodiments, the end of the hard pipe 2 connected to the pagoda adapter 5 is an internal thread with a diameter of 3.175 mm, and the end of the pagoda adapter 5 connected to the hard pipe 2 is an external thread with a diameter of 3.175 mm and a length of 10 mm, and the thread specifications are both M30x1.5;
[0048] The hard pipe fitting 2 and the pagoda adapter 5 are sealed with a J-type gasket.
[0049] In some embodiments, sealing grease is applied between the J-shaped gasket and the hard pipe 2 .
[0050] In practical applications, sealing grease is applied between the J-type gasket and the hard pipe fitting 2 to increase sealing and ease of operation. The inner diameter of the J-type gasket is slightly smaller than the hard pipe fitting 2 to ensure the sealing effect, and the outer diameter matches the inner diameter of the corresponding internal thread joint where the gasket is placed.
[0051] In some embodiments, the specification of the one-way valve 6 is 8 mm.
[0052] In actual application, the one-way valve 6 is placed inside the pagoda adapter 5 near the pagoda head, and the outer wall has a gasket to ensure good sealing. By using a small portable object such as a ballpoint pen to press the middle valve core, air flow can be achieved to release the air pressure of the airbag ball.
[0053] In some embodiments, the internal threaded joint 4 and the hard pipe 2 are sealed by a sealing gasket 3 .
[0054] In some embodiments, the hard pipe 2 has a length of 15 cm to 20 cm and is made of stainless steel.
[0055] In practical application, first check that the airbag ball 1 is in an uninflated state, the internal threaded joint 4 and the sealing gasket 3 are correctly placed, and the sealing gasket 3 is sleeved on the hard pipe 2 and is relatively close to the airbag ball 1.
[0056] During construction, first close the old gas meter front valve 7 to be removed, move the internal threaded joint 4 to connect with the old gas meter front valve 7, and hold the hard pipe fitting 2 to ensure that it does not fall off and the sealing gasket 3 is still in contact with the hard pipe fitting 2 to seal. Then open the old gas meter front valve 7, insert one end of the airbag ball 1 into the pipe section from the old gas meter front valve 7 to the other end of the gas pipe, and inflate the airbag ball 1 through the inflation device connected to the one-way valve 6. During the inflation process, the hard pipe fitting 2 can be pushed and pulled back and forth slightly to check whether the airbag ball 1 is in close contact with the inner wall of the gas pipe and generates sufficient friction; when the airbag ball 1 is in close contact with the inner wall of the gas pipe and generates sufficient friction, it means that the inflation is completed.
[0057] After the plugging of the gas pipe is completed, the connection between the hard pipe 2 and the inflation device is removed, and the one-way valve 6 is kept locked to keep the airbag ball 1 inflated. Then, tools are used to sequentially remove the connection between the old gas meter front valve 7 and the internal threaded joint 4, and the connection between the old gas meter front valve 7 and the gas pipe. The old gas meter front valve 7 is taken out from the end with the one-way valve 6, and then the threaded connection between the gas pipeline and the gas meter front valve 7 is cleaned and re-wrapped with raw tape;
[0058] Then, the new gas meter front valve 7 and the internal threaded joint 4 are successively arranged on the hard pipe fitting 2 from the end provided with the one-way valve 6, and are successively connected to the gas pipeline.
[0059] Unlock the one-way valve 6 to deflate and shrink the airbag ball 1, and slowly withdraw the long rod until the airbag ball 1 retreats away from the valve core of the new gas meter front valve 7. During the process, the sealing gasket 3 is located between the internal threaded joint 4 and the hard pipe fitting 2 to achieve sealing.
[0060] Finally, close the new gas meter front valve 7, disassemble the connection between the gas meter front valve 7 and the internal threaded joint 4, remove the utility model, and complete the replacement operation.
[0061] The utility model uses the above technical solution to ensure that almost no gas escape occurs during the entire replacement process of the front valve 7 of the gas meter.
[0062] The preferred specific embodiments of the utility model are described in detail above. It should be understood that ordinary technicians in this field can make many modifications and changes based on the concept of the utility model without creative work. Therefore, all technical solutions that can be obtained by technicians in this technical field based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the existing technology should be within the scope of protection determined by the claims.
Claims
1. A gas pipe anti-leakage plugging device for replacing the front valve of a gas meter; characterized in that: It comprises an air bag ball (1) for blocking a gas pipe; The airbag ball (1) is arranged at one end of a hard tube (2); The outer diameter of the airbag ball (1) when not inflated and the outer diameter of the hard pipe (2) are both smaller than the inner diameter of the gas pipe of the gas meter front valve (7) to be replaced and the through diameter of the valve core of the gas meter front valve (7); The outer diameter of the airbag ball (1) after being inflated is larger than the inner diameter of the gas pipe; An internal threaded joint (4) is sleeved on the outside of the hard pipe (2) and is movable along the length direction of the hard pipe (2); The internal thread joint (4) and the outer wall of the hard pipe (2) are in an airtight state, and the axis of the internal thread is colinear with the axis of the hard pipe (2); The internal thread of the internal thread joint (4) matches the external thread of the gas meter front valve (7); The other end of the hard pipe (2) is connected to the inflation device via a one-way valve (6).
2. The gas pipe anti-leakage plugging device for replacing the front valve of a gas meter according to claim 1 is characterized in that: The airbag ball (1) and the hard tube (2) are detachably connected; one end of the hard tube (2) on which the airbag ball (1) is arranged is provided with a groove for installing the airbag ball (1).
3. The gas pipe anti-leakage plugging device for replacing the front valve of a gas meter according to claim 1, characterized in that: The hard pipe (2) and the one-way valve (6) are connected via a pagoda adapter (5).
4. The gas pipe anti-leakage plugging device for replacing the front valve of a gas meter according to claim 3 is characterized in that: One end of the hard pipe (2) connected to the pagoda adapter (5) is an internal thread with a diameter of 3.175 mm, and one end of the pagoda adapter (5) connected to the hard pipe (2) is an external thread with a diameter of 3.175 mm and a length of 10 mm, and the thread specifications are both M30x1.5; The hard pipe (2) and the pagoda adapter (5) are sealed with a J-shaped gasket.
5. The gas pipe anti-leakage plugging device for replacing the front valve of a gas meter according to claim 4, characterized in that: Sealing grease is applied between the J-shaped gasket and the hard pipe (2).
6. The gas pipe anti-leakage plugging device for replacing the front valve of a gas meter according to claim 4, characterized in that: The specification of the one-way valve (6) is 8 mm.
7. The gas pipe anti-leakage plugging device for replacing the front valve of a gas meter according to claim 1, characterized in that: The internal thread joint (4) and the hard pipe (2) are sealed via a sealing gasket (3).
8. The gas pipe anti-leakage plugging device for replacing the front valve of a gas meter according to claim 1, characterized in that: The hard pipe (2) has a length of 15 cm to 20 cm and is made of stainless steel.
