Distributed energy storage centralized efficient heat management system

Through the distributed energy storage centralized and efficient thermal management system, the centralized and efficient thermal management room and circulating water pump system have been used to cancel the thermal management unit of a single energy storage cabinet, which has solved the high energy consumption and cooling of the liquid cooling system of the electrochemical energy storage power station. The problem of uniformity achieves the effect of precise temperature control and energy consumption reduction.

CN222051887UActive Publication Date: 2024-11-22江苏领储宇能科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420387284.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-11-22
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The existing electrochemical energy storage power station liquid cooling system equipment is large in number and complex in structure, resulting in high energy consumption, high cost, and uneven cooling, which affects the battery life and system energy consumption.

Method used

Adopt distributed energy storage centralized and efficient thermal management system, including centralized and efficient thermal management machine room, primary circulation main pipeline, energy storage cabinet and secondary circulation main circuit. The flow of cooling medium is monitored and controlled in real time through the main controller, and cancelled The thermal management unit of a single energy storage cabinet uses plate heat exchangers and circulating water pumps to achieve precise temperature control and reduce energy consumption.

Benefits of technology

It effectively reduces the energy consumption and maintenance costs of the energy storage system, improves the reliability and safety of the thermal management system, extends the service life of the battery cell, and realizes the precise temperature control and stability of the thermal management system of the power station.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222051887U_ABST
    Figure CN222051887U_ABST
Patent Text Reader

Abstract

According to the distributed energy storage centralized efficient heat management system, the main controller is directly connected with the temperature measuring points of the water pump and the battery pack of each stage in the energy storage system, heat management of the distributed energy storage cabinet is managed and controlled in a centralized mode, a heat management unit of a single energy storage cabinet is omitted, the energy consumption of the energy storage system is effectively reduced, and the energy consumption of the energy storage system is reduced. And the design and maintenance cost of the system is reduced. The temperature of each energy storage cabinet can be accurately controlled through real-time communication state information of each monitoring point in each level of the energy storage system by the centralized efficient heat management machine room, and when a certain energy storage cabinet is subjected to thermal runaway, the refrigerating capacity of the whole energy storage power station can be adjusted to be used for rapid cooling of a thermal runaway battery pack, so that the energy storage power station can be used for rapidly cooling the thermal runaway battery pack. And the safety and the stability of the energy storage system are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power batteries and energy storage battery packs, and in particular relates to a distributed energy storage centralized and efficient thermal management system. Background Art

[0002] As the demand for domestic energy storage market continues to increase, the scale of energy storage industry is rapidly expanding, and the project's requirements for energy storage system energy density, integration, battery consistency and other performance are gradually increasing. The design of electrochemical energy storage battery cells is mainly based on container prefabricated cabins. The energy density and consistency of container prefabricated cabin battery cells are affected by the battery layout structure and thermal management method in the cabin. In order to ensure that the battery cells in the energy storage system operate within the appropriate temperature range, it is necessary to design a set of energy storage thermal management system. Energy storage thermal management forms are diverse, and air cooling and liquid cooling are relatively mature. With the continuous improvement of the single unit scale and multiple of energy storage projects, the shortcomings of air cooling systems in heat dissipation efficiency will gradually become apparent. Liquid cooling systems have stronger heat dissipation capabilities than air cooling systems, and are more adaptable to the development trend of large-scale and high energy density energy storage projects. Liquid cooling can improve cooling efficiency and solve the problem of uneven cooling, so liquid cooling solutions are gradually becoming the development direction of electrochemical energy storage power stations.

[0003] At present, the liquid cooling system of the battery energy storage power station is mostly designed with a single industrial and commercial energy storage cabinet as the object for cooling scheme design, in which each battery cabinet is equipped with a set of liquid cooling units, and each liquid cooling unit controls the temperature of the battery cells in a single battery cabinet. The entire liquid cooling unit has a large number of equipment, a complex structure, and a high investment and operation cost; at the same time, due to the limitation of the site installation location, multiple units are set up to work together, causing a "hot wall" effect, resulting in low operating efficiency of the chiller in a high temperature environment, affecting the service life of the battery cells and the energy consumption of the system. In addition, there are many energy storage cabinets, and it is impossible to achieve unified management of temperature control and fire protection, resulting in high system energy consumption and high costs. In view of the above problems, the present invention proposes a distributed energy storage centralized and efficient thermal management system, which effectively reduces the energy consumption of the system. Summary of the invention

[0004] In view of the problems of high energy consumption and high cost in the existing liquid cooling technology, the present invention discloses a distributed energy storage centralized high-efficiency thermal management system, which effectively reduces the energy consumption of the energy storage power station, greatly reduces the design cost and subsequent maintenance cost, and transforms the maintenance guarantee object from a large number of scattered single air conditioners to centralized maintenance of the high-efficiency computer room system, thereby realizing precise temperature control of the thermal management system of the power station, improving the reliability and safety of the thermal management system of the energy storage power station, and increasing the service life of the battery cells.

[0005] A distributed energy storage centralized high-efficiency thermal management system includes a centralized high-efficiency thermal management room 10, a primary side circulation main line 14, an energy storage cabinet 16, a secondary side circulation main line 203 and a plate heat exchanger 206.

[0006] The centralized high-efficiency thermal management room 10 is connected to the energy storage cabinet 16 based on the primary side circulation main line 14 to realize the cooling / heat exchange on the primary side of the energy storage cabinet 16. The energy storage cabinet 16 is connected to the plate heat exchanger 206 based on the secondary side circulation main line 203 to realize the cooling / heat exchange on the secondary side. Specifically,

[0007] The centralized high-efficiency thermal management room 10 includes a cooling and heating module, an energy storage water tank and a main controller. The coolant is cooled / heated by the cooling and heating module and then stored in the energy storage water tank. The primary side circulation main line 14 is connected to the energy storage water tank. The primary side circulation main line 14 is provided with a primary side circulation water pump 11, a primary side pressure flow detection unit 12, and a primary side temperature detection unit 13 to transmit cold / hot water of a certain flow rate and a certain temperature to the primary side of the energy storage cabinet 16;

[0008] The primary circulation main line 14 is connected to a plurality of primary circulation branch lines 17, the primary circulation branch lines 17 are connected to one side of the plate heat exchanger 206 in the energy storage cabinet 16, and the other side of the plate heat exchanger 206 is connected to the battery pack in the energy storage cabinet 16 through the secondary circulation main line 203, and the secondary circulation main line 203 is provided with a secondary circulation water pump 207, a secondary temperature measuring unit 204 and a secondary switch valve 205 to transmit cold / hot water of a certain flow rate and a certain temperature to the secondary side of the energy storage cabinet 16;

[0009] The battery pack is provided with a battery pack temperature measuring unit 15, and the primary side circulating water pump 11, the primary side pressure flow detection unit 12, the primary side temperature detection unit 13, the secondary side circulating water pump 207, the secondary side temperature measuring unit 204, the secondary side switch valve 205, and the battery pack temperature measuring unit 15 are all electrically connected to the main controller in the centralized high-efficiency thermal management room 10.

[0010] Preferably, the primary side circulation main pipeline 14 includes a primary side circulation primary pipeline and a primary side circulation secondary pipeline 142, each primary side circulation primary pipeline 141 is connected to a plurality of primary side circulation secondary pipelines 142; each primary side circulation secondary pipeline 142 is connected to a plurality of primary side circulation branch pipelines 17, and each primary side circulation branch pipeline 17 corresponds to an energy storage cabinet 16.

[0011] Preferably, the primary side circulation first-level pipeline 141 includes a primary side liquid supply circuit and a primary side liquid return circuit, which are respectively connected to the energy storage water tank to realize the water circulation function of liquid supply and liquid return of the energy storage water tank. Several energy storage cabinets 16 are arranged between the primary side liquid supply circuit and the primary side liquid return circuit, and are respectively connected to the primary side liquid supply circuit and the primary side liquid return circuit through the primary side circulation branch pipeline 17; the primary side circulation water pump 11, the primary side pressure flow detection unit 12 and the primary side temperature detection unit 13 are provided on the primary side liquid supply circuit, and the primary side temperature detection unit 13 is provided on the primary side liquid return circuit.

[0012] Preferably, each of the primary circulation branch pipes 17 is provided with an adjustable primary branch switch valve 171 and a pressure sensor 172, and the primary branch switch valve 171 and the pressure sensor 172 are electrically connected to the main controller, so as to monitor the pressure and flow of the branch in real time, and can be remotely closed if there is any abnormality.

[0013] Preferably, the secondary side circulation main circuit 203 is connected to a plurality of secondary side circulation branches 161 , and each secondary side circulation branch 161 is connected to a battery pack.

[0014] Preferably, the secondary side circulation main circuit 203 includes a secondary side liquid supply main circuit and a secondary side liquid return main circuit, which are respectively connected to the plate heat exchanger 206 to realize the circulation function of exchanging cold water / hot water. Several battery packs are arranged between the secondary side liquid supply main circuit and the secondary side liquid return main circuit. Each battery pack corresponds to a secondary side circulation branch 161, which is respectively connected to the secondary side liquid supply main circuit and the secondary side liquid return main circuit through the secondary side circulation branch 161; the secondary side liquid supply main circuit is provided with a secondary side temperature measuring unit 204 and a secondary side switch valve 205, and the secondary side liquid return main circuit is provided with a secondary side switch valve 205 and a secondary side circulation water pump 207.

[0015] Preferably, a liquid replenishment expansion water tank 202 is provided on the secondary side liquid supply main circuit, and an exhaust valve 201 is provided on the secondary side liquid return main circuit.

[0016] Preferably, based on the temperature feedback of the battery pack temperature measuring unit, the main controller controls the working mode of the secondary side circulating water pump 207: the higher the temperature of the battery pack, the faster the speed of the secondary side circulating water pump 207; when the temperature of the battery pack is within a preset range, the water pump speed decreases.

[0017] Preferably, the cooling and heating modules in the centralized high-efficiency thermal management room 10 are provided with a backup cooling and heating module, and when one module fails, the backup module is started.

[0018] Preferably, the cooling and heating module in the centralized high-efficiency thermal management room 10 heats or cools in advance according to the local electricity price when the electricity price is low, and stores the target temperature coolant in the energy storage tank; when the electricity price is high, the coolant in the energy storage tank is released.

[0019] The present invention also discloses a distributed energy storage centralized efficient thermal management method. Based on the above-mentioned distributed energy storage centralized efficient thermal management system, the main controller of the centralized efficient thermal management room 10 controls the flow of the cooling medium / heating medium entering the primary side of the battery pack based on the primary side circulating water pump 11 and the primary side pressure flow detection unit 12, and controls the flow of the cooling medium / heating medium entering the secondary side of the battery pack based on the secondary side circulating water pump 207 and the secondary side switch valve 205, according to the temperature information fed back in real time by the primary side temperature detection unit 13, the secondary side temperature measurement unit 204 and the battery pack temperature measurement unit 15, combined with the battery pack...preset temperature range.

[0020] Preferably, when a battery pack in a certain energy storage cabinet 16 experiences thermal runaway, the speed of all water pumps is controlled based on the temperature signal of the battery pack temperature measurement unit to increase the flow rate, and at the same time, the cooling and heating module of the centralized high-efficiency thermal management room 10 performs cooling based on the maximum power. That is, the battery system needs to be heated or cooled to a suitable temperature range when working, and the heating and cooling can be combined with the local electricity price. For example, if the electricity price is relatively cheap at midnight, the water temperature can be cooled first at midnight and placed in the energy storage box. The electricity price is high during the day, and cold water can be used for cooling at night.

[0021] The beneficial effects of the present invention are:

[0022] 1. This application proposes a distributed energy storage centralized thermal management solution, which directly connects the main controller with the temperature measurement points of the water pump and battery pack at each level in the energy storage system, centrally controls the thermal management of the distributed energy storage cabinet, eliminates the thermal management unit of a single energy storage cabinet, effectively reduces the energy consumption of the energy storage system, and reduces the design and maintenance costs of the system.

[0023] 2. This application uses a centralized and efficient thermal management room to communicate real-time status information of each monitoring point in each level of the energy storage system, which can accurately control the temperature of each energy storage cabinet. In addition, when a certain energy storage cabinet has thermal runaway, the refrigeration capacity of the entire energy storage power station can be mobilized to quickly cool down the thermal runaway battery pack, thereby improving the safety and stability of the energy storage system. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below.

[0025] Figure 1 It is an overall schematic diagram of a high-efficiency thermal management device of the present invention;

[0026] Figure 2 It is a schematic diagram of a cooling circulation device in an energy storage cabinet of the present invention;

[0027] Figure 3 It is a schematic diagram of an inlet and outlet pipeline device of an energy storage cabinet of the present invention.

[0028] Figure markings: 10-centralized high-efficiency thermal management room, 11-primary side circulating water pump, 12-primary side pressure and flow detection unit, 13-primary side temperature detection unit, 14-primary side circulating main line, 141-primary side circulating primary pipeline, 142-primary side circulating secondary pipeline, 15-battery pack temperature measuring unit, 16-energy storage cabinet, 161-secondary side circulating branch, 17-primary side circulating branch, 171-primary side branch switch valve, 172-pressure testing unit, 20-hydraulic module, 201-exhaust valve, 202-liquid replenishment expansion water tank, 203-secondary side circulating main line, 204-secondary side temperature measuring unit, 205-secondary side switch valve, 206-heat exchanger, 207-secondary side circulating water pump. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] The present invention discloses a distributed energy storage centralized and efficient thermal management system and method. By directly connecting a main controller with the temperature measuring points of a water pump and a battery pack at each stage in the energy storage system, the thermal management of the distributed energy storage cabinet is centrally controlled, and the thermal management unit of a single energy storage cabinet is eliminated, thereby effectively reducing the energy consumption of the energy storage system and reducing the design and maintenance costs of the system.

[0031] A distributed energy storage centralized high-efficiency thermal management system includes a centralized high-efficiency thermal management room 10, a primary side circulation main line 14, a primary side circulation branch line 17, an energy storage cabinet 16 and a hydraulic module system 20.

[0032] like Figure 1As shown, the centralized high-efficiency thermal management room 10 includes a cooling and heating module and an energy storage water tank. The cooling and heating module has the function of cooling or heating the coolant. The coolant is stored in the energy storage water tank after being cooled or heated. The energy storage water tank has a heat preservation performance. In this embodiment, the cooling and heating module of the centralized high-efficiency thermal management room 10 is designed with a spare module, that is, the module that realizes the cooling function and the module that realizes the heating function are both equipped with a spare module. When a module fails, the spare module is started, which can realize the uninterrupted operation of the energy storage power station and improve the stability of the energy storage power station.

[0033] The primary circulation main line 14 includes a primary circulation primary pipeline 141 and a primary circulation secondary pipeline 142. The energy storage water tank in the centralized high-efficiency thermal management room is connected to the primary circulation primary pipeline 141. The primary circulation primary pipeline 141 is provided with a primary circulation water pump 11, and the primary circulation water pump 11 is electrically connected to the primary pressure flow detection unit 13 and the primary temperature detection unit 12. There are two primary circulation primary pipelines 141, which are the primary liquid supply circuit and the primary liquid return circuit. The energy storage cabinet 16 is arranged between the primary liquid supply circuit and the primary liquid return circuit to realize the water circulation between the energy storage water tank and the energy storage cabinet 16. The primary circulation secondary pipeline 142 is a branch pipeline of the primary circulation primary pipeline 141, so each primary circulation primary pipeline 141 is connected to a plurality of primary circulation secondary pipelines 142. The primary circulation secondary pipeline 142 is divided into a plurality of primary circulation branch pipelines 17, so each of the primary circulation secondary pipelines 142 is connected to a plurality of primary circulation branch pipelines 17. The energy storage cabinet 16 is connected to the primary liquid supply circuit and the primary liquid return circuit based on the primary circulation branch pipelines 17. Figure 3 As shown, a switch valve 171 and a pressure sensor 172 are provided on the primary circulation branch pipeline 17. The sensor signal is connected to the main controller for real-time monitoring of the pressure and flow of the branch. If a branch leak is found, the branch flow can be remotely closed.

[0034] The primary side of the energy storage cabinet 16 forms a cycle of energy storage water tank-primary side liquid supply circuit-primary side circulation secondary pipeline 142-primary side circulation branch pipeline 17-energy storage cabinet 16-primary side circulation branch pipeline 17-primary side circulation secondary pipeline 142-primary side liquid return circuit-energy storage water tank.

[0035] like Figure 2As shown, the energy storage cabinet 16 includes a number of battery packs, and the hydraulic module 20 is also arranged inside the energy storage cabinet. The hydraulic module system 20 includes a plate heat exchanger 206. The primary side circulation branch pipe 17 is connected to one side of the plate heat exchanger 206, and the other side of the plate heat exchanger 206 is connected to the secondary side circulation main line 203. The plate heat exchanger 206 can reduce or increase the secondary side fluid temperature. The cold fluid enters the cold side of the plate heat exchanger 206, passes through the flow channel in the plate group, and forms a thin film flow between the inner wall of the flow channel and the plate, thereby absorbing heat and causing the temperature of the cold fluid to rise. At the same time, the hot fluid transfers heat to the cold fluid through thin film flow on the hot side, but it will also lose part of its own heat, and the temperature will drop accordingly.

[0036] The secondary circulation main circuit 203 includes a secondary liquid supply main circuit and a secondary liquid supply loop. The battery pack is arranged between the secondary liquid supply main circuit and the secondary liquid supply loop to realize water circulation between the plate heat exchanger 206 and the energy storage cabinet 16. In this embodiment, since the hydraulic module 20 is a closed system, the coolant will have hot gas discharged during the circulation process, and the coolant will be lost. Therefore, a liquid replenishment expansion water tank 202 is provided on the secondary liquid supply main circuit, and an exhaust valve 201 is provided on the secondary liquid return main circuit. A secondary temperature measuring unit 204 is provided on the secondary liquid supply main circuit, a secondary switch valve 205 is provided on the secondary liquid return main circuit, and a secondary circulating water pump 207 is provided. When the temperature feedback from the battery pack temperature measuring unit 15 is too high, the main controller sends a speed increase signal to the secondary circulating water pump 207, the system flow rate increases, the heat exchange capacity of the liquid cooling plate increases, and the temperature of the battery pack temperature measuring unit 15 decreases. A secondary switch valve 205 is provided on the secondary liquid return main circuit to close the secondary liquid cooling circuit during maintenance to prevent leakage of the main circuit fluid.

[0037] The secondary side circulating water pump in the hydraulic module 20 drives the cooling liquid and the liquid cooling plate to exchange heat to remove the heat generated by the battery pack. The heated liquid coolant continues to exchange heat with the cold end on the other side of the heat exchanger under the drive of the pump, and the next cycle is carried out after the temperature of the coolant drops.

[0038] The secondary side circulation main circuit 203 is connected to a plurality of secondary side circulation branches 161 , each of which is connected to a battery pack. A temperature sensor is provided in the battery pack to control the working mode of the secondary side circulation water pump through temperature feedback.

[0039] The secondary side of the energy storage cabinet 16 forms a cycle of: primary side circulation branch pipeline 17 - plate heat exchanger 206 - secondary side liquid supply main line - secondary side circulation branch 161 - battery pack liquid cooling plate - secondary side circulation branch 161 - secondary side liquid return main line - plate heat exchanger 206 .

[0040] The primary side circulating water pump 11, the primary side pressure flow detection unit 12, the primary side temperature detection unit 13, the secondary side temperature measurement unit 204, the secondary side circulating water pump 207, and the battery pack temperature measurement unit are respectively connected to the main controller through remote networking.

[0041] The present invention also discloses a distributed energy storage centralized efficient thermal management method. The main controller of the centralized efficient thermal management room 10 controls the flow of the cooling medium / heating medium entering the primary side of the battery pack based on the primary side circulating water pump 11 and the primary side pressure flow detection unit 12, and controls the flow of the cooling medium / heating medium entering the secondary side of the battery pack based on the secondary side circulating water pump 207 and the secondary side switch valve 205, according to the temperature information fed back in real time by the primary side temperature detection unit 13, the secondary side temperature measurement unit 204 and the battery pack temperature measurement unit 15, combined with the preset temperature range of the battery pack.

[0042] Specifically, the working mode of the secondary side circulating water pump 207 is controlled through the temperature feedback of the battery pack. The working speed of the secondary side circulating water pump 207 is proportional to the temperature of the battery. The higher the temperature of the battery pack, the faster the speed of the water pump, the higher the heat exchange efficiency of the heat exchanger, the flow rate at the outlet of the heat exchanger increases and the water temperature decreases, which is conducive to reducing the temperature of the battery pack; when the temperature of the battery pack is within an appropriate range, the speed of the water pump decreases, the flow rate at the outlet of the heat exchanger decreases, and the temperature increases, which can effectively reduce the energy consumption of the system while ensuring that the battery pack works in a suitable temperature range.

[0043] Under severe working conditions, increasing the speed of the secondary circulating water pump 207 can no longer effectively reduce the battery pack temperature. Through temperature feedback from the battery pack, the working mode of the primary circulating water pump 11 is controlled, the speed of the primary circulating water pump 11 is increased, the heat exchange capacity of the heat exchanger is increased, and the secondary water temperature is reduced.

[0044] When a battery pack 16 in a certain energy storage cabinet experiences thermal runaway, the speed of the water pump 11 and the secondary side circulating water pump 207 is controlled to increase the flow rate based on the temperature signal of the battery pack temperature measuring unit. At the same time, the cooling and heating module of the centralized high-efficiency thermal management room 10 performs cooling based on the maximum power.

[0045] In this embodiment, the centralized high-efficiency thermal management room 10 heating model and cooling module can heat or cool in advance according to the local electricity price, and store the target temperature coolant in the energy storage tank. When the local electricity price is high, the battery discharge process is used to cool the battery pack, which is beneficial to reduce system energy consumption.

[0046] The calculation and selection of the liquid cooling system of this embodiment: using a single cell of 314Ah, a single pack of 1p52s, a single cabinet of 1p416s, 0.5C charging and discharging, the average heating value of the cell is 14.72W. Assuming that a high-efficiency computer room is used to cool the cells of 9 cabinets, there are 9 liquid cooling cabinets in a pile, with a total of 3744 cells, and the total heating value of the cells is 3744*14.72=55112W.

[0047] The flow rate requirement for a single PACK is 6.0L / MIN. Each cabinet has 8 battery packs connected in parallel, and the cabinets are connected in parallel. The flow rate required for a single cabinet is 6*8*9=432L / MIN. Through calculation, the cooling capacity of the efficient computer room is 55112w, and the flow rate is 432L / MIN.

[0048] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A distributed energy storage centralized and efficient thermal management system, It is characterized in that It includes a centralized high-efficiency thermal management room (10), a primary circulation main line (14), an energy storage cabinet (16), a secondary circulation main line (203) and a plate heat exchanger (206). The centralized high-efficiency thermal management room (10) is connected to the energy storage cabinet (16) based on the primary side circulation main line (14) to achieve cooling / heat exchange on the primary side of the energy storage cabinet (16); the energy storage cabinet (16) is connected to the plate heat exchanger (206) based on the secondary side circulation main line (203) to achieve cooling / heat exchange on the secondary side of the energy storage cabinet (16). Specifically, The centralized high-efficiency thermal management room (10) comprises a cooling and heating module, an energy storage water tank and a main controller. The coolant is cooled / heated by the cooling and heating module and then stored in the energy storage water tank. The primary side circulation main line (14) is connected to the energy storage water tank. The primary side circulation main line (14) is provided with a primary side circulation water pump (11), a primary side pressure flow detection unit (12), and a primary side temperature detection unit (13) to transmit cold / hot water of a certain flow rate and a certain temperature to the primary side of the energy storage cabinet (16); The primary side circulation main line (14) is connected to a plurality of primary side circulation branch lines (17), the primary side circulation branch line (17) is connected to one side of a plate heat exchanger (206) in the energy storage cabinet (16), and the other side of the plate heat exchanger (206) is connected to the battery pack in the energy storage cabinet (16) via a secondary side circulation main line (203), and the secondary side circulation main line (203) is provided with a secondary side circulation water pump (207), a secondary side temperature measuring unit (204) and a secondary side switch valve (205) to transmit cold / hot water of a certain flow rate and a certain temperature to the secondary side of the energy storage cabinet (16); A battery pack temperature measuring unit (15) is provided on the battery pack, and the primary side circulating water pump (11), the primary side pressure flow detection unit (12), the primary side temperature detection unit (13), the secondary side circulating water pump (207), the secondary side temperature measuring unit (204), the secondary side switch valve (205), and the battery pack temperature measuring unit (15) are all electrically connected to a main controller in the centralized high-efficiency thermal management room (10).

2. The distributed energy storage centralized high-efficiency thermal management system according to claim 1, It is characterized in that The primary side circulation main pipeline (14) comprises a primary side circulation primary pipeline (141) and a primary side circulation secondary pipeline (142), each primary side circulation primary pipeline (141) is connected to a plurality of primary side circulation secondary pipelines (142); each primary side circulation secondary pipeline (142) is connected to a plurality of primary side circulation branch pipelines (17), and each primary side circulation branch pipeline (17) corresponds to an energy storage cabinet (16).

3. The distributed energy storage centralized high-efficiency thermal management system according to claim 1, It is characterized in that The primary circulation primary pipeline (141) comprises a primary liquid supply circuit and a primary liquid return circuit, which are respectively connected to the energy storage water tank to realize the water circulation function of liquid supply and liquid return of the energy storage water tank; a plurality of energy storage cabinets (16) are arranged between the primary liquid supply circuit and the primary liquid return circuit, and are respectively connected to the primary liquid supply circuit and the primary liquid return circuit through the primary circulation branch pipeline (17); the primary circulation water pump (11), the primary pressure flow detection unit (12) and the primary temperature detection unit (13) are arranged on the primary liquid supply circuit, and the primary temperature detection unit (13) is arranged on the primary liquid return circuit.

4. The distributed energy storage centralized high-efficiency thermal management system according to any one of claims 1 to 3, It is characterized in that Each of the primary-side circulation branch pipelines (17) is provided with an adjustable primary-side branch switch valve (171) and a pressure sensor (172), and the primary-side branch switch valve (171) and the pressure sensor (172) are both electrically connected to the main controller.

5. The distributed energy storage centralized high-efficiency thermal management system according to claim 1, It is characterized in that The secondary side circulation main circuit (203) is connected to a plurality of secondary side circulation branches (161), and each secondary side circulation branch (161) is connected to a battery pack.

6. The distributed energy storage centralized high-efficiency thermal management system according to claim 5, It is characterized in that The secondary side circulation main path (203) comprises a secondary side liquid supply main path and a secondary side liquid return main path, which are respectively connected to the plate heat exchanger (206) to realize the circulation function of exchanging cold water / hot water. The plurality of battery packs are arranged between the secondary side liquid supply main path and the secondary side liquid return main path. Each battery pack corresponds to a secondary side circulation branch (161) and is respectively connected to the secondary side liquid supply main path and the secondary side liquid return main path through the secondary side circulation branch (161). The secondary side liquid supply main path is provided with a secondary side temperature measuring unit (204) and a secondary side switch valve (205), and the secondary side liquid return main path is provided with a secondary side switch valve (205) and a secondary side circulation water pump (207).

7. The distributed energy storage centralized high-efficiency thermal management system according to claim 6, It is characterized in that The secondary side liquid supply main circuit is provided with a liquid replenishment expansion water tank (202), and the secondary side liquid return main circuit is provided with an exhaust valve (201).

8. The distributed energy storage centralized high-efficiency thermal management system according to claim 1, It is characterized in that Based on the temperature feedback of the battery pack temperature measurement unit, the main controller controls the working mode of the secondary side circulating water pump (207): the higher the temperature of the battery pack, the faster the rotation speed of the secondary side circulating water pump (207); when the temperature of the battery pack is within a preset range, the rotation speed of the water pump decreases.

9. The distributed energy storage centralized high-efficiency thermal management system according to claim 1, It is characterized in that The cooling and heating modules in the centralized high-efficiency thermal management room (10) are provided with a backup cooling and heating module, and when one of the modules fails, the backup module is activated.

10. The distributed energy storage centralized high-efficiency thermal management system according to claim 1, It is characterized in that The cooling and heating module in the centralized high-efficiency thermal management room (10) heats or cools in advance according to the local electricity price when the electricity price is low, and stores the target temperature coolant in the energy storage tank; when the electricity price is high, the coolant in the energy storage tank is released.