Water conservancy construction piling equipment
By using elastic clamping plates and balls in water conservancy construction pile driving equipment, the problem of pile driving force barrier in the prior art has been solved, and the stability and efficiency of pile driving are improved.
Patent Information
- Application Number
- CN202420374753.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-02-28
AI Technical Summary
When existing water conservancy construction pile driving equipment limits pile columns of different specifications, it will lead to blocking the pile driving force and affecting the pile driving efficiency.
Two clamping plates are used for elastic clamping limits, and balls are installed on the inner side of the clamping plate to reduce the friction between the clamping plate and the pile body and improve the stability and efficiency during pile driving.
By elastic clamping and balling, the stability and efficiency of pile driving are improved, the resistance during pile driving is reduced, and construction efficiency is improved.
Smart Images

Figure CN222065453U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy construction, in particular to a water conservancy construction piling device. Background Art
[0002] When constructing water conservancy projects, piling work is required to make the foundation of the building more solid and less likely to collapse, so water conservancy construction piling equipment is needed. At present, piling equipment generally consists of a pile hammer, a pile frame and auxiliary equipment. The pile hammer is attached between two parallel vertical guide rods at the front of the pile frame and lifted by a lifting hook.
[0003] At present, a Chinese patent with publication number CN218990155U discloses a water conservancy construction piling device, which can clamp and fix piles of different thicknesses through the cooperation of a compression spring, a limit plate, a compression column and a clamp. Although this elastic clamping fixation can limit piles of different specifications to ensure the accuracy of piling, it will cause a certain degree of blocking effect on the piling force, thereby affecting the piling efficiency.
[0004] Therefore, the present application provides a water conservancy construction piling equipment to meet the needs. Utility Model Content
[0005] The technical problem to be solved by the utility model is to provide a water conservancy construction piling equipment, which can utilize two clamping plates to elastically clamp and limit the pile body to be driven, so as to ensure its stability during piling, and balls are arranged on the inner sides of the clamping plates, which can reduce the friction between the clamping plates and the pile body and reduce the downward resistance during piling. Compared with the prior art, it is beneficial to ensure the piling efficiency.
[0006] In order to realize the above technical solution, the utility model provides the following technical solution:
[0007] A water conservancy construction piling equipment comprises a base plate, a hanger is fixed at one end of the upper end surface of the base plate, an electric winch is fixed at the top of the hanger, a steel cable is wound on the electric winch, a pile hammer is vertically suspended downward by the steel cable, two fixing plates are symmetrically fixed to one end of the base plate on which the hanger is mounted, clamping plates are elastically mounted on the opposite sides of the two fixing plates, the opposite sides of the two clamping plates are butt-jointed and located directly below the pile hammer, and a plurality of balls are symmetrically mounted on the middle of the opposite sides of the two clamping plates.
[0008] Optionally, a plurality of rollers are fixed to the lower end surface of the base plate, and a handle is fixed to one end of the upper end surface of the base plate away from the hanger.
[0009] Optionally, a control box is installed in the middle of the upper end surface of the substrate, and the control box is electrically connected to the electric winch.
[0010] Optionally, a horizontal plate is fixed to the top side of the hanger, a through hole is opened in the middle of the horizontal plate, and the steel cable vertically passes through the through hole.
[0011] Optionally, a horizontal fixing plate is fixed to the lower end of the steel cable, a vertical fixing screw is fixed to the middle of the lower end surface of the fixing plate, and a screw hole for threadedly plugging and fixing with the fixing plate is opened at the top end of the pile hammer.
[0012] Optionally, a horizontal limiting sliding groove is provided on one side of the base plate facing the two clamping plates, and sliding blocks are fixed to the ends of the two clamping plates, and the sliding blocks are horizontally slidably placed in the limiting sliding groove.
[0013] Optionally, a horizontally inclined guide plate is fixed to one end of the two clamping plates away from the base plate, and the two guide plates form an "eight"-shaped expansion structure.
[0014] Optionally, a horizontal movable rod is fixed to the middle parts of the two clamping plates away from each other, the movable rod passes through the fixed plate horizontally, and a spring is sleeved on the movable rod.
[0015] Optionally, one end of the spring is fixed to the inner side of the fixing plate, and the other end abuts against the clamping plate, and the two springs abut the two clamping plates toward each other.
[0016] Optionally, an anti-dropping protrusion is fixed to one end of the movable rod passing through the fixed plate.
[0017] Compared with the prior art, the utility model has at least the following beneficial effects:
[0018] In the above scheme, by elastically installing the clamping plates on the inner sides of the two fixing plates, the two clamping plates can be used to elastically clamp and limit the pile body to be driven, so as to ensure its stability during piling, and the balls arranged on the inner sides of the clamping plates can reduce the friction between the clamping plates and the pile body, and reduce the downward resistance during piling. Compared with the prior art, this is conducive to ensuring the efficiency of piling.
[0019] By setting a horizontal plate, after the electric winch lifts the pile hammer with the steel cable, the pile hammer can be quickly reset and the shaking can be stopped through the horizontal connection between the fixed plate and the lower end surface of the horizontal plate, so as to facilitate the pile driving again. The structure is simple and the use effect is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The accompanying drawings, which are incorporated herein and constitute part of the specification, illustrate embodiments of the present invention and, together with the description, further serve to explain the principles of the present invention and enable those skilled in the relevant art to make and use the present invention.
[0021] Figure 1 This is a three-dimensional structural diagram of the piling equipment for water conservancy construction;
[0022] Figure 2 This is a partial structural diagram of the piling equipment for water conservancy construction;
[0023] Figure 3 Piling equipment for water conservancy construction Figure 1 A magnified schematic diagram of the structure at center A;
[0024] Figure 4 This is a schematic diagram of the three-dimensional structure of a pile hammer used in water conservancy construction piling equipment.
[0025] [reference numerals]
[0026] 1. Base plate; 101. Roller; 102. Handle; 103. Limit slide; 2. Control chassis; 3. Hanger; 4. Electric winch; 5. Steel cable; 501. Fixed plate; 502. Fixed screw; 6. Pile hammer; 7. Horizontal plate; 701. Through hole; 8. Fixed plate; 9. Clamping plate; 901. Guide plate; 902. Ball; 903. Slider; 10. Movable rod; 1001. Spring.
[0027] As shown in the figure, in order to clearly implement the structure of the embodiment of the utility model, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the utility model to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION
[0028] The following is a detailed description of a water conservancy construction piling device provided by the utility model in combination with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternatives to implement some known technologies; and the accompanying drawings are only for more specific description of the embodiments, and are not intended to specifically limit the utility model.
[0029] It should be noted that the references to "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).
[0030] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.
[0031] It is to be understood that the meanings of “on,” “over,” and “above” in the present invention should be interpreted in the broadest manner, so that “on” not only means “directly on” something, but also includes the meaning of being “on” something with intervening features or layers, and “on” or “above” not only means “on” or “above” something, but also includes the meaning of being “on” or “above” something with no intervening features or layers.
[0032] Additionally, spatially relative terms such as "under," "beneath," "lower," "above," "upper," and the like may be used herein for descriptive convenience to describe the relationship of one element or feature to another element or features, as shown in the accompanying drawings. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially relative descriptors used herein may be similarly interpreted accordingly.
[0033] like Figure 1 and Figure 2 As shown, an embodiment of the utility model provides a water conservancy construction piling equipment, including a base plate 1, a plurality of rollers 101 are fixed to the lower end surface of the base plate 1, and a handle 102 is fixed to the upper end surface of the base plate 1 away from the hanger 3, so as to move the base plate 1 to a suitable position for use.
[0034] A hanger 3 is fixed to one end of the upper end surface of the base plate 1, and an electric winch 4 is fixed to the top of the hanger 3. A steel cable 5 is wound on the electric winch 4, and a pile hammer 6 is vertically suspended downward from the steel cable 5. A control box 2 is installed in the middle of the upper end surface of the base plate 1, and a PLC controller is arranged in the control box 2. A control panel is arranged on the surface of the control box 2, and the control box 2 is electrically connected to the motor on the electric winch 4 through a wire, so that the staff can control the start of the electric winch 4 through the control box 2 to lower the steel cable 5 or wind up the steel cable 5.
[0035] like Figure 3 and Figure 4As shown, a horizontal plate 7 is fixed to the top side of the hanger 3, a through hole 701 is provided in the middle of the horizontal plate 7, and the steel cable 5 vertically passes through the through hole 701, and a horizontal fixing plate 501 is fixed to the lower end of the steel cable 5, and a vertical fixing screw 502 is fixed to the middle of the lower end surface of the fixing plate 501, and a screw hole is provided at the top of the pile hammer 6 for threaded plugging and fixing with the fixing plate 501, so that the pile hammer 6 can be detachably fixed to the lower end surface of the fixing plate 501, which is convenient for later replacement, and the fixing plate 501 can be horizontally connected with the lower end surface of the horizontal plate 7, so that the pile hammer 6 can be quickly stabilized when the pile hammer 6 is lifted.
[0036] like Figure 1 and Figure 2 As shown, two fixing plates 8 are symmetrically fixed to one end of the base plate 1 on which the hanger 3 is installed, and clamping plates 9 are elastically installed on the opposite sides of the two fixing plates 8. The opposite sides of the two clamping plates 9 are butt-jointed and located directly below the pile hammer 6. During specific implementation, a horizontal limiting groove 103 is provided on one side of the base plate 1 facing the two clamping plates 9, and sliders 903 are fixed at the ends of the two clamping plates 9. The sliders 903 slide horizontally and are placed in the limiting groove 103, and a horizontal movable rod 10 is fixed at the middle parts of the two clamping plates 9 away from each other. The movable rod 10 passes horizontally through the fixed plate 8, and an anti-slip protrusion is fixed at one end of the movable rod 10 that passes through the outside of the fixed plate 8, and a spring 1001 is sleeved on the movable rod 10, one end of the spring 1001 is fixed to the inner side of the fixed plate 8, and the other end abuts against the clamping plate 9. The two springs 1001 abut the two clamping plates 9 against each other, so that the clamping plate 9 can elastically clamp and limit the pile body placed between the fixed plates 8.
[0037] At the same time, a horizontally inclined guide plate 901 is fixed to one end of the two clamping plates 9 away from the base plate 1, and the two guide plates 901 form an "eight"-shaped expansion structure to facilitate guiding piles of different specifications to be placed between the two clamping plates 9, and a plurality of balls 902 are symmetrically installed in the middle of the opposite sides of the two clamping plates 9, which can reduce the friction between the clamping plates 9 and the piles, thereby reducing the friction resistance during piling to ensure the piling efficiency.
[0038] The working principle provided by the utility model is that the water conservancy construction piling equipment can be moved by the roller 101 when in use, so that the pile body to be piled is located between the two fixed plates 8. At this time, the guide plate 901 at the front end of the two clamping plates 9 will slide along the surface of the pile body to place the pile body between the two clamping plates 9, and perform elastic clamping and limiting to ensure its stability during piling. Subsequently, the electric winch 4 can be started to use the steel cable 5 to lower the pile hammer 6 to perform a heavy-hitting pile driving operation on the clamped and limited pile body, and during the piling process, the ball 902 arranged on the inner side of the clamping plate 9 can reduce the friction between the clamping plate 9 and the pile body, and reduce the downward resistance during piling. Compared with the prior art, it is beneficial to ensure the piling efficiency.
[0039] In addition, when repeatedly driving piles, due to the horizontal plate 7 arranged on the top side of the hanger 3, after the electric winch 4 lifts the pile hammer 6 with the steel cable 5, the pile hammer 6 can be quickly reset and the shaking can be stopped by horizontally connecting the fixed plate 501 with the lower end surface of the horizontal plate 7, so as to facilitate the next hammering and pile driving. The structure is simple and the use effect is good.
[0040] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the following preferred embodiments of the present invention, and those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.
[0041] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A water conservancy construction piling equipment, comprising a base plate, a hanger is fixed to one end of the upper end surface of the base plate, an electric winch is fixed to the top of the hanger, a steel cable is wound on the electric winch, a pile hammer is vertically suspended downward from the steel cable, It is characterized in that The base plate is provided with one end of the hanger symmetrically fixed with two fixing plates, and the two fixing plates are elastically provided with clamping plates on the opposite sides thereof, and the two clamping plates are butt-jointed on the opposite sides thereof and are located directly below the pile hammer, and a plurality of balls are symmetrically provided on the middle of the opposite sides thereof; A horizontal fixing plate is fixed to the lower end of the steel cable, a vertical fixing screw is fixed to the middle of the lower end surface of the fixing plate, and a screw hole which is threadedly plugged and fixed to the fixing plate is provided at the top end of the pile hammer.
2. The water conservancy construction piling equipment according to claim 1, It is characterized in that A plurality of rollers are fixed to the lower end surface of the base plate, and a handle is fixed to one end of the upper end surface of the base plate away from the hanger.
3. The water conservancy construction piling equipment according to claim 1, It is characterized in that A control box is installed in the middle of the upper end surface of the base plate, and the control box is electrically connected to the electric winch.
4. The water conservancy construction piling equipment according to claim 1, It is characterized in that A horizontal plate is fixed on the top side of the hanger, a through hole is opened in the middle of the horizontal plate, and the steel cable vertically passes through the through hole.
5. The water conservancy construction piling equipment according to claim 1, It is characterized in that A horizontal limiting sliding groove is provided on one side of the base plate facing the two clamping plates, and sliding blocks are fixed to the ends of the two clamping plates, and the sliding blocks are horizontally slidably placed in the limiting sliding groove.
6. The water conservancy construction piling equipment according to claim 1, It is characterized in that A horizontally inclined guide plate is fixed to one end of the two clamping plates away from the base plate, and the two guide plates form an "eight"-shaped expansion structure.
7. The water conservancy construction piling equipment according to claim 1, It is characterized in that A horizontal movable rod is fixed to the middle parts of the two clamping plates away from each other. The movable rod passes through the fixed plate horizontally, and a spring is sleeved on the movable rod.
8. The water conservancy construction piling equipment according to claim 7, It is characterized in that One end of the spring is fixed to the inner side of the fixing plate, and the other end is abutted against the clamping plate, and the two springs abut the two clamping plates toward each other.
9. The water conservancy construction piling equipment according to claim 7, It is characterized in that An anti-dropping protrusion is fixed on one end of the movable rod passing through the fixing plate.