Water dry-type box transformer substation foundation

By designing a splicable prefabricated structure and drainage mechanism, the existing water dry box-changing foundation size is not adaptable and water inlet problems, rapid installation and efficient drainage are achieved, and the convenience and safety of box-changing foundation are improved.

CN222065545UActive Publication Date: 2024-11-26SHANXI LINGXIANG CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420725604.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-11-26
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

The existing dry-type water box transformer foundation cannot be easily spliced ​​to form a suitable size to suit different box transformers, and lacks drainage functions, which can easily lead to water inlet failure of box transformers.

Method used

A water dry box-changing foundation including a prefabricated structure and a drainage mechanism was designed. The prefabricated structure consists of prefabricated columns, prefabricated beams, prefabricated plates and prefabricated guardrails. The prefabricated beams and plates can be spliced ​​into platforms of different sizes and are equipped with water leakage holes. Pump pump and water level sensor for drainage.

Benefits of technology

It realizes rapid installation and adaptation to box-changing foundations of different sizes, effectively eliminates internal moisture, and improves installation efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065545U_ABST
    Figure CN222065545U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of box-type transformer substations, and discloses an overwater dry-type box-type transformer substation foundation which structurally comprises a prefabricated structure and a drainage mechanism, the prefabricated structure comprises a prefabricated column, a prefabricated beam, a prefabricated plate and a prefabricated guardrail, the prefabricated beam is arranged above the prefabricated column, the prefabricated plate is arranged above the prefabricated beam, the prefabricated plate is arranged above the prefabricated beam, and the drainage mechanism is arranged above the prefabricated beam. The upper surface of the prefabricated plate is sloped from the periphery to the middle, and a prefabricated guardrail is arranged on the upper surface of the prefabricated plate. Through the arrangement of the prefabricated structure, different numbers of prefabricated column units can be assembled to adapt to foundation installation of water depths with different design requirements, the prefabricated beams and the prefabricated plates can be spliced to form platforms of different sizes, the dry-type box transformer substations of different sizes can be conveniently adapted to installation, and the foundation structure is the prefabricated structure, so that the installation is convenient. The device can be manufactured and pretreated on land and then transported to an installation site to be rapidly installed, so that the installation time is greatly shortened, and the manufacturing cost is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of box-type transformer substations, in particular to an above-water dry-type box-type transformer foundation. Background Art

[0002] The water-based dry box transformer foundation is a special type of infrastructure, which is mainly used for the construction of water power facilities. The water-based dry box transformer foundation usually consists of one or more prefabricated concrete structures, which can be built on land and then transported to the installation site.

[0003] In the existing box-type transformer platform foundation, for example, the Chinese patent with publication number: CN220335866U discloses a water surface photovoltaic box-type transformer platform foundation template, which proposes that "the foundation template includes a plurality of foundation units, and the foundation units include pipe piles, embedded anchor plates, hanging supports and platform components; the embedded anchor plates are arranged on the top of the pipe piles, and the transverse or longitudinal ends of the embedded anchor plates have extended connecting plates arranged vertically downward; the hanging support includes a support arm and a placement end on the support arm arranged away from the pipe pile, the support arm is fixed to the extended connecting plate, and the placement end is used to place the platform component." The following problems exist during use: Although the above device can meet the installation requirements of the safety protection net to reduce the safety hazards of the operators. However, the above device still has the following problems: First, the box transformer foundation has different models and sizes, and the above device cannot be conveniently spliced ​​into a suitable size to adapt to different box transformers; second, in order to ensure the safe operation of the dry box transformer, measures should be taken to prevent moisture from entering the transformer. The above device does not have a drainage function, which can easily cause the box transformer to malfunction due to water ingress. Therefore, we need a more convenient water-based dry box transformer foundation to improve the convenience of the device. Utility Model Content

[0004] The purpose of the utility model is to provide an above-water dry box transformer foundation to solve the problem that the box transformer foundations proposed in the above background technology have different models and sizes, and the existing devices cannot be conveniently spliced ​​into suitable sizes to adapt to different box transformers.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an above-water dry box transformer foundation, the structure of which includes a prefabricated structure and a drainage mechanism, the prefabricated structure includes prefabricated columns, prefabricated beams, prefabricated panels and prefabricated guardrails, prefabricated beams are arranged above the prefabricated columns, prefabricated panels are arranged above the prefabricated beams, the upper surface of the prefabricated panels is sloped from the surroundings to the middle, and prefabricated guardrails are arranged on the upper surface of the prefabricated panels.

[0006] Preferably, structural steel bars are arranged inside the prefabricated column, and the bottom ends of the structural steel bars are exposed on the lower surface of the prefabricated column.

[0007] Preferably, a slot is provided on the upper surface of the prefabricated column, the size of the slot matches the size of the bottom end of the prefabricated column, a grouting sleeve is provided inside the slot, and the grouting sleeve is clamped with the bottom end of the structural steel bar.

[0008] Preferably, a grouting hole is opened on the outer surface of the prefabricated column, and the grouting hole is arranged outside the grouting sleeve.

[0009] Preferably, fixed columns are symmetrically arranged on the upper surface of the precast beam along the central axis of the long side, the fixed columns on the upper surface of the precast beam are plug-connected with the precast plate, structural steel bars are arranged on the lower surface of the precast beam, and the structural steel bars on the lower surface of the precast beam are clamped and connected with the grouting sleeve.

[0010] Preferably, the prefabricated beam is formed by splicing two types of components: cross-shaped and L-shaped.

[0011] Preferably, a water leakage hole is arranged in the center of the upper surface of the prefabricated board, a drainage pipe is arranged below the water leakage hole, a water pump is arranged on one side of the water leakage hole, and the water pump is threadedly connected to the side surface of the drainage pipe.

[0012] Preferably, a partition is provided between the water pump and the drain pipe, and the partition is connected to the drain pipe via a rotating shaft.

[0013] Preferably, a water level sensor is provided at the bottom end of the surface of the prefabricated guardrail.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. The utility model adopts the setting of prefabricated structure, assembling different numbers of prefabricated column units can adapt to the foundation installation of different water depths, and the prefabricated beams and prefabricated panels can be spliced ​​to form platforms of different sizes, which is convenient for the installation of dry-type box transformers of different sizes. Moreover, the foundation structure is a prefabricated structure, which can be manufactured and preprocessed on land, and then transported to the installation site for rapid installation, which greatly shortens the installation time and cost;

[0016] 2. The utility model can effectively remove excess water inside the foundation through the setting of the drainage mechanism, the leakage hole and the water pump. The leakage hole can directly drain the water inside the foundation to the bottom of the device, and when there is a lot of water accumulation, the water level sensor sends a signal to the water pump to quickly drain the water. The two complement each other and improve the drainage effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0018] Figure 2 It is a schematic diagram of the prefabricated structure of the utility model.

[0019] Figure 3It is a schematic diagram of the drainage mechanism structure of the utility model.

[0020] Figure 4 It is a schematic diagram of the prefabricated structure of the utility model.

[0021] Figure 5 This is a schematic diagram of the prefabricated column structure of the utility model.

[0022] In the figure: 1. prefabricated structure; 101. prefabricated column; 102. prefabricated beam; 103. prefabricated board; 104. prefabricated guardrail; 105. structural steel bar; 106. fixed column; 107. slot; 108. grouting sleeve; 109. grouting hole; 2. drainage mechanism; 201. leakage hole; 202. drainage pipe; 203. water pump; 204. partition; 205. rotating shaft; 206. water level sensor. DETAILED DESCRIPTION

[0023] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1-5 A water-based dry box transformer foundation, which includes a prefabricated structure 1 and a drainage mechanism 2. The prefabricated structure 1 includes a prefabricated column 101, a prefabricated beam 102, a prefabricated board 103 and a prefabricated guardrail 104. The prefabricated column 101 is provided with a prefabricated beam 102, and the prefabricated board 103 is provided above the prefabricated beam 102. The upper surface of the prefabricated board 103 is sloped from the surroundings to the middle, and the upper surface of the prefabricated board 103 is provided with a prefabricated guardrail 104.

[0026] Structural steel bars 105 are arranged inside the prefabricated column 101, and the bottom ends of the structural steel bars 105 are exposed on the lower surface of the prefabricated column 101. The structural steel bars 105 facilitate the splicing between the prefabricated column 101 units, so that the prefabricated columns 101 can be spliced ​​into a length that meets construction requirements, thereby improving the stability of the device.

[0027] A slot 107 is provided on the upper surface of the prefabricated column 101, and the size of the slot 107 matches the size of the bottom end of the prefabricated column 101. A grouting sleeve 108 is provided inside the slot 107, and the grouting sleeve 108 is engaged with the bottom end of the structural steel bar 105. When the prefabricated column 101 is spliced, the top end is tightly fitted with the slot 107, and the structural steel bar 105 is inserted into the grouting sleeve 108 in the slot 107, which is easy to install and tightly combined.

[0028] The outer surface of the precast column 101 is provided with a grouting hole 109 , which is arranged outside the grouting sleeve 108 . By injecting cement slurry into the grouting hole 109 , the structural steel bars 105 in the grouting sleeve 108 can be tightly combined together, thereby increasing the strength of the precast column 101 .

[0029] Fixed columns 106 are symmetrically arranged on the upper surface of the precast beam 102 along the central axis of the long side. The fixed columns 106 on the upper surface of the precast beam 102 are plug-connected with the precast plate 103. Structural steel bars 105 are arranged on the lower surface of the precast beam 102. The structural steel bars 105 on the lower surface of the precast beam 102 are snap-connected with the grouting sleeve 108. The precast beam 102 tightly combines the precast columns 101 and the precast plate 103 together through the structural steel bars 105 and the fixed columns 106, which play the role of connecting the structure and transferring the load.

[0030] The precast beam 102 is made of two types of components, a cross-shaped component and an L-shaped component. The two types of precast beams 102 can be conveniently combined into structures suitable for different sizes to carry the precast panels 103 above, so that they can adapt to the installation of box-type transformers of different sizes on site. The precast beams 102 are connected by pouring concrete after installation.

[0031] A water leakage hole 201 is arranged in the center of the upper surface of the prefabricated plate 103, a drainage pipe 202 is arranged below the water leakage hole 201, a water pump 203 is arranged on one side of the water leakage hole 201, and the water pump 203 is threadedly connected to the side of the drainage pipe 202. The water leakage hole 201 and the water pump 203 are used to drain the accumulated water in time to prevent the water from flooding the entire device. The two complement each other and improve the drainage effect.

[0032] A partition 204 is provided between the water pump 203 and the drain pipe 202 . The partition 204 is connected to the drain pipe 202 via a rotating shaft 205 . The partition 204 can prevent water from flowing back.

[0033] A water level sensor 206 is disposed at the bottom of the surface of the prefabricated guardrail 104. When there is a lot of water accumulation, the water level sensor 206 sends a signal to the water pump 203 to quickly drain the water.

[0034] Working principle: First, determine the required amount of materials through design drawings, transport the prefabricated components to the construction site, insert the bottom end of the prefabricated column 101 into the top of the bottom end of another prefabricated column 101, and at the same time insert the structural steel bar 105 at the bottom end of the upper prefabricated column 101 into the grouting sleeve 108 in the top slot 107 of the lower prefabricated column 101. Repeat the above steps to assemble the prefabricated column 101 unit until the construction requirements are met, grout the grouting sleeve 108 through the grouting hole 109, and wait for the cement slurry to solidify and reach the strength. The precast column 101 can then be piled. After the precast column 101 is piled, the precast beam 102 is adjusted in angle and installed on the top of the precast column 101. The structural steel bar 105 below the precast beam 102 is inserted into the grouting sleeve 108 at the top of the precast column 101. Grouting is performed on the grouting hole 109 at the top of the precast column 101. Concrete is poured between the joints of the precast beam 102. The precast beam 102 is fixed. The precast panel 103 is installed on the top of the precast beam 102. The fixing column 106 is inserted into the prefabricated board 103, the prefabricated board 103 is fixed, and then the prefabricated guardrail 104 is fixed to the four sides of the upper surface of the prefabricated board 103 by bolts. Finally, when water accumulates on the surface of the prefabricated board 103 due to rain or other reasons, the water level sensor 206 detects the water level. When the water level is lower than the warning water level, the accumulated water flows into the leakage hole 201 along the slope of the upper surface of the prefabricated board 103 and is discharged by the drain pipe 202. When the water level is higher than the warning water level, the water level sensor 206 detects the water level. The water pump 203 sends a signal, and the water pump 203 starts working to pump the accumulated water into the drain pipe 202. When the accumulated water enters the drain pipe 202, the water flow hits the partition 204, and the partition 204 rotates around the rotating shaft 205 to close the drain pipe 202 below the leakage hole 201 to prevent the accumulated water from flowing back. Until the water level drops below the warning water level, the water pump 203 stops working, and the partition 204 rotates around the rotating shaft 205 under the action of gravity and then returns to its original position. In this way, a method for using an above-water dry box transformer foundation is completed.

[0035] The above is only an embodiment of the utility model, and the common sense such as the known specific structure and characteristics in the scheme is not described too much here. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and the utility model can be implemented in other specific forms without departing from the spirit or basic features of the utility model. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the utility model. Any figure mark in the claims should not be regarded as limiting the claims involved.

Claims

1. A dry-type box-type substation foundation on water, comprising a prefabricated structure (1) and a drainage mechanism (2), characterized in that: The prefabricated structure (1) comprises a prefabricated column (101), a prefabricated beam (102), a prefabricated board (103) and a prefabricated guardrail (104); the prefabricated beam (102) is arranged above the prefabricated column (101); the prefabricated board (103) is arranged above the prefabricated beam (102); the upper surface of the prefabricated board (103) is sloped from the periphery to the middle; and the upper surface of the prefabricated board (103) is provided with a prefabricated guardrail (104).

2. The above-water dry box transformer foundation according to claim 1 is characterized by: The prefabricated column (101) is provided with a structural steel bar (105) inside, and the bottom end of the structural steel bar (105) is exposed on the lower surface of the prefabricated column (101).

3. The above-water dry box-type transformer foundation according to claim 1 is characterized by: A slot (107) is provided on the upper surface of the prefabricated column (101), the size of the slot (107) matches the size of the bottom end of the prefabricated column (101), a grouting sleeve (108) is provided inside the slot (107), and the grouting sleeve (108) is clamped with the bottom end of the structural steel bar (105).

4. The above-water dry box-type transformer foundation according to claim 1 is characterized by: The outer surface of the prefabricated column (101) is provided with a grouting hole (109), and the grouting hole (109) is arranged outside the grouting sleeve (108).

5. The above-water dry-type box-type transformer foundation according to claim 1 is characterized by: The upper surface of the precast beam (102) is symmetrically provided with fixing columns (106) along the central axis of the long side, and the fixing columns (106) on the upper surface of the precast beam (102) are plug-connected with the precast plate (103). The lower surface of the precast beam (102) is provided with structural steel bars (105), and the structural steel bars (105) on the lower surface of the precast beam (102) are snap-connected with the grouting sleeve (108).

6. The above-water dry-type box-type transformer foundation according to claim 1 is characterized by: The prefabricated beam (102) is formed by splicing two types of components: cross-shaped and L-shaped.

7. The above-water dry-type box-type transformer foundation according to claim 1 is characterized by: A water leakage hole (201) is arranged at the center of the upper surface of the prefabricated plate (103), a drainage pipe (202) is arranged below the water leakage hole (201), a water pump (203) is arranged on one side of the water leakage hole (201), and the water pump (203) is threadedly connected to the side of the drainage pipe (202).

8. The above-water dry-type box-type transformer foundation according to claim 7 is characterized by: A partition (204) is provided between the water pump (203) and the drainage pipe (202), and the partition (204) is connected to the drainage pipe (202) via a rotating shaft (205).

9. The above-water dry-type box-type transformer foundation according to claim 1, characterized in that: A water level sensor (206) is provided at the bottom end of the surface of the prefabricated guardrail (104).