Prefabricated assembly type pedestrian road plate structure in circular jacking pipe
Through the prefabricated assembled walkway board structure, high-density polyethylene material and wedge-shaped rubber strips and other components, the problems of long construction time and high cost in the top pipe are solved, and the construction simplicity, high safety and cost-effectiveness are improved.
Patent Information
- Application Number
- CN202323479232.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2033-12-20
AI Technical Summary
In the construction of urban underground comprehensive pipeline corridors, the existing pipe top construction methods have problems such as long construction time, high labor costs, inconvenient operation and maintenance and large costs, especially because water accumulation is prone to the bottom of the circular pipe and later operation and maintenance personnel are prone to later operation and maintenance. It is inconvenient to walk, and the existing paving layer method requires artificial concrete pouring and drainage ditches forming, which affects construction efficiency and safety.
Adopt prefabricated walkway board structure, including high-density polyethylene walkway board, beef legs, wedge rubber strips, water seepage spring steel pipes and HDPE gaskets. The wedge rubber strips are tightly attached to the top pipe wall, beef legs and drainage plates Fixed connection and seepage spring steel pipe drainage design simplifies the construction process and reduces labor intensity.
It achieves convenient construction and suitable for multiple inner diameter top pipes, shortens the construction cycle, reduces costs, and effectively avoids water accumulation through multiple drainage designs, improving construction safety and cleanliness.
Smart Images

Figure CN222083242U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of municipal equipment and relates to a prefabricated assembled pedestrian walkway plate structure in a circular top pipe. Background Art
[0002] With the rapid development of urban construction and renewal in my country and the research and development and application of many new technologies, the utilization of urban underground space has been increasingly favored by planners and designers, and the construction method is becoming increasingly perfect in the direction of "fast, stable, quiet and precise". Taking this as an opportunity, the construction of urban underground comprehensive pipe corridors has sprung up everywhere. As a non-excavation construction technology, the pipe jacking method has the advantages of fast construction speed, less impact on the natural environment, no interruption of traffic, less surrounding settlement, and low construction noise in the construction of comprehensive pipe corridors. Therefore, it is widely used in various long and short distance comprehensive pipe corridors. At present, the most widely used in pipe jacking construction is reinforced concrete circular pipe segment. This type of pipe segment is prefabricated in the factory. After being transported to the construction site, the pipe jacking machine is used to nest the pipe segments one by one and push them into place according to the designed horizontal and vertical curves. Since the bottom of the circular pipe jacking is a circular curved surface, it is easy to accumulate water and it is inconvenient for the later operation and maintenance personnel to walk. Therefore, after the pipe jacking is in place, a pavement layer of a certain width will be applied to the bottom of the pipe jacking, and drainage ditches will be set on both sides. At present, there are two main methods for paving: ① Plain concrete cast-in-place walkway. Although this method is easy to operate, due to the limited space in the top pipe, the concrete mixture needs to be transported into the top pipe for pouring manually, and other ancillary facilities must not be installed during the concrete curing period. It is time-consuming and labor-intensive, has high labor protection requirements, is costly, and is not conducive to rapid construction; ② Prefabricated reinforced concrete walkway slabs: Although this method can prefabricate walkway slabs on the ground in advance, it is necessary to manually move the walkway slabs into the top pipe and stack them in place, and the drainage ditches on both sides still need to be cast in place with concrete, which has a high labor cost. Summary of the invention
[0003] In view of the above-mentioned problems, the utility model provides a prefabricated assembled pedestrian walkway plate structure in a circular jacking pipe. The walkway plate structure has a simple structure, is lightweight and high-strength, is easy to construct, is suitable for jacking pipes of various inner diameters, can effectively shorten the construction period, and reduce costs.
[0004] According to the technical solution of the utility model: a prefabricated assembled pedestrian walkway plate structure in a circular top pipe, supported and arranged in the top pipe, characterized in that: it comprises a plurality of walkway plates, the walkway plates are supported in the top pipe, and the bottoms of the two supporting legs of the walkway plates are respectively provided with wedge-shaped rubber strips;
[0005] The two sides of the walkway board are respectively provided with brackets, the brackets are fixedly connected to the drainage board, the drainage board is provided with a drainage groove on one side close to the walkway board, and the other side of the drainage board is attached to the inner wall of the top pipe;
[0006] A water-permeable spring steel pipe is respectively placed on the outer sides of the supporting legs of the walkway plate.
[0007] As a further improvement of the utility model, the drain plate includes a front drain plate and a rear drain plate, the connection end of the front drain plate constructs a lower overlap portion, the connection end of the rear drain plate constructs an upper overlap portion, the upper overlap portion is fitted with the lower overlap portion, and a gasket is arranged at the connection where the upper overlap portion and the lower overlap portion are fitted with each other, the upper overlap portion, the lower overlap portion and the gasket are fastened to the corbel by self-tapping screws.
[0008] As a further improvement of the utility model, the wedge-shaped rubber strip is in close contact with the wall of the top pipe.
[0009] As a further improvement of the present invention, the inner side surface of the wedge-shaped rubber strip is configured as a concave arc.
[0010] The technical effect of the utility model is that the prefabricated assembled pedestrian walkway slab structure of the utility model is composed of high-density polyethylene (HDPE) walkway slab, bracket, high-density polyethylene (HDPE) drainage board, wedge-shaped rubber strip, seepage spring steel pipe, HDPE gasket and self-tapping screws. HDPE material has the advantages of good wear resistance, high chemical corrosion resistance, good insulation, high rigidity and toughness, easy processing and molding; light weight and high strength, convenient construction, suitable for jacking pipes of various inner diameters, which can effectively shorten the construction period and reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the use state of the utility model.
[0012] Figure 2 It is an explosion diagram of the utility model.
[0013] Figure 3 It is a schematic diagram of the connection between the walkway board and the drainage board in the utility model.
[0014] Figure 4 Schematic diagram of the splicing of two connected walkway boards and drainage boards. DETAILED DESCRIPTION
[0015] The specific implementation of the utility model is further described below in conjunction with the accompanying drawings.
[0016] Figures 1 to 4 It includes a walkway plate 1, a corbel 2, a drainage plate 3, a rear drainage plate 31, an upper overlapping portion 31-1, a front drainage plate 32, a lower overlapping portion 32-1, a wedge-shaped rubber strip 4, a water-seepage spring steel pipe 5, a gasket 6, etc.
[0017] like Figures 1 to 4As shown, the utility model is a prefabricated assembled pedestrian walkway plate structure in a circular top pipe, which is supported and arranged in the top pipe, including multiple walkway plates 1, and the walkway plates 1 are supported in the top pipe. The bottoms of the two supporting legs of the walkway plates 1 are respectively matched with wedge-shaped rubber strips 4.
[0018] Corbels 2 are respectively arranged on both sides of the walkway board 1, and the corbels 2 are fixedly connected to the drainage board 3. A drainage groove is arranged on one side of the drainage board 3 close to the walkway board 1, and the other side of the drainage board 3 is attached to the inner wall of the top pipe.
[0019] A water-permeable spring steel pipe 5 is placed on the outer side of the supporting legs of the walkway plate 1.
[0020] The drain plate 3 includes a front drain plate 32 and a rear drain plate 31. The connection end of the front drain plate 32 is configured with a lower overlap portion 32-1, and the connection end of the rear drain plate 31 is configured with an upper overlap portion 31-1. The upper overlap portion 31-1 fits with the lower overlap portion 32-1. After the upper overlap portion 31-1 and the lower overlap portion 32-1 are relatively connected, the front and rear drain plates 3 can be tightly connected to each other to ensure that there is no water leakage during use. A gasket 6 is provided at the connection where the upper overlap portion 31-1 and the lower overlap portion 32-1 fit each other. The upper overlap portion 31-1, the lower overlap portion 32-1 and the gasket 6 are fastened to the corbel 2 by self-tapping screws 7. It can be understood that the outer end of the drain plate 3 is configured as an inclined surface, and the outer end inclined surface of the drain plate 3 can be effectively pressed against the inner wall of the top pipe. In order to ensure that the front and rear drain boards 3 are reliably connected, two self-tapping screws 7 are used to fix the upper overlapping portion 31 - 1 and the lower overlapping portion 32 - 1 , the gasket 6 and the corbel 2 .
[0021] The wedge-shaped rubber strip 4 is in close contact with the wall of the top pipe.
[0022] The inner side surface of the wedge-shaped rubber strip 4 is configured as an inwardly concave arc, and the bottom surface of the wedge-shaped rubber strip 4 can be effectively and closely attached to the pipe wall of the top pipe.
[0023] like Figures 1 to 4 As shown, during the production of the utility model: after the pipe sections of the jacking pipe are pushed into place and the cable brackets, lighting and other facilities are installed, the workers will move the above components into the jacking pipe. Each walkway board 1 is 1.5m long and can be moved by only one worker. Install the first walkway board 1 from one end of the jacking pipe. Before installation, securely stick the wedge-shaped rubber strip 4 to the bottom of the support leg of the walkway board 1, and then put the walkway board 1 in place and ensure that the wedge-shaped rubber strip 4 is in close contact with the wall of the jacking pipe (to prevent some seepage water from flowing into the lowest point of the section), and place seepage spring steel pipes 5 on both sides of the walkway board (the seepage spring steel pipes should be kept as unbroken as possible, and the ends should extend into the water collection well). Drainage boards 3 are placed on the bull legs on both sides. It is worth noting that the two ends of the drainage board 3 are spliced, such as Figure 4As shown, the connection end of the front drain board 32 is constructed with a lower overlap 32-1, and the connection end of the rear drain board 31 is constructed with an upper overlap 31-1, so as to facilitate firm and tight assembly. After the front and rear drain boards 3 are spliced, they are pressed with gaskets 6 at the joints, and two self-tapping screws 7 are used to firmly connect the two adjacent walkway boards 1 and drain boards 3. Repeat the above steps until the walkway boards 1 and drain boards 3 in the top pipe are laid. All components of the structure can be pre-processed and formed in the factory, and can be directly installed after arriving at the site. No machinery is required for transportation in the top pipe, and it can be moved manually; the structure is easy to install, lightweight and high-strength, uses fewer accessories, and has a high cleanliness of the construction site, which is conducive to labor safety protection and embodies the concept of green construction; the structure adopts multi-channel drainage, that is, drainage on the surface of the drainage board and water collection at the bottom of the seepage spring steel pipe, to avoid water accumulation as much as possible. The prefabricated walkway slab structure has a high prefabrication and assembly rate, stable and controllable quality, a wide range of applications, and can be mass-produced. If it can be promoted, it can effectively reduce construction costs.
[0024] The above is only a preferred specific implementation method of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed by the utility model according to the technical solution and improved ideas of the utility model, which should be included in the protection scope of the utility model.
Claims
1. A prefabricated pedestrian walkway slab structure in a circular top pipe, supported and arranged in the top pipe, characterized in that: It comprises a plurality of walkway plates (1), wherein the walkway plates (1) are supported in a top pipe, and the bottoms of two supporting legs of the walkway plates (1) are respectively provided with wedge-shaped rubber strips (4); The two sides of the walkway plate (1) are respectively provided with brackets (2), the brackets (2) are fixedly connected to the drainage plate (3), a drainage groove is provided on one side of the drainage plate (3) close to the walkway plate (1), and the other side of the drainage plate (3) is in contact with the inner wall of the top pipe; A water-permeable spring steel pipe (5) is placed on the outer side of each supporting leg of the walkway plate (1).
2. The circular pipe-top prefabricated pedestrian walkway slab structure according to claim 1, characterized in that: The drain plate (3) comprises a front drain plate (32) and a rear drain plate (31); the connection end of the front drain plate (32) is formed with a lower overlap portion (32-1); the connection end of the rear drain plate (31) is formed with an upper overlap portion (31-1); the upper overlap portion (31-1) is fitted with the lower overlap portion (32-1); a gasket (6) is provided at a joint where the upper overlap portion (31-1) and the lower overlap portion (32-1) cooperate with each other; the upper overlap portion (31-1), the lower overlap portion (32-1) and the gasket (6) are fastened to the corbel (2) by self-tapping screws (7).
3. The circular top tube prefabricated pedestrian walkway slab structure according to claim 1, characterized in that: The wedge-shaped rubber strip (4) is in close contact with the wall of the top pipe.
4. The circular pipe-top prefabricated pedestrian walkway slab structure according to claim 1, characterized in that: The inner side surface of the wedge-shaped rubber strip (4) is configured as an inwardly concave arc.
