Telescopic channel steel scaffold installation basic part and slope scaffold thereof

Through the design of the retractable channel steel scaffolding installation foundation, the problem of poor stability of scaffolding on concrete inclined surface is solved, stable installation and efficient construction on slope surfaces are achieved, construction costs and time are reduced, and suitable for 15°~75° The slope surface provides reliable stability and convenience for multiple use.

CN222084004UActive Publication Date: 2024-11-29云南建投第四建设有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420071331.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2024-11-29
Estimated Expiration
2034-01-11

AI Technical Summary

Technical Problem

In construction, it is difficult for the existing technology to erect scaffolding on the concrete inclined surface, resulting in a small stress area and poor stability of the vertical pole foundation, which poses a major safety hazard. The construction process of secondary casting concrete foundation is complicated and time-consuming. Large volume, labor-consuming, not energy-saving and environmentally friendly.

Method used

Provide a retractable channel steel scaffolding installation foundation, including vertical sections, flat sections and slope connection sections. Angle adjustment and length adjustment are achieved through connecting bolts. It is suitable for various slope surfaces, simplifying the installation process of scaffolding and reducing the Construction preparation time, and factory processing and multiple use are achieved.

Benefits of technology

The device can stably install scaffolding on slopes between 15° and 75°, reducing construction costs and strength, improving construction quality and efficiency, avoiding the need for secondary pouring of concrete foundations, and achieving reliable and stable scaffolding and multiple times use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084004U_ABST
    Figure CN222084004U_ABST
Patent Text Reader

Abstract

The utility model discloses a telescopic channel steel scaffold mounting basic part and a slope scaffold thereof. The telescopic channel steel scaffold mounting basic part comprises a vertical section, a plane section and a slope connecting section. The upper end of the slope connecting section is connected with the first vertical section through a connecting bolt in an angle-adjustable manner; one end of the plane section is connected with the other end of the slope connecting section in an angle-adjustable manner through a connecting bolt; the vertical section is fixedly connected with a vertical surface at the upper part of the concrete slope; the plane section is fixedly connected with a horizontal plane at the lower part of the concrete slope; and the slope connecting section is fixedly connected with the concrete slope surface. The device has good adjustability, can meet the construction requirements of concrete slope external scaffolds with various lengths and gradients, and can be suitable for the slope gradient between 15 degrees and 75 degrees.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a telescopic channel steel scaffolding installation base member and a slope scaffolding thereof. Background Art

[0002] During the construction process, the stability of the scaffolding foundation is related to the safety of the construction process. At present, the stable and reliable erection of scaffolding on the concrete slope has always been a difficult problem to solve in the construction process. The existing pole foundation has a small force-bearing area and is set on the slope, which has poor stability and great safety hazards.

[0003] The problem of installing scaffolding on the inclined surface has not been solved. The current solution is to cast a 150×150×150mm concrete foundation at the installation position of the scaffolding pole on the concrete inclined surface before the construction. However, since it is difficult to accurately position on the inclined surface, in order to obtain a reliable flat secondary cast reinforced concrete foundation, the construction process is complicated, takes a long time, and the quality of concrete molding is difficult to control. After the external frame is removed in the later stage, the secondary cast concrete foundation needs to be manually removed, which is a large project, time-consuming, not energy-saving and environmentally friendly, and wastes a lot of time, manpower and material resources. Utility Model Content

[0004] In response to the above-mentioned technical problems, the present application provides a retractable channel steel scaffolding installation base member and a slope scaffolding thereof, the device is suitable for installing an adjustable scaffolding foundation on a slope, the device can adjust the length according to the slope surface, and adjust the installation angle according to the slope, which can effectively solve the installation problem of scaffolding uprights on the slope foundation, and can realize factory processing and turnover use, shortening the preparation time for construction, improving construction quality and efficiency.

[0005] The present application provides a retractable channel steel scaffold installation foundation, comprising: a vertical section, a plane section, and a slope connection section; the upper end of the slope connection section is connected to the first vertical section by a connecting bolt and can be disassembled and adjusted at an angle; one end of the plane section is connected to the other end of the slope connection section by a connecting bolt and can be disassembled and adjusted at an angle; the vertical section is fixedly connected to the vertical surface of the upper part of the concrete slope surface; the plane section is fixedly connected to the horizontal surface of the lower part of the concrete slope surface; the slope connection section is fixedly connected to the concrete slope surface;

[0006] At least two horizontal platforms are set at intervals on the slope connection section;

[0007] The horizontal platform is parallel to the ground; a mounting rod is inserted on the horizontal platform; the top end of the mounting rod is detachably connected to a mounting base at the bottom of the scaffolding.

[0008] Preferably, the slope connecting section includes: a first inclined channel steel, a second inclined channel steel, and a connecting adjustment channel steel; a plurality of length adjustment holes are arranged at intervals on the connecting adjustment channel steel; the first inclined channel steel is connected to the length adjustment hole at one end of the connecting adjustment channel steel by a connecting bolt; the second inclined channel steel is connected to the length adjustment hole at the other end of the connecting adjustment channel steel by a connecting bolt.

[0009] Preferably, the slope connection section includes: a first inclined channel steel, a first horizontal platform, and a first mounting rod; the first horizontal platform is detachably connected to the first inclined channel steel by connecting bolts; and the first mounting rod is fixedly inserted on the first horizontal platform.

[0010] Preferably, a mounting rod hole is provided on the bottom end of the first mounting rod; the first mounting rod is detachably connected to the first inclined channel steel via a connecting bolt.

[0011] Preferably, the slope connection section includes: a second inclined channel steel, a second horizontal platform, and a second mounting rod; the second horizontal platform is detachably connected to the second inclined channel steel via connecting bolts; and the second mounting rod is fixedly inserted on the second horizontal platform.

[0012] Preferably, a mounting rod hole is provided on the bottom end of the second mounting rod; the second mounting rod is detachably connected to the second inclined channel steel via a connecting bolt.

[0013] Preferably, the vertical section comprises: a first abutting channel steel; a plurality of first inclined surface mounting holes are arranged at intervals on the first abutting channel steel; and the first abutting channel steel is fixedly connected to the vertical surface by connecting bolts inserted into the first inclined surface mounting holes.

[0014] Preferably, a first adjusting connection hole is symmetrically provided at one end of the first abutting channel steel; and the first abutting channel steel is connected to the first inclined channel steel by a connecting bolt passing through the first adjusting connection hole of the connecting bolt.

[0015] Preferably, the plane section comprises: a second abutting channel steel; a plurality of second inclined surface mounting holes are arranged at intervals on the second abutting channel steel; and the second abutting channel steel is fixedly connected to the vertical surface by connecting bolts inserted into the second inclined surface mounting holes.

[0016] Another aspect of the present application provides a slope scaffolding, comprising: a scaffolding body, a plurality of retractable channel steel scaffolding mounting base components as described above; the plurality of retractable channel steel scaffolding mounting base components are installed side by side and at intervals on a concrete slope surface; and the mounting base at the bottom of the scaffolding body is installed on a horizontal platform of the retractable channel steel scaffolding mounting base components.

[0017] The beneficial effects of this application include:

[0018] 1) The retractable channel steel scaffolding installation base provided by the present application has good adjustability and can be adapted to the construction requirements of concrete slope external scaffolding of various lengths and slopes. The applicable slope is between 15° and 75°. The device can be prefabricated in the factory or processed on the construction site, which can effectively solve the problems of scaffolding on the slope foundation on the construction site. It is highly practical, easy to install and dismantle, and has strong versatility. There is no need to cast the plane twice and dismantle the plane, which reduces the construction intensity and cost, and the adjustable plane can effectively improve the construction quality.

[0019] 2) The slope scaffolding provided in the present application is installed on a plurality of retractable channel steel scaffolding installation base members arranged side by side and at intervals. The scaffolding can be installed on a concrete slope to obtain a reliable and stable horizontal platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the side view structure of the retractable channel steel scaffolding installation base provided for this application;

[0021] Figure 2 A schematic diagram of the main structure of the retractable channel steel scaffolding installation foundation provided for this application;

[0022] Figure 3 A schematic diagram of a three-dimensional effect of the device in use provided by this application;

[0023] Figure 4 for Figure 3 A schematic diagram of a partially enlarged three-dimensional structure;

[0024] Legend:

[0025] The first abutting channel steel 1, the connecting bolt 11, the first inclined mounting hole 112, the first adjusting connecting hole 113, the second adjusting connecting hole 114, the first inclined channel steel 2, the first mounting rod 21, the first horizontal platform 22, the first adjustment hole group 23, the platform hole 221, the mounting rod hole 211, the second inclined channel steel 4, the second mounting rod 41, the second horizontal platform 42, the second adjustment hole group 43, the connecting adjustment channel steel 3, the length adjustment hole 31, the second abutting channel steel 5, and the second inclined mounting hole 51. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0027] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.

[0028] The technical means that are not described in detail in this application and are not used to solve the technical problems of this application are all set according to the common knowledge in the field, and can be implemented in a variety of common knowledge settings.

[0029] See also Figures 1 to 4 The retractable channel steel scaffolding installation foundation provided by the present application includes: a first abutting channel steel 1, a first inclined channel steel 2, a second inclined channel steel 4, and a second abutting channel steel 5; the first abutting channel steel 1, the first inclined channel steel 2, the second inclined channel steel 4, and the second abutting channel steel 5 are sequentially matched through bolts and screw holes to achieve angle adjustment and disassembly connection. After installation, the first abutting channel steel 1 abuts against the outer wall of the vertical surface at the upper part of the concrete slope, and the vertical surface is perpendicular to the ground; the first inclined channel steel 2 and the second inclined channel steel 4 are connected by adjusting the extension length through the connection adjustment channel steel 3; the first inclined channel steel 2, the second inclined channel steel 4, and the connection adjustment channel steel 3 after connection abut against the concrete slope. After the second abutting channel steel 5 is connected to one end of the second inclined channel steel 4, after adjusting the angle through the connection bolt 11, the bottom surface of the second abutting channel steel 5 abuts against the ground connected to the lower part of the concrete slope.

[0030] The first inclined channel steel 2 and the second inclined channel steel 4 are respectively installed with a first horizontal platform 22 and a second horizontal platform 42 with adjustable positions; the first horizontal platform 22 is inserted with a first mounting rod 21, which is arranged vertically on the ground, and the top end of the first mounting rod 21 is detachably connected to the bottom mounting rod of the scaffolding.

[0031] The second mounting rod 41 is inserted on the second horizontal platform 42, and the second mounting rod 41 is set vertically on the ground. The top of the second mounting rod 41 is detachably connected to the mounting rod at the bottom of the scaffold. When in use, multiple devices can be installed at intervals on the concrete slope to provide multiple reliable installation support points for the scaffold, improve the stability of use, and use the first abutting channel steel 1, the first inclined channel steel 2, the second inclined channel steel 4, and the second abutting channel steel 5 to obtain plane support. The use of this device does not require the installation of secondary plane cement on the existing concrete slope, which reduces the difficulty of construction and improves the construction efficiency. Moreover, the device can be disassembled and used repeatedly, which reduces the construction investment.

[0032] The device is manufactured and processed by the manufacturer according to the model specifications (it can also be processed on the construction site) to achieve factory production. The specific size of the channel steel processing can be determined based on the length and slope of the inclined surface measured on site. The length of the inclined surface is determined by adjusting the connection position of the first inclined channel steel 2, the second inclined channel steel 4 and the connecting adjustment channel steel 3 according to the slope length of the inclined surface, and then assembled on a flat ground.

[0033] 1) Connect the first inclined channel steel 2, the connecting and adjusting channel steel 3, and the second inclined channel steel 4 through the connecting bolts 11, and one end of the first inclined channel steel 2 and the second inclined channel steel 4 are respectively detachably connected with the two ends of the connecting and adjusting channel steel 3, and the position of the telescopic hole on the connecting and adjusting channel steel 3 is adjusted by the inclined length; connect the first inclined channel steel 2, the connecting and adjusting channel steel 3, and the second inclined channel steel 4 through the connecting bolts 11, and in the subsequent operation steps, the formed inclined surface segment is fixedly installed on the concrete inclined surface;

[0034] 2) Using the connecting bolts 11 to disassemble the upper end of the first inclined channel steel 2 and the lower end of the first abutting channel steel 1;

[0035] 3) The first horizontal platform 22 is installed at a preset position of the first inclined channel steel 2 by means of the connecting bolts 11, the first mounting rod 21 is fixedly arranged on the first horizontal platform 22, the first end of the first mounting rod 21 extends out of the first horizontal platform 22 and is connected to the mounting base of the scaffold; a mounting rod hole 211 is arranged on the second end of the first horizontal platform 22, the connecting bolts 11 are passed through the mounting rod hole 211, and the two ends are installed on the first inclined channel steel 2 to fix the positions of the first mounting rod 21 and the first horizontal platform 22 on the first inclined channel steel 2;

[0036] 4) The second mounting rod 41 and the second horizontal platform 42 on the second inclined channel steel 4 are arranged in the same manner as in step 3);

[0037] 5) Install the assembled components as a whole to the position of the scaffolding positioning line on the slope; insert the connecting bolt 11 into the length adjustment hole 31 opened on the connecting adjustment channel steel 3, and the connecting bolt 11 passes through the connecting adjustment channel steel 3, the first inclined channel steel 2 or the second inclined channel steel 4 at the same time to fix the inclined surface section at the installation position; open a second inclined surface installation hole 51 on the bottom surface of the second abutting channel steel 5, and the connecting bolt 11 passes through the second inclined surface installation hole 51 to fix the second abutting channel steel 5 on the concrete horizontal ground;

[0038] 6) The length can be fine-tuned through the connecting bolt 11 in the length adjustment hole 31, and the mounting nuts of the first horizontal platform 22 and the second horizontal platform 42 can be adjusted to keep the first horizontal platform 22 and the second horizontal platform 42 level with the ground.

[0039] 7) Then the first abutting channel steel 1 is abutted against and fixedly installed on the vertical surface of the upper part of the concrete slope by connecting bolts 11; the second abutting channel steel 5 is abutted against and fixedly installed by connecting bolts 11 inserted into the second slope mounting hole 51. At this point, the installation of the entire retractable channel steel scaffolding foundation is completed.

[0040] In a specific embodiment, the first adjustment hole group 23 is symmetrically arranged on both side walls of the first inclined channel steel 2; the connecting bolt 11 is inserted into the platform hole 221 of the first horizontal platform 22 and the first adjustment hole group 23 to fix the position of the first horizontal platform 22 relative to the first inclined channel steel 2.

[0041] The first adjustment hole group 23 includes: a plurality of holes spaced apart from each other and arranged on one side of the first inclined channel steel 2 , so as to facilitate movement of the setting position of the first horizontal platform 22 on the first inclined channel steel 2 .

[0042] In a specific embodiment, second adjustment hole groups 43 are symmetrically arranged on both side walls of the second inclined channel steel 4 ; connecting bolts 11 are inserted into the platform holes 221 of the second horizontal platform 42 and the second adjustment hole groups 43 to fix the position of the second horizontal platform 42 relative to the first inclined channel steel 2 .

[0043] The second adjustment hole group 43 includes: a plurality of holes spaced apart from each other and arranged on one side of the second inclined channel steel 4 , so as to facilitate movement of the second horizontal platform 42 on the first inclined channel steel 2 .

[0044] In a specific embodiment, an adjustment connection hole 113 is provided on the connection end of the first abutting channel steel 1; a second adjustment connection hole 114 is provided on the connection end of the first inclined channel steel 2; the first adjustment connection hole 113 and the second adjustment connection hole 114 are aligned and disassembled and connected through the connecting bolt 11, so as to facilitate the adjustment of the installation angle. The connection method of the second inclined channel steel 4 and the second abutting channel steel 5 is the same, and will not be repeated here.

[0045] See also Figures 3-4 Another aspect of the present application provides a slope scaffolding, comprising: a plurality of the above-mentioned foundation members arranged at intervals on a concrete slope surface, and a scaffolding bottom mounting seat mounted on the first mounting rod 21 and the second mounting rod 41 of the above-mentioned foundation members to obtain a horizontal plane. The installation is reliable and stable, the construction is convenient, and the scaffolding can be disassembled and reused without on-site construction.

[0046] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A retractable channel steel scaffolding installation base, characterized in that: include: Vertical section, plane section, slope connection section; the upper end of the slope connection section is connected to the first vertical section by connecting bolts with adjustable disassembly angle; one end of the plane section is connected to the other end of the slope connection section by connecting bolts with adjustable disassembly angle; the vertical section is fixedly connected to the vertical surface at the upper part of the concrete slope surface; the plane section is fixedly connected to the horizontal surface at the lower part of the concrete slope surface; the slope connection section is fixedly connected to the concrete slope surface; At least two horizontal platforms are set at intervals on the slope connection section; The horizontal platform is parallel to the ground; a mounting rod is inserted on the horizontal platform; the top end of the mounting rod is detachably connected to a mounting base at the bottom of the scaffolding.

2. The telescopic channel steel scaffolding installation base member according to claim 1 is characterized in that: The slope connection section includes: a first inclined channel steel, a second inclined channel steel, and a connecting adjustment channel steel; a plurality of length adjustment holes are arranged at intervals on the connecting adjustment channel steel; the first inclined channel steel is connected to the length adjustment hole at one end of the connecting adjustment channel steel by a connecting bolt; the second inclined channel steel is connected to the length adjustment hole at the other end of the connecting adjustment channel steel by a connecting bolt.

3. The telescopic channel steel scaffolding installation base member according to claim 2 is characterized in that: The slope connection section includes: a first inclined channel steel, a first horizontal platform, and a first mounting rod; the first horizontal platform is detachably connected to the first inclined channel steel through connecting bolts; and the first mounting rod is fixedly inserted on the first horizontal platform.

4. The telescopic channel steel scaffolding installation base member according to claim 3 is characterized in that: A mounting rod hole is provided on the bottom end of the first mounting rod; the first mounting rod is detachably connected to the first inclined channel steel through a connecting bolt.

5. The telescopic channel steel scaffolding installation base member according to claim 1 is characterized in that: The slope connection section includes: a second inclined channel steel, a second horizontal platform, and a second mounting rod; the second horizontal platform is detachably connected to the second inclined channel steel through connecting bolts; and the second mounting rod is fixedly inserted on the second horizontal platform.

6. The telescopic channel steel scaffolding installation base member according to claim 5 is characterized in that: A mounting rod hole is provided on the bottom end of the second mounting rod; the second mounting rod is detachably connected to the second inclined channel steel through a connecting bolt.

7. The telescopic channel steel scaffolding installation base member according to claim 1, characterized in that: The vertical section comprises: a first abutting channel steel; a plurality of first inclined plane mounting holes are arranged at intervals on the first abutting channel steel; the first abutting channel steel is fixedly connected to the vertical plane by connecting bolts inserted in the first inclined plane mounting holes.

8. The telescopic channel steel scaffolding installation base member according to claim 7, characterized in that: One end of the first abutting channel steel is symmetrically provided with a first adjusting connection hole; the first abutting channel steel is connected to the first inclined channel steel by a connecting bolt which is penetrated through the first adjusting connection hole of the connecting bolt.

9. The telescopic channel steel scaffolding installation base member according to claim 1, characterized in that: The plane section comprises: a second abutting channel steel; a plurality of second inclined plane mounting holes are arranged at intervals on the second abutting channel steel; and the second abutting channel steel is fixedly connected to the vertical plane through connecting bolts inserted in the second inclined plane mounting holes.

10. A slope scaffolding, characterized in that: include: A scaffold body, a plurality of retractable channel steel scaffold mounting base members as described in any one of claims 1 to 9; A plurality of telescopic channel steel scaffolding installation foundation components are installed side by side and at intervals on a concrete slope surface; a mounting base at the bottom of a scaffolding body is installed on a horizontal platform of the telescopic channel steel scaffolding installation foundation components.