Test system for low-voltage shunt monitoring unit

By designing a test system integrating voltage and current boxes and test terminals, the problem of dispersion and cumbersome operation of the low-voltage branch monitoring unit test module is solved, rapid detection and efficient testing are achieved, and testing efficiency is improved.

CN222087834UActive Publication Date: 2024-11-29SHANDONG LUNENG SOFTWARE TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323642931.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-29
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The test modules of the medium and low voltage branch monitoring units in the prior art are scattered, and the functional test operation is complicated. The various functional tests for incoming wires require wiring of multiple interfaces, which cannot meet the various test requirements, and the test efficiency is not high.

Method used

A test system including voltage and current box, test box and test terminal is designed, integrating the low-voltage branch monitoring unit interface module, communication interface module, power input interface module and test switch module, and connecting the power input interface module to the low-voltage division through wires. The interface module of the circuit monitoring unit uses high-precision voltage and current sources and sensors to achieve one-click detection, simplifying the testing process.

Benefits of technology

It realizes quick plug-in and one-click detection of low-voltage branch monitoring units, reduces wire disassembly, wiring and handling processes, improves inspection efficiency, meets the testing needs of communication units, power modules and monitoring units, and saves working time .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222087834U_ABST
    Figure CN222087834U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of power grid test tools, and particularly relates to a test system for a low-voltage shunt monitoring unit, which comprises a voltage and current box, a test box and a test terminal. The test box comprises a test box main body, a main control board arranged in the test box main body and a test panel arranged on the test box main body; the test panel is provided with a low-voltage shunt monitoring unit interface module, a communication interface module, a power input interface module and a test switch module which are connected with the main control board; the voltage and current box is connected with the power input interface module of the test box. The other end of the power input interface module of the test box is connected with the low-voltage shunt monitoring unit interface module. The test box is connected with the test terminal through the communication interface module. According to the utility model, interfaces required by testing are integrated on the test box, so that rapid plug-in and one-button detection of the LTU can be realized; in this way, the sequence transfer among various function tests in the testing process is omitted, including repeated wire removal and wire connection, and the testing efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of power grid testing tooling, and in particular relates to a testing system for a low-voltage branch monitoring unit. Background Art

[0002] The statements in this section merely provide background technical information related to the present invention and do not necessarily constitute prior art.

[0003] The development and application of low-voltage terminal unit (LTU) has realized the rapid detection, rapid isolation and real-time data collection of distribution network faults, and achieved the observability and controllability of distribution network. For example, LTU can realize the "three remotes" (telemetry, telesignaling and teleadjustment) of distribution lines, and can accurately detect short-circuit faults, grounding faults, power outages, three-phase voltage, three-phase current, active power, reactive power, zero-sequence voltage, zero-sequence current, etc. of the lines, and can clearly see the operating status of the entire distribution line including trunk lines and branches, which is truly observable.

[0004] However, currently when testing and demonstrating the low-voltage branch monitoring unit LTU, the test modules are scattered, the functional test operation is cumbersome, and multiple interface wiring is required for various functional tests of the incoming lines, which cannot meet multiple test requirements and the test efficiency is low. Utility Model Content

[0005] In order to overcome the above-mentioned deficiencies of the prior art, the utility model provides a test system for a low-voltage shunt monitoring unit, which realizes rapid detection of the low-voltage shunt monitoring unit.

[0006] To achieve the above objectives, one or more embodiments of the present invention provide the following technical solutions:

[0007] The first aspect of the utility model provides a test system for a low voltage shunt monitoring unit, comprising: a voltage and current box, a test box and a test terminal;

[0008] The test box comprises a test box body, a main control board arranged in the test box body and a test panel arranged on the test box body;

[0009] The test panel is provided with a low-voltage branch monitoring unit interface module, a communication interface module, a power input interface module and a test switch module connected to the main control board;

[0010] The voltage and current box is connected to the power input interface module of the test box through a wire, and is used to provide various types of current sources and voltage sources during the test process; the other end of the power input interface module of the test box is connected to the low-voltage shunt monitoring unit interface module; the test box is connected to the test terminal through the communication interface module.

[0011] Further, the test panel includes a first test panel arranged on the upper surface of the test box body and a second test panel arranged on the side of the test box body;

[0012] The low-voltage shunt monitoring unit interface module and the test switch module are arranged on a first test panel, and the communication interface module and the power input interface module are arranged on a second test panel.

[0013] Furthermore, the first test panel is also provided with a power indicator light and a voltage display screen.

[0014] Furthermore, the first test panel is also provided with a low-voltage communication unit interface module and an intelligent power supply interface module, which are respectively used to connect the low-voltage communication unit to be tested and the intelligent power supply to be tested.

[0015] Furthermore, the test switch module includes a test function switch, a test loop switch and a remote signal loop button which are arranged in sequence from top to bottom on the test panel.

[0016] Furthermore, the test function switch includes a low-voltage communication unit interface power switch, a closing power switch, a module power switch, a load access switch, a CAN port conversion switch and an RS485 port conversion switch, which are arranged from left to right.

[0017] Furthermore, the voltage and current input interface includes: a UA interface, a UB interface, a UC interface, a UN interface and an AC line inlet.

[0018] Furthermore, the model of the main control board is a 32-bit ARM microcontroller of the GD32F103 series.

[0019] Furthermore, the test terminal is a PC-side human-computer interaction platform.

[0020] Furthermore, it also includes a handheld code scanning device that is communicatively connected to the test terminal.

[0021] One or more of the above technical solutions have the following beneficial effects:

[0022] (1) The utility model integrates the interfaces, switch arrays and other components required for testing into the test box, which enables quick plug-in and one-button detection of LTUs, eliminates the need to switch between various functional tests during the test process, including repeated wiring, wiring and transportation, and improves inspection efficiency.

[0023] (2) The utility model can meet the testing needs of LTU communication unit, power supply module and LTU monitoring unit. It uses high-precision voltage and current source and cooperates with high-precision sensor to realize one-key detection of analog quantity, remote signal quantity and communication of low-voltage branch monitoring unit. The testing process is simple, saving working time and improving work efficiency.

[0024] Advantages of additional aspects of the present invention will be partially given in the following description, and partially become apparent from the following description, or be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.

[0026] Figure 1 This is a structural diagram of a test system for a low-voltage shunt monitoring unit according to Example 1.

[0027] Figure 2 This is a schematic diagram of the structure of the test box of Example 1.

[0028] In the figure, 1. voltage and current box, 101 voltage and current source, 102 mutual inductor, 2. test box body, 3. main control board, 4. first test panel, 5. second test panel, 6. low voltage branch monitoring unit interface module, 7. intelligent power interface module, 8. low voltage communication unit interface module, 9. test function switch, 10. test loop switch, 11. remote signal loop button, 12. communication interface module, 13. voltage input interface module, 14. current input interface module, 15. AC power interface module, 16. power indicator light, 17. voltage display screen, 18. monitoring terminal, 19. handheld code scanning device. DETAILED DESCRIPTION

[0029] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0030] Embodiment 1

[0031] like Figure 1 , Figure 2 As shown, the utility model proposes a test system for a low-voltage branch monitoring unit, comprising: a voltage and current box 1, a test box and a test terminal 18;

[0032] The test box includes a test box body 2, a main control board 3 arranged in the test box body 2, and a test panel arranged on the test box body, and the test panel is provided with a low-voltage branch monitoring unit interface module connected to the main control board 3, a communication interface module, a power input interface module 10, and a test switch module;

[0033] The voltage and current box 1 is connected to the power input interface module 10 of the test box through a wire. One end of the power input interface module 10 is connected to a high-precision voltage and current source, and the other end is transferred to the low-voltage shunt monitoring unit interface module. The voltage and current box 1 is used to provide various types of current sources and voltage sources according to test needs during the test process. The low-voltage shunt monitoring unit LTU to be tested is connected to the test box through the low-voltage shunt monitoring unit interface module, and the voltage and current box and the test box are respectively connected through communication with the test terminal 18.

[0034] Furthermore, the test panel includes a first test panel 6 arranged on the upper surface of the test box body and a second test panel 7 arranged on the side of the test box body; the low-voltage branch monitoring unit interface module 8 and the test switch module are both arranged on the first test panel 6, and the communication interface module 12 and the power input interface module 10 are both arranged on the second test panel 7.

[0035] The low-voltage branch monitoring unit interface module 8 (TZ interface module) includes multiple groups of LTU quick-connect terminals, each group of LTU quick-connect terminals includes a network interface and a power port, which are respectively connected to the corresponding ports of the LTU to be tested. The LTU to be tested can be connected to the LTU quick-connect terminals on the test box panel in different combinations.

[0036] The low-voltage branch monitoring unit interface module 8 in the utility model includes six groups of LTU quick-connect terminals, so that a large number of LTUs to be tested can be tested at the same time, and time-sharing multiplexing testing can be realized for multiple LTUs to be tested, reducing test time, reducing time costs, and improving test efficiency.

[0037] The communication interface module 12 includes an RS485 interface and a CAN interface. The communication interface module 12 is used to realize communication between the LTU under test and the test terminal 18, so that the test terminal 18 can transmit the test signal corresponding to the test item to the LTU under test to test the LTU under test. At the same time, the fault signal, switch signal, etc. collected by the LTU under test are transmitted to the test terminal 18 for analysis to obtain the test result.

[0038] The power input interface module 10 includes a UA interface, a UB interface, a UC interface, a UN interface and an AC line inlet. The various interfaces of the power input interface module 10 are respectively used to connect to the corresponding interfaces on the voltage and current box 1, and the other end of the power input interface module 10 is transferred to the low-voltage branch monitoring unit interface module 8 to provide the voltage and current required for the test.

[0039] The test switches are connected to the corresponding interfaces through internal switching relays to realize the on and off of the corresponding circuits; the test switch module includes: a test function switch 9, a test circuit switch 10 and a remote signal circuit button 11 arranged in sequence from top to bottom on the first test panel 6;

[0040] The test function switch 9 includes, arranged from left to right: a low-voltage communication unit interface power switch (DZ power switch), a closing power switch, a module power switch, a load access switch, a CAN port conversion switch, and an RS485 port conversion switch;

[0041] The DZ power switch is used to control the on and off of the input power of the low-voltage communication unit interface module 6 (DZ test interface), the closing power switch is used to realize the opening and closing functions, and the module power switch is used to control the on and off of the input power of the corresponding module.

[0042] The load access switch is used to control the access or disconnection of the DZ test interface and the PZ test interface, wherein the low-voltage communication unit interface module 6 (DZ test interface) and the intelligent power interface module 7 (PZ test interface) are additional test interfaces of the test box, which can be selected as a combination of communication interfaces such as USB interfaces and power interfaces, and are respectively used to connect the low-voltage communication unit and the intelligent power module; the test box of the utility model can not only realize the test of the low-voltage shunt monitoring unit, but also realize the test of the low-voltage communication unit and the intelligent power module by integrating the DZ test interface and the PZ test interface.

[0043] The CAN port conversion switch and RS485 port conversion switch are both communication conversion switches of the test box. The CAN port conversion switch is used to realize the on-off of the PZ interface; the RS485 port conversion switch is used to realize the conversion and conduction of the low-voltage communication unit interface module (DZ interface) or the low-voltage branch monitoring unit interface module (TZ interface);

[0044] There are 6 test circuit switches 10 and 6 remote signal circuit buttons 11, which correspond to the LTU quick-connect terminals one by one, and are used to realize the remote control switch opening and closing function test. The test circuit switch is used to control the on and off of the corresponding LTU test circuit to realize the remote control test function, including the first test circuit switch, the second test circuit switch, the third test circuit switch, the fourth test circuit switch, the fifth test circuit switch and the sixth test circuit switch (TZ-1~TZ-6) arranged from left to right; the remote signal circuit button includes the first to sixth remote signal circuit buttons arranged from left to right, and the remote signal circuit button is used to control the on and off of the corresponding LTU test circuit to realize the establishment of the remote signal test channel.

[0045] The test box is connected to the test terminal 18 via the RS485 interface and is connected to the barcode quick entry handheld scanning device 19 via the serial port conversion module. The test terminal 18 is a PC-side human-computer interaction platform, which is used to load analog quantities of special conditions such as line faults, grounding, abnormalities, etc. on the LTU device to be tested, as well as the telesignaling, telemetry, and remote control information collected under normal operating conditions, to achieve testing and joint debugging of the LTU device to be tested; the barcode quick entry handheld scanning device is used to scan and enter information on the LTU and other devices to be tested during testing.

[0046] The power input interface module 10 is arranged from top to bottom in sequence: UA interface, UB interface, UC interface, UN interface and AC line inlet. The number of UA interface, UB interface, UC interface, UN interface and AC line inlet is six each, which are respectively connected to the corresponding LTU quick-connect terminals.

[0047] Furthermore, the second test panel 7 is also provided with an AC input interface 15, one end of which is used to connect to a 220 AC source, and the other end is connected to the test interface through an AC / DC conversion circuit; the first test panel 6 is also provided with a main power indicator light 16 and a voltage display screen 17; the main power indicator light and the voltage display screen are both connected to the main control board 3, and the model of the main control board 3 is a 32-bit ARM microcontroller of the GD32F103 series.

[0048] Furthermore, the voltage and current box 1 is used to provide the voltage and current signals required for the test. The high-precision voltage and current box 1 is connected to the test terminal 18 via Ethernet to achieve program control of the output voltage and current signals. A high-precision voltage and current source 101 and a voltage and current conversion module (high-precision transformer) are provided inside the voltage and current box 1. The voltage and current conversion module is a 250A / 50mA three-phase complete transformer 102. The high-precision voltage and current source is used to output the required standard voltage. Then, after the current output by the high-precision voltage and current source passes through the transformer, the required standard current is output on the secondary side of the transformer.

[0049] The working principle of the utility model is: plug the LTU to be tested into the functional test box of the low-voltage branch monitoring unit, power it on, connect it to the PC-side human-computer interaction platform, use a handheld code scanning device to enter the barcode of the product to be tested, and the system automatically starts various test items, such as telemetry, telesignaling, and topology. After the test is completed, records are automatically generated and saved, and a test report can be output.

[0050] Although the above describes the specific implementation methods of the utility model in combination with the accompanying drawings, it is not intended to limit the scope of protection of the utility model. Technical personnel in the relevant field should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the utility model.

Claims

1. A test system for a low voltage shunt monitoring unit, It is characterized in that include: Voltage and current boxes, test boxes and test terminals; The test box comprises a test box body, a main control board arranged in the test box body and a test panel arranged on the test box body; The test panel is provided with a low-voltage branch monitoring unit interface module, a communication interface module, a power input interface module and a test switch module connected to the main control board; The voltage and current box is connected to the power input interface module of the test box through a wire, and is used to provide various types of current sources and voltage sources during the test process; the other end of the power input interface module of the test box is connected to the low-voltage shunt monitoring unit interface module; The test box is connected to the test terminal via a communication interface module.

2. A test system for a low voltage shunt monitoring unit according to claim 1, It is characterized in that The test panel comprises a first test panel arranged on the upper surface of the test box body and a second test panel arranged on the side of the test box body; The low-voltage shunt monitoring unit interface module and the test switch module are arranged on a first test panel, and the communication interface module and the power input interface module are arranged on a second test panel.

3. A test system for a low voltage shunt monitoring unit according to claim 2, It is characterized in that The first test panel is also provided with a power indicator light and a voltage display screen.

4. A test system for a low voltage shunt monitoring unit according to claim 2, It is characterized in that The first test panel is also provided with a low-voltage communication unit interface module and an intelligent power supply interface module, which are respectively used to connect the low-voltage communication unit to be tested and the intelligent power supply to be tested.

5. A test system for a low voltage shunt monitoring unit according to claim 4, It is characterized in that The test switch module comprises a test function switch, a test loop switch and a remote signal loop button which are arranged in sequence from top to bottom on the test panel.

6. A test system for a low voltage shunt monitoring unit according to claim 5, It is characterized in that The test function switch includes a low-voltage communication unit interface power switch, a closing power switch, a module power switch, a load access switch, a CAN port conversion switch and an RS485 port conversion switch, which are arranged in sequence from left to right.

7. A test system for a low voltage shunt monitoring unit according to claim 1, It is characterized in that The voltage and current input interfaces include: a UA interface, a UB interface, a UC interface, a UN interface and an AC line inlet.

8. A test system for a low voltage shunt monitoring unit according to claim 1, It is characterized in that The model of the main control board is a 32-bit ARM single-chip microcomputer of the GD32F103 series.

9. A test system for a low voltage shunt monitoring unit according to claim 1, It is characterized in that The test terminal is a PC-side human-computer interaction platform.

10. A test system for a low voltage shunt monitoring unit according to claim 1, It is characterized in that It also includes a handheld code scanning device that is communicatively connected to the test terminal.