Modularized prefabricated pipeline of large refrigerating machine room
The modular prefabricated pipeline system addresses installation complexities by using elastic stabilization and transmission components for adjustable pipe fixation, improving efficiency and stability in large refrigeration rooms.
Patent Information
- Application Number
- CN202421399285.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-06-19
AI Technical Summary
Existing modular prefabricated piping systems for large refrigeration rooms face complications in installation due to the use of threaded rods and nuts, which are cumbersome for pipes of different diameters, affecting efficiency and maintenance.
A modular prefabricated pipeline system with a base frame, prefabricated mechanisms featuring elastic stabilization components and a transmission assembly, allowing for adjustable installation and stable fixation of pipes of varying diameters through a synchronous belt and threaded rods with adjustable springs.
Facilitates efficient installation, maintenance, and replacement of pipes with improved stability and adaptability to different diameters, enhancing construction efficiency and ease of operation.
Smart Images

Figure CN222095932U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of modular installation of refrigeration rooms, in particular to modular prefabricated pipelines in large refrigeration rooms. Background Art
[0002] Modular prefabricated piping for large refrigeration rooms is an efficient construction method. It divides the piping system into standardized modules, prefabricates them in the factory, and then transports them to the construction site for assembly. This method can greatly improve construction efficiency, reduce on-site processing and welding work, and reduce construction costs, while ensuring the quality and reliability of the piping system.
[0003] After searching, the patent document with publication number CN219259286U discloses modular prefabricated pipes for large refrigeration rooms, including pipes and a base for installing the pipes. The base is composed of multiple staggered square tubes. The front and rear sections of the base are fixed with angle steels, and clips are fixed on the angle steels. This new type of use can reduce the number of on-site construction procedures and increase construction efficiency.
[0004] The above prior art often has the following problems when used:
[0005] When the existing large-scale modular prefabricated pipes in the refrigeration room are used, the pipes are first fixed during the prefabrication process. The existing technology uses a plurality of threaded rods and nuts to fix the pipes. The operation is too complicated and it is not convenient to use for pipes of different diameters, which affects the processing efficiency and also affects the subsequent maintenance and replacement. Utility Model Content
[0006] In view of the deficiencies in the prior art, the utility model provides modular prefabricated pipelines for a large refrigeration room.
[0007] The embodiment of the utility model provides a modular prefabricated pipeline for a large refrigeration room, comprising:
[0008] A base frame, wherein two bottom plates are fixedly connected to the upper surface of the base frame;
[0009] Four prefabricated mechanisms, the four prefabricated mechanisms are equidistantly arranged between the upper surfaces of the two base plates, the prefabricated mechanisms include two prefabricated components, two elastic stabilization components and a transmission component, the prefabricated components include a fixed seat fixedly connected to the upper surface of the base plate, two support plates are fixedly connected to the upper surface of the base plate, a fixed plate is fixedly connected between the top ends of the two support plates, a threaded rod is rotatably connected to the upper surface of the fixed plate through a bearing, a nut is threadedly connected to the threaded rod, and two limit plates are fixedly connected to the side walls of the nut, the bottom surfaces of the two limit plates are fixedly connected to the limit rods, the two limit rods are both slidably connected to the bottom surface of the fixed plate, and a bearing plate is fixedly connected between the bottom ends of the two limit rods.
[0010] Furthermore, the elastic stabilization component includes an arc-shaped pressure plate arranged above the fixed seat, and two guide rods are fixedly connected to the upper surface of the arc-shaped pressure plate. The two guide rods are both slidably connected to the upper surface of the supporting plate, and two springs are fixedly connected between the supporting plate and the arc-shaped pressure plate, and the two springs are respectively sleeved on the two guide rods.
[0011] Furthermore, the transmission assembly includes a synchronous wheel circumferentially fixedly connected to the two threaded rods, and a synchronous belt is meshed between the two synchronous wheels.
[0012] Furthermore, a knob is fixedly connected to the top end of any threaded rod in each of the prefabricated mechanisms.
[0013] Furthermore, two hooks are fixedly provided on the upper surfaces of the two base plates, and the four hooks are respectively located at the four corners above the base frame.
[0014] Furthermore, in each of the elastic stabilizing components, a force-bearing rod is fixedly connected between the top ends of the two guide rods.
[0015] Compared with the prior art, the utility model has the following beneficial effects:
[0016] The utility model provides a prefabricated mechanism, which can realize convenient installation of pipelines. The convenient installation operation will improve the construction efficiency. The utility model is applicable to pipelines of different diameters and has strong applicability. At the same time, it also has good stability. The two prefabricated components in the prefabricated mechanism cooperate with each other to realize stable installation. The transmission component provided makes the installation operation more convenient, which is conducive to subsequent efficient inspection, repair and replacement. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of modular prefabricated pipelines in a large refrigeration room described in an embodiment of the utility model.
[0018] Figure 2It is a three-dimensional structural schematic diagram of the modular prefabricated pipelines of the large refrigeration room described in the embodiment of the utility model from another perspective.
[0019] Figure 3 It is a three-dimensional structural schematic diagram of the modular prefabricated pipelines of the large refrigeration room described in the embodiment of the utility model from another perspective.
[0020] Figure 4 for Figure 2 Enlarged view of point A in the middle.
[0021] In the above drawings: 1 base frame, 2 bottom plate, 3 fixed seat, 4 support plate, 5 fixed plate, 6 threaded rod, 7 nut, 8 limit plate, 9 limit rod, 10 bearing plate, 11 arc pressure plate, 12 guide rod, 13 spring, 14 synchronous wheel, 15 synchronous belt, 16 hook, 17 force rod. DETAILED DESCRIPTION
[0022] The technical solution of the present utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0023] like Figure 1-Figure 4 As shown, the embodiment of the utility model proposes a modular prefabricated pipeline for a large refrigeration room, including:
[0024] A base frame 1, two bottom plates 2 are fixedly connected to the upper surface of the base frame 1, four prefabricated mechanisms, and the four prefabricated mechanisms are equidistantly arranged between the upper surfaces of the two bottom plates 2. The prefabricated mechanism includes two prefabricated components, two elastic stabilizing components and a transmission component. The prefabricated component includes a fixed seat 3 fixedly connected to the upper surface of the bottom plate 2, two support plates 4 are fixedly connected to the upper surface of the bottom plate 2, a fixed plate 5 is fixedly connected between the tops of the two support plates 4, a threaded rod 6 is rotatably connected to the upper surface of the fixed plate 5 through a bearing, a nut 7 is threadedly connected to the threaded rod 6, and two limit plates are fixedly connected to the side wall of the nut 7 8. The bottom surfaces of the two limit plates 8 are fixedly connected with the limit rods 9, and the two limit rods 9 are slidably connected to the bottom surface of the fixed plate 5. A bearing plate 10 is fixedly connected between the bottom ends of the two limit rods 9. The transmission assembly includes a synchronous wheel 14 circumferentially fixedly connected to the two threaded rods 6, and a synchronous belt 15 is meshed between the two synchronous wheels 14. The top of any threaded rod 6 in each prefabricated mechanism is fixedly connected with a knob to facilitate the operation of the staff. Two hooks 16 are fixedly provided on the upper surfaces of the two bottom plates 2. The four hooks 16 are respectively located at the four corners above the base frame 1, and the edges are used for subsequent lifting operations;
[0025] The elastic stabilization component includes an arc-shaped pressure plate 11 arranged above the fixed seat 3, and two guide rods 12 are fixedly connected to the upper surface of the arc-shaped pressure plate 11. The two guide rods 12 are both slidably connected to the upper surface of the supporting plate 10. Two springs 13 are fixedly connected between the supporting plate 10 and the arc-shaped pressure plate 11. The two springs 13 are respectively sleeved on the two guide rods 12. In each elastic stabilization component, a force rod 17 is fixedly connected between the top ends of the two guide rods 12 to facilitate operation by the staff.
[0026] The detailed working process of the utility model is as follows:
[0027] When in use, when it is necessary to install the pipeline, taking a prefabricated mechanism as an example, the two force-bearing rods 17 are lifted upward to drive the arc-shaped pressure plate 11 to move, thereby increasing the distance between the arc-shaped pressure plate 11 and the fixing seat 3, and then the pipeline is inserted between the two arc-shaped pressure plates 11 and the fixing seat 3, and the force-bearing rods 17 are loosened. Under the action of multiple springs 13, the two arc-shaped pressure plates 11 always have a downward movement tendency under the action of the springs 13, and then cooperate with the fixing seat 3 to achieve fixed assembly of the pipeline between the two. If it is necessary to disassemble it later, it is also done by lifting the force-bearing rods 17 and then taking out the pipeline;
[0028] Before the above-mentioned fixed assembly of the pipeline, it is necessary to adjust the force that the spring 13 can generate according to the diameter of the pipeline. The threaded rod 6 is rotated by the knob. Under the transmission of the synchronous wheel 14 and the synchronous belt 15, the two threaded rods 6 rotate synchronously, and then under the limitation of multiple limit plates 8 and limit rods 9, the two nuts 7 will engage with the threaded rod 6, and then drive the bearing plate 10 up and down through the limit rod 9, thereby continuously compressing or stretching the spring 13, so that when the position of the arc pressure plate 11 remains unchanged, the elastic force it can provide is different, and it is adjusted according to the diameter of the pipeline to be assembled. When the diameter of the pipeline is large, the spring 13 is severely compressed, and the elastic force it can provide is large. When the diameter of the pipeline is small, it needs to be adjusted to make it compressed, so as to ensure the stability of the pipeline after assembly. After completing the above, the base frame 1 is hoisted by the hook, and then the overall installation is completed. The operation is convenient and the construction efficiency is improved.
[0029] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.
Claims
1. Modular prefabricated pipelines for large refrigeration rooms, characterized by: include: A base frame (1), wherein two bottom plates (2) are fixedly connected to the upper surface of the base frame (1); Four prefabricated mechanisms, the four prefabricated mechanisms are equidistantly arranged between the upper surfaces of the two base plates (2), the prefabricated mechanisms include two prefabricated components, two elastic stabilizing components and a transmission component, the prefabricated components include a fixing seat (3) fixedly connected to the upper surface of the base plate (2), the upper surface of the base plate (2) is fixedly connected to two support plates (4), a fixing plate (5) is fixedly connected between the top ends of the two support plates (4), the upper surface of the fixing plate (5) is rotatably connected to a threaded rod (6) through a bearing, a nut (7) is threadedly connected to the threaded rod (6), and two limit plates (8) are fixedly connected to the side walls of the nut (7), the bottom surfaces of the two limit plates (8) are fixedly connected to limit rods (9), the two limit rods (9) are both penetrated and slidably connected to the bottom surface of the fixing plate (5), and a bearing plate (10) is fixedly connected between the bottom ends of the two limit rods (9).
2. The modular prefabricated pipeline for large refrigeration room according to claim 1 is characterized in that: in: The elastic stabilizing component comprises an arc-shaped pressure plate (11) arranged above the fixing seat (3); the upper surface of the arc-shaped pressure plate (11) is fixedly connected to two guide rods (12); the two guide rods (12) are both slidably connected to the upper surface of the supporting plate (10); two springs (13) are fixedly connected between the supporting plate (10) and the arc-shaped pressure plate (11); the two springs (13) are respectively sleeved on the two guide rods (12).
3. The modular prefabricated pipeline for large refrigeration room according to claim 1 is characterized in that: in: The transmission assembly comprises a synchronous wheel (14) circumferentially fixedly connected to two threaded rods (6), and a synchronous belt (15) is meshed between the two synchronous wheels (14).
4. The modular prefabricated pipeline for a large refrigeration room according to claim 1 is characterized in that: in: The top end of any threaded rod (6) in each of the prefabricated mechanisms is fixedly connected with a knob.
5. The modular prefabricated pipeline for a large refrigeration room according to claim 1 is characterized in that: in: Two hooks (16) are fixedly provided on the upper surfaces of the two bottom plates (2), and the four hooks (16) are respectively located at the four corners above the base frame (1).
6. The modular prefabricated pipeline for a large refrigeration room according to claim 2 is characterized in that: in: In each of the elastic stabilizing components, a force-bearing rod (17) is fixedly connected between the top ends of the two guide rods (12).
