Beam pre-tensioning method tensioning reaction frame

The tensioning reaction frame with a novel bracket and beam configuration addresses the installation and recycling challenges of existing frames by enabling quick assembly and enhanced structural strength for pre-tensioned prestressed concrete beams.

CN222096512UActive Publication Date: 2024-12-03CCCC FOURTH HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420635677.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-12-03
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

Existing tensioning reaction frames for pre-tensioned prestressed concrete beams have numerous welding parts, leading to time-consuming installation and inconvenient recycling and disassembly.

Method used

A tensioning reaction frame design comprising a first and second bracket, a bottom and top beam frame, an arc-shaped beam frame, and corner brackets, with T-shaped connecting grooves, connecting pins, and positioning bolts for quick and convenient assembly, enhancing structural strength and stability.

Benefits of technology

The design facilitates rapid installation and improves structural strength while allowing for easier disassembly and recycling, ensuring the safety and quality of pre-tensioned prestressed concrete beams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222096512U_ABST
    Figure CN222096512U_ABST
Patent Text Reader

Abstract

The utility model discloses a beam pre-tensioning method tensioning reaction frame, which relates to the field of tensioning reaction frames and comprises a first support and a second support, a bottom beam frame is movably mounted on the bottom sides of the first support and the second support, and a top beam frame is movably mounted on the top sides of the first support and the second support. The same arc-shaped beam frame is movably installed between the first support and the second support, an auxiliary supporting beam frame is movably installed between the arc-shaped beam frame and the top beam frame, and corner supports are movably installed between the first support and the bottom beam frame and between the second support and the bottom beam frame respectively. The first support, the second support, the bottom beam frame and the top beam frame are combined and installed through the arc-shaped beam frame and the corner support, a triangular structure is formed through the corner support, the arc-shaped beam frame and the auxiliary supporting beam frame are used for forming the arc-shaped top beam, the structural strength of the tension reaction frame is effectively enhanced, and meanwhile the tension reaction frame is more stable and reliable due to the combination mode of clamping and bolts. Installation is convenient and fast.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tensioning reaction frames, in particular to a tensioning reaction frame using a beam pre-tensioning method. Background Art

[0002] The tensioning reaction frame of the pre-tensioning method is one of the main equipment in the production of pre-tensioned prestressed concrete beams. It bears all the reaction forces when the prestressed tendons are tensioned, and evenly transmits this reaction force to the pedestal, and then to the foundation by the pedestal. Therefore, the reaction frame must have sufficient rigidity, strength and stability to ensure the safety of the prestressed tendons during tensioning and to ensure the quality of the pre-tensioned prestressed concrete beams.

[0003] In the prior art, tensioning reaction frames are an important part of construction, but the existing tensioning reaction frames have many welding parts, which are time-consuming and laborious to install, and are not convenient for later recycling and disassembly. Therefore, a tensioning reaction frame using the beam pre-tensioning method is needed to meet people's needs. Utility Model Content

[0004] The utility model aims to provide a tensioning reaction frame for beam pre-tensioning method, so as to solve the problem that the tensioning reaction frame proposed in the above background technology is an important component of construction, but the existing tensioning reaction frame has many welding parts, the installation is time-consuming and laborious, and it is not convenient to recycle and disassemble later.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a beam pre-tensioning method tensioning reaction frame, comprising a first bracket and a second bracket, a bottom beam frame movably installed on the bottom side of the first bracket and the second bracket, a top beam frame movably installed on the top side of the first bracket and the second bracket, a same arc-shaped beam frame movably installed between the first bracket and the second bracket, an auxiliary support beam frame movably installed between the arc-shaped beam frame and the top beam frame, and corner brackets movably installed between the first bracket, the second bracket and the bottom beam frame respectively.

[0006] Preferably: the bottom beam and the top beam are both provided with T-shaped connecting grooves, a T-shaped connecting block is slidably installed in the T-shaped connecting groove, the T-shaped connecting block is fixedly installed on the corresponding first bracket and the second bracket, and positioning bolts are threadedly installed on the first bracket and the second bracket, and the positioning bolts are in contact with the T-shaped connecting block.

[0007] Preferably: the first bracket and the second bracket are both provided with connecting holes, connecting pins are inserted into the two connecting holes, and the two connecting pins are fixedly mounted on the arc-shaped beam frame.

[0008] Preferably: arc grooves are provided on the sides of the top beam and the arc beam that are close to each other, arc connecting blocks are movably installed in the two arc grooves, and the two arc connecting blocks are fixedly installed at both ends of the auxiliary support beam respectively.

[0009] Preferably: two limit rods are movably installed on the auxiliary support beam frame, and the two limit rods are in contact with the top beam frame and the arc beam frame. The two ends of the limit rods are threadedly installed with limit rod mounting bolts on the top beam frame and the arc beam frame respectively.

[0010] Preferably: positioning holes are provided on the first bracket and the bottom beam, positioning pins are movably installed in the positioning holes, and two positioning pins are respectively fixedly installed on the two ends of the corner brackets.

[0011] Preferably, fixing rings are fixedly installed at both ends of the corner brackets, and fixing bolts are threadedly installed between the two fixing rings and the corresponding first brackets and the bottom beam frame.

[0012] The beneficial effects of the utility model are:

[0013] In the utility model, an arc-shaped beam frame and corner brackets are installed in combination with a first bracket, a second bracket, a bottom beam frame, and a top beam frame. A triangular structure is formed by the corner brackets. An arc-shaped beam frame and an auxiliary supporting beam frame are used to form an arc-shaped top beam, which effectively enhances the structural strength of the tensioning reaction frame. At the same time, the combination of clips and bolts makes installation convenient and quick. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a three-dimensional structural schematic diagram of the tensioning reaction frame of the beam pre-tensioning method proposed by the utility model;

[0015] Figure 2 It is a side view structural schematic diagram of the tensioning reaction frame of the beam pre-tensioning method proposed by the utility model;

[0016] Figure 3 It is a front view structural schematic diagram of the tensioning reaction frame of the beam pre-tensioning method proposed by the utility model;

[0017] Figure 4 The utility model is a schematic diagram of the structure of the tensioning reaction frame of the beam pre-tensioning method proposed by the present invention when viewed from above.

[0018] In the figure: 100, first bracket; 101, second bracket; 102, T-shaped connecting groove; 103, T-shaped connecting block; 104, positioning bolt; 200, bottom beam; 201, top beam; 300, arc-shaped beam; 301, auxiliary support beam; 302, connecting hole; 303, connecting pin; 304, arc-shaped groove; 305, arc-shaped connecting block; 306, limit rod; 307, limit rod mounting bolt; 400, corner bracket; 401, positioning hole; 402, positioning pin; 403, fixing ring; 404, fixing bolt. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0020] Reference Figure 1-4 The tensioning reaction frame of the beam pre-tensioning method includes a first bracket 100 and a second bracket 101, wherein a bottom beam frame 200 is movably installed on the bottom side of the first bracket 100 and the second bracket 101, and a top beam frame 201 is movably installed on the top side of the first bracket 100 and the second bracket 101, and the same arc-shaped beam frame 300 is movably installed between the first bracket 100 and the second bracket 101, and an auxiliary support beam frame 301 is movably installed between the arc-shaped beam frame 300 and the top beam frame 201, and corner brackets 400 are movably installed between the first bracket 100, the second bracket 101 and the bottom beam frame 200, respectively. The arc-shaped beam frame and the corner brackets are installed in combination on the first bracket, the second bracket, the bottom beam frame and the top beam frame, and a triangular structure is formed by the corner brackets. The arc-shaped beam frame and the auxiliary support beam frame are used to form an arc top beam, which effectively enhances the structural strength of the tensioning reaction frame. At the same time, the combination of clamping and bolts is convenient and quick to install.

[0021] In an optional embodiment: the bottom beam 200 and the top beam 201 are both provided with a T-shaped connecting groove 102, a T-shaped connecting block 103 is slidably installed in the T-shaped connecting groove 102, the T-shaped connecting block 103 is fixedly installed on the corresponding first bracket 100 and the second bracket 101, and a positioning bolt 104 is threadedly installed on the first bracket 100 and the second bracket 101, the positioning bolt 104 is in contact with the T-shaped connecting block 103, and the T-shaped connecting groove 102 and the T-shaped connecting block 103 are combined for installation, and are positioned and fixed using the positioning bolt 104.

[0022] In an optional embodiment: a connecting hole 302 is provided on the first bracket 100 and the second bracket 101, and a connecting pin 303 is inserted into the two connecting holes 302. The two connecting pins 303 are fixedly installed on the arc-shaped beam frame 300. The arc-shaped beam frame 300 can be installed between the first bracket 100 and the second bracket 101 through the connecting holes 302 and the connecting pins 303. The arc-shaped structure has better buffering performance.

[0023] In an optional embodiment: an arc groove 304 is provided on the side where the top beam 201 and the arc beam 300 are close to each other, and an arc connecting block 305 is movably installed in the two arc grooves 304. The two arc connecting blocks 305 are respectively fixedly installed at the two ends of the auxiliary support beam 301, and the two ends of the auxiliary support beam 301 are clamped in the arc groove 304 through the arc connecting blocks 305, so that the arc connection can have a larger contact area.

[0024] In an optional embodiment: two limit rods 306 are movably installed on the auxiliary support beam frame 301, and the two limit rods 306 are in contact with the top beam frame 201 and the arc beam frame 300. The two ends of the limit rod 306 are respectively threadedly installed with limit rod mounting bolts 307 on the top beam frame 201 and the arc beam frame 300. The two auxiliary support beam frames 301 strengthen the supporting effect of the arc beam frame 300. The limit rods 306 are fixed to both sides of the auxiliary support beam frame 301 using the limit rod mounting bolts 307 to prevent the auxiliary support beam frame 301 from moving.

[0025] In an optional embodiment: a positioning hole 401 is formed on the first bracket 100 and the bottom beam 200, a positioning pin 402 is movably installed in the positioning hole 401, and two positioning pins 402 are respectively fixedly installed on the two ends of the corner bracket 400, and the two ends of the corner bracket 400 are combined and installed in the positioning holes 401 of the first bracket 100 and the second bracket 101 through the positioning pins 402.

[0026] In an optional embodiment: fixing rings 403 are fixedly installed at both ends of the corner bracket 400, and fixing bolts 404 are threadedly installed between the two fixing rings 403 and the corresponding first bracket 100 and the bottom beam 200. It should be noted that the fixing rings 403 and the fixing bolts 404 are used for positioning to avoid the corner bracket 400 from loosening.

[0027] Working principle of this utility model:

[0028] When using the device, the first bracket 100 and the second bracket 101 are installed on the bottom beam frame 200 and the top beam frame 201, and the T-shaped connecting groove 102 and the T-shaped connecting block 103 are used for combination installation, and the positioning bolts 104 are used for positioning and fixing. The arc beam frame 300 can be installed between the first bracket 100 and the second bracket 101 through the connecting hole 302 and the connecting pin 303. The arc structure has better buffering performance and can enhance the supporting effect when the pressure changes. The two auxiliary support beam frames 301 are used to enhance the supporting effect of the arc beam frame 300. The limit rod 306 is fixed on both sides of the auxiliary support beam frame 301 using the limit rod mounting bolts 307 to prevent the auxiliary support beam frame 301 from moving. The two ends of the auxiliary support beam frame 301 are clamped in the arc groove 304 through the arc connecting block 305. The arc connection can have a larger contact area. The two ends of the corner bracket 400 are installed in the positioning holes 401 of the first bracket 100 and the second bracket 101 through the positioning pin 402 combination. At the same time, the fixing ring 403 and the fixing bolt 404 are used for positioning to prevent the corner bracket 400 from loosening.

[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A beam pre-tensioning method tensioning reaction frame, comprising a first bracket (100) and a second bracket (101), characterized in that: A bottom beam frame (200) is movably installed on the bottom side of the first bracket (100) and the second bracket (101), a top beam frame (201) is movably installed on the top side of the first bracket (100) and the second bracket (101), a same arc-shaped beam frame (300) is movably installed between the first bracket (100) and the second bracket (101), an auxiliary support beam frame (301) is movably installed between the arc-shaped beam frame (300) and the top beam frame (201), and corner brackets (400) are movably installed between the first bracket (100), the second bracket (101) and the bottom beam frame (200), respectively.

2. The beam pre-tensioning tensioning reaction frame according to claim 1 is characterized in that: The bottom beam frame (200) and the top beam frame (201) are both provided with a T-shaped connection groove (102), a T-shaped connection block (103) is slidably installed in the T-shaped connection groove (102), the T-shaped connection block (103) is fixedly installed on the corresponding first bracket (100) and the second bracket (101), and positioning bolts (104) are threadedly installed on the first bracket (100) and the second bracket (101), and the positioning bolts (104) are in contact with the T-shaped connection block (103).

3. The beam pre-tensioning tensioning reaction frame according to claim 1 is characterized in that: The first bracket (100) and the second bracket (101) are both provided with connection holes (302), connection pins (303) are inserted into the two connection holes (302), and the two connection pins (303) are fixedly mounted on the arc-shaped beam frame (300).

4. The beam pre-tensioning tensioning reaction frame according to claim 1 is characterized in that: The top beam frame (201) and the arc-shaped beam frame (300) are both provided with an arc-shaped groove (304) on the side close to each other, and arc-shaped connecting blocks (305) are movably installed in the two arc-shaped grooves (304). The two arc-shaped connecting blocks (305) are respectively fixedly installed at the two ends of the auxiliary support beam frame (301).

5. The beam pre-tensioning tensioning reaction frame according to claim 1, characterized in that: Two limit rods (306) are movably mounted on the auxiliary support beam frame (301), and the two limit rods (306) are in contact with the top beam frame (201) and the arc beam frame (300). Limit rod mounting bolts (307) are respectively threadedly mounted on the two ends of the limit rod (306) and the top beam frame (201) and the arc beam frame (300).

6. The beam pre-tensioning tensioning reaction frame according to claim 1, characterized in that: The first bracket (100) and the bottom beam (200) are both provided with positioning holes (401), positioning pins (402) are movably installed in the positioning holes (401), and the two positioning pins (402) are respectively fixedly installed at the two ends of the corner bracket (400).

7. The beam pre-tensioning tensioning reaction frame according to claim 1 is characterized in that: Both ends of the corner bracket (400) are fixedly mounted with fixing rings (403), and fixing bolts (404) are threadedly mounted between the two fixing rings (403) and the corresponding first bracket (100) and the bottom beam frame (200).