Coking system

By directly exchanging heat with red hot coke by using the low-temperature flue gas after cooling in the waste heat boiler in the coking system, the problems of poor coke quality and low dry coke quenching efficiency in wet coke quenching are solved, and efficient dry coke quenching and waste heat recovery are achieved , improves coke quality and production efficiency.

CN222099862UActive Publication Date: 2024-12-03HUATAI YONGCHUANG (BEIJING) TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420288922.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-07
Publication Date
2024-12-03
Estimated Expiration
2034-02-07

AI Technical Summary

Technical Problem

In the existing coking process, wet coke quenching leads to high moisture content and poor quality of coke, while dry coke quenching has low heat exchange efficiency and long coke quenching time.

Method used

A coking system was designed, using the low-temperature flue gas after cooling of the waste heat boiler into the coking quenching unit through the connecting pipe, and directly contacted with the red hot coke to exchange heat, achieving an efficient dry coking process, avoiding the use of cooling water, and through Flue gas recycling improves waste heat recovery efficiency.

Benefits of technology

The quality and heat exchange efficiency of coke are improved, the moisture content is reduced, the coke quenching time is shortened, and the steam output of waste heat boiler is increased through flue gas recycling, improving production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222099862U_ABST
    Figure CN222099862U_ABST
Patent Text Reader

Abstract

The embodiment of the utility model provides a coking system which is characterized in that at a coking station, each coking box body covers a coal supporting base to form a coking unit; at the coke quenching station, each coke quenching box body covers a coal supporting base to form a coke quenching unit; the coking space and the quenching space are both communicated with a flue gas inlet of the flue; a flue gas outlet of the flue is communicated with an inlet of the waste heat boiler; the waste heat boiler is used for cooling flue gas entering the waste heat boiler; an outlet of the waste heat boiler is communicated with an inlet of the first gas driving device; a first smoke inlet of the connecting pipeline is communicated with an outlet of the first gas driving device; a first smoke outlet of the connecting pipeline is communicated with the smoke treatment device, and a second smoke outlet of the connecting pipeline is communicated with the quenching space of the quenching unit positioned at the quenching station; the connecting pipeline is provided with a first valve used for controlling opening and closing of the first smoke outlet and a second valve used for controlling opening and closing of the second smoke outlet. The coking system is high in heat exchange efficiency, and the waste heat recovery efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of coking, in particular to a coking system. Background Art

[0002] Coke quenching is an important step in the coking process. Coke quenching is to cool the refined red-hot coke to a temperature that is convenient for transportation and storage. In the mobile box-type briquette coking process, there are two ways to quench coke. One is wet quenching, which sprays cooling water directly onto the red-hot coke to cool the coke; the other is dry quenching, which uses cooling water pipes to circulate cooling water and indirectly exchange heat with the red-hot coke to cool the coke. The coke after wet quenching has a high moisture content, low M40, and high M10, and the coke quality is poor; dry quenching uses cooling water in the water-cooling pipe to indirectly cool the red-hot coke, with low heat exchange efficiency and long quenching time. Utility Model Content

[0003] The purpose of the embodiment of the utility model is to provide a coking system to improve the quality of coke and the heat exchange efficiency. The specific technical scheme is as follows:

[0004] The first embodiment of the present application proposes a coking system, which includes at least one coal supporting base, at least one coking box, at least one quenching box, a flue, a waste heat boiler, a first gas driving device, a connecting pipe and a flue gas treatment device. Specifically, the coking system is provided with at least one coking station and at least one quenching station; at the coking station, each of the coking box covers is arranged on one of the coal supporting bases to form a coking unit; the coking unit has a coking space for accommodating coal cakes and coke; at the quenching station, each of the quenching box covers is arranged on one of the coal supporting bases to form a quenching unit; the quenching unit has a quenching space for accommodating coke; the coking space of the coking unit located at the coking station and the quenching space of the quenching unit located at the quenching station are both connected to the flue gas inlet; the flue gas outlet is connected to the inlet of the waste heat boiler. The exhaust gas boiler is connected with a first smoke inlet, a first smoke outlet and at least one second smoke outlet; the first smoke inlet is connected with the outlet of the first gas driving device; the first smoke outlet is connected with the smoke treatment device; the second smoke outlet is connected with the quenching space of the quenching unit located at the quenching station; the connecting pipeline is provided with a first valve for controlling the opening and closing of the first smoke outlet, and a second valve for controlling the opening and closing of the second smoke outlet, and the second smoke outlet and the second valve are arranged in a one-to-one correspondence.

[0005] In some embodiments of the present application, the connecting pipeline includes: a main pipeline, a first branch pipeline and at least one second branch pipeline;

[0006] The first smoke inlet is arranged on the main pipeline;

[0007] The first branch pipe is connected to the main pipe, and the first smoke outlet and the first valve are arranged on the first branch pipe;

[0008] The second branch pipe is communicated with the main pipe, and the second smoke outlet and the second valve are arranged on the second branch pipe in a one-to-one correspondence.

[0009] In some embodiments of the present application, the main pipeline has a first parallel section and a second parallel section arranged in parallel, and the inlets of the first parallel section and the second parallel section are connected to each other, and the outlets are connected to each other;

[0010] The inlet of the first pipe is connected between the inlet of the first parallel section and the first smoke inlet; the inlet of the second pipe is connected to the outlet of the first parallel section;

[0011] The first parallel section is provided with a third valve for controlling its on and off;

[0012] A second gas driving device is provided on the second parallel section; the inlet of the second gas driving device is connected to the outlet of the first gas driving device, and the outlet of the second gas driving device is connected to the second smoke outlet;

[0013] When the pressure in the first pipeline is less than or equal to the first preset pressure, the second gas driving device is started and the third valve is closed; when the pressure in the first pipeline is greater than the first preset pressure, the second gas driving device is closed and the third valve is opened.

[0014] In some embodiments of the present application, the flue comprises: a main flue and at least two branch flues;

[0015] Each of the coking stations and each of the coke quenching stations is provided with at least one branch flue; the flue gas inlets are provided on the branch flues in a one-to-one correspondence; the outlets of the plurality of branch flues converge at the main flue; each of the branch flues is provided with a branch flue damper;

[0016] The smoke outlet is located on the main smoke duct; a main smoke duct damper is provided on the main smoke duct.

[0017] In some embodiments of the present application, a supplementary air port is provided on the main flue;

[0018] The supplementary air port is located between the main flue damper and the branch flue damper, and is used to supplement air into the main flue.

[0019] In some embodiments of the present application, the coal supporting base is used to place the coal cakes or the coke; the coal supporting base is provided with a smoke descending hole, and the smoke descending hole is used to connect the coking space of the coking unit located at the coking station with the flue, or to connect the coke quenching space of the coke quenching unit located at the coke quenching station with the flue.

[0020] In some embodiments of the present application, an air inlet is provided on the quenching box; the air inlet is used to connect the quenching space and the second smoke outlet of the connecting pipe.

[0021] In some embodiments of the present application, the quenching box comprises: a metal shell, a heat-insulating layer and a fire-resistant layer arranged in sequence from the outside to the inside;

[0022] The thermal insulation layer is arranged to cover the inner wall of the metal shell;

[0023] The refractory layer separates the thermal insulation layer from the coking space.

[0024] In some embodiments of the present application, the quenching box is provided with an exhaust port; the exhaust port is provided with an exhaust valve for controlling the opening and closing thereof; and the quenching space is provided with a pressure sensor;

[0025] When the indication of the pressure sensor reaches a second preset pressure, the exhaust valve opens.

[0026] In some embodiments of the present application, the coking system further comprises: a hoisting device;

[0027] The coking system is also provided with a temporary storage station;

[0028] The coal supporting base, the coking box and the coke quenching box are all provided with a lifting ear structure for cooperating with the lifting equipment;

[0029] The hoisting equipment is used to hoist the coal supporting base on which the coke is placed at the temporary storage station to the coking station, and to hoist the coking box and cover it on the coal supporting base on which the coke is placed, so as to form a coking unit;

[0030] The hoisting equipment is also used to hoist the coking unit that has completed coking to the quenching station; to hoist the coking box away from the quenching station; and to hoist the quenching box on the temporary storage station and cover it on the coal supporting base where the coke is placed, to form the quenching unit.

[0031] The second embodiment of the present application proposes a coking system, which includes at least one coal supporting base, at least one coking box, at least one quenching box, a flue, a waste heat boiler, a first gas driving device, a connecting pipe, a flue gas treatment device, a quenching gas outlet pipe and a movable quenching trolley. Specifically, the coking system is provided with at least one coking station and at least one quenching station; at the coking station, each of the coking box covers is arranged on one of the coal supporting bases to form a coking unit; the coking unit has a coking space for accommodating coal cakes and coke; the coking space of the coking unit located at the coking station is connected with the flue gas inlet; the flue gas outlet is connected with the inlet of the waste heat boiler; the waste heat boiler is used to cool the flue gas entering therein; the outlet of the waste heat boiler is connected with the inlet of the first gas driving device; the connecting pipe has a first smoke inlet, a first smoke outlet and at least one second smoke outlet; the first smoke inlet is connected with the outlet of the first gas driving device; the first smoke outlet is connected with the flue gas treatment device; the second smoke outlet is connected with the quenching device located at the quenching station The quenching space of the unit is connected; the connecting pipe is provided with a first valve for controlling the opening and closing of the first smoke outlet, and a second valve for controlling the opening and closing of the second smoke outlet, and the second smoke outlet and the second valve are arranged in a one-to-one correspondence; at the quenching station, a movable quenching trolley is provided, and each quenching box cover is arranged on a coal supporting base to form a quenching unit; the quenching unit is arranged on the movable quenching trolley; the quenching unit has a quenching space for accommodating coke; the quenching box is provided with an air inlet and an air outlet; the quenching air outlet pipe has a second smoke inlet and a third smoke outlet; the second smoke inlet is connected with the air outlet of the quenching unit; the third smoke outlet is connected with the inlet of the waste heat boiler through the flue; the quenching air outlet pipe is provided with a fifth valve for controlling the opening and closing of the third smoke outlet.

[0032] Beneficial effects:

[0033] In the coking system of the first embodiment of the present application, the high-temperature flue gas in the coking space of the coking unit located at the coking station and the high-temperature flue gas in the quenching space of the quenching unit located at the quenching station enter the flue through the flue gas inlet under the action of the first gas driving device, and then enter the waste heat boiler through the flue gas outlet. The waste heat boiler cools the flue gas entering therein so that the high-temperature flue gas becomes low-temperature flue gas. The low-temperature flue gas enters the first gas driving device from the outlet of the waste heat boiler, and then enters the connecting pipe through the first smoke inlet of the connecting pipe. When the quenching unit located at the quenching station needs to quench, the corresponding second valve is opened, so that the low-temperature flue gas can enter the quenching unit and exchange heat with the red-hot coke in the quenching unit until the quenching is completed, and the corresponding second valve is closed; in this process, the second valve corresponding to the quenching station that does not need to quench is kept closed to prevent the leakage of flue gas; when there is no quenching unit that needs to quench, and when the amount of low-temperature flue gas in the connecting pipeline is greater than the amount of flue gas required for quenching, the first valve is opened, and the low-temperature flue gas enters the flue gas treatment device. The coking system of the embodiment of the present application uses the low-temperature flue gas from the waste heat boiler as a cooling medium, and passes it into the quenching unit located at the quenching station, directly exchanging heat with the red-hot coke, and the heat exchange efficiency is high; and there is no need to use cooling water, which is a dry quenching process. Compared with the wet quenching method, the coke obtained by the quenching system of the embodiment of the present application is of higher quality; in addition, the flue gas generated by the coking unit and the quenching unit can be recycled in the coking system, which improves the waste heat recovery efficiency, thereby increasing the steam production of the waste heat boiler.

[0034] In the coking system of the second embodiment of the present application, the high-temperature flue gas in the coking space of the coking unit located at the coking station enters the flue through the flue gas inlet under the action of the first gas driving device, and then enters the waste heat boiler through the flue gas outlet. The waste heat boiler cools the flue gas entering it, so that the high-temperature flue gas becomes low-temperature flue gas. The low-temperature flue gas enters the first gas driving device from the outlet of the waste heat boiler, and then enters the connecting pipe through the first smoke inlet of the connecting pipe. When the coke quenching unit located at the quenching station needs to be quenched, the corresponding second valve is opened, so that the low-temperature flue gas can enter the quenching unit and exchange heat with the red-hot coke in the quenching unit until the quenching is completed, and the corresponding second valve is closed; in this process, the second valve corresponding to the quenching station that does not need to be quenched remains closed to prevent the leakage of flue gas; when there is no quenching unit that needs to be quenched, and when the amount of low-temperature flue gas in the connecting pipe is greater than the amount of flue gas required for quenching, the first valve is opened, and the low-temperature flue gas enters the flue gas treatment device. When the fifth valve is opened, the flue gas discharged from the quenching unit enters the quenching outlet pipe, then enters the waste heat boiler and the first gas drive device in sequence, and returns to the quenching unit to participate in quenching or enters the flue gas treatment device. The coking system of the embodiment of the present application uses the low-temperature flue gas from the waste heat boiler as a cooling medium, and passes it into the quenching unit located at the quenching station, directly contacting and exchanging heat with the red-hot coke, with high heat exchange efficiency; and there is no need to use cooling water, which is a dry quenching process. Compared with the wet quenching method, the coke obtained by the coke quenching system of the embodiment of the present application is of higher quality; in addition, the flue gas generated by the coking unit and the quenching unit can be recycled in the coking system, which improves the waste heat recovery efficiency, thereby increasing the steam production of the waste heat boiler. In addition, there is no corresponding relationship between the quenching station in the embodiment of the present application and the flue gas inlet, and the quenching station does not need to be set in the coking area, which can save space in the coking area, so that more coking stations can be set in the coking area, which is beneficial to improving coking efficiency and output; the quenching station has no fixed position, and the movable quenching trolley can be moved to a position where any quenching unit can be connected to the second smoke inlet of the quenching outlet pipe and the second smoke outlet of the connecting pipe, thereby improving production flexibility and work efficiency.

[0035] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0037] Figure 1This is a process flow chart of a coking system according to a first embodiment of the present application;

[0038] Figure 2 This is a plan view of a coking system according to a first embodiment of the present application;

[0039] Figure 3 This is a connection diagram of the quenching unit, flue and connecting pipe in the first embodiment of the present application;

[0040] Figure 4 This is a schematic diagram of the structure of the center console in the first embodiment of the present application;

[0041] Figure 5 This is a schematic structural diagram of a coal supporting base in the first embodiment of the present application;

[0042] Figure 6a This is a schematic structural diagram of a coke quenching box in the first embodiment of the present application;

[0043] Figure 6b This is a front view of the quenching box in the first embodiment of the present application;

[0044] Figure 7 This is a schematic diagram of the structure of the coking box in the first embodiment of the present application;

[0045] Figure 8 This is a process flow chart of a coking system according to a second embodiment of the present application;

[0046] Fig. 9 This is a plan view of a coking system according to a second embodiment of the present application;

[0047] Fig.10 This is a connection diagram of the quenching unit and the movable quenching trolley in the second embodiment of the present application.

[0048] Description of reference numerals:

[0049] Coking station A; quenching station B; temporary storage station C; coking unit 10; coking box 11; metal shell 111; air preheating pipe 112; insulation layer 113; quenching unit 20; quenching box 21; metal shell 211; insulation layer 212; refractory layer 213; air inlet 214; exhaust port 215; air outlet 216; coal supporting base 31; flue gas descending hole 311; first through hole 3111; refractory brick 312; carbon plate 313; opening area AA; placement area BB; metal base 314; ear structure 32; flue 40; main flue 41; main flue damper 411; supplementary air port 412; branch flue 42; branch flue damper 421; waste heat boiler 50; first gas driving device 61; induced draft machine 611; second gas driving device 62; blower 621; connecting pipeline 70; main pipeline 71; first parallel section 711; third valve 7111; second parallel section 712; fourth valve 7121; first branch pipeline 72; first valve 721; second branch pipeline 73; second valve 731; flue gas treatment device 80; desulfurization device 81; lifting equipment 91; gantry crane 911; press machine 92; stacker 93; transport vehicle 94; flatbed vehicle 941; tractor 942; coke platform 95; coke screening building 96; movable coke quenching trolley 97; coke quenching outlet pipeline 98; fifth valve 981; central control panel 99; first button 991; second button 992; display screen 993; third button 994. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field based on this application belong to the scope of protection of the utility model.

[0051] Coke quenching is an important step in the coking process. Coke quenching is the process of cooling the refined red-hot coke to a temperature that is convenient for transportation and storage. There are two ways to quench coke in the mobile box-type coal coking process, one is wet quenching and the other is dry quenching. Wet quenching is to spray cooling water directly onto the red-hot coke to cool the coke; therefore, a large amount of water vapor will be generated during wet quenching, and the water vapor needs to be discharged in time to prevent the pressure in the quenching unit from being too high and causing an explosion; and the coke after wet quenching has a higher moisture content, lower M40, and higher M10 than the coke after dry quenching, and the coke quality is poor; it should be noted that M40 represents the crushing strength of the coke, and the larger the value, the better; M10 represents the wear resistance of the coke, and the smaller the value, the better. Dry quenching is to circulate cooling water in the cooling water pipe, and the cooling water and the red-hot coke are indirectly exchanged with heat to cool the coke. The cooling water pipe is coiled in the coke quenching hood, which has the risk of water leakage; the heat exchange between the cooling water and the red-hot coke is indirect, the heat exchange efficiency is low, and the coke quenching time is long. In order to solve the above technical problems, the embodiment of the present application proposes a coking system.

[0052] like Figures 1 to 3 As shown, Figure 1 This is a process flow chart of a coking system according to the first embodiment of the present application. Figure 2 This is a plan view of the coking system of the first embodiment of the present application. Figure 3This is a connection relationship diagram of the quenching unit 20, the flue 40 and the connecting pipe 70 in the first embodiment of the present application. The present application implements a coking system, which includes at least one coal supporting base 31, at least one coking box 11, at least one quenching box 21, the flue 40, the waste heat boiler 50, the first gas driving device 61, the connecting pipe 70 and the flue gas treatment device 80. Specifically, the coking system is provided with at least one coking station A and at least one quenching station B; at the coking station A, each coking box 11 is covered on a coal supporting base 31 to form a coking unit 10; the coking unit 10 has a coking space for accommodating coal cakes and coke; at the quenching station B, each quenching box 21 is covered on a coal supporting base 31 to form a quenching unit 20; the quenching unit 20 has a quenching space for accommodating coke; the coking space of the coking unit 10 located at the coking station A and the quenching space of the quenching unit 20 located at the quenching station B are both connected to the flue gas inlet 40; the flue gas outlet 40 is connected to the waste heat boiler 5 0; the waste heat boiler 50 is used to cool the flue gas entering therein; the outlet of the waste heat boiler 50 is connected to the inlet of the first gas driving device 61; the connecting pipe 70 has a first smoke inlet, a first smoke outlet and at least one second smoke outlet; the first smoke inlet is connected to the outlet of the first gas driving device 61; the first smoke outlet is connected to the flue gas treatment device 80; the second smoke outlet is connected to the quenching space of the quenching unit 20 located at the quenching station B; the connecting pipe 70 is provided with a first valve 721 for controlling the opening and closing of the first smoke outlet, and a second valve 731 for controlling the opening and closing of the second smoke outlet, and the second smoke outlet and the second valve 731 are arranged in a one-to-one correspondence.

[0053] In the coking system of the embodiment of the present application, the high-temperature flue gas in the coking space of the coking unit 10 located at the coking station A and the high-temperature flue gas in the quenching space of the quenching unit 20 located at the quenching station B enter the flue 40 through the flue gas inlet of the flue 40 under the action of the first gas driving device 61, and then enter the waste heat boiler 50 through the flue gas outlet. The waste heat boiler 50 cools the flue gas entering therein so that the high-temperature flue gas becomes low-temperature flue gas. The low-temperature flue gas enters the first gas driving device 61 from the outlet of the waste heat boiler 50, and then enters the connecting pipe 70 through the first smoke inlet of the connecting pipe 70. When the quenching unit 20 located at the quenching station B needs to be quenched, the corresponding second valve 731 is opened, so that the low-temperature flue gas can enter the quenching unit 20 and exchange heat with the red-hot coke located in the quenching unit 20 until quenching is completed, and the corresponding second valve 731 is closed; during this process, the second valve 731 corresponding to the quenching station B that does not need to be quenched remains closed to prevent the smoke from leaking; when there is no quenching unit 20 that needs to be quenched, and when the amount of low-temperature flue gas in the connecting pipe 70 is greater than the amount of flue gas required for quenching, the first valve 721 is opened, and the low-temperature flue gas enters the flue gas treatment device 80. The coking system of the embodiment of the present application uses the low-temperature flue gas from the waste heat boiler 50 as a cooling medium, which is passed into the coke quenching unit 20 located at the quenching station B, and directly contacts and exchanges heat with the red-hot coke, with high heat exchange efficiency; and there is no need to use cooling water, which is a dry quenching process. Compared with the wet quenching method, the coke obtained by the coke quenching system of the embodiment of the present application is of higher quality; in addition, the flue gas generated by the coking unit 10 and the quenching unit 20 can be recycled in the coking system, which improves the waste heat recovery efficiency, thereby increasing the steam production of the waste heat boiler 50.

[0054] Specifically, Figure 4 As shown, Figure 4 This is a structural schematic diagram of the central control console 99 in the first embodiment of the present application. A thermometer with a remote transmission function (not shown in the figure) can be provided in the quenching space. The thermometer is connected to the central control console 99, and the reading of the thermometer is transmitted to the central control console 99 and displayed on a display screen 993 of the central control console 99. The central control console 99 is provided with a first button 991 for controlling the first valve 721, and a second button 992 for controlling the second valve 731; whether to introduce low-temperature flue gas into the quenching unit 20 is determined according to the reading of the thermometer; when the reading of the thermometer is higher than the preset temperature, the corresponding second valve 731 is opened by the second button 992, and the low-temperature flue gas enters the quenching space for heat exchange with the red-hot coke; until the reading of the thermometer is equal to or lower than the preset temperature, the quenching is completed, and the corresponding second valve 731 is closed by the second button 992 to stop introducing low-temperature flue gas into the quenching space.

[0055] In some other embodiments of the present application, it is also possible to go to the area where the coking system is located and manually control the opening and closing of the first valve 721 and the second valve 731, which is not limited in the present application.

[0056] It should be noted that Figure 1 The coking unit 10 included in the illustrated embodiment may refer to one or more coking units 10 , and the quenching unit 20 may refer to one or more quenching units 20 .

[0057] In the first embodiment of the present application, Figure 1 and Figure 2 As shown, the connecting pipe 70 includes a main pipe 71, a first branch pipe 72 and at least one second branch pipe 73; the first smoke inlet is arranged on the main pipe 71; the first branch pipe 72 is connected to the main pipe 71, and the first smoke outlet and the first valve 721 are arranged on the first branch pipe 72; the second branch pipe 73 is connected to the main pipe 71, and the second smoke outlet and the second valve 731 are arranged on the second branch pipe 73 in a one-to-one correspondence. In this way, each quenching station B is arranged corresponding to a second branch pipe 73, and multiple quenching units 20 can quench at the same time, which is conducive to improving production efficiency. Specifically, Figure 2 In the illustrated embodiment, the number of quenching units 20 and the number of second branch pipes 73 are both two, which are arranged in one-to-one correspondence. Low-temperature flue gas is introduced into different quenching units 20 through different second branch pipes 73, so that the two quenching units 20 can produce independently.

[0058] Preferably, stainless steel can be used to prepare the connecting pipe 70. Since the exhaust gas from the waste heat boiler 50 is corrosive and stainless steel has good corrosion resistance, using stainless steel to prepare the connecting pipe 70 is conducive to extending its service life.

[0059] In the first embodiment of the present application, Figure 1 and Figure 2As shown, the main pipeline 71 has a first parallel section 711 and a second parallel section 712 arranged in parallel; the inlets of the first parallel section 711 and the second parallel section 712 are connected to each other, and the outlets are connected to each other; the inlet of the first branch pipeline 72 is connected between the inlet of the first parallel section 711 and the first smoke inlet; the inlet of the second branch pipeline 73 is connected to the outlet of the first parallel section 711; the first parallel section 711 is provided with a third valve 7111 for controlling its on and off; the second parallel section 712 is provided with a second gas driving device 62; the inlet of the second gas driving device 62 is connected to the outlet of the first gas driving device 61, and the outlet of the second gas driving device 62 is connected to the second smoke outlet; when the pressure in the first branch pipeline 72 is less than or equal to the first preset pressure, the second gas driving device 62 is started, and the third valve 7111 is closed; when the pressure in the first branch pipeline 72 is greater than the first preset pressure, the second gas driving device 62 is closed, and the third valve 7111 is opened. That is, when the power of the first gas driving device 61 is insufficient, the third valve 7111 can be closed and the second gas driving device 62 can be started to provide power; when the power of the first gas driving device 61 is sufficient, the third valve 7111 can be opened and the second gas driving device 62 can be closed to save energy. Optionally, the first gas driving device 61 can be an induced draft fan 611, and the second gas driving device 62 can be a blower 621; a pressure sensor (not shown in the figure) can be set in the first branch pipeline 72 to monitor the pressure in the first branch pipeline 72.

[0060] Furthermore, two fourth valves 7121 may be provided on the second parallel section 712 , and the two fourth valves 7121 are respectively located at the inlet and the outlet of the second gas driving device 62 , so as to better control the on-off of the second parallel section 712 .

[0061] In the first embodiment of the present application, Figure 1 and Figure 2 As shown, the flue 40 includes a main flue 41 and at least two branch flues 42; each coking station A and each quenching station B is provided with at least one branch flue 42; the flue gas inlets are arranged on the branch flues 42 one by one; the outlets of the plurality of branch flues 42 converge at the main flue 41; each branch flue 42 is provided with a branch flue damper 421; the flue gas outlet is located on the main flue 41; the main flue damper 411 is provided on the main flue 41. The flue gas in the coking unit 10 at the coking station A and the flue gas in the quenching unit 20 at the quenching station B enter the main flue 41 through the branch flue 42, and then enter the waste heat boiler 50; by adjusting the opening of the main flue damper 411 and the branch flue damper 421, the gas volume entering the coking unit 10 and the quenching unit 20 can be adjusted, thereby adjusting the coking speed of the coking unit 10 and the quenching speed of the quenching unit 20, and the production method is more flexible.

[0062] In the first embodiment of the present application, Figure 1 and Figure 2 As shown, the main flue 41 is provided with a supplementary air port 412; the supplementary air port 412 is located between the main flue damper 411 and the branch flue damper 421, and is used to supplement air into the main flue 41. Supplementing air from the supplementary air port 412 to the main flue 41 can make the combustible components in the flue gas burn completely, and prevent the combustible components from entering the waste heat boiler 50 and causing an explosion; further, in order to achieve a better effect, the supplementary air port 412 is usually arranged at the end of the main flue 41 close to the waste heat boiler 50.

[0063] In the first embodiment of the present application, Figures 2 to 5 As shown, Figure 5 This is a schematic diagram of the structure of the coal supporting base 31 in the first embodiment of the present application. The coal supporting base 31 is used to place coal cakes or coke. A smoke descending hole 311 is provided on the coal supporting base 31. The smoke descending hole 311 is used to connect the coking space of the coking unit 10 located at the coking station A with the flue 40, or to connect the coke quenching space of the coke quenching unit 20 located at the coke quenching station B with the flue 40. The smoke in the coking unit 10 and the coke quenching unit 20 enters the flue 40 through the smoke descending hole 311, and the implementation method is simple. Specifically, the coal supporting base 31 can be directly placed at the smoke inlet of the branch flue 42 to facilitate the smoke to enter the branch flue 42.

[0064] In the first embodiment of the present application, Figure 5 As shown, the coal supporting base 31 includes a plurality of placement areas BB and a plurality of opening areas AA, and the plurality of placement areas BB and the plurality of opening areas AA are arranged alternately; the placement area BB is used to place coke; a plurality of flue gas descending holes 311 are formed in the opening area AA; such a design can ensure that flue gas can be discharged smoothly; there are gaps between the coke or coal cakes on adjacent placement areas BB, which can increase the contact area between the coke or coal cakes and the gas, and is conducive to improving the coking and quenching efficiency. Optionally, the coal supporting base 31 may include a metal base 314, and a plurality of carbon plates 313 and a plurality of refractory bricks 312 arranged on the metal base 314; the refractory bricks 312 and the carbon plates 313 can separate the metal base 314 from the coking space or the quenching space to protect the metal base 314. The carbon plates 313 are arranged one by one in the placement area BB; a plurality of refractory bricks 312 are provided in the opening area AA, and two adjacent refractory bricks 312 are spliced ​​to form a first through hole 3111, and a second through hole (not shown in the figure) is provided on the metal base 314, and the first through hole 3111 and the second through hole are arranged correspondingly to form a smoke descending hole 311.

[0065] In the first embodiment of the present application, Figure 3 , Figure 6a and Figure 6b As shown, Figure 6a2 is a schematic structural diagram of a quenching box 21 in the first embodiment of the present application. Figure 6b This is a front view of the quenching box 21 in the first embodiment of the present application. The quenching box 21 is provided with an air inlet 214; the air inlet 214 is used to connect the quenching space and the second smoke outlet of the connecting pipe 70. The quenching box 21 is provided with the air inlet 214, which is convenient for connecting with the connecting pipe 70 and has a simple structure. Specifically, the air inlet 214 can be set on the side wall of the quenching box 21 and close to the top. The section of the connecting pipe 70 directly connected to the air inlet 214 can be a metal hose to ensure that the quenching box 21 can be lifted.

[0066] In the first embodiment of the present application, Figure 6a and Figure 6b As shown, the quenching box 21 includes a metal shell 211, a heat-insulating layer 212 and a fire-resistant layer 213 arranged in sequence from the outside to the inside; the heat-insulating layer 212 covers the inner wall of the metal shell 211; the fire-resistant layer 213 separates the heat-insulating layer 212 from the coking space, so as to prevent the metal shell 111 from contacting with the high-temperature flue gas in the quenching space and causing damage, thereby extending the service life of the quenching box 21.

[0067] In the first embodiment of the present application, Figure 4 , Figure 6a and Figure 6b As shown, the quenching box 21 is provided with an exhaust port 215; an exhaust valve (not shown in the figure) for controlling the opening and closing of the exhaust port 215 is provided; a pressure sensor (not shown in the figure) is provided in the quenching space; when the indication of the pressure sensor reaches the second preset pressure, the exhaust valve opens. This prevents the gas pressure in the quenching box 21 from being too high and causing an explosion. Specifically, a pressure sensor with a remote transmission function can be used, and the pressure sensor is electrically connected to the central console 99. The central console 99 is provided with a third button 994 for controlling the opening and closing of the exhaust valve. When the indication of the pressure sensor reaches the preset temperature, the third button 994 is operated to open the exhaust valve.

[0068] In the first embodiment of the present application, Figure 7 As shown, Figure 7 This is a structural schematic diagram of a coking box 11 in the first embodiment of the present application. The coking box 11 has a metal shell 111 and an insulating layer 113 arranged on the inner wall of the metal shell 111. An air preheating pipe 112 is arranged between the metal shell 111 and the insulating layer 113. Air enters the coking space through the air preheating pipe 112, and is preheated by the insulating layer 113 during the process. The preheated air burns with the raw coal gas precipitated from the coke, and the heat generated is used for coking.

[0069] In the first embodiment of the present application, Figure 1 and Figure 2As shown, the coking system also includes a lifting device 91; the coking system is also provided with a temporary storage station C; the coal supporting base 31, the coking box 11 and the quenching box 21 are all provided with a lifting ear structure 32 for cooperating with the lifting device 91; the lifting device 91 is used to lift the coal supporting base 31 with coke placed on the temporary storage station C to the coking station A, lift the coking box 11 and cover it on the coal supporting base 31 with coke placed, so as to form a coking unit 10; the lifting device 91 is also used to lift the coking unit 10 that has completed coking to the quenching station B; lift the coking box 11 away from the quenching station B; and lift the quenching box 21 on the temporary storage station C and cover it on the coal supporting base 31 with coke placed, so as to form a quenching unit 20. The coking system of the embodiment of the present application adopts a mobile box-type briquette coking process. The coking unit 10 and the quenching unit 20 can be moved during the production process, which has the advantages of short process, simple equipment, flexible operation, environmental friendliness and low cost.

[0070] Specifically, the hoisting device 91 may be a gantry crane 911. The flue gas treatment device 80 may be a desulfurization device 81.

[0071] The coking system of the embodiment of the present application is provided with a coking station A, a coke quenching station B and a temporary storage station C. During the production process, the hoisting equipment 91 first hoists the coal supporting base 31 on which the coke is placed on the temporary storage station C to the coking station A, and hoists and covers the coking box 11 on the coal supporting base 31 on which the coke is placed, so as to form a coking unit 10; the coking unit 10 cokes the coke placed on the coal supporting base 31 to produce red-hot coke; the high-temperature flue gas generated during the coking process enters the waste heat boiler 50 through the flue 40, is cooled by the waste heat boiler 50, and obtains low-temperature flue gas; the low-temperature flue gas enters the connecting pipe 70; the hoisting equipment Preparation 91 hoists the coking unit 10 that has completed coking to the quenching station B, and hoists the coking box 11 of the coking unit 10 away from the quenching station B; then hoists the quenching box 21 on the temporary storage station C and covers it on the coal supporting base 31 on which red-hot coke is placed, to form a quenching unit 20; opens the corresponding second valve 731, so that the low-temperature flue gas in the second branch pipe 73 enters the quenching unit 20, and exchanges heat with the red-hot coke in the quenching space until the quenching is completed. The high-temperature flue gas formed after the heat exchange in the quenching process enters the waste heat boiler 50 through the flue 40, is cooled by the waste heat boiler 50, and participates in the quenching process. The flue gas generated by the coking unit 10 and the quenching unit 20 is used to circulate between the quenching unit 20 and the waste heat boiler 50; the waste heat recovery efficiency is improved, thereby increasing the steam output of the waste heat boiler 50. Moreover, the quenching process is dry quenching, which does not produce wet quenching wastewater and no large amount of steam is generated, making the production process safer.

[0072] like Figure 1 and Figure 2As shown, the coking system of the embodiment of the present application further includes a press 92, a stacker 93, a transport vehicle 94, a coke platform 95 and a coke screening building 96. The press 92 is used to make coal cakes from the blended coal, and the coal cakes are used as the objects to be processed; the stacker 93 is used to place the coal cakes on the coal supporting base 31. The transport vehicle 94 transports the first coal supporting base 31 with cold coke to the coke platform 95, and then to the coke screening building 96 for screening, and finally transports it out. Specifically, the transport vehicle 94 may include a flatbed vehicle 941 and a tractor 942.

[0073] The coking process of the coking system of the first embodiment of the present application is described in detail below. The coking process includes the following steps:

[0074] Step 1: The press 92 forms the blended coal into briquettes;

[0075] Step 2: The stacker 93 places the coal cakes on the first coal supporting base 31 on the transport vehicle 94;

[0076] Step 3: The transport vehicle 94 transports the first coal supporting base 31 with the coal cakes to the temporary storage station C;

[0077] Step 4: The gantry crane 911 hoists the first coal supporting base 31 for placing coal cakes to the coking station A;

[0078] Step 5: The gantry crane 911 hoists the coking box 11 from the temporary storage station C or the quenching station B to the coking station A, so that the coking box 11 and the first coal supporting base 31 located at the coking station A form a coking unit 10;

[0079] Step 5, the coking unit 10 cokes the coal cakes, and the coal cakes are refined into red hot coke after a high-temperature dry distillation cycle of a coking cycle;

[0080] Specifically, before the first coking, the coking box 11 can be preheated and then hoisted to the coking station A. The heat of the coking box 11 causes the coal cake to precipitate a large amount of raw coal gas; the raw coal gas contacts and burns with the air entering the coking space; the heat generated by the combustion of the raw coal gas heats the coal cake to complete the coking process;

[0081] During the coking process, the high-temperature flue gas generated by the combustion of the raw coal gas enters the waste heat boiler 50 through the flue 40, and the waste heat boiler 50 cools the high-temperature flue gas to generate low-temperature flue gas;

[0082] Step 6: After the coke is mature, the gantry crane 911 hoists the coking unit 10 located at the coking station A to the coke quenching station B;

[0083] Step 7: The transport vehicle 94 transports the second coal supporting base 31 with the coal cakes to the temporary storage station C;

[0084] Step 8: The gantry crane 911 hoists the second coal supporting base 31 with the coal cakes to the coking station A;

[0085] Step 9, the gantry crane 911 hoists the coking box 11 located at the quenching station B back to the coking station A, so that the coking box 11 and the second coal supporting base 31 located at the coking station A constitute a coking unit 10;

[0086] Step 10, the coking unit 10 cokes the coal cakes to produce red coke;

[0087] Step 11: The gantry crane 911 hoists the quenching box 21 from the temporary storage station C to the quenching station B, so that the quenching box 21 and the first coal supporting base 31 located at the quenching station B form a quenching unit 20; the air inlet 214 on the quenching box 21 is connected to the second smoke outlet of the connecting pipe 70;

[0088] Step 12, opening the second valve 731, so that the low-temperature flue gas from the waste heat boiler 50 enters the coke quenching unit 20 through the connecting pipe 70 for heat exchange, and the coke quenching unit 20 quenches the red-hot coke to produce cold coke;

[0089] Step 13: After quenching is completed, close the second valve 731;

[0090] Step 14: The gantry crane 911 hoists the quenching box 21 from the quenching station B to the temporary storage station C;

[0091] Step 15: The gantry crane 911 hoists the first coal supporting base 31 on which the cold coke is placed to the transport vehicle 94;

[0092] Step 16: The transport vehicle 94 transports the first coal supporting base 31 on which the cold coke is placed to the coke platform 95, and then to the coke screening building 96 for screening, and finally transports it out.

[0093] The coking system of the second embodiment of the present application is different from the coking system of the first embodiment of the present application in that the flow path of the flue gas exhausted from the coke quenching unit 20 is different.

[0094] like Figures 7 to 10 As shown, Figure 8 This is a process flow chart of a coking system according to a second embodiment of the present application. Fig. 9 This is a plan view of a coking system according to a second embodiment of the present application. Fig.10This is a connection diagram of the quenching unit 20 and the movable quenching trolley 97 in the second embodiment of the present application. The coking system of the second embodiment of the present application includes at least one coal supporting base 31, at least one coking box 11, at least one quenching box 21, a flue 40, a waste heat boiler 50, a first gas driving device 61, a connecting pipe 70, a flue gas treatment device 80, a quenching gas outlet pipe 98 and a movable quenching trolley 97. Specifically, the coking system is provided with at least one coking station A and at least one quenching station B; at the coking station A, each coking box 11 is covered on a coal supporting base 31 to form a coking unit 10; the coking unit 10 has a coking space for accommodating coal cakes and coke; the coking space of the coking unit 10 located at the coking station A is connected to the flue gas inlet of the flue 40; the flue gas outlet of the flue 40 is connected to the inlet of the waste heat boiler 50; the waste heat boiler 50 is used to cool the flue gas entering therein; the outlet of the waste heat boiler 50 is connected to the inlet of the first gas driving device 61; the connecting pipe 70 has a first smoke inlet, a first smoke outlet and at least one second smoke outlet; the first smoke inlet is connected to the outlet of the first gas driving device 61; the first smoke outlet is connected to the smoke treatment device 80; the second smoke outlet is connected to the quenching space of the quenching unit 20 located at the quenching station B The connecting pipe 70 is provided with a first valve 721 for controlling the opening and closing of the first smoke outlet, and a second valve 731 for controlling the opening and closing of the second smoke outlet, and the second smoke outlet and the second valve 731 are arranged in a one-to-one correspondence; at the quenching station B, a movable quenching trolley 97 is provided, and each quenching box 21 is covered on a coal supporting base 31 to form a quenching unit 20; the quenching unit 20 is arranged on the movable quenching trolley 97; the quenching unit 20 has a quenching space for accommodating coke; the quenching box 21 is provided with an air inlet 214 and an air outlet 216; the quenching gas outlet pipe 98 has a second smoke inlet and a third smoke outlet; the second smoke inlet is connected to the air outlet 216 of the quenching unit 20; the third smoke outlet is connected to the inlet of the waste heat boiler 50 through the flue 40; the quenching gas outlet pipe 98 is provided with a fifth valve 981 for controlling the opening and closing of the third smoke outlet.

[0095] In the coking system of the second embodiment of the present application, the high-temperature flue gas in the coking space of the coking unit 10 located at the coking station A enters the flue 40 through the flue gas inlet of the flue 40 under the action of the first gas driving device 61, and then enters the waste heat boiler 50 through the flue gas outlet. The waste heat boiler 50 cools the flue gas entering therein so that the high-temperature flue gas becomes low-temperature flue gas. The low-temperature flue gas enters the first gas driving device 61 from the outlet of the waste heat boiler 50, and then enters the connecting pipe 70 through the first smoke inlet of the connecting pipe 70. When the quenching unit 20 located at the quenching station B needs to be quenched, the corresponding second valve 731 is opened, so that the low-temperature flue gas can enter the quenching unit 20 and exchange heat with the red-hot coke in the quenching unit 20 until the quenching is completed, and the corresponding second valve 731 is closed; in this process, the second valve 731 corresponding to the quenching station B that does not need to be quenched remains closed to prevent the leakage of flue gas; when there is no quenching unit 20 that needs to be quenched, and when the amount of low-temperature flue gas in the connecting pipe 70 is greater than the amount of flue gas required for quenching, the first valve 721 is opened, and the low-temperature flue gas enters the flue gas treatment device 80. The fifth valve 981 is opened, and the flue gas discharged from the quenching unit 20 enters the quenching gas outlet pipe 98, and then enters the waste heat boiler 50 and the first gas driving device 61 in sequence, and returns to the quenching unit 20 to participate in quenching or enters the flue gas treatment device 80. The coking system of the embodiment of the present application uses the low-temperature flue gas from the waste heat boiler 50 as a cooling medium, which is passed into the coke quenching unit 20 located at the quenching station B, and directly contacts and exchanges heat with the red-hot coke, with high heat exchange efficiency; and there is no need to use cooling water, which is a dry quenching process. Compared with the wet quenching method, the coke obtained by the coke quenching system of the embodiment of the present application is of higher quality; in addition, the flue gas generated by the coking unit 10 and the quenching unit 20 can be recycled in the coking system, which improves the waste heat recovery efficiency, thereby increasing the steam production of the waste heat boiler 50. In addition, there is no corresponding relationship between the quenching station B in the embodiment of the present application and the flue gas inlet 40. The quenching station B does not need to be set in the coking area, which can save space in the coking area, so that more coking stations A can be set in the coking area, which is beneficial to improving coking efficiency and output; the quenching station B has no fixed position, and the movable quenching trolley 97 can move to a position where any quenching unit 20 can be connected to the second smoke inlet of the quenching gas outlet pipe 98 and the second smoke outlet of the connecting pipe 70, thereby improving production flexibility and work efficiency.

[0096] like Fig.10As shown, in the second embodiment of the present application, the air inlet 214 and the air outlet 216 on the quenching box 21 can be both formed on the side wall of the quenching box 21, with the air inlet 214 arranged close to the top and the air outlet 216 arranged close to the bottom; the quenching unit 20 falls on the movable quenching trolley 97, and the coal supporting base 31 and the body of the movable quenching trolley 97 form a closed space, so that the smoke does not overflow from the smoke descending hole 311 on the coal supporting base 31, and the bottom of the body of the movable quenching trolley 97 is provided with rollers.

[0097] The coking process of the coking system of the second embodiment of the present application is described in detail below. The coking process includes the following steps:

[0098] Step 1: The press 92 forms the blended coal into briquettes;

[0099] Step 2: The stacker 93 places the coal cakes on the first coal supporting base 31 on the transport vehicle 94;

[0100] Step 3: The transport vehicle 94 transports the first coal supporting base 31 with the coal cakes to the temporary storage station C;

[0101] Step 4: The gantry crane 911 hoists the first coal supporting base 31 for placing coal cakes to the coking station A;

[0102] Step 5: The gantry crane 911 hoists the coking box 11 from the temporary storage station C or the quenching station B to the coking station A, so that the coking box 11 and the first coal supporting base 31 located at the coking station A form a coking unit 10;

[0103] Step 5, the coking unit 10 cokes the coal cakes, and the coal cakes are refined into red hot coke after a high-temperature dry distillation cycle of a coking cycle;

[0104] During the coking process, the high-temperature flue gas generated by the combustion of the raw coal gas enters the waste heat boiler 50 through the flue 40, and the waste heat boiler 50 cools the high-temperature flue gas to generate low-temperature flue gas;

[0105] Step 6: After the coke is mature, the gantry crane 911 hoists the coking unit 10 located at the coking station A to the movable quenching trolley 97 located at the quenching station B;

[0106] Step 7: The transport vehicle 94 transports the second coal supporting base 31 with the coal cakes to the temporary storage station C;

[0107] Step 8: The gantry crane 911 hoists the second coal supporting base 31 with the coal cakes to the coking station A;

[0108] Step 9, the gantry crane 911 hoists the coking box 11 located at the quenching station B back to the coking station A, so that the coking box 11 and the second coal supporting base 31 located at the coking station A constitute a coking unit 10;

[0109] Step 10, the coking unit 10 cokes the coal cakes to produce red coke;

[0110] Step 11: The gantry crane 911 hoists the quenching box 21 from the temporary storage station C to the quenching station B, so that the quenching box 21 and the first coal supporting base 31 located at the quenching station B form a quenching unit 20; the air inlet 214 on the quenching box 21 is connected to the second smoke outlet of the connecting pipe 70; the air outlet 216 is connected to the second smoke inlet of the quenching gas outlet pipe 98;

[0111] Step 12: Open the second valve 731, so that the low-temperature flue gas from the waste heat boiler 50 enters the coke quenching unit 20 through the connecting pipe 70 for heat exchange, and the coke quenching unit 20 quenches the red-hot coke to produce cold coke; the flue gas in the coke quenching unit 20 enters the coke quenching gas outlet pipe 98, and the fifth valve 981 is opened, so that the flue gas returns to the coke quenching unit 20 through the waste heat boiler 50 or enters the desulfurization device 81;

[0112] Step 13: After quenching is completed, close the second valve 731;

[0113] Step 14: The gantry crane 911 hoists the quenching box 21 from the quenching station B to the temporary storage station C;

[0114] Step 15: The movable quenching trolley 97 transports the first coal supporting base 31 on which the cold coke is placed to the coke platform 95, and then to the coke screening building 96 for screening, and finally transports it out.

[0115] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.

Claims

1. A coking system, characterized in that: include: At least one coal supporting base (31), at least one coking box (11), at least one coke quenching box (21), a flue (40), a waste heat boiler (50), a first gas driving device (61), a connecting pipeline (70) and a flue gas treatment device (80); The coking system is provided with at least one coking station (A) and at least one coke quenching station (B); In the coking station (A), each of the coking boxes (11) is covered on a coal supporting base (31) to form a coking unit (10); the coking unit (10) has a coking space for accommodating coal cakes and coke; In the quenching station (B), each quenching box (21) is mounted on a coal supporting base (31) to form a quenching unit (20); the quenching unit (20) has a quenching space for accommodating coke; The coking space of the coking unit (10) located at the coking station (A) and the coke quenching space of the coke quenching unit (20) located at the coke quenching station (B) are both connected to the flue gas inlet of the flue (40); the flue gas outlet of the flue (40) is connected to the inlet of the waste heat boiler (50); The waste heat boiler (50) is used to cool the flue gas entering therein; the outlet of the waste heat boiler (50) is connected to the inlet of the first gas driving device (61); The connecting pipe (70) has a first smoke inlet, a first smoke outlet and at least one second smoke outlet; The first smoke inlet is connected to the outlet of the first gas driving device (61); the first smoke outlet is connected to the smoke treatment device (80); the second smoke outlet is connected to the quenching space of the quenching unit (20) located at the quenching station (B); the connecting pipe (70) is provided with a first valve (721) for controlling the opening and closing of the first smoke outlet, and a second valve (731) for controlling the opening and closing of the second smoke outlet, and the second smoke outlet and the second valve (731) are arranged in a one-to-one correspondence.

2. The coking system according to claim 1, characterized in that: The connecting pipeline (70) comprises: a main pipeline (71), a first branch pipeline (72) and at least one second branch pipeline (73); The first smoke inlet is arranged on the main pipe (71); The first branch pipe (72) is in communication with the main pipe (71), and the first smoke outlet and the first valve (721) are arranged on the first branch pipe (72); The second branch pipe (73) is in communication with the main pipe (71), and the second smoke outlet and the second valve (731) are arranged on the second branch pipe (73) in a one-to-one correspondence.

3. The coking system according to claim 2, characterized in that: The main pipeline (71) comprises a first parallel section (711) and a second parallel section (712) which are arranged in parallel, wherein the inlets of the first parallel section (711) and the second parallel section (712) are connected to each other, and the outlets are connected to each other; The inlet of the first pipe (72) is connected between the inlet of the first parallel section (711) and the first smoke inlet; the inlet of the second pipe (73) is connected to the outlet of the first parallel section (711); The first parallel section (711) is provided with a third valve (7111) for controlling its on and off; The second parallel section (712) is provided with a second gas driving device (62); the inlet of the second gas driving device (62) is connected to the outlet of the first gas driving device (61), and the outlet of the second gas driving device (62) is connected to the second smoke outlet; When the pressure in the first branch pipeline (72) is less than or equal to a first preset pressure, the second gas driving device (62) is started and the third valve (7111) is closed; when the pressure in the first branch pipeline (72) is greater than the first preset pressure, the second gas driving device (62) is closed and the third valve (7111) is opened.

4. The coking system according to claim 2, characterized in that: The flue (40) comprises: a main flue (41) and at least two branch flues (42); Each of the coking stations (A) and each of the coke quenching stations (B) is provided with at least one branch flue (42); the flue gas inlets are arranged one by one on the branch flues (42); the outlets of the plurality of branch flues (42) converge on the main flue (41); each of the branch flues (42) is provided with a branch flue damper (421); The smoke outlet is located on the main smoke duct (41); and a main smoke duct damper (411) is provided on the main smoke duct (41).

5. The coking system according to claim 4, characterized in that: The main flue (41) is provided with a supplementary air port (412); The supplementary air port (412) is located between the main flue damper (411) and the branch flue damper (421) and is used to supplement air into the main flue (41).

6. The coking system according to any one of claims 1 to 5, characterized in that: The coal supporting base (31) is used to place the coal cakes or the coke; The coal supporting base (31) is provided with a smoke descending hole (311), and the smoke descending hole (311) is used to connect the coking space of the coking unit (10) located at the coking station (A) with the flue (40), or to connect the quenching space of the coke quenching unit (20) located at the quenching station (B) with the flue (40).

7. The coking system according to claim 6, characterized in that: The quenching box (21) is provided with an air inlet (214); the air inlet (214) is used to connect the quenching space and the second smoke outlet of the connecting pipe (70).

8. The coking system according to claim 7, characterized in that: The coke quenching box (21) comprises: a metal shell (211), a heat-insulating layer (212) and a fire-resistant layer (213) which are arranged in sequence from the outside to the inside; The thermal insulation layer (212) is arranged to cover the inner wall of the metal shell (211); The refractory layer (213) separates the thermal insulation layer (212) from the coking space.

9. The coking system according to claim 7, characterized in that: The quenching box (21) is provided with an exhaust port (215); the exhaust port (215) is provided with an exhaust valve for controlling its opening and closing; and a pressure sensor is provided in the quenching space; When the indication of the pressure sensor reaches a second preset pressure, the exhaust valve opens.

10. The coking system according to claim 1, characterized in that: The coking system further comprises: a hoisting device (91); The coking system is also provided with a temporary storage station (C); The coal supporting base (31), the coking box (11) and the coke quenching box (21) are all provided with a lifting ear structure (32) for cooperating with the lifting equipment (91); The hoisting device (91) is used to hoist the coal supporting base (31) on which the coke is placed on the temporary storage station (C) to the coking station (A), and to hoist the coking box (11) and cover it on the coal supporting base (31) on which the coke is placed, so as to form a coking unit (10); The hoisting equipment (91) is also used to hoist the coking unit (10) that has completed coking to the quenching station (B); to hoist the coking box (11) away from the quenching station (B); and to hoist the quenching box (21) on the temporary storage station (C) and cover it on the coal supporting base (31) on which the coke is placed, so as to form the quenching unit (20).

11. A coking system, characterized in that: include: At least one coal supporting base (31), at least one coking box (11), at least one quenching box (21), a flue (40), a waste heat boiler (50), a first gas driving device (61), a connecting pipeline (70), a flue gas treatment device (80), a quenching gas outlet pipeline (98) and a movable quenching trolley (97); The coking system is provided with at least one coking station (A) and at least one coke quenching station (B); In the coking station (A), each of the coking boxes (11) is covered on a coal supporting base (31) to form a coking unit (10); the coking unit (10) has a coking space for accommodating coal cakes and coke; The coking space of the coking unit (10) located at the coking station (A) is communicated with the flue gas inlet of the flue (40); the flue gas outlet of the flue (40) is communicated with the inlet of the waste heat boiler (50); The waste heat boiler (50) is used to cool the flue gas entering therein; the outlet of the waste heat boiler (50) is connected to the inlet of the first gas driving device (61); The connecting pipe (70) has a first smoke inlet, a first smoke outlet and at least one second smoke outlet; The first smoke inlet is connected to the outlet of the first gas driving device (61); the first smoke outlet is connected to the smoke treatment device (80); the second smoke outlet is connected to the quenching space of the quenching unit (20) located at the quenching station (B); the connecting pipe (70) is provided with a first valve (721) for controlling the opening and closing of the first smoke outlet, and a second valve (731) for controlling the opening and closing of the second smoke outlet, and the second smoke outlet and the second valve (731) are arranged in a one-to-one correspondence; A movable quenching trolley (97) is provided at the quenching station (B); each quenching box (21) is covered on a coal supporting base (31) to form a quenching unit (20); the quenching unit (20) is provided on the movable quenching trolley (97); the quenching unit (20) has a quenching space for accommodating coke; the quenching box (21) is provided with an air inlet (214) and an air outlet (216); The quenching gas outlet pipeline (98) has a second smoke inlet and a third smoke outlet; the second smoke inlet is connected to the gas outlet (216) of the quenching unit (20); the third smoke outlet is connected to the inlet of the waste heat boiler (50) through the flue (40); and a fifth valve (981) is provided on the quenching gas outlet pipeline (98) for controlling the opening and closing of the third smoke outlet.