Air distribution device of pulverized coal gasification furnace
By designing a slidable and rotatable air-dressing plate structure, combined with the drive and exhaust fan, the problem of the ashes in the gasifier is not easy to be discharged, and the effect of improving gas purity is achieved.
Patent Information
- Application Number
- CN202323505513.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-22
AI Technical Summary
The ash produced by the pyrolysis of fuel in existing gasifiers is not easily discharged from the ash outlet under the action of the fan, affecting the purity of the gas.
A pulverized coal gasification furnace air cloth device is designed, including a reaction box and a air cloth plate structure. The first air cloth plate can be slidably installed on the side wall of the reaction box, and the second air cloth plate can be rotatably installed, and driven by the drive member. The air cloth plate is tilted, pour the ash in the reaction box into the ash collection box, and combine the exhaust fan and filter to deal with and clean the ash.
Effectively clean up the ash in the reaction chamber and improve the purity of the exhaust gas.
Smart Images

Figure CN222099870U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gasifiers, in particular to an air distribution device for a pulverized coal gasifier. Background Art
[0002] Gasifier is also called straw gasifier, environmental protection and energy-saving gasifier, straw gasifier, straw gasifier, household straw gasifier, environmental protection and energy-saving gasifier, biomass gasifier, high-efficiency biomass gasifier. At present, most of the gasifiers are in actual use, and the fuel in the furnace is in a piled state for combustion. The fuel is pyrolyzed and gasified to produce gas, and at the same time, the fuel will produce ash after decomposition and combustion.
[0003] For example, a conical channel air distribution plate device for a biomass gasifier proposed in a Chinese patent with application number CN202220928380.5 includes a gasifier body, an air distribution plate is arranged inside the gasifier body, a plurality of air distribution channels are opened on the air distribution plate, the air distribution channels are tapered channel structures that are narrow at the top and wide at the bottom, a slag receiving plate is arranged at the bottom of the gasifier body, and the slag receiving plate is fixedly connected to the air distribution plate through a connecting rod. The utility model sets the air distribution channels on the air distribution plate as tapered channel structures that are narrow at the top and wide at the bottom. Even if some sand and glass slag are stuck in the air distribution channels, the sand and glass slag stuck in the channels can be easily blown away by the fresh air coming from below, or because the channels are narrow at the top and wide at the bottom, the sand and glass slag can fall to the slag receiving plate below the air distribution plate due to gravity, and the slag receiving plate and the air distribution plate are fixedly connected by a connecting rod, and the slag receiving plate is fixed by a fastening bolt, so as to facilitate the installation and disassembly of the air distribution plate. However, the device still has the following problems: the ash produced when the fuel is pyrolyzed and gasified in the gasifier is not easy to be discharged from the ash outlet under the action of the fan, and the ash in the skull cannot be processed and will be discharged along with the gas, affecting the purity of the gas. Summary of the invention
[0004] The main purpose of the utility model is to provide an air distribution device for a pulverized coal gasification furnace, which is intended to clean up the ash produced by the fuel in the reaction box and improve the purity of the exhaust gas.
[0005] To achieve the above-mentioned purpose, the utility model proposes a pulverized coal gasification furnace air distribution device, including a reaction box and an air distribution plate structure, the air distribution plate structure including a first air distribution plate, a second air distribution plate and a driving component, one end of the first air distribution plate can be slidably installed on the side wall of the reaction box and partially exposed outside the reaction box, and the other end is connected to the second air distribution plate, the other end of the second air distribution plate can be rotatably installed on the side wall of the reaction box, and the driving component is installed outside the reaction box and connected to the part of the first air distribution plate exposed outside the reaction box.
[0006] Optionally, a receiving groove is provided on the first air distribution plate, and one end of the second air distribution plate is clamped in the receiving groove.
[0007] Optionally, limiting grooves are respectively provided on the two opposite side walls of the accommodating groove, and limiting platforms are respectively provided on the two side walls of the second air distribution plate, and the limiting platforms are clamped in the limiting grooves.
[0008] Optionally, a sliding groove is provided on the side wall of the reaction box, and a boss is provided on the first air distribution plate, and the boss is stuck in the sliding groove.
[0009] Optionally, a depression is provided on the side wall of the reaction box, positioning columns are respectively provided on the two opposite side walls of the depression, and a positioning hole is provided on the second air distribution plate, and the positioning column is clamped in the positioning hole.
[0010] Optionally, a notch and a first ash collecting box are provided on the side wall of the reaction box, the notch is located above the depression, and the first ash collecting box is connected to the interior of the reaction box through the notch.
[0011] Optionally, a plurality of air distribution holes are respectively provided on the first air distribution plate and the second air distribution plate.
[0012] Optionally, each air distribution hole is provided with a hood, and the hood is provided with a plurality of through holes.
[0013] Optionally, the reaction box is provided with a feed port, and the feed port is located on the side wall where the sliding groove is opened and above the sliding groove.
[0014] A pulverized coal gasification furnace air distribution device comprises a reaction box and an air distribution plate structure, wherein the air distribution plate structure comprises a first air distribution plate, a second air distribution plate and a driving member, wherein one end of the first air distribution plate can be slidably mounted on the side wall of the reaction box and partially exposed outside the reaction box, and the other end is connected to the second air distribution plate, and the other end of the second air distribution plate can be rotatably mounted on the side wall of the reaction box, the driving member is mounted outside the reaction box and connected to the portion of the first air distribution plate exposed outside the reaction box; an exhaust box is provided on one side of the reaction box, the exhaust box is connected to the reaction box through a channel, an exhaust fan and the filter are provided in the channel, and the filter is located between the exhaust fan and the reaction box.
[0015] Compared with the prior art, the utility model has the following beneficial effects:
[0016] The pulverized coal gasification furnace air distribution device of the technical solution of the utility model is provided with a reaction box and an air distribution plate structure, the air distribution plate structure includes a first air distribution plate, a second air distribution plate and a driving member, one end of the first air distribution plate can be slidably mounted on the side wall of the reaction box and partially exposed outside the reaction box, and the other end is connected to the second air distribution plate, the other end of the second air distribution plate can be rotatably mounted on the side wall of the reaction box, and the driving member is installed outside the reaction box and connected to the part of the first air distribution plate exposed outside the reaction box. Driven by the driving member, the first air distribution plate and the second air distribution plate can be tilted to pour the ash in the reaction box into the same collection area, to process the ash produced by the pyrolysis of the fuel, and to improve the purity of the exhaust gas. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0018] Figure 1 This is a structural schematic diagram of an embodiment of an air distribution device for a pulverized coal gasification furnace of the utility model;
[0019] Figure 2 It is a structural exploded diagram of the first air distribution plate and the second air distribution plate;
[0020] Figure 3 for Figure 1 A schematic structural diagram of a stroke cap.
[0021] Description of Figure Numbers:
[0022] Label name Label name 100 Pulverized coal gasifier air distribution device 10 Reaction box 11 Slide slot 12 Depression 12a Positioning column 13 gap 14 Episode 1 Gray Box 15 Feed port 20 Wind distribution board structure 21 First wind board 22 Second wind distribution plate 23 Drive parts 21a Receiving slot 21b Limit slot 211 Boss 22a Positioning hole 221 Limiting table 24 Air holes 40 aisle 41 Episode 2 Gray Box 42 Connecting strip 43 Mounting table 50 Dust removal structure 51 Filter 52 Exhaust fan 60 Exhaust box 61 Exhaust port 70 Pusher 71 Scraper plate 80 Blower 81 Gas Pipe 30 Hood 31 Cap body 32 Column 31a Through Hole
[0023] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] It should be noted that all directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the various components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0026] In addition, the descriptions of "first", "second", etc. in the present utility model are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present utility model.
[0027] The utility model provides an air distribution device 100 for a pulverized coal gasification furnace.
[0028] See also Figure 1-3 In one embodiment of the utility model, the pulverized coal gasification furnace air distribution device 100 includes a reaction box 10, an air distribution plate structure 20 and an exhaust box 60. The exhaust box 60 is connected to the reaction box 10 through a channel 40. The air distribution plate structure 20 is installed in the reaction box 10. A dust removal structure 50 is provided in the channel 40. The dust removal structure 50 can remove ash floating with the gas during the process of the gas being discharged from the exhaust box 60.
[0029] In one embodiment of the utility model, the air distribution plate structure 20 includes a first air distribution plate 21, a second air distribution plate 22 and a driving member 23. One end of the first air distribution plate 21 can be slidably installed on the side wall of the reaction box 10 and is partially exposed outside the reaction box 10, and the other end is provided with a receiving groove 21a. One end of the second air distribution plate 22 is stuck in the receiving groove 21a and is connected to the first air distribution plate 21. The other end of the second air distribution plate 22 can be rotatably installed on the side wall of the reaction box 10. The driving member 23 is installed outside the reaction box 10 and is connected to the part of the first air distribution plate 31 exposed outside the reaction box 10.
[0030] The side wall of the reaction box 10 is provided with a sliding groove 11, and the first air distribution plate 21 is provided with a boss 211, which is stuck in the sliding groove 11. The boss 211 is partially exposed outside the reaction box 10 and connected to the driving member 23. Under the drive of the driving member 23, the boss 211 can move in the sliding groove 11, so that the first air distribution plate 21 changes its position. The side wall of the reaction box 10 opposite to the side wall of the sliding groove 11 is provided with a recess 12, and the two opposite side walls of the recess 12 are respectively provided with positioning columns 12a, and the second air distribution plate 22 is provided with a positioning hole 22a, and the positioning column 12a is stuck in the positioning hole 22a, so that the second air distribution plate 22 can rotate with the positioning column 12a as the rotation center.
[0031] In this embodiment, the thickness of the first air distribution plate 21 is greater than that of the second air distribution plate 22, and the thickness of the second air distribution plate 22 is consistent with the height of the accommodating groove 21a. Under the premise of ensuring that the second air distribution plate 22 can slide smoothly in the accommodating groove 21a, the gap between it and the first air distribution plate 21 is reduced. The movement of the second air distribution plate 22 in the accommodating groove 21a can change the distance between the first air distribution plate 21 and the second air distribution plate 22, thereby changing the total length of the two.
[0032] The cross section of the recess 12 is semicircular so that the second air distribution plate 22 will not be blocked when rotating. Limiting grooves 21b are respectively provided on the opposite side walls of the accommodating groove 21a, and limiting platforms 221 are respectively provided on the two side walls of the second air distribution plate 22. The limiting platforms 221 are stuck in the limiting grooves 21b to prevent the second air distribution plate 22 from separating from the first air distribution plate 21. It can be understood that when the driving member 23 drives the first air distribution plate 21 to lean against the top of the sliding groove 11, the first air distribution plate 21 and the second air distribution plate 22 flip upward with the positioning column 12a as the rotation point. At this time, the two are transformed from a horizontal state to an inclined state, and the distance between the first air distribution plate 21 and the second air distribution plate 22 becomes longer.
[0033] In one embodiment of the utility model, a notch 13 and a first ash collecting box 14 are provided on the side wall of the reaction box 10. The notch 13 is located above the recess 12. The first ash collecting box 14 is connected to the interior of the reaction box 10 through the notch 13 and is used to collect ash generated by pyrolysis and gasification of the fuel. The reaction box 10 is also provided with a feed port 15 for putting fuel into the reaction box 10.
[0034] In this embodiment, the feed port 15 is located on the side wall where the sliding groove 11 is opened and above the sliding groove 11. The fuel is put into the reaction box 10 from the feed port 15 for pyrolysis and gasification. The ash generated during the pyrolysis and gasification process falls on the first air distribution plate 21 and the second air distribution plate 22. The driving member 23 is started. The driving member 23 can be a common rodless cylinder. The first air distribution plate 21 is pushed upward so that the first air distribution plate 21 and the second air distribution plate 22 are in an inclined state. The ash generated during the pyrolysis and gasification of the fuel is poured from the notch 13 into the first ash collecting box 14. When the driving member 23 retracts, the first air distribution plate 21 and the second air distribution plate 22 return to a horizontal state. This process is repeated to collect and process the ash in the reaction box 10.
[0035] In one embodiment of the utility model, a plurality of air distribution holes 24 are respectively provided on the first air distribution plate 21 and the second air distribution plate 22, each of the air distribution holes 24 is provided with a hood 30, and a plurality of through holes 31a are provided on the hood 30. A blower 80 is also provided on the reaction box 10, and the blower 80 is connected to the reaction box 10 through an air pipe 81. The blower 80 is located on the side wall where the first ash collecting box 14 is provided and below the first air distribution plate 21. The blower 80 supplies air to the reaction box 10 through the air pipe 81, and the air enters the hood 30 and is then sent out from the through hole 31a, so that the fuel pyrolysis and gasification effect is better.
[0036] In this embodiment, the hood 30 includes a column 32 and a cap body 31. The column 32 is a hollow cylindrical shape as a whole, one end of which is installed in the air distribution hole 24, and the cap body 31 is connected to the other end of the column 32. The plurality of through holes 31a are equidistantly arranged on the periphery of the cap body 31, and the central axis of each through hole 31a is perpendicular to the central axis of the column 32, so that the ash produced by the pyrolysis and gasification of the fuel will not easily fall into the through hole 31a, thereby avoiding the blockage of the through hole 31a.
[0037] In one embodiment of the utility model, the dust removal structure 50 includes an exhaust fan 52, a filter screen 51 and a push member 70. The exhaust fan 52 and the filter screen 51 are both installed in the channel 40, and the filter screen 51 is located between the exhaust fan 52 and the reaction box 10. The push member 70 is installed on the channel 40 and partially extends into the channel 40 to be tightly attached to the side wall of the filter screen 51.
[0038] In this embodiment, the pusher 70 can be a common rodless cylinder, and the exhaust fan 52 is a prior art, which will not be described in detail in this application. The pusher 70 is provided with a scraper plate 71, and the scraper plate 71 is in close contact with the filter 51. The lower end of the channel 40 is provided with a second ash box 41, and the two side walls of the second ash box 41 are respectively provided with connecting strips 42, and the connecting strips 42 are connected to the mounting platform 43. One end of the filter 51 is snapped on the mounting platform 43, and the other end is snapped on the side wall of the channel 40. It can be understood that under the suction of the exhaust fan 52, the gas generated by the pyrolysis and gasification of the fuel enters the exhaust box 60, and the exhaust box 60 is provided with an exhaust port 61, and the gas is discharged from the exhaust port 61 to enter the next process. At the same time, the ashes that have not been completely cleaned in the reaction box 10 will flow to the exhaust box 60 with the gas, and the filter screen 51 will intercept the ashes. At this time, the pushing member 70 is started, and the scraper plate 71, driven by the pushing member 70, pushes the ash impurities on the filter screen 51 into the second ash collecting box 41 for unified collection and treatment.
[0039] Working principle: the fuel is put into the reaction box 10 from the feed port 15, and the fuel is pyrolyzed and gasified in the reaction box 10. During the pyrolysis and gasification process, the blower 80 is started to supply air to achieve a better pyrolysis and gasification effect. The ash produced by the pyrolysis and gasification of the fuel falls on the first air distribution plate 21 and the second air distribution plate 22. The driving member 23 is started to drive the first air distribution plate 21 to move, so that the first air distribution plate 21 and the second air distribution plate 22 are switched between inclined and horizontal. When inclined, the ash can be put into the first ash collecting box 14. The gas produced by pyrolysis floats to the exhaust box 60 under the action of the exhaust fan 52, and is discharged from the exhaust port 61 to the next process. At the same time, the ashes that have not been completely cleaned in the reaction box 10 will flow to the exhaust box 60 with the gas, and the filter screen 51 will intercept the ashes. At this time, the pusher 70 is started, and the scraper plate 71, driven by the pusher 70, pushes the ash impurities on the filter screen 51 into the second ash collecting box 41 for unified collection and treatment, thereby improving the purity of the exhaust gas.
[0040] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A pulverized coal gasification furnace air distribution device, characterized in that: It includes a reaction box and an air distribution plate structure, wherein the air distribution plate structure includes a first air distribution plate, a second air distribution plate and a driving component, wherein one end of the first air distribution plate can be slidably installed on the side wall of the reaction box and is partially exposed outside the reaction box, and the other end is connected to the second air distribution plate, and the other end of the second air distribution plate can be rotatably installed on the side wall of the reaction box, and the driving component is installed outside the reaction box and connected to the part of the first air distribution plate exposed outside the reaction box.
2. The air distribution device for a pulverized coal gasifier according to claim 1, characterized in that: The first air distribution plate is provided with a receiving groove, and one end of the second air distribution plate is clamped in the receiving groove.
3. The air distribution device for a pulverized coal gasification furnace according to claim 2, characterized in that: Limiting grooves are respectively provided on the two opposite side walls of the accommodating groove, and limiting platforms are respectively provided on the two side walls of the second air distribution plate, and the limiting platforms are clamped in the limiting grooves.
4. The air distribution device for a pulverized coal gasifier according to claim 3, characterized in that: A sliding groove is provided on the side wall of the reaction box, and a boss is provided on the first air distribution plate, and the boss is stuck in the sliding groove.
5. The air distribution device for a pulverized coal gasifier according to claim 4, characterized in that: A depression is provided on the side wall of the reaction box, and positioning posts are respectively provided on the two opposite side walls of the depression. A positioning hole is provided on the second air distribution plate, and the positioning post is clamped in the positioning hole.
6. The air distribution device for a pulverized coal gasifier according to claim 5, characterized in that: A notch and a first ash collecting box are provided on the side wall of the reaction box. The notch is located above the depression, and the first ash collecting box is connected with the interior of the reaction box through the notch.
7. The air distribution device for a pulverized coal gasifier according to claim 1, characterized in that: A plurality of air distribution holes are respectively formed on the first air distribution plate and the second air distribution plate.
8. The air distribution device for a pulverized coal gasifier according to claim 7, characterized in that: Each air distribution hole is provided with a hood, and the hood is provided with a plurality of through holes.
9. The air distribution device for a pulverized coal gasifier according to claim 4, characterized in that: The reaction box is provided with a feed inlet, and the feed inlet is located on the side wall where the sliding groove is opened and above the sliding groove.
10. A pulverized coal gasification furnace air distribution device, characterized in that: It includes a reaction box and an air distribution plate structure, the air distribution plate structure includes a first air distribution plate, a second air distribution plate and a driving member, one end of the first air distribution plate can be slidably installed on the side wall of the reaction box and is partially exposed outside the reaction box, and the other end is connected to the second air distribution plate, the other end of the second air distribution plate can be rotatably installed on the side wall of the reaction box, the driving member is installed outside the reaction box and connected to the part of the first air distribution plate exposed outside the reaction box; an exhaust box is provided on one side of the reaction box, the exhaust box is connected to the reaction box through a channel, an exhaust fan and a filter are provided in the channel, and the filter is located between the exhaust fan and the reaction box.