Prestressed pipeline grouting filling degree quality control equipment
By introducing a grouting mechanism and a temperature control system into the prestressed pipeline grouting equipment, the problem of uncontrolled slurry flow is solved, the crack resistance and load bearing capacity of the bridge are improved, and the construction quality is ensured.
Patent Information
- Application Number
- CN202420208878.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-29
AI Technical Summary
In the existing prestressed pipeline grouting filling quality control equipment, the slurry flow is not effectively controlled, resulting in a decrease in the rigidity and bearing capacity of concrete bridges, and the construction records are not rigorous and there are quality defects.
A device including a grouting mechanism, prestressed pipeline, slurry discharge mechanism, microcontroller and display is designed. Through the slurry inlet valve, slurry discharge valve, temperature sensor and connecting plate, the flow ambient temperature of the slurry is controlled to ensure that the slurry is in The filling quality in the prestressed pipeline.
The control of the slurry flow ambient temperature is achieved, the anchoring reliability and crack resistance are improved, the bridge construction quality is ensured, and the quality defects during the construction process are reduced.
Smart Images

Figure CN222100623U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a prestressed pipeline grouting filling quality control device. Background Art
[0002] Due to the continuous growth of traffic load and natural disasters, bridge collapse accidents have occurred repeatedly. Professionally speaking, the main reasons are that the prestress applied to the steel strands during prestressing construction deviates from the design requirements; secondly, the grouting of the duct is not dense, which cannot effectively protect the prestressing mechanism, resulting in concrete damage and cracking, steel corrosion, and support hollowing. These damages lead to a decrease in the overall stiffness and bearing capacity of the concrete bridge, thus affecting the service life of the bridge.
[0003] The key technology research on quality control of prestressed pipe grouting filling degree is aimed at improving the drawbacks of traditional grouting, such as uncontrollable water-cement ratio, arbitrary grouting process, and inaccurate construction records, so as to eliminate quality defects in the construction process, protect prestressed tendons from corrosion, and ensure the durability of the structure. The cement slurry poured into the hole can wrap the prestressed tendons and contact the hole wall, bonding the prestressed tendons and the hole wall together, which work together to increase the reliability of anchoring, improve the crack resistance and bearing capacity of the structure, and ensure that the quality of bridge construction meets the design requirements.
[0004] Chinese patent authorization announcement number: CN218116143U, authorization announcement date December 23, 2022, discloses a filling enhancement device with a slurry storage pipe, including a slurry inlet end exhaust mechanism connected to the slurry inlet end anchor plate of the beam body, and a slurry outlet end exhaust mechanism connected to the slurry outlet end anchor plate of the beam body; the slurry inlet end exhaust mechanism includes a slurry inlet end connecting pipe sealedly connected to the slurry inlet end anchor plate, the slurry inlet end of the slurry inlet end connecting pipe is connected to a first three-way pipe joint, and the slurry inlet of the first three-way pipe joint is connected to the slurry outlet end of the beam body. The end is provided with a slurry inlet valve, and the exhaust end of the first three-way pipe joint is inserted with an exhaust pipe, which passes through the first three-way pipe joint and the anchor plate at the slurry inlet end in sequence and extends into the prestressed pipe of the beam body. The exhaust end of the exhaust pipe is connected with the slurry inlet end storage pipe, and the exhaust end of the slurry inlet end storage pipe is connected with the first ball valve; the exhaust mechanism at the slurry outlet end includes a slurry outlet storage pipe and a second ball valve, one end of the slurry outlet storage pipe is connected with the anchor plate at the slurry outlet end, and the other end of the slurry outlet storage pipe is connected with the second ball valve. The disadvantage of this technical solution is that after grouting through the first three-way pipe joint, the slurry is directly discharged through the rear plate of the prestressed pipe in the beam body, and there is no design around the prestressed pipe in the beam body to control the flow of the slurry, that is, the slurry is always discharged in one state. However, the slurry reaches a full and tight state, but it needs to be controlled during the slurry circulation process, such as anchoring control, grouting control and temperature control, so that the filling quality of the slurry is reasonably controlled.
[0005] In summary, the conditions of the flowing slurry can be changed by controlling the external structure, thereby satisfying the quality control of the filling degree of the slurry. Utility Model Content
[0006] The utility model aims to overcome the deficiency that the existing slurry is not discharged and collected under any control conditions, and provides a prestressed pipeline grouting filling quality control device which can control the ambient temperature when the slurry flows.
[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0008] A prestressed pipe grouting filling quality control device comprises a grouting mechanism, a prestressed pipe, a grouting mechanism, a single chip computer and a display, wherein the grouting mechanism comprises a grouting pipe, a connecting pipe, a grouting valve and a grouting pipe, wherein the grouting valve is connected to the grouting pipe, and the grouting pipe is connected to the grouting pipe through the connecting pipe, and a grouting anchor pad and a grouting outlet anchor pad are installed on the prestressed pipe, wherein the grouting anchor pad is placed at the front end of the prestressed pipe, and the grouting pipe is connected to the front end of the prestressed pipe through the grouting anchor pad, and the grouting mechanism comprises a grouting outlet pipe and a second ball valve, and the grouting outlet anchor pad is placed at the front end of the prestressed pipe. The rear end of the prestressed pipe, the slurry outlet pipe is communicated with the rear end of the prestressed pipe through the slurry outlet anchor pad, the second ball valve is connected to the slurry outlet pipe, a conduit and a plurality of connecting plates are installed on the prestressed pipe, the two ends of the conduit are respectively placed on the slurry inlet anchor pad and the slurry outlet anchor pad, the conduit is sleeved on the prestressed pipe, a plurality of connecting plates are evenly distributed from the front end to the rear end of the prestressed pipe, the prestressed pipe is connected to the conduit through the connecting plate, a temperature sensor is installed on the connecting plate, the temperature sensor is electrically connected to the single-chip microcomputer, and the single-chip microcomputer is electrically connected to the display.
[0009] This design allows the slurry to be introduced through the grouting mechanism. The grouting mechanism here includes a grouting pipe, a connecting pipe, a slurry inlet valve and a slurry inlet pipe. The slurry inlet valve is connected to the grouting pipe, and the grouting pipe is connected to the slurry inlet pipe through the connecting pipe. A slurry inlet anchor plate and a slurry outlet anchor plate are installed on the prestressed pipe. The slurry inlet anchor plate is placed at the front end of the prestressed pipe, and the slurry inlet pipe can be connected to the front end of the prestressed pipe through the slurry inlet anchor plate. Then, after controlling the slurry inlet valve, the slurry can be introduced from the grouting pipe, allowing the slurry to pass through the connecting pipe. After passing through the pipe and the slurry inlet pipe, it flows to the front end of the prestressed pipe, and under the guidance of the prestressed pipe, it flows into the slurry discharge mechanism. This slurry discharge mechanism includes a slurry discharge pipe and a second ball valve, and the slurry discharge anchor plate is placed at the rear end of the prestressed pipe. The slurry discharge pipe is connected with the rear end of the prestressed pipe through the slurry discharge anchor plate, and the second ball valve is connected to the slurry discharge pipe. In this way, by controlling the switch of the second ball valve, the slurry can flow through the slurry discharge anchor plate into the slurry discharge pipe and then be discharged. This is the flow channel of the slurry. A conduit and several connecting plates are installed on the prestressed pipe. The two ends of the conduit are respectively placed on the slurry inlet anchor plate and the slurry outlet anchor plate. The conduit is sleeved on the prestressed pipe and connected to the prestressed pipe through several connecting plates evenly distributed from the front end to the rear end of the prestressed pipe. Therefore, during the flow of the slurry, liquid water can be introduced through the end of the conduit on the slurry inlet anchor plate. The temperature of the liquid water is adjusted according to the required temperature of the slurry. The liquid water flows on the outer edge of the prestressed pipe and is discharged through the end at the slurry outlet anchor plate, which can have a heating effect on the slurry. In this way, the slurry can flow smoothly under the high temperature effect, thereby achieving the purpose of controlling the ambient temperature when the slurry flows. Not only that, a temperature sensor is installed on the connecting plate, so the liquid water can contact the temperature sensor during the flow process, and the temperature sensor will sense the temperature of the liquid water, that is, the temperature of the slurry. Then the temperature sensor can transmit the sensed information to the electrically connected single-chip microcomputer. After the single-chip microcomputer works, the processed temperature information is transmitted to the display, allowing the display to show the value of the slurry's temperature, thereby adjusting the temperature.
[0010] Preferably, the connection disk is provided with a plurality of through holes, and the temperature sensor is placed on the through holes. By providing a plurality of through holes on the connection disk, the liquid water can pass smoothly and then flow. The temperature sensor can be stably installed at the through hole, so when the liquid water flows through the through hole, the temperature sensor can smoothly contact the liquid water and sense the temperature information of the liquid water so as to display the temperature on the display.
[0011] Preferably, the prestressed pipe is mounted with a beam body, the prestressed pipe and the conduit are both placed in the beam body, the grout inlet anchor pad is placed at the front end of the beam body, and the grout outlet anchor pad is placed at the rear end of the beam body. In this design, by mounting the beam body on the prestressed pipe, the prestressed pipe and the conduit are both placed in the beam body, while the grout inlet anchor pad is placed at the front end of the beam body and the grout outlet anchor pad is placed at the rear end of the beam body, that is, the connection work of the prestressed pipe, the conduit, the grout inlet anchor pad and the grout outlet anchor pad is stably done, so that the grout and liquid water can flow smoothly under the support effect.
[0012] Preferably, an exhaust pipe and several sealing rings are installed on the connecting pipe, the diameter of the connecting pipe is larger than the diameter of the exhaust pipe, the rear end of the exhaust pipe is sleeved in the connecting pipe, and several sealing rings are evenly distributed, and the sealing rings are sleeved on the exhaust pipe in the connecting pipe. In this design, the exhaust pipe and several sealing rings are installed on the connecting pipe. The diameter of the connecting pipe here is larger than the diameter of the exhaust pipe, so the rear end of the exhaust pipe can be sleeved in the connecting pipe, and the sealing ring is sleeved on the exhaust pipe in the connecting pipe. In this way, the slurry can smoothly pass through the slurry inlet pipe and flow into the prestressed pipe, and the slurry can be prevented from flowing back to the exhaust pipe. Not only that, but the structure here is more compact.
[0013] Preferably, the exhaust pipe is equipped with a slurry storage pipe 1, a first ball valve and a liquid storage tank 1, the liquid storage tank 1 is placed at the front end of the exhaust pipe, the first ball valve is connected to the exhaust pipe, and the slurry outlet pipe is equipped with a slurry storage pipe 2 and a liquid storage tank 2, the slurry storage pipe 2 is placed between the slurry outlet anchor plate and the second ball valve, and the slurry outlet pipe is connected to the liquid storage tank 2. In this design, by installing a slurry storage pipe 1, a first ball valve and a liquid storage tank 1 on the exhaust pipe, the liquid storage tank 1 is placed at the front end of the exhaust pipe, and the first ball valve is connected to the exhaust pipe, then under the switch control of the first ball valve, the slurry can be poured in, and the gas in the connecting pipe and the exhaust pipe can be pushed toward the slurry storage pipe 1, and then toward the liquid storage tank 1, then the foam ball in the transparent liquid poured into the liquid storage tank 1 will jump under the push of the gas, until the foam ball stops jumping, it can be judged that the gas has been discharged. Similarly, a slurry storage pipe No. 2 and a liquid storage tank No. 2 are installed on the slurry discharge pipe. The slurry storage pipe No. 2 is placed between the slurry discharge anchor plate and the second ball valve, and the slurry pipe is connected to the liquid storage tank No. 2. In this way, under the switch control of the second ball valve, when the slurry is discharged outward, the gas in the prestressed pipeline and the slurry discharge pipe is pushed to float toward the slurry storage pipe No. 2, and then toward the liquid storage tank No. 2. Then, the foam ball in the transparent liquid poured in the liquid storage tank No. 2 will jump under the push of the gas, until the foam ball stops jumping, it can be judged that the gas has been discharged.
[0014] Preferably, a filter screen is installed in both the first and second slurry storage pipes, a water accumulation block is installed at the rear end of the beam body, a water accumulation groove is provided on the water accumulation block, the water accumulation block is placed at the bottom end of the beam body, the slurry discharge anchor pad is placed between the top end of the beam body and the water accumulation block, and the position of the slurry discharge anchor pad corresponds to the position of the water accumulation groove. This design can reduce the loss of slurry flow during exhaust by installing filter screens in both the first and second slurry storage pipes, reduce waste, and reduce costs. A water accumulation block is installed at the rear end of the beam body, a water accumulation groove is provided on the water accumulation block, the water accumulation block is placed at the bottom end of the beam body, and the slurry discharge anchor pad is placed between the top end of the beam body and the water accumulation block, and the position of the slurry discharge anchor pad corresponds to the position of the water accumulation groove, that is, the liquid water flowing out from the end of the slurry discharge anchor pad after flowing through the conduit can fall into the water accumulation groove, which is convenient for the collection and reuse of liquid water.
[0015] The utility model has the beneficial effects of: achieving the purpose of controlling the ambient temperature when the slurry flows; facilitating the smooth discharge of gas in the prestressed pipe; and being equipped with a component for recovering liquid water after use. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the utility model;
[0017] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model;
[0018] Figure 3 yes Figure 2 Schematic diagram of the structure of the cross section at AA;
[0019] Figure 4 yes Figure 2 The enlarged cross-sectional view at B in the middle;
[0020] Figure 5 It is a schematic diagram of the installation of the filter screen of the utility model;
[0021] Figure 6 It is a schematic diagram of the connection between the prestressed pipe and the conduit of the utility model.
[0022] In the figure: 1. beam body, 2. prestressed pipe, 3. conduit, 4. connecting plate, 5. water accumulation block, 6. slurry inlet anchor plate, 7. slurry outlet anchor plate, 8. slurry inlet pipe, 9. connecting pipe, 10. exhaust pipe, 11. filter screen, 12. slurry inlet valve, 13. slurry storage pipe 1, 14. slurry outlet pipe, 15. sealing ring, 16. liquid storage tank 1, 17. first ball valve, 18. liquid storage tank 2, 19. slurry storage pipe 2, 20. second ball valve, 21. grouting pipe, 22. display. DETAILED DESCRIPTION
[0023] The utility model is further described below in conjunction with the accompanying drawings and specific implementation methods.
[0024] like Figure 1 , Figure 2 , Figure 3 and Figure 6 In the illustrated implementation case, a prestressed pipe grouting filling quality control device comprises a grouting mechanism, a prestressed pipe 2, a slurry discharge mechanism, a single chip computer and a display 22. The grouting mechanism comprises a grouting pipe 21, a connecting pipe 9, a slurry inlet valve 12 and a slurry inlet pipe 8. The slurry inlet valve 12 is connected to the grouting pipe 21. The grouting pipe 21 is connected to the slurry inlet pipe 8 through the connecting pipe 9. A slurry inlet anchor plate 6 and a slurry discharge anchor plate 7 are installed on the prestressed pipe 2. The slurry inlet anchor plate 6 is placed at the front end of the prestressed pipe 2. The slurry inlet pipe 8 is connected to the front end of the prestressed pipe 2 through the slurry inlet anchor plate 6. The slurry discharge mechanism comprises a slurry discharge pipe 14 and a second ball valve 20. The slurry outlet anchor pad 7 is placed at the rear end of the prestressed pipe 2, the slurry outlet pipe 14 is connected to the rear end of the prestressed pipe 2 through the slurry outlet anchor pad 7, the second ball valve 20 is connected to the slurry outlet pipe 14, the prestressed pipe 2 is equipped with a conduit 3 and a plurality of connection plates 4, the two ends of the conduit 3 are respectively placed on the slurry inlet anchor pad 6 and the slurry outlet anchor pad 7, the conduit 3 is sleeved on the prestressed pipe 2, and a plurality of connection plates 4 are evenly distributed from the front end to the rear end of the prestressed pipe 2, the prestressed pipe 2 is connected to the conduit 3 through the connection plate 4, a temperature sensor is installed on the connection plate 4, the temperature sensor is electrically connected to the single-chip microcomputer, and the single-chip microcomputer is electrically connected to the display 22. The connection plate 4 is provided with a plurality of through holes, and the temperature sensor is placed on the through holes.
[0025] like Figure 1 , Figure 2 and Figure 4 As shown, the prestressed pipe 2 is sleeved with the beam body 1, the prestressed pipe 2 and the conduit 3 are both placed in the beam body 1, the slurry inlet anchor pad 6 is placed at the front end of the beam body 1, and the slurry outlet anchor pad 7 is placed at the rear end of the beam body 1. An exhaust pipe 10 and a plurality of sealing rings 15 are installed on the connecting pipe 9, the diameter of the connecting pipe 9 is larger than the diameter of the exhaust pipe 10, the rear end of the exhaust pipe 10 is sleeved in the connecting pipe 9, a plurality of sealing rings 15 are evenly distributed, and the sealing ring 15 is sleeved on the exhaust pipe 10 in the connecting pipe 9. A slurry storage pipe 13, a first ball valve 17 and a liquid storage tank 16 are installed on the exhaust pipe 10, the liquid storage tank 16 is placed at the front end of the exhaust pipe 10, the first ball valve 17 is connected to the exhaust pipe 10, a slurry storage pipe 2 19 and a liquid storage tank 2 18 are installed on the slurry outlet pipe 14, the slurry storage pipe 2 19 is placed between the slurry outlet anchor pad 7 and the second ball valve 20, and the slurry outlet pipe 14 is connected to the liquid storage tank 2 18. A filter screen 11 is installed in both the slurry storage pipe 13 and the slurry storage pipe 2 19, a water accumulation block 5 is installed at the rear end of the beam body 1, a water accumulation groove is provided on the water accumulation block 5, the water accumulation block 5 is placed at the bottom end of the beam body 1, and the slurry anchor plate 7 is placed between the top of the beam body 1 and the water accumulation block 5, and the position of the slurry anchor plate 7 corresponds to the position of the water accumulation groove up and down.
[0026] First of all, it is necessary to understand the required ambient temperature of the slurry. Generally speaking, the slurry temperature is controlled within 35°C during cement slurry mixing and grouting. When the temperature is below 5°C, it is not convenient to compact. And within 45 hours after grouting, the temperature needs to be kept above 5°C. Then it is necessary to adjust the temperature of liquid water in advance for grouting (water below 100°C will not evaporate, so water vapor is not used). Not only that, the pipe during grouting (mainly prestressed pipe 2 here) needs to have a pressure resistance of ≥2MPa, so high-strength rubber tube can be selected, which not only ensures a firm connection during grouting, does not detach the pipe or break, but also the installation and placement of prestressed pipe 2 can be in an arc shape, so that the grouting work can be strictly followed from bottom to top, and from low to high. The length of prestressed pipe 2 can control the grouting time to be no less than 2 minutes. Of course, the pressure control should be 1.0MPa, and the grouting process is completed continuously to ensure that the cement slurry is full and solid.
[0027] Then the compaction work can be carried out. Before the slurry is introduced, the external pipeline can be connected to the grouting pipe 21 at the front end of the beam body 1, and the liquid storage tank 18 at the rear end of the beam body 1 is connected to a water pump. Then, the grouting pipe 21 can be opened by controlling the slurry inlet valve 12 on the grouting pipe 21, and liquid water can be introduced into the grouting pipe 21 through the pipeline. Then, the liquid water can be discharged through the connecting pipe 9, the slurry inlet pipe 8, the prestressed pipe 2 and the slurry outlet pipe 14 in sequence through the control of the second ball valve 20 on the slurry storage pipe 19 and the control of the water pump. Then, the prestressed pipe 2 is moistened to enhance the fluidity of the slurry. Then, transparent liquid can be filled into the liquid storage tank 16 and the liquid storage tank 2 18, and the first ball valve 17 is opened. When the slurry is introduced into the grouting pipe 21, the slurry can push the gas in the slurry pipe 8 and the exhaust pipe 10, and float toward the liquid storage tank 16 after passing through the slurry storage pipe 13. Then, bubbles will emerge from the transparent liquid in the liquid storage tank 16 under the push of the gas, which means that the gas in the first ball valve 17 has been discharged, until there are no bubbles in the transparent liquid in the liquid storage tank 16, then the first ball valve 17 can be closed. Similarly, the slurry will also move the gas in the prestressed pipe 2 and the slurry outlet pipe 14, and float toward the liquid storage tank 2 18 after passing through the slurry storage pipe 2 19. Then, bubbles will emerge from the transparent liquid in the liquid storage tank 2 18 under the push of the gas, which means that the gas in the second ball valve 20 has been discharged, until there are no bubbles in the transparent liquid in the slurry storage pipe 2 19, then it can be known that the gas has been exhausted.
[0028] Then it is necessary to introduce liquid water into the front end of the conduit 3 on the slurry inlet anchor pad 6. This liquid water is the prepared liquid water mentioned above. Under the guiding effect of the conduit 3, the liquid water will pass through the beam body 1, and then be discharged from the rear end of the conduit 3 on the slurry outlet anchor pad 7. A water accumulation block 5 is installed at the bottom of the rear end of the beam body 1. The position of the water accumulation trough on the water accumulation block 5 corresponds to the position of the slurry outlet anchor pad 7. Of course, the most critical thing is to make the position of the water accumulation trough correspond to the position of the rear end of the conduit 3. Then, the liquid water flowing out from the rear end of the conduit 3 will automatically fall into the water accumulation trough, which is convenient for collection and reuse. The conduit 3 is sleeved on the prestressed pipe 2, and several connecting plates 4 are evenly distributed from the front end to the rear end of the prestressed pipe 2. The prestressed pipe 2 is connected to the conduit 3 through the connecting plates 4, which not only makes the connection between the prestressed pipe 2 and the conduit 3 more stable and firm, but also allows liquid water to contact the connecting plates 4. The connecting plates 4 are provided with several through holes, and the temperature sensors are placed on the through holes, which means that liquid water can smoothly contact the temperature sensor. Of course, the connecting plates 4 here can be made of metal mesh, which is not only simple and easy to connect, but also strong and durable.
[0029] Then, when the slurry flows, the liquid water also flows. The ambient temperature of the slurry is regulated by the liquid water. In this way, the purpose of controlling the ambient temperature of the slurry when it flows is achieved. At the same time, the temperature information sensed by the temperature sensor is transmitted to the single-chip microcomputer. After the single-chip microcomputer works, the processed information is transmitted to the display 22. Then the display 22 displays the temperature value of the liquid water in the conduit 3, that is, the temperature value of the slurry in the prestressed pipe 2. Even if there is a slight difference, the change will not be too large (the temperature of the liquid water in the conduit 3 can also be appropriately increased to adapt to the required temperature of the slurry).
Claims
1. A prestressed pipe grouting filling quality control device, characterized in that: The invention comprises a grouting mechanism, a prestressed pipe (2), a grouting mechanism, a single chip computer and a display (22); the grouting mechanism comprises a grouting pipe (21), a connecting pipe (9), a grouting valve (12) and a grouting pipe (8); the grouting valve (12) is connected to the grouting pipe (21); the grouting pipe (21) is connected to the grouting pipe (8) through the connecting pipe (9); a grouting anchor pad (6) and a grouting anchor pad (7) are installed on the prestressed pipe (2); the grouting anchor pad (6) is placed at the front end of the prestressed pipe (2); the grouting pipe (8) is connected to the front end of the prestressed pipe (2) through the grouting anchor pad (6); the grouting mechanism comprises a grouting pipe (14) and a second ball valve (20); the grouting anchor pad (7) is placed at the front end of the prestressed pipe (2); The slurry outlet pipe (14) is connected to the rear end of the prestressed pipe (2) through the slurry outlet anchor pad (7), the second ball valve (20) is connected to the slurry outlet pipe (14), a conduit (3) and a plurality of connection plates (4) are installed on the prestressed pipe (2), two ends of the conduit (3) are respectively placed on the slurry inlet anchor pad (6) and the slurry outlet anchor pad (7), the conduit (3) is sleeved on the prestressed pipe (2), a plurality of connection plates (4) are evenly distributed from the front end to the rear end of the prestressed pipe (2), the prestressed pipe (2) is connected to the conduit (3) through the connection plate (4), a temperature sensor is installed on the connection plate (4), the temperature sensor is electrically connected to the single-chip microcomputer, and the single-chip microcomputer is electrically connected to the display (22).
2. The prestressed pipe grouting filling quality control device according to claim 1 is characterized in that: The connection plate (4) is provided with a plurality of through holes, and the temperature sensors are placed on the through holes.
3. The prestressed pipe grouting filling quality control device according to claim 1 is characterized in that: The prestressed pipe (2) is sleeved with a beam body (1), the prestressed pipe (2) and the conduit (3) are both placed inside the beam body (1), the grout inlet anchor plate (6) is placed at the front end of the beam body (1), and the grout outlet anchor plate (7) is placed at the rear end of the beam body (1).
4. The prestressed pipe grouting filling quality control device according to claim 3 is characterized in that: An exhaust pipe (10) and a plurality of sealing rings (15) are mounted on the connecting pipe (9); the diameter of the connecting pipe (9) is larger than the diameter of the exhaust pipe (10); the rear end of the exhaust pipe (10) is sleeved inside the connecting pipe (9); the plurality of sealing rings (15) are evenly distributed; and the sealing rings (15) are sleeved on the exhaust pipe (10) inside the connecting pipe (9).
5. The prestressed pipe grouting filling quality control device according to claim 4 is characterized in that: The exhaust pipe (10) is provided with a slurry storage pipe (13), a first ball valve (17) and a liquid storage tank (16); the liquid storage tank (16) is disposed at the front end of the exhaust pipe (10); the first ball valve (17) is connected to the exhaust pipe (10); the slurry discharge pipe (14) is provided with a slurry storage pipe (19) and a liquid storage tank (18); the slurry storage pipe (19) is disposed between a slurry discharge anchor plate (7) and a second ball valve (20); the slurry discharge pipe (14) is connected to the liquid storage tank (18).
6. The prestressed pipe grouting filling quality control device according to claim 5 is characterized in that: A filter screen (11) is installed in both the first slurry storage pipe (13) and the second slurry storage pipe (19); a water accumulation block (5) is installed at the rear end of the beam body (1); a water accumulation groove is provided on the water accumulation block (5); the water accumulation block (5) is placed at the bottom end of the beam body (1); the slurry outlet anchor pad (7) is placed between the top end of the beam body (1) and the water accumulation block (5); the position of the slurry outlet anchor pad (7) corresponds to the position of the water accumulation groove in the upper and lower directions.