Device used in cooperation with large vibratory hammer to achieve one-time hole forming and belt returning preventing effects
By designing a device for lengthening and widening of duckbill casing and curved iron plate pin, the problems of hole-forming underbelt and backbelt under complex geological conditions are solved, and efficient plastic drainage plate construction is achieved, suitable for fragmented stones and Geological conditions such as medium-tight sand layers reduce construction costs and mechanical damage.
Patent Information
- Application Number
- CN202420747353.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-11
AI Technical Summary
In the prior art, under complex geological conditions such as high content of fragmented stones, medium-density and above sand layers, it is difficult to achieve a hole-forming belt at one time and prevent plastic drainage plates from returning, and there are chain protection problems connecting pins and pin bending. question.
A device is designed to match large vibrating hammers, including extended and widened duckbill sleeves, extended chains, curved iron plates and U-shaped hook pins. The device is improved by misaligned welding and slot design. The bending resistance and self-weight reduce the possibility of sludge entering the casing and reduce friction and friction resistance.
It realizes the hole-forming underbelly belt under high moisture content flow plastic silt conditions, prevents plastic drainage plates from being retracted, improves construction efficiency and structural resistance, reduces costs, and is suitable for various soft foundation treatment projects.
Smart Images

Figure CN222100804U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of soft foundation treatment, in particular to a device which is used in conjunction with a large-scale vibration hammer to achieve one-time hole forming and anti-backlash effects. Background Art
[0002] In the past, the landfill formed by the development projects of large ports, coastal power plants, etc. was not fully processed in the early stage of formation, but was constructed in phases (up to 20 years) in accordance with national planning and policies. Therefore, the uninvolved landfill area became a site for the accumulation of waste soil and construction waste after a period of drying. When it was included in the planning, it was found that the surface of the landfill area had a certain bearing capacity (hard shell layer) due to the influence of long-term drying and accumulation of waste soil, but the soil below the surface (about 4-5 m) was not effectively consolidated and was still in an under-consolidated state, with a water content exceeding the liquid limit (in a plastic state), high compressibility, and low strength. It needs further treatment, and is generally treated by vacuum preloading (combined with heap load preloading).
[0003] The main construction procedures of the vacuum preloading (combined with surcharge preloading) method are site leveling, plastic drainage board installation, vacuum preloading, and surcharge preloading. Among them, the successful installation of plastic drainage boards is the key to ensuring the formation of effective vertical vacuum transmission and drainage channels.
[0004] Conventional plastic drain panels are installed by using a vibrating hammer (20 type) and a duckbill casing. The drain panel is pulled out of the duckbill and fixed on the pin for one week, then inserted into the casing, and finally the duckbill groove is sealed with the pin to install the drain panel (Chinese patent CN214116577U). This device is mainly suitable for dredged soil filling, tidal flats and other situations where the soil is relatively simple and soft and easy to break through, but it does not consider the problem of chain protection of the connecting pin and the bending of the pin when encountering complex geological conditions, such as high content of broken stones, the presence of medium-dense and above sand layers (saturated ash layers, etc.), etc., which require hole treatment.
[0005] Chinese patent CN115573323A provides a device and construction method for eliminating the back-carrying of plastic drain boards in soft foundation treatment. The device mainly includes L-shaped pile shoes and flat-mouthed drain board casings. It mainly relies on L-shaped pile shoes (steel pads and steel connecting rods) to penetrate the hard shell layer, increase the time of fixing the drain board in the silt and the recycling of the pile shoes, thereby improving the work efficiency and benefits of the plug-in board. However, from the perspective of the structure of the L-type pile shoe, there are the following problems: ① The length and width of the steel pad in the L-type pile shoe are both larger than the outer diameter of the casing. When pulling out the casing, the larger area of the steel pad can increase the time for fixing the drainage plate in the sludge; relatively speaking, the presence of the steel pad will also increase the frictional resistance during the lowering, resulting in difficulty in lowering, especially in the hard shell layer; ② The connection between the steel pad and the steel connecting rod in the L-type pile shoe is hinged (ideally, it can penetrate the hard shell layer). When encountering geological conditions such as broken stones that require drilling treatment, the steel pad and the steel connecting rod are easily broken; ③ When the L-type pile shoe is recovered, the steel pad can rotate freely around the screw rod connected to the steel connecting rod in an ideal state, but it is inevitable that the fluidized silt will enter the gap between the screw rods connecting the two, resulting in poor rotation of the steel pad, and the L-type pile shoe cannot be effectively recovered.
[0006] Chinese patent CN207659963U mentions a new type of pile shoe that reduces the problem of drainage board back-carrying. Considering the problem that "V"-shaped steel plates can be used to insert harder soil layers, when encountering hard objects such as broken stones, the thin "V"-shaped steel plates (0.8 mm-1.0 mm) will undergo significant deformation or embed into the duckbill during the insertion process and are not easy to be recovered. In addition, the wire rope is easily broken due to the lack of any protection measures.
[0007] In view of this, the utility model provides a device which is used in conjunction with a large-scale vibrating hammer to achieve the effects of one-time hole forming and anti-backlash. Utility Model Content
[0008] The purpose of the utility model is to realize one-time hole formation and anti-backflow plastic drainage board construction problem in which the prior art has not effectively solved the above-mentioned geological conditions where the surface layer to be bored and the depth range of the plastic drainage board are high-water content fluidized silt with high water content, and the plastic drainage board has a high content of broken stone content and complex components such as medium-dense and above sand layers, and the construction of the plastic drainage board is a device that is used in conjunction with a large vibrating hammer to achieve one-time hole formation and anti-backflow.
[0009] In order to solve the above technical problems, the following technical solutions are adopted:
[0010] The device is used in conjunction with a large-scale vibrating hammer to achieve the effects of one-time hole forming and anti-backlash, comprising a sleeve, a chain connected to the sleeve and a pin connected to the chain.
[0011] A curved iron plate and a hook are welded on the pin shaft, wherein the curved iron plate is located on one side of the pin shaft, and the hook is located on the other side of the pin shaft, wherein the curved iron plate and the pin shaft are welded in a staggered manner.
[0012] A plastic drain board is arranged in the sleeve, and a part of the plastic drain board is pulled out from the mouth groove of the sleeve, and the board head of the plastic drain board is bent into a hook shape around the hook, and then inserted into the sleeve.
[0013] A further improvement based on the technical solution is that a groove matching the pin is provided at the lower part of the sleeve.
[0014] A further improvement based on the technical solution is that the sleeve is a lengthened and widened duckbill sleeve.
[0015] A further improvement based on the technical solution is that the duckbill length of the sleeve is extended to 50-70 cm. Preferably, the duckbill length of the sleeve is extended to 60 cm.
[0016] A further improvement based on the technical solution is that the widening of the sleeve is to increase the width at the duckbill of the sleeve, and the increased width of the duckbill of the sleeve is less than 2.5 times the diameter of the pin shaft.
[0017] A further improvement based on the technical solution is that the hook is a U-shaped hook.
[0018] A further improvement based on the technical solution is that the chain is an extended chain, the length of the extended chain is 50-70 cm, and the extended chain is welded to the middle and lower part of the sleeve. Preferably, the length of the extended chain is 60 cm.
[0019] A further improvement based on the technical solution is that the length of the offset welding between the curved iron plate and the pin shaft = 2 times the chain width - (the length of the curved iron plate - the length of the pin shaft).
[0020] A further improvement based on the technical solution is that the length of the hook is (4 / 5-1) the width of the plastic drain board.
[0021] A further improvement based on the technical solution is that the pin shaft matches the slot at the duckbill of the sleeve.
[0022] The above technical solution has the following beneficial effects:
[0023] The utility model is a device that can be used in conjunction with a large vibrating hammer to achieve one-time hole formation and anti-backflow effects. The utility model can be used in conjunction with a large vibrating hammer, which is a 40-type vibrating hammer used for geological hole drilling. The device can be used in conjunction with a large vibrating hammer to achieve one-time hole formation and anti-backflow plastic drainage board construction under geological conditions with high content of broken stones, complex components such as medium-dense and above sand layers, and high-water content fluidized silt in the surface layer to be drilled and the depth range of the plastic drainage board. It has the advantages of simple structure and operation, wide application range, high construction efficiency and low cost.
[0024] The specific effects are as follows:
[0025] 1. The lengthening of the duckbill length and the widening of the duckbill mouth of the duckbill type casing in the design of the utility model are beneficial to reducing the friction resistance of the entire casing during the lowering process of the plastic drainage board, thereby reducing the wear rate of the casing.
[0026] 2. The extended chain in the design of the utility model is conducive to extending the time and reserving space to facilitate the entrainment of high-water content fluidized silt back into the soil.
[0027] 3. The pin shaft provided with a curved iron plate and a U-shaped hook in the design of the utility model further reduces the possibility of silt entering the casing during the lowering process, and reduces the friction between the plastic drainage board and the casing when pulling up the casing; improves the overall deadweight, rigidity and bending resistance of the pin shaft, and can break the soil when encountering medium-dense and above ash layers, broken stones, etc. during the lowering process, and prevents the plastic drainage board from breaking. The curved iron plate has a certain curvature, which can reduce the frictional resistance during the lowering process, thereby reducing mechanical damage during the construction process.
[0028] 4. The widening of the duckbill and the staggered welding of the pin and the curved iron plate in the design of the utility model reserve sufficient space for the chain that droops under its own weight, protecting the chain from being broken by hard objects such as crushed stones in the soil during the installation of the plastic drainage board.
[0029] 5. The utility model is designed with a lengthened and widened duckbill casing, a lengthened chain connected to the casing, and a pin connected to the chain with a curved iron plate and a U-shaped hook, which are used in conjunction with a large vibrating hammer. It can be applied to the construction of plastic drain boards in various soft foundation treatment projects, especially for the surface layer of the foundation to be treated with a high content of broken and lumpy stones, and medium-dense and above sand layers (saturated ash, etc.). No additional holes are required, and the plastic drain boards can be drilled and installed in one time and prevented from being carried back. It has the advantages of simple structure and operation, high construction efficiency, low cost, etc., and is easy to produce and promote. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The utility model is further described below in conjunction with the accompanying drawings:
[0031] Figure 1This is a schematic structural diagram of the device before the belt is lowered, which is used in conjunction with a large vibrating hammer to achieve one-time hole formation and anti-backlash effects.
[0032] Figure 2 It is a structural schematic diagram of the device when the casing is pulled up, which is used in conjunction with a large vibrating hammer to achieve one-time hole formation and anti-backlash effects.
[0033] Figure 3 The utility model is provided with a curved iron plate and a U-shaped hook pin structure schematic diagram of the embodiment of the present invention.
[0034] In the figure: 1- casing 1; 2- slot; 3- duckbill; 4- extended chain; 5- curved iron plate; 6- pin shaft; 7- U-shaped hook; 8- plastic drain board 8. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below through the accompanying drawings and embodiments. However, it should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the scope of the utility model. In addition, in the following description, the description of the known structure and technology is omitted to avoid unnecessary confusion of the concept of the utility model.
[0036] See also Figure 1-3 The device is used in conjunction with a large vibrating hammer to achieve one-time hole forming and anti-backlash effects, comprising a sleeve 1, a chain connected to the sleeve 1, and a pin 6 connected to the chain.
[0037] As a further explanation of this embodiment, a curved iron plate 5 and a hook are welded on the pin 6, wherein the curved iron plate 5 is located on one side of the pin 6 and the hook is located on the other side of the pin 6, wherein the curved iron plate 5 is staggeredly welded with the pin 6. The curved iron plate 5 increases the deadweight of the pin 6 while increasing its rigidity and bending resistance, which is beneficial for breaking the soil and preventing the plastic drainage board 8 from breaking when encountering medium-dense and above sand layers, hard objects such as broken stones, etc.
[0038] As a further explanation of this embodiment, a plastic drain board 8 is arranged in the sleeve 1. The plastic drain board 8 is partially pulled out from the mouth groove of the sleeve 1, and the board head of the plastic drain board 8 is bent into a hook shape around the hook and then inserted into the sleeve 1.
[0039] As a further illustration of this embodiment, a slot 2 matching the pin 6 is provided at the lower portion of the sleeve 1.
[0040] As a further explanation of this embodiment, the sleeve 1 is a lengthened and widened duckbill sleeve 1. The length of the duckbill of the sleeve 1 is lengthened to 50-70 cm. Preferably, the length of the duckbill of the sleeve 1 is lengthened to 60 cm. The widening of the sleeve 1 is to increase the width at the duckbill opening of the sleeve 1, and the increased width of the sleeve 1 at the duckbill opening of the sleeve 1 is less than 2.5 times the diameter of the pin 6. Increasing the length and width of the duckbill of the duckbill sleeve 1 is to minimize the wear of the sleeve 1 due to frictional resistance at the premise of sacrificing the duckbill.
[0041] As a further illustration of this embodiment, the hook is a U-shaped hook 7.
[0042] As a further explanation of this embodiment, the chain is an extended chain 4, the length of the extended chain 4 is 50-70 cm, and the extended chain 4 is welded to the middle and lower part of the casing 1. Preferably, the length of the extended chain 4 is 60 cm. The extended chain 4 is used to recycle the pin 6 and extend the time for the pin 6 to fix the plastic drain board 8 and reserve space for the fluidized (high water content) silt to be entrained in the soil.
[0043] As a further illustration of this embodiment, the length of the offset welding between the curved iron plate 5 and the pin 6 = 2 times the chain width - (length of the curved iron plate 5 - length of the pin 6).
[0044] As a further illustration of this embodiment, the length of the hook is (4 / 5-1) the width of the plastic drain board 8.
[0045] As a further illustration of this embodiment, the pin shaft 6 matches the slot 2 at the duckbill of the sleeve 1.
[0046] The embodiment and a soft foundation treatment project of a power plant are further described in detail.
[0047] There is a soft foundation treatment project in a power plant, which adopts the "vacuum combined loading preloading method" for treatment. The strata within the treatment range are widely distributed with silty clay, the treatment depth is 25 m, and the surface is fully covered with medium-density and above saturated ash, and there are local hard objects such as broken stones and lumps. The width b of the plastic drainage board 8 is 100 mm, and the thickness is The thickness of the drainage board is 4 mm, and the plastic drainage boards 8 are arranged in an equilateral triangle with a spacing of 1.1 m.
[0048] A method for constructing a plastic drainage board 8 using a device that is used in conjunction with a large vibrating hammer to achieve one-time hole formation and anti-backflow effects, the main construction steps include:
[0049] S1. According to the width of the plastic drain board 8, a lengthened and widened duckbill sleeve 1 of corresponding size is manufactured and connected to the main sleeve 1.
[0050] S2. Weld a chain 4 of the same length to the lengthened and widened duckbill casing 1.
[0051] S3, a pin 6 is welded on the other end of the chain 4, which is tightly fitted with the slot 2 at the duckbill;
[0052] S4. Weld a U-shaped hook 7 at the center axis of one side of the pin 6, and weld a curved iron plate 5 on the other side thereof. It is required that the curved iron plate 5 and the pin 6 are welded in a staggered manner.
[0053] S5, pull the plastic drain board 8 out of the mouth groove of the lengthened and widened duckbill casing 1 by about 50 cm, bend the board head of the plastic drain board 8 around the U-shaped hook 75 into a hook shape, and then reversely insert it into the duckbill casing 1;
[0054] S6. Insert the U-shaped hook 75 into the duckbill casing 1, and the construction personnel pull it from the other end of the plastic drain plate 8 to make the pin 6 fit tightly into the slot 2 of the duckbill casing 1, and make the duckbill 3 of the duckbill casing 1 completely embedded in the protection range of the curved iron plate 5 to prevent silt from entering the casing 1. In addition, arrange the chain 4 to prevent them from being entangled with each other and make it fall into the protection range of the curved iron plate 5.
[0055] S7. Start the vibrating hammer to drive the pin 6 with the curved iron plate 5 and the U-shaped hook 7 into the designed depth, and lift the duckbill casing 1. Due to the extended time and reserved space of the extended chain 4, the fluidized silt can be entrained with the soil. The part of the pin 6 with the curved iron plate 5 and the U-shaped hook 7 that exceeds the range of the casing 1 automatically falls off due to the action of its own weight, soil pressure and friction, so that it can be lifted to the surface by the extended chain 4, and then the next plastic drainage board 8 is driven.
[0056] As a further illustration of this embodiment, in step S1, the width of the plastic drain board 8 is 100 mm, the outer diameter of the duckbill sleeve 1 is 130 mm, the inner diameter is 110 mm, and the thickness of the sleeve 1 is 10 mm. The duckbill length of the duckbill sleeve 1 is 600 mm, and the width of the widened duckbill is 140 mm.
[0057] Preferably, the welding method in step S2 is full welding, using a scrap steel bar to fully weld the chain onto the sleeve 1, and the length of the extended chain 4 is 600 mm and the width is 30 mm.
[0058] Preferably, the welding method in step S3 is full welding, the diameter of the slot 2 at the duckbill and the diameter of the pin 6 are both 25 mm, and further, the length of the pin 6 is 160 mm to ensure that sludge does not enter the casing 1 from the duckbill.
[0059] Preferably, the welding method in step S4 is full welding, the length of the U-shaped hook 7 is 80 mm, the length of the curved iron plate 5 is 185 mm, the thickness is 10 mm, and the offset welding length of the curved iron plate 5 and the pin 6 is 35 mm, satisfying the welding length + (length of the curved iron plate 5 - length of the pin 6) = 35 + (185-160) = 60 mm = 2*30 mm (width of the chain).
[0060] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims
1. A device used in conjunction with a large vibrating hammer to achieve one-time hole formation and anti-carryback effects, characterized by: It includes a sleeve, a chain connected to the sleeve, and a pin connected to the chain. A curved iron plate and a hook are welded on the pin shaft, wherein the curved iron plate is located on one side of the pin shaft, and the hook is located on the other side of the pin shaft, wherein the curved iron plate and the pin shaft are welded in a staggered manner; A plastic drain board is arranged in the sleeve, and a part of the plastic drain board is pulled out from the mouth groove of the sleeve, and the board head of the plastic drain board is bent into a hook shape around the hook, and then inserted into the sleeve.
2. The device for achieving one-time hole forming and anti-carryback effect when used in conjunction with a large-scale vibrating hammer according to claim 1, characterized in that: The lower part of the sleeve is provided with a slot matching the pin shaft.
3. The device for achieving one-time hole forming and anti-carryback effect when used in conjunction with a large-scale vibrating hammer according to claim 1, characterized in that: The sleeve is a lengthened and widened duckbill sleeve.
4. The device for achieving one-time hole forming and anti-carrying effect when used in conjunction with a large-scale vibrating hammer according to claim 3 is characterized in that: The duckbill length of the sleeve is extended to 50-70 cm.
5. The device for achieving one-time hole forming and anti-carryback effect when used in conjunction with a large-scale vibrating hammer according to claim 4, characterized in that: The widening of the sleeve is to increase the width at the duckbill of the sleeve, and the increased width at the duckbill of the sleeve is less than 2.5 times the diameter of the pin shaft.
6. The device for achieving one-time hole forming and anti-carryback effect when used in conjunction with a large-scale vibrating hammer according to claim 1, characterized in that: The hook is a U-shaped hook.
7. The device for achieving one-time hole forming and anti-carryback effect when used in conjunction with a large-scale vibrating hammer according to claim 1, characterized in that: The chain is an extended chain with a length of 50-70 cm. The extended chain is welded to the middle and lower part of the sleeve.
8. The device for achieving one-time hole forming and anti-carrying effect when used in conjunction with a large-scale vibrating hammer according to any one of claims 1 to 7, characterized in that: The length of the offset welding between the curved iron plate and the pin shaft = 2 times the chain width - (the length of the curved iron plate - the length of the pin shaft).
9. The device for achieving one-time hole forming and anti-slipping effect when used in conjunction with a large-scale vibrating hammer according to any one of claims 1 to 7, characterized in that: The length of the hook is (4 / 5-1) the width of the plastic drain board.
10. The device for achieving one-time hole forming and anti-carrying effect when used in conjunction with a large-scale vibrating hammer according to any one of claims 1 to 7, characterized in that: The pin shaft matches the slot at the duckbill of the sleeve.
Citation Information
Patent Citations
Device for eliminating return belt of plastic drainage plate in soft foundation treatment and construction method of device
CN115573323A
Reduce drain bar and return novel shoe of taking problem