System for improving cooperative stress of uplift anchor rod and uplift pile
By adding pre-tightening nuts and steel plates at the anchor end of the resistant pull-resistant anchor, combined with spiral stirrups and water-stop expansion rubber strips, the problem that the resistant pull-resistant anchor and the resistant pull-resistant pile cannot be subjected to stress in concert, and uniform resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant pull-resistant Force transmission avoids cracking and leakage of the base plate.
Patent Information
- Application Number
- CN202420474367.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-12
AI Technical Summary
The existing anti-pull-resistant anchor rods and anti-pull-resistant piles cannot co-operate with stress in the underground structure, resulting in uneven stress, which may lead to cracking and leakage of the bottom plate.
By adding pre-tightening nuts and steel plates to the anchor end of the pull-resistant anchor rod, ensure that the anchor rod is in a tight state before pouring the bottom plate, and use spiral stirrups and water-stop expansion rubber strips to achieve coordinated stress between the anchor rod and the pile.
It ensures the coordinated force between the anchor rod and the pile, reduces the force delay, ensures the uniform resistance to pulling force of the bottom plate, and avoids cracking and leakage.
Smart Images

Figure CN222100835U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pull-out anchor rod construction, in particular to a system for improving the coordinated force of pull-out anchor rods and pull-out piles. Background Art
[0002] In recent years, in order to better solve the shortage of land, the application of underground space has become more and more extensive, and large underground buildings with shallow groundwater levels have appeared in the project. Because such underground structures have large construction areas, deep foundations, and relatively few building floors, under the highest groundwater level in history, the deadweight of the structure is not enough to resist the buoyancy of groundwater. Therefore, anti-floating measures need to be set up to resist buoyancy, and general measures include pull-out piles and anti-floating anchors.
[0003] Usually, the end of the pull-out anchor needs to be anchored to the basement floor to transfer the tension to the basement floor. The specific method is to place the metal embedded parts at the end of the anchor in the pouring area before pouring the basement floor, and then pour them together after the reinforcement of the basement floor is tied, so as to achieve a rigid connection between the anchor and the base. However, in actual situations, unlike the pile foundation, the single anchor steel sheet at the end of the anchor is not in a tight state after the basement is poured, and the connection with the base is not as tight as the end of the pile and the raft. The transmission of pull-out force is not direct, and it requires a certain small displacement before participating in the force, so the force has a certain delay effect. In this case, the pile and the anchor cannot be stressed together, and such uneven stress will cause the pull-out pile to be overloaded, and it will also cause the basement to crack and leak locally under unbalanced stress, with serious consequences. Summary of the invention
[0004] In view of the above-mentioned prior art, the utility model proposes a system for improving the coordinated force of the pull-out anchor rod and the pull-out pile.
[0005] The utility model provides a system for improving the coordinated force of an anti-pull anchor rod and an anti-pull pile, comprising an anti-pull anchor rod, wherein the upper rod portion of the anti-pull anchor rod located on the ground is threadedly connected to a lower pad, the upper end of the upper rod portion located at the lower pad is threadedly connected to a lower nut, the upper rod portion located above the lower nut is threadedly connected to an upper nut, the upper end of the upper rod portion located at the upper nut is threadedly connected to an upper pad, and the upper rod portion is located between the lower nut and the upper nut and is interspersed with spiral stirrups.
[0006] Preferably, the upper rod portion is located at the upper end of the lower nut and is provided with a lower water-swellable waterproof rubber strip.
[0007] Preferably, the upper rod portion is located at the lower end of the upper nut and is provided with an upper water-swellable waterproof rubber strip.
[0008] Preferably, the diameter of the spiral stirrups is 10 mm, and the spacing between the stirrups is 50 mm.
[0009] Preferably, the upper pad and the lower pad are both made of 250×250 mm square steel plates, and the thickness of the lower pad is 10 mm.
[0010] Preferably, the lower nut and the lower pad, and the upper nut and the upper pad are all configured as an integrated structure.
[0011] Compared with the prior art, the beneficial effects of the utility model are as follows: the utility model provides a system for improving the coordinated force of pull-out anchor rods and pull-out piles, by optimizing the anchoring end of the anchor rod and adding pre-tightening nuts and steel plates, so that the pull-out anchor rods are in a taut state before the bottom plate concrete is poured. In this way, after the bottom plate is poured, the anchor rods can cooperate with the pull-out piles to bear force, and the strength of each pull-out anchor rod is fully exerted, while reducing the delay in the force of the anchor rods, ensuring that the pull-out force of the piles and anchor rods is exerted, thereby ensuring that the bottom plate is subjected to uniform pull-out force and avoiding cracking and leakage. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic structural diagram of a system for improving the coordinated force of pull-out anchor rods and pull-out piles in an embodiment of the utility model.
[0013] Figure 2 It is a schematic diagram of the application of the system for improving the coordinated force of the pull-out anchor rod and the pull-out pile in the embodiment of the utility model.
[0014] In the figure: 1. Pull-out anchor rod; 2. Lower pad; 3. Lower nut; 4. Upper nut; 5. Upper pad; 6. Spiral stirrups; 7. Lower water-swelling waterstop strip; 8. Upper water-swelling waterstop strip. DETAILED DESCRIPTION
[0015] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.
[0016] Example: Figure 1 A system for improving the coordinated force of an anti-pull anchor rod and an anti-pull pile is shown, comprising an anti-pull anchor rod 1, an upper rod portion of the anti-pull anchor rod 1 located on the ground is threadedly connected to a lower pad 2, the upper end of the upper rod portion located at the lower pad 2 is threadedly connected to a lower nut 3, the upper rod portion located above the lower nut 3 is threadedly connected to an upper nut 4, the upper end of the upper rod portion located at the upper nut 4 is threadedly connected to an upper pad 5, the upper rod portion is located between the lower nut 3 and the upper nut 4 and is interspersed with a spiral stirrup 6, the reinforcement body diameter of the spiral stirrup 6 is 10 mm, and the reinforcement body spacing is 50 mm.
[0017] Furthermore, the upper end of the upper rod portion located at the lower nut 3 is provided with a lower water-swellable waterproofing strip 7, and the upper end of the upper rod portion located at the upper nut 4 is provided with an upper water-swellable waterproofing strip 8. The upper pad 5 and the lower pad 2 are both made of 250×250mm square steel plates, and the thickness of the lower pad 2 is 10mm. The lower nut 3 and the lower pad 2, and the upper nut 4 and the upper pad 5 are all set as an integrated structure.
[0018] like Figure 2 As shown, when this embodiment is used, first use GPS for positioning to mark the position of the pull-out anchor 1; use a high-pressure rotary jet pile driver to drill a hole to the designed depth, expand the hole, and pull out the drill bit; insert the pull-out anchor 1 and perform pressure grouting and maintenance; install the lower pad 2 and the lower nut 3 for pre-tightening, so that the pull-out anchor 1 is in a taut state; place the lower water-swellable waterstop strip 7; install the spiral stirrups 6, and place the upper water-swellable waterstop strip 8; install the upper nut 4 and the upper pad 5 for anchoring; tie the bottom plate steel bars and pour concrete.
[0019] In this embodiment, after the anti-pullout anchor rod 1 is constructed on the cushion layer, the anti-pullout anchor rod 1 is pre-tightened by the lower nut 3 so that the anti-pullout anchor rod 1 is in a taut state. Under the action of uniform buoyancy on the bottom plate, the bottom plate drives the anti-pullout anchor rod 1 and the anti-pullout pile to deform synergistically, while exerting an anti-pullout effect, which can reduce local concentrated force and the hazards of bottom plate cracking and leakage caused by it.
[0020] The above are only implementation methods of the present utility model, and are not intended to limit the patent scope of the present utility model. Any equivalent structure made using the contents of the specification and drawings of the present utility model, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present utility model.
Claims
1. A system for improving the coordinated force of pull-out anchor rods and pull-out piles, It is characterized in that It includes a pull-out anchor rod, wherein the upper rod portion of the pull-out anchor rod located on the ground is threadedly connected to a lower pad, the upper end of the upper rod portion located at the lower pad is threadedly connected to a lower nut, the upper rod portion located above the lower nut is threadedly connected to an upper nut, the upper end of the upper rod portion located at the upper nut is threadedly connected to an upper pad, and the upper rod portion is located between the lower nut and the upper nut and is interspersed with spiral stirrups.
2. The system for improving the coordinated force of the pull-out anchor rod and the pull-out pile according to claim 1, It is characterized in that The upper end of the upper rod portion located at the lower nut is provided with a lower water-swellable waterproof rubber strip.
3. The system for improving the coordinated force of the pull-out anchor rod and the pull-out pile according to claim 1 or 2, It is characterized in that The upper rod portion is located at the lower end of the upper nut and is provided with an upper water-swellable waterproof rubber strip.
4. The system for improving the coordinated force of the pull-out anchor rod and the pull-out pile according to claim 1 or 2, It is characterized in that The diameter of the spiral stirrups is 10 mm, and the spacing between the stirrups is 50 mm.
5. The system for improving the coordinated force of the pull-out anchor rod and the pull-out pile according to claim 1 or 2, It is characterized in that The upper pad and the lower pad are both made of 250×250 mm square steel plates, and the thickness of the lower pad is 10 mm.
6. The system for improving the coordinated force of the pull-out anchor rod and the pull-out pile according to claim 1 or 2, It is characterized in that The lower nut and the lower pad, and the upper nut and the upper pad are all configured as an integrated structure.