Draught fan foundation pouring formwork

By designing the first and second bucket bodies of the fan foundation cast formwork and combining with the installation part of the formwork assembly, the problem of concrete spillover is solved, the effective utilization and recycling of concrete is realized, and waste and environmental pollution are reduced.

CN222100858UActive Publication Date: 2024-12-03CHINA THREE GORGES RENEWABLES (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420015012.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-12-03
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

During the pouring of fan foundation, concrete slurry is prone to overflow, resulting in concrete waste.

Method used

A fan foundation casting formwork is designed, including a formwork assembly, a first bucket body and a second bucket body. By providing a first mounting part and a second mounting part, the first bucket body and the second bucket body are respectively arranged around the template assembly. circumference to limit and accommodate spilled concrete, reduce spillage, and concrete recovery through the second bucket body.

Benefits of technology

It effectively reduces the waste of concrete, improves the utilization rate of concrete, and reduces pollution to the surrounding environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100858U_ABST
    Figure CN222100858U_ABST
Patent Text Reader

Abstract

The utility model provides a fan foundation pouring formwork. The draught fan foundation pouring formwork comprises a formwork assembly, a first bucket body and a second bucket body, and the formwork assembly is provided with a pouring hole used for allowing concrete to pass through; a first mounting part and a second mounting part are arranged on the outer side wall of the formwork assembly, the first mounting part and the second mounting part are arranged in the height direction of the formwork assembly in a spaced mode, the first hopper body is connected with the formwork assembly through the first mounting part, and the first hopper body is arranged on the peripheral side of the formwork assembly in a surrounding mode so that part of concrete can be limited in the first hopper body; the second hopper body is connected with the formwork assembly through the second mounting part, and the second hopper body is arranged on the peripheral side of the formwork assembly in a surrounding mode so as to contain concrete overflowing from the first hopper body. According to the fan foundation pouring formwork, overflow of concrete grout is reduced, and therefore waste of concrete is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of wind turbine foundation construction, and in particular to a wind turbine foundation casting template. Background Art

[0002] The full name of wind turbine is wind turbine. Due to its heavy weight, before the wind turbine is hoisted, it is necessary to first pour concrete into the foundation of the wind turbine to form a foundation platform.

[0003] In the prior art, before pouring the wind turbine foundation, the steel bars are first tied, then the pouring formwork is installed, concrete is poured into the formwork, and vibration operations are performed.

[0004] However, during the pouring and vibrating of concrete, a large amount of concrete slurry will overflow, resulting in a waste of concrete. Utility Model Content

[0005] The present application provides a fan foundation casting template to solve the problem of concrete slurry overflowing and causing concrete waste.

[0006] The fan foundation casting template provided in the present application includes a template assembly, a first bucket body and a second bucket body, and the template assembly has casting holes for concrete to pass through.

[0007] A first mounting portion and a second mounting portion are provided on the outer side wall of the formwork assembly, and the first mounting portion and the second mounting portion are spaced apart along the height direction of the formwork assembly. The first bucket body is connected to the formwork assembly through the first mounting portion, and the first bucket body is arranged around the circumference of the formwork assembly to limit part of the concrete inside the first bucket body. The second bucket body is connected to the formwork assembly through the second mounting portion, and the second bucket body is arranged around the circumference of the formwork assembly to accommodate concrete overflowing from the first bucket body.

[0008] In a possible implementation, the fan foundation casting formwork provided in the present application has a first mounting portion located at the top of the formwork assembly, and the first mounting portion has a first slot on the side facing away from the formwork assembly, and the first bucket is inserted into the first mounting portion through the first slot.

[0009] In a possible implementation, the fan foundation casting template provided in the present application has a second slot on the side of the second mounting portion facing away from the template assembly, and the second bucket is inserted into the second mounting portion through the second slot.

[0010] In a possible implementation, in the fan foundation casting template provided by the present application, a receiving groove is formed between the second bucket and the template assembly, and the receiving groove is used to receive concrete overflowing from the first bucket.

[0011] In a possible implementation, the wind turbine foundation casting template provided in the present application, the first mounting part, the second mounting part and the template assembly are integrally formed.

[0012] In a possible implementation, in the wind turbine foundation casting template provided by the present application, the first bucket body and the second bucket body are both inclined toward the top of the template assembly.

[0013] The included angle between the first bucket body and the template assembly is 30°-50°, and the included angle between the second bucket body and the template assembly is 50°-70°.

[0014] In a possible implementation, in the wind turbine foundation casting template provided by the present application, the projection of the first bucket along the height direction of the template assembly is located inside the second bucket.

[0015] In a possible implementation, the wind turbine foundation casting formwork provided in the present application, the second bucket body includes a first arc-shaped plate and a second arc-shaped plate, both ends of the first arc-shaped plate have a first abutment portion, both ends of the second arc-shaped plate are provided with a second abutment portion, and the second abutment portion is used to abut with the first abutment portion.

[0016] In a possible implementation, the wind turbine foundation casting template provided in the present application, the template assembly includes a first template and a second template, the first template and the second template are semicircular, and the first template and the second template are arranged opposite to each other to form a casting hole.

[0017] The first arc plate is detachably connected to the first template, and the second arc plate is detachably connected to the second template.

[0018] In a possible implementation, the wind turbine foundation casting template provided in the present application has a first connecting portion at both ends of the first template, and a first connecting hole is provided on the first connecting portion.

[0019] Second connecting parts are provided at both ends of the second template, second connecting parts are provided with second connecting holes, and the first connecting hole and the second connecting hole are connected by screws.

[0020] The fan foundation casting formwork provided in the present application is provided with a formwork assembly, a first bucket body and a second bucket body. The first bucket body is connected to the formwork assembly through a first mounting portion, and the first bucket body is arranged around the circumference of the formwork assembly, which can reduce concrete overflow and improve the utilization rate of concrete; the second bucket body is connected to the formwork assembly through a second mounting portion, and the second bucket body is arranged around the circumference of the formwork assembly to accommodate concrete overflowing from the first bucket body, thereby recycling the concrete and further reducing the waste of concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0022] Figure 1 A schematic diagram of the structure of a fan foundation casting template provided in an embodiment of the present application;

[0023] Figure 2 for Figure 1 A schematic diagram of the structure from another angle;

[0024] Figure 3 for Figure 1 Schematic diagram of the structure of the first template, the first curved plate and the third curved plate.

[0025] Description of reference numerals:

[0026] 100-Template component;

[0027] 110 - casting hole; 120 - first mounting portion; 130 - second mounting portion;

[0028] 140-first template; 141-first connecting portion; 150-second template; 151-second connecting portion;

[0029] 200-first bucket;

[0030] 210-third curved plate; 220-fourth curved plate;

[0031] 300- second bucket;

[0032] 310 - first arc-shaped plate; 311 - first abutting portion; 320 - second arc-shaped plate; 321 - second abutting portion.

[0033] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0034] First, those skilled in the art should understand that these implementations are only used to explain the technical principles of the present application and are not intended to limit the scope of protection of the present application. Those skilled in the art can make adjustments to them as needed to adapt to specific application scenarios.

[0035] Secondly, it should be noted that in the description of this application, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, or it can be an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0036] Then, it should be noted that, in the description of the present application, the terms "upper", "lower", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.

[0037] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0038] As shown in the background art, in the prior art, the wind turbine foundation is first reinforced with steel bars before pouring, then the pouring formwork is installed, concrete is poured into the formwork, and vibrated. However, due to the slope of the wind turbine foundation, a large amount of concrete slurry will overflow during the pouring and vibrating of concrete, resulting in a waste of concrete.

[0039] Based on this, the fan foundation casting formwork provided in the present application is provided with a formwork assembly, a first bucket body and a second bucket body. The first bucket body is connected to the formwork assembly through a first mounting part, and the first bucket body is arranged around the circumference of the formwork assembly, which can reduce concrete overflow and improve the utilization rate of concrete; the second bucket body is connected to the formwork assembly through a second mounting part, and the second bucket body is arranged around the circumference of the formwork assembly to accommodate concrete overflowing from the first bucket body, thereby recycling the concrete and further reducing the waste of concrete.

[0040] In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the embodiments of the present application will be described in more detail below in conjunction with the drawings in the preferred embodiments of the present application. In the drawings, the same or similar reference numerals throughout represent the same or similar parts or parts with the same or similar functions. The described embodiments are part of the embodiments of the present application, not all of the embodiments. The embodiments described below with reference to the drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limitations on the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0041] Figure 1 A schematic diagram of the structure of a fan foundation casting template provided in an embodiment of the present application.

[0042] See also Figure 1 As shown, the wind turbine foundation casting template provided by the present application includes a template assembly 100, a first bucket body 200 and a second bucket body 300, and the template assembly 100 has a casting hole 110 for concrete to pass through.

[0043] The outer side wall of the formwork assembly 100 is provided with a first mounting portion 120 and a second mounting portion 130, and the first mounting portion 120 and the second mounting portion 130 are spaced apart along the height direction of the formwork assembly 100, the first bucket body 200 is connected to the formwork assembly 100 through the first mounting portion 120, and the first bucket body 200 is arranged around the circumference of the formwork assembly 100 to limit part of the concrete in the first bucket body 200, the second bucket body 300 is connected to the formwork assembly 100 through the second mounting portion 130, and the second bucket body 300 is arranged around the circumference of the formwork assembly 100 to accommodate concrete overflowing from the first bucket body 200.

[0044] It should be noted that the formwork assembly 100 is used to support concrete pouring construction, and the pouring holes 110 on the formwork assembly 100 are used to pour concrete, and can be removed after the concrete is formed.

[0045] It should also be noted that the first mounting portion 120 and the second mounting portion 130 are arranged along the height direction of the template assembly 100, that is, the first mounting portion 120 and the second mounting portion 130 are arranged along the height direction of the template assembly 100. Figure 1 The second mounting portion 130 is arranged in the +X direction as indicated by the arrow, and the second mounting portion 130 is located in the −X direction as indicated by the arrow of the first mounting portion 120 .

[0046] Furthermore, the first bucket body 200 is arranged around the circumference of the formwork assembly 100. During the concrete pouring or vibrating process, the concrete falling on the inner wall of the first bucket body 200 can flow along its inner wall to the pouring hole 110, reducing concrete overflow and thus improving the utilization rate of the concrete.

[0047] Furthermore, the second bucket body 300 is arranged around the circumference of the formwork assembly 100. During the concrete pouring or vibration process, concrete that overflows from the first bucket body 200 due to excessive concrete pouring or excessive vibration force can drip onto the second bucket body 300, so that the concrete can be collected by the second bucket body 300, further reducing the waste of concrete.

[0048] Exemplarily, the first bucket body 200, the second bucket body 300 and the template assembly 100 can be made of materials such as rubber and metal. As long as the first bucket body 200, the second bucket body 300 and the template assembly 100 are made of the same material, the present application does not impose any limitation on this.

[0049] It is understandable that, compared with the prior art, a large amount of concrete slurry will overflow during the pouring and vibrating operations, resulting in a waste of concrete. In the present embodiment, the fan foundation pouring template is provided with a template assembly 100, a first bucket 200 and a second bucket 300. The first bucket 200 is connected to the template assembly 100 through a first mounting portion 120, and the first bucket 200 is arranged around the periphery of the template assembly 100, which can reduce the overflow of concrete and improve the utilization rate of concrete; the second bucket 300 is connected to the template assembly 100 through a second mounting portion 130, and the second bucket 300 is arranged around the periphery of the template assembly 100 to accommodate the concrete overflowing from the first bucket 200, thereby recycling the concrete, further reducing the waste of concrete, and reducing the pollution to the surrounding environment.

[0050] In some embodiments, see Figure 1 As shown, the first mounting portion 120 is located at the top of the template assembly 100 , and the first mounting portion 120 has a first slot on a side away from the template assembly 100 , and the first bucket 200 is inserted into the first mounting portion 120 through the first slot.

[0051] It should be noted that the first mounting portion 120 is located at the top of the formwork assembly 100, that is, the bottom of the first bucket body 200 is flush with the top of the formwork assembly 100, thereby reducing the resistance of the concrete on the inner wall of the first bucket body 200 flowing to the casting hole 110, avoiding the concrete from sticking to the inner wall of the first bucket body 200, and improving the utilization rate of the concrete.

[0052] Furthermore, the first slot is located on the side of the first mounting portion 120 away from the formwork assembly 100, so that the first bucket body 200 is inserted on the outer peripheral side of the formwork assembly 100, thereby partially limiting the concrete overflowing the formwork assembly 100 on the first bucket body 200, reducing the waste of concrete.

[0053] In some embodiments, see Figure 1As shown, the second installation portion 130 has a second slot on a side facing away from the template assembly 100 , and the second bucket 300 is inserted into the second installation portion 130 through the second slot.

[0054] It can be understood that the second slot is arranged on the side of the second mounting portion 130 away from the formwork assembly 100, so that the second bucket body 300 is inserted on the outer peripheral side of the formwork assembly 100, so that the concrete overflowing from the first bucket body 200 can fall on the second bucket body 300, further reducing the waste of concrete.

[0055] For example, the second mounting portion 130 may be disposed in a middle portion of the template assembly 100 in a height direction.

[0056] In some embodiments, see Figure 1 As shown, a receiving groove is formed between the second bucket body 300 and the formwork assembly 100 , and the receiving groove is used to receive concrete overflowing from the first bucket body 200 .

[0057] Specifically, concrete overflowing from the first bucket body 200 due to excessive concrete pouring or excessive vibration force drips onto the second bucket body 300, and the concrete is collected through the receiving groove between the second bucket body 300 and the formwork assembly 100. The receiving groove ensures sufficient collection space to prevent the concrete from dripping onto the ground and polluting the surrounding environment. At the same time, the concrete in the receiving groove can be recycled to further reduce the waste of concrete.

[0058] In some embodiments, see Figure 1 As shown, the first mounting portion 120 , the second mounting portion 130 and the template assembly 100 are integrally formed.

[0059] It should be noted that the first mounting part 120, the second mounting part 130 and the template assembly 100 are integrally formed, which can make the first mounting part 120 and the second mounting part 130 stronger, ensure that the device is more solid, and at the same time make the installation of the first bucket body 200 and the second bucket body 300 more convenient, thereby improving work efficiency.

[0060] Figure 2 for Figure 1 A schematic diagram of the structure from another angle.

[0061] In some embodiments, see Figure 2 As shown, the first bucket body 200 and the second bucket body 300 are both inclined toward the top of the template assembly 100 .

[0062] The included angle between the first bucket body 200 and the template assembly 100 is 30°-50°, and the included angle between the second bucket body 300 and the template assembly 100 is 50°-70°.

[0063] It can be understood that the first bucket body 200 is inclined toward the top of the formwork assembly 100 , so that the concrete spilled on the first bucket body 200 can flow into the pouring hole 110 along the inner wall of the first bucket body 200 .

[0064] At the same time, the second bucket body 300 is inclined toward the top of the formwork assembly 100, so that the concrete dripping on the inner wall of the second bucket body 300 can be temporarily stored in the receiving groove, which is convenient for recycling the concrete and prevents the concrete from dripping on the surrounding ground to avoid causing environmental pollution.

[0065] Exemplarily, the angle between the first bucket body 200 and the formwork assembly 100 can be 45°, the angle between the second bucket body 300 and the formwork assembly 100 is 60°, and the angle between the second bucket body 300 and the formwork assembly 100 is greater than the angle between the first bucket body 200 and the formwork assembly 100, ensuring that concrete overflowing from the first bucket body 200 can enter the second bucket body 300, while at the same time greatly increasing the accommodating space of the accommodating groove.

[0066] In some embodiments, see Figure 2 As shown, the projection of the first bucket body 200 along the height direction of the template assembly 100 is located inside the second bucket body 300 .

[0067] It should be noted that, along the height direction of the formwork assembly 100, the projection of the first hopper body 200 is located inside the second hopper body 300, that is, the diameter of the top of the second hopper body 300 is larger than the diameter of the top of the first hopper body 200, so that part of the concrete splashed from above the first hopper body 200 can fall onto the second hopper body 300, thereby improving the collection capacity of the second hopper body 300 and further reducing the waste of concrete.

[0068] Figure 3 for Figure 1 Schematic diagram of the structure of the first template, the first curved plate and the third curved plate.

[0069] In some embodiments, see Figure 2 and Figure 3 As shown, the second bucket body 300 includes a first arc plate 310 and a second arc plate 320 . Both ends of the first arc plate 310 have a first abutting portion 311 . Both ends of the second arc plate 320 have a second abutting portion 321 for abutting against the first abutting portion 311 .

[0070] It should be noted that the second bucket body 300 includes a first curved plate 310 and a second curved plate 320. When the second bucket body 300 is plugged into the second mounting portion 130, the first curved plate 310 and the second curved plate 320 can be inserted into the second mounting portion 130 in sequence from both sides of the template assembly 100, so that the installation of the first curved plate 310 and the second curved plate 320 is quick and convenient.

[0071] Specifically, the first abutting portion 311 of the first arc plate 310 abuts against the second abutting portion 321 of the second arc plate 320, making the first arc plate 310 and the second arc plate 320 closer, preventing the concrete in the receiving groove from leaking through the gap between the first arc plate 310 and the second arc plate 320, thereby ensuring the reliability of the device.

[0072] In some embodiments, see Figure 2 As shown, the template assembly 100 includes a first template 140 and a second template 150 . The first template 140 and the second template 150 are semicircular, and the first template 140 and the second template 150 are arranged opposite to each other to form a casting hole 110 .

[0073] The first curved plate 310 is detachably connected to the first template 140 , and the second curved plate 320 is detachably connected to the second template 150 .

[0074] Specifically, the first template 140 has a second slot on the side facing away from the second template 150, and the second template 150 also has a second slot on the side facing away from the first template 140. The first curved plate 310 is installed on the first template 140 through the second slot, and the second curved plate 320 is installed on the second template 150 through the second slot. The installation is convenient, and after the concrete pouring is completed, the template assembly 100 is easy to disassemble.

[0075] It should be noted that the inner diameter of the casting hole 110 can be determined according to the size of the wind turbine foundation, thereby selecting the size of the first template 140 and the second template 150 .

[0076] It should also be noted that the first bucket body 200 may also include a third curved plate 210 and a fourth curved plate 220 . The third curved plate 210 is detachably connected to the first template 140 , and the fourth curved plate 220 is detachably connected to the second template 150 .

[0077] In some embodiments, see Figure 2 As shown, two ends of the first template 140 have first connecting parts 141 , and the first connecting parts 141 are provided with first connecting holes.

[0078] The second template 150 is provided with a second connection portion 151 at both ends. The second connection portion 151 is provided with a second connection hole. The first connection hole and the second connection hole are connected by screws.

[0079] Exemplarily, the first connection portion 141 may be a protrusion, and the second connection portion 151 may also be a protrusion.

[0080] Specifically, the first connecting hole and the second connecting hole are arranged opposite to each other, and screws are used to pass through the first connecting hole and the second connecting hole in sequence to fix the first template 140 and the second template 150. The installation is convenient. When disassembling, the first template 140 and the second template 150 can be separated by simply taking out the screws. The disassembly is convenient.

[0081] It should be noted that the first connection portion 141 and the second connection portion 151 are in contact with each other, which can prevent the concrete in the casting hole 110 from seeping out along the gap between the first connection portion 141 and the second connection portion 151 .

[0082] Those skilled in the art will appreciate that the fan foundation casting formwork provided in the present application, by setting a formwork assembly 100, a first bucket body 200 and a second bucket body 300, wherein the first bucket body 200 is connected to the formwork assembly 100 through a first mounting portion 120, and the first bucket body 200 is disposed around the periphery of the formwork assembly 100, thereby reducing concrete overflow and improving the utilization rate of concrete; the second bucket body 300 is connected to the formwork assembly 100 through a second mounting portion 130, and the second bucket body 300 is disposed around the periphery of the formwork assembly 100 to accommodate concrete overflowing from the first bucket body 200, thereby recycling the concrete, further reducing the waste of concrete, and reducing the pollution caused to the surrounding environment.

[0083] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0084] It should be understood that the various numerical numbers involved in the embodiments of the present application are only used for the convenience of description and are not used to limit the scope of the embodiments of the present application.

[0085] So far, the technical solutions of the present application have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present application is obviously not limited to these specific embodiments. Without departing from the principles of the present application, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present application.

Claims

1. A fan foundation casting template, characterized in that: It comprises a template assembly, a first bucket body and a second bucket body, wherein the template assembly has a pouring hole for concrete to pass through; The outer side wall of the formwork assembly is provided with a first mounting portion and a second mounting portion, the first mounting portion and the second mounting portion are spaced apart along the height direction of the formwork assembly, the first bucket body is connected to the formwork assembly via the first mounting portion, and the first bucket body is disposed around the periphery of the formwork assembly to restrict part of the concrete within the first bucket body, the second bucket body is connected to the formwork assembly via the second mounting portion, and the second bucket body is disposed around the periphery of the formwork assembly to accommodate the concrete overflowing from the first bucket body.

2. The fan foundation casting template according to claim 1 is characterized in that: The first mounting portion is located at the top of the template assembly, and a side of the first mounting portion facing away from the template assembly has a first slot, and the first bucket is inserted into the first mounting portion through the first slot.

3. The fan foundation casting template according to claim 1 is characterized in that: The second mounting portion has a second slot on a side facing away from the template assembly, and the second bucket body is inserted into the second mounting portion through the second slot.

4. The fan foundation casting template according to claim 3 is characterized in that: A receiving groove is formed between the second bucket body and the formwork assembly, and the receiving groove is used to receive the concrete overflowing from the first bucket body.

5. The fan foundation casting template according to claim 1, characterized in that: The first mounting portion, the second mounting portion and the template assembly are integrally formed.

6. The fan foundation casting template according to claim 1, characterized in that: The first bucket body and the second bucket body are both inclined toward the top of the template assembly; The included angle between the first bucket body and the template assembly is 30°-50°, and the included angle between the second bucket body and the template assembly is 50°-70°.

7. The wind turbine foundation casting template according to any one of claims 1 to 6, characterized in that: The projection of the first bucket body along the height direction of the template assembly is located inside the second bucket body.

8. The wind turbine foundation casting template according to any one of claims 1 to 6, characterized in that: The second bucket body includes a first arc-shaped plate and a second arc-shaped plate, both ends of the first arc-shaped plate have first abutting portions, both ends of the second arc-shaped plate are provided with second abutting portions, and the second abutting portions are used to abut against the first abutting portions.

9. The fan foundation casting template according to claim 8, characterized in that: The template assembly includes a first template and a second template, the first template and the second template are semicircular, and the first template and the second template are arranged opposite to each other to form the casting hole; The first arc plate is detachably connected to the first template, and the second arc plate is detachably connected to the second template.

10. The fan foundation casting template according to claim 9, characterized in that: The first template has first connecting parts at both ends, and the first connecting parts are provided with first connecting holes; The second template is provided with second connecting parts at both ends, the second connecting parts are provided with second connecting holes, and the first connecting hole and the second connecting hole are connected by screws.