Micro pile pull-out test device

By designing a micro pile pull-out test device including jacks and chucks, the problems of inconvenient operation and insufficient applicability of the anti-out test device in the prior art are solved, and efficient pull-out test for small-diameter micro piles are realized. Test under various conditions.

CN222100967UActive Publication Date: 2024-12-03CENT SOUTHERN CHINA ELECTRIC POWER DESIGN INST CHINA POWER ENG CONSULTING GROUP CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420160883.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-12-03
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

The existing pull-out test device is inconvenient to operate when providing sufficient tension. Especially in small diameter micro piles and deep foundation pit environments, the equipment is highly limited and cannot meet the pull-out bearing capacity requirements of micro piles.

Method used

A micro pile resistance test device is designed, including piles to be inspected, piers, force transmission steel beams and force application units. The force application unit is composed of a jack, upper crossbar, chuck, connecting rod and force transmission cylinder. The jack and chuck transmit tension, suitable for steel bars of different diameters, and are precisely controlled by load measurement units and pull-up measurement units.

Benefits of technology

It achieves simple structure, convenient operation and high testing accuracy. It is suitable for ordinary foundation piles with a diameter of no more than 500mm. It provides efficient pull-out tests especially in environments with limited space, meeting the pull-out test needs of small-diameter piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100967U_ABST
    Figure CN222100967U_ABST
Patent Text Reader

Abstract

The utility model discloses a micro pile pull-out test device, and relates to a pull-out test device. The device comprises a to-be-detected pile, a buttress, a force transmission steel beam and a force application unit, the force application unit comprises a jack located at the top of the force transmission steel beam, an upper cross arm, a chuck and a connecting rod; the jack is provided with a load measuring unit, and the pile top of the to-be-detected pile is provided with an upward pulling amount measuring unit. The device is simple in structure, small in dead weight, convenient to hoist and operate, high in test precision, large in detected tension range, applicable to micro piles with different diameters, light, flexible, wide in application range, capable of being applied to anti-pulling tests under various different conditions, and high in practicability. And especially, the method has outstanding advantages on application conditions of small-diameter piles and limited test operation environment space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an anti-pulling test device, more specifically a micro pile anti-pulling test device. Background Art

[0002] Micro piles refer to tree root piles, precast concrete piles or steel pipe piles with a diameter of no more than 300mm formed in the soil by pile-driving machinery or other small equipment. The micro pile single pile pullout static load test is a test method that applies vertical tension step by step to the top of the pile, observes the pullout displacement of the top of the pile over time, and determines the corresponding single pile vertical pullout bearing capacity. It is used to determine whether the vertical pullout bearing capacity meets the design requirements.

[0003] Among the existing related technologies, there are certain inconveniences in providing sufficient tension to complete the pull-out test. Micropiles are generally small-diameter piles with a small distance between piles. When the foundation pit is deep, the existing large-scale static load equipment cannot meet the needs of on-site operations due to the small on-site operation space and the large limitations of the detection equipment. The tension provided by small test devices such as traditional anti-floating anchor pull-out tests is relatively small compared to the pull-out bearing capacity requirements of micropiles. In addition, unlike the anchor foundation with a small number of steel bars and a concentrated arrangement, the steel bars of the micropile foundation are mostly evenly dispersed and distributed in a ring shape, which brings many inconveniences to the pull-out test.

[0004] Therefore, it is necessary to develop a test device with simple structure, convenient operation, adjustable use, high flexibility, and the ability to meet the needs of micropile pull-out tests. Utility Model Content

[0005] The purpose of the utility model is to overcome the shortcomings of the above-mentioned background technology and to provide a micro pile pull-out test device.

[0006] In order to achieve the above-mentioned purpose, the technical scheme of the utility model is: a micro pile pullout test device, characterized in that it includes a pile to be tested, piers located on both sides of the pile to be tested, a force transmission steel beam located on the top of the pier, and a force application unit; the force application unit includes a jack located on the top of the force transmission steel beam, an upper cross arm located on the top of the jack, a chuck connected to the steel bar at the top of the pile to be tested, and a connecting rod connected to the upper cross arm at one end and the chuck at the other end;

[0007] The jack is provided with a load measuring unit, and the top of the pile to be inspected is provided with an upward pull-out measuring unit.

[0008] In the above technical solution, the upper cross arm includes a plurality of spaced apart web plates, a first upper groove plate located at the top of the web plates, and a first lower groove plate located at the bottom of the web plates. Both ends of the first upper groove plate and the first lower groove plate are provided with a plurality of upper cross arm grooves. The top of the connecting rod passes through the upper cross arm groove and is connected to the first upper groove plate through a limit nut.

[0009] In the above technical solution, the chuck includes a force transmission cylinder, a second upper groove plate located at the top of the force transmission cylinder, and a second lower groove plate located at the bottom of the force transmission cylinder. A plurality of spaced stiffening ribs are arranged on both sides of the force transmission cylinder. Chuck grooves are opened at the gaps between adjacent stiffening ribs on both sides of the second upper groove plate and the second lower groove plate. The bottom of the connecting rod passes through the chuck groove and is connected to the second lower groove plate through a limit nut; the upper cross arm groove matches the chuck groove;

[0010] The second upper trough plate and the second lower trough plate are both provided with a plurality of holes, and the top of the steel bar at the top of the pile to be inspected passes through the holes and is connected to the second upper trough plate through anchors.

[0011] In the above technical solution, first stop bars are provided at both ends of the first upper groove plate.

[0012] In the above technical solution, four upper cross arm partitions are arranged at intervals inside the belly vertical plate.

[0013] In the above technical solution, eight holes are opened on the second upper groove plate and the second lower groove plate, and the holes are evenly arranged along the center of the second upper groove plate and the second lower groove plate. Two first longitudinal partitions, four first transverse partitions and two second transverse partitions are arranged in the force transmission cylinder. The two first longitudinal partitions, four first transverse partitions and two second transverse partitions divide the force transmission cylinder into nine force transmission chambers, and each hole corresponds to a force transmission chamber.

[0014] In the above technical solution, the middle part of the hole is rectangular, and both ends are arc-shaped.

[0015] In the above technical solution, both ends of the top of the first upper trough plate are provided with lifting ears, and the side surfaces of the belly vertical plate are provided with identification marks.

[0016] In the above technical solution, four hooks are arranged on the side of the force transmission cylinder, and second baffles are arranged at both ends of the second upper groove plate and the second lower groove plate.

[0017] In the above technical solution, two hooks are respectively arranged at both ends of the force-transmitting steel beam.

[0018] Compared with the prior art, the utility model has the following advantages:

[0019] 1) The utility model has a simple structure, small deadweight, convenient hoisting, easy operation, high test accuracy, a large range of tested tensile forces, and is suitable for micro piles of various diameters and ordinary foundation piles with a diameter not exceeding 500 mm. It is light and flexible, has a wide range of applications, and can be applied to pull-out tests under various conditions, especially for small-diameter piles and limited test environment space.

[0020] 2) The long elliptical holes of the utility model can meet the position of steel bars of different pile diameters of micropiles, and at the same time have strong tolerance for the verticality of steel bars during construction. The hole diameter can meet all current steel bar models and has a wide applicability.

[0021] 3) The first upper groove plate of the utility model is provided with first stop bars at both ends to prevent accidents during the test and to prevent the connector from sliding sideways.

[0022] 4) The utility model divides the force transmission cylinder into nine force transmission chambers by means of two first longitudinal partitions, four first transverse partitions and two second transverse partitions, which is beneficial for the force applying unit to apply tension to perform pull-out test on the pile to be tested.

[0023] 5) The length of the groove of the slot plate for fixing the connecting rod of the utility model is reasonably designed, and four connecting rods can be accommodated on one side to match the pull-out resistance requirements of different tests. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of the utility model.

[0025] Figure 2 This is the front view of the upper crossarm.

[0026] Figure 3 This is a side view of the upper crossarm.

[0027] Figure 4 This is a top view of the upper cross arm.

[0028] Figure 5 This is a front view of the chuck.

[0029] Figure 6 A top view of the chuck.

[0030] Figure 7 A cross-sectional view of the chuck.

[0031] Among them, 1-pile to be inspected, 11-rebar, 2-pier, 3-force-transmitting steel beam, 31-hook, 4-force-applying unit, 41-jack, 42-upper cross arm, 421-belly plate, 422-first upper slot plate, 4221-first baffle, 423-first lower slot plate, 424-upper cross arm groove, 425-cross arm partition, 426-lifting ear, 427-identification mark, 43-chuck, 431-force-transmitting cylinder, 4311-first longitudinal partition, 4312-first transverse partition, 4313-second transverse partition, 4314-hook, 432-second upper slot plate, 433-second lower slot plate, 434-stiffening rib, 435-chuck groove, 436-hole, 437-anchor, 438-force-transmitting cavity, 439-second baffle, 44-connecting rod, 45-limiting nut. DETAILED DESCRIPTION

[0032] The following is a detailed description of the implementation of the present invention in conjunction with the accompanying drawings, but they do not constitute a limitation of the present invention and are only used as examples. At the same time, the advantages of the present invention become clearer and easier to understand through the description.

[0033] Referring to the attached drawings, it can be seen that: a micropile pullout test device comprises a pile to be tested 1, piers 2 located on both sides of the pile to be tested 1, a force transmission steel beam 3 located on the top of the pier 2, and a force application unit 4; the force application unit 4 comprises a jack 41 located on the top of the force transmission steel beam 3, an upper cross arm 42 located on the top of the jack 41, a chuck 43 connected to the steel bar 11 at the top of the pile to be tested 1, and a connecting rod 44 connected to the upper cross arm 42 at one end and connected to the chuck 43 at the other end; the directions of the upper cross arm 42 and the chuck 43 are both perpendicular to the placement direction of the force transmission steel beam 3;

[0034] The jack 41 is provided with a load measuring unit, and the top of the pile 1 to be inspected is provided with an uplift measuring unit.

[0035] The upper cross arm 42 includes a plurality of spaced apart web plates 421, a first upper groove plate 422 located at the top of the web plates 421, and a first lower groove plate 423 located at the bottom of the web plates 421. Both ends of the first upper groove plate 422 and the first lower groove plate 423 are provided with a plurality of upper cross arm grooves 424. The top of the connecting rod 44 passes through the upper cross arm groove 424 and is connected to the first upper groove plate 422 through a limiting nut 45.

[0036] The chuck 43 includes a force transmission cylinder 431, a second upper groove plate 432 located at the top of the force transmission cylinder 431, and a second lower groove plate 433 located at the bottom of the force transmission cylinder 431. A plurality of spaced stiffening ribs 434 are arranged on both sides of the force transmission cylinder 431. Chuck grooves 435 are opened on both sides of the second upper groove plate 432 and the second lower groove plate 433 at right angles to the gaps between adjacent stiffening ribs 434. The bottom of the connecting rod 44 passes through the chuck groove 435 and is connected to the second lower groove plate 433 through a limiting nut 45; the upper cross arm groove 424 matches the chuck groove 435; the groove length can accommodate four connecting rods 44 on one side, thereby providing a larger range of tension values ​​according to the test requirements.

[0037] A plurality of holes 436 are formed on the second upper groove plate 432 and the second lower groove plate 433 . The top of the steel bar 11 at the top of the pile 1 to be inspected passes through the hole 436 and is connected to the second upper groove plate 432 via an anchor 437 .

[0038] Both ends of the first upper groove plate 422 are provided with first stop bars 4221 to prevent accidents during the test and to prevent the connector from sliding sideways.

[0039] Four upper cross arm partitions 425 are arranged at intervals in the web vertical plate 421 .

[0040] Eight holes 436 are formed on the second upper groove plate 432 and the second lower groove plate 433, and the holes 436 are evenly arranged along the center of the second upper groove plate 432 and the second lower groove plate 433. Two first longitudinal partitions 4311, four first transverse partitions 4312 and two second transverse partitions 4313 are arranged in the force transmission cylinder 431. The two first longitudinal partitions 4311, the four first transverse partitions 4312 and the two second transverse partitions 4313 divide the force transmission cylinder 431 into nine force transmission chambers 438, and each hole 436 corresponds to a force transmission chamber 438; the number of holes 436 is consistent with the number of steel bars 11 at the top of the pile 1 to be inspected, and the positions of the holes 436 are aligned with the positions of the steel bars 11 at the top of the pile 1 to be inspected, and the steel bars 11 at the top of the pile 1 to be inspected pass through the holes 436.

[0041] The hole 436 is rectangular in the middle and arc-shaped at both ends, which is referred to as a long elliptical hole; the long elliptical hole can meet the position of steel bars 11 of different pile diameters of micropiles, and at the same time has a strong tolerance for the verticality of the steel bars 11 during construction; the diameter of the hole 436 meets all current steel bar models and has a wide applicability.

[0042] Both ends of the top of the first upper groove plate 422 are provided with lifting ears 426 , and the side of the belly vertical plate 421 is provided with an identification mark 427 .

[0043] Four hooks 4314 are arranged on the side of the force transmission cylinder 431 . The hooks 4314 are located at the connection between the force transmission cylinder 431 and the stiffening rib 434 . Second blocking bars 439 are arranged at both ends of the second upper groove plate 432 and the second lower groove plate 433 .

[0044] Two hooks 31 are arranged at both ends of the force transmission steel beam 3 .

[0045] The utility model mainly solves the problems of the prior art that the pull-out test device is complex, inconvenient to operate, and not applicable to small-diameter piles. The utility model has a simple structure, convenient operation, high test accuracy, and can meet the pull-out test requirements of small-diameter micro piles.

[0046] The working principle of the utility model is as follows: during the test, two piers 2 are symmetrically arranged on both sides of the pile to be tested 1, and the distance between the outer edge of the pier 2 and the center of the pile to be tested 1 is equal to half the total length of the force transmission steel beam 3; the steel bar 11 of the pile to be tested 1 is passed through the hole 436 and the steel bar 11 is anchored and connected with the chuck 43 through the anchor 437, so that the chuck 43 is fixed on the top of the pile to be tested 1;

[0047] The force transmission steel beam 3 is hoisted and placed on the pier 2, the jack 41 is placed in the center of the force transmission steel beam 3, aligned with the pile 1 to be inspected, and the upper cross arm 42 is placed on the top of the jack 41, with the direction perpendicular to the force transmission steel beam 3; the top of the connecting rod 44 is clamped into the upper cross arm groove 424, and the bottom is clamped into the chuck groove 435, and the top and bottom of the connecting rod 44 are fixed by the limit nut 45; the force application process of the force application unit 4 is to start the jack 41, lift up the upper cross arm 42, and the upper cross arm 42 pulls the chuck 43 through the connecting rod 44, and then transmits the tension to the steel bar 11 of the pile 1 to be inspected through the force transmission cylinder 431 and the anchor 437 of the chuck 43, so as to perform a pull-out test on the micro pile;

[0048] During the test, the loading amount and loading rate are controlled by the load measuring unit arranged on the jack 41, and the uplift amount value of the pile top is read by the uplift amount measuring unit (displacement meter) arranged on the pile to be tested 1.

[0049] Other parts not described belong to the prior art.

Claims

1. A micropile pull-out test device, Features: The invention comprises a pile to be inspected (1), piers (2) located on both sides of the pile to be inspected (1), a force transmission steel beam (3) located on the top of the pier (2), and a force applying unit (4); the force applying unit (4) comprises a jack (41) located on the top of the force transmission steel beam (3), an upper cross arm (42) located on the top of the jack (41), a chuck (43) connected to the steel bar (11) at the top of the pile to be inspected (1), and a connecting rod (44) connected to the upper cross arm (42) at one end and connected to the chuck (43) at the other end; The jack (41) is provided with a load measuring unit, and the top of the pile to be inspected (1) is provided with an uplift measurement unit.

2. A micropile pull-out test device according to claim 1, Features: The upper cross arm (42) comprises a plurality of spaced apart web plates (421), a first upper groove plate (422) located at the top of the web plates (421), and a first lower groove plate (423) located at the bottom of the web plates (421); both ends of the first upper groove plate (422) and the first lower groove plate (423) are provided with a plurality of upper cross arm grooves (424); the top of the connecting rod (44) passes through the upper cross arm groove (424) and is connected to the first upper groove plate (422) via a limiting nut (45).

3. A micropile pull-out test device according to claim 2, Features: The chuck (43) comprises a force transmission cylinder (431), a second upper groove plate (432) located at the top of the force transmission cylinder (431), and a second lower groove plate (433) located at the bottom of the force transmission cylinder (431); a plurality of spaced stiffening ribs (434) are provided on both sides of the force transmission cylinder (431); chuck grooves (435) are provided on both sides of the second upper groove plate (432) and the second lower groove plate (433) at right angles to the gaps between adjacent stiffening ribs (434); the bottom of the connecting rod (44) passes through the chuck groove (435) and is connected to the second lower groove plate (433) through a limiting nut (45); the upper cross arm groove (424) matches the chuck groove (435); The second upper groove plate (432) and the second lower groove plate (433) are both provided with a plurality of holes (436), and the top of the steel bar (11) at the top of the pile to be inspected (1) passes through the hole (436) and is connected to the second upper groove plate (432) via an anchor (437).

4. A micropile pull-out test device according to claim 2, Features: First stop bars (4221) are provided at both ends of the first upper groove plate (422).

5. A micropile pull-out test device according to claim 2, Features: Four upper cross arm partitions (425) are arranged at intervals inside the web vertical plate (421).

6. A micropile pull-out test device according to claim 3, Features: The second upper groove plate (432) and the second lower groove plate (433) are each provided with eight holes (436), and the holes (436) are evenly arranged along the center of the second upper groove plate (432) and the second lower groove plate (433). Two first longitudinal partitions (4311), four first transverse partitions (4312) and two second transverse partitions (4313) are arranged in the force transmission cylinder (431), and the two first longitudinal partitions (4311), the four first transverse partitions (4312) and the two second transverse partitions (4313) divide the force transmission cylinder (431) into nine force transmission chambers (438), and each hole (436) corresponds to one force transmission chamber (438).

7. A micropile pull-out test device according to claim 3, Features: The hole (436) is rectangular in the middle and arc-shaped at both ends.

8. A micropile pull-out test device according to claim 2, Features: Both ends of the top of the first upper groove plate (422) are provided with lifting ears (426), and the side of the belly vertical plate (421) is provided with an identification mark (427).

9. A micropile pull-out test device according to claim 3, Features: Four hooks (4314) are arranged on the side of the force transmission cylinder (431), and second blocking bars (439) are arranged at both ends of the second upper groove plate (432) and the second lower groove plate (433).

10. A micropile pull-out test device according to claim 1, Features: Two hooks (31) are provided at both ends of the force transmission steel beam (3).