Fabricated steel bar truss novel concrete floor support plate

By designing transition surfaces or transition gaps on the new concrete bearing slab of prefabricated steel bar truss to form a receiving groove, the problem of easy cracking of concrete at the joint position of the truss bearing slab is solved, building quality and connection stability are improved, and production is reduced cost.

CN222101243UActive Publication Date: 2024-12-03SHANDONG QIXING IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420154435.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2024-12-03
Estimated Expiration
2034-01-22

AI Technical Summary

Technical Problem

In prefabricated buildings, concrete at the splicing position of the truss floor bearing plates is prone to cracking, affecting the quality of the building.

Method used

A new type of concrete floor bearing plate with prefabricated steel bar truss is designed. The top of the prefabricated plate has a cast end face and a transition surface or transition notch is provided at the edge to form a receiving groove, increasing the concrete thickness and contact area, and reducing the risk of cracking.

Benefits of technology

By increasing the concrete thickness and contact area, the cracking risk at the splicing location is reduced, building quality and connection stability are improved, while production difficulty and cost are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101243U_ABST
    Figure CN222101243U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of fabricated buildings, and discloses a fabricated steel bar truss novel concrete floor support plate which comprises a prefabricated plate, a web bar with one end of the bottom extending into the prefabricated plate, an upper chord bar arranged on the upper portion of the web bar and a lower chord bar arranged on the lower portion of the web bar. Transition faces are arranged at the edges of the pouring end faces, the transition faces are arranged in the pouring end faces in a sunken mode, and after a plurality of novel concrete floor support plates of the assembly type steel bar truss are spliced, every two adjacent transition faces form a containing groove, so that more concrete can be contained between every two adjacent prefabricated slabs, the thickness of the concrete at the position is increased, and the construction efficiency is improved. The risk of cracking at the splicing position of two adjacent fabricated steel bar truss novel concrete floor support plates is reduced, and the building quality is improved. In addition, a containing groove is formed between every two adjacent transition faces, the contact area of the concrete and the prefabricated plate can be increased, the connection stability of the concrete and the prefabricated plate is improved, and the building quality is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of prefabricated buildings, and specifically relates to a new type of prefabricated steel truss concrete floor deck. Background Art

[0002] With the continuous development of the construction industry, prefabricated buildings have gradually matured, which has led to the emergence of truss floor decks and has been promoted into the prefabricated building industry.

[0003] In the related art, a truss floor deck includes web reinforcement, upper chord reinforcement, lower chord reinforcement and precast panels. Two groups of web reinforcement are arranged relatively, the upper end of each group of web reinforcement is located above the precast panel, and the lower end of each group of web reinforcement extends into the precast panel, the upper chord reinforcement is located between the two groups of web reinforcement and connected to the upper parts of the two groups of web reinforcement, and the lower chord reinforcement is located below the upper chord reinforcement and connected to the web reinforcement. When using a truss floor deck, it is usually necessary to assemble multiple truss floor decks so that multiple truss floor panels together form a casting plane, and then pour concrete on the casting plane so that the concrete solidifies and the truss floor decks together form a floor structure.

[0004] However, since the precast panels are usually plate-shaped structures with flat end faces, after pouring concrete on the spliced ​​truss floor decks, the concrete is prone to cracking at the splicing positions of the truss floor decks, thereby affecting the quality of the building. Utility Model Content

[0005] The present application provides a new type of assembled steel truss concrete floor deck to reduce the risk of concrete cracking at the joints of the truss floor deck and improve the quality of the building.

[0006] The technical solution adopted in this application is:

[0007] A new type of assembled steel truss concrete floor deck comprises a precast plate, a web reinforcement with one bottom end extending into the precast plate, an upper chord reinforcement arranged above the web reinforcement and a lower chord reinforcement arranged below the web reinforcement. The top of the precast plate has a casting end face, a transition face is arranged at the edge of the casting end face, and the transition face is recessed in the casting end face.

[0008] By adopting the above technical solution, after splicing a plurality of assembled steel truss new concrete floor decks, the transition surfaces on two adjacent prefabricated panels are opposite to each other, so that the two adjacent transition surfaces form a receiving groove, and then when pouring concrete, more concrete can be accommodated between the two adjacent prefabricated panels to increase the thickness of the concrete there, thereby reducing the risk of cracking at the splicing position of the two adjacent assembled steel truss new concrete floor decks, thereby improving the quality of the building. At the same time, the formation of a receiving groove between two adjacent transition surfaces can also increase the contact area between the concrete and the prefabricated panels, thereby increasing the connection stability between the concrete and the prefabricated panels, and further improving the quality of the building.

[0009] Optionally, a transition notch is provided at the edge of the prefabricated plate, and the wall surface of the transition notch forms the transition surface.

[0010] By adopting the above technical scheme, after a plurality of assembled steel truss new concrete floor decking plates are spliced ​​together, the transition notches on two adjacent prefabricated plates are opposite to each other, so that the two adjacent transition notches together form a receiving groove, thereby further increasing the amount of concrete that can be accommodated at the splicing position of the two adjacent prefabricated plates, further increasing the thickness of the concrete at the splicing position of the two adjacent prefabricated plates, and further increasing the connection area between the concrete and the prefabricated plates, thereby reducing the risk of cracking at the splicing position of the assembled steel truss new concrete floor decking plates, and further improving the quality of the building.

[0011] Optionally, the depth H of the transition notch satisfies: 3mm≤H≤5mm.

[0012] By adopting the above technical solution, the depth H of the transition notch is set to satisfy 3mm≤H≤5mm. On the one hand, the structural strength of the prefabricated panel can be guaranteed, and on the other hand, the thickness of the concrete at the joints of the assembled steel truss new concrete floor decking can be guaranteed, so as to further reduce the risk of concrete cracking at the joints of the assembled steel truss new concrete floor decking, thereby further improving the quality of the building.

[0013] Optionally, a slope cutout is provided at the edge of the prefabricated panel, and the wall surface of the slope cutout forms the transition surface.

[0014] By adopting the above technical solution, after a plurality of assembled steel truss new concrete floor decks are spliced ​​together, the slope cuts on two adjacent prefabricated panels are opposite to each other, so that a receiving groove is formed between the walls of the two adjacent slope cuts, thereby further increasing the thickness of the concrete at the splicing position of the two adjacent prefabricated panels, and further increasing the connection area between the concrete and the prefabricated panels, thereby further reducing the risk of cracking at the splicing of the assembled steel truss new concrete floor decks, and further improving the quality of the building. At the same time, the setting of the slope cut reduces the difficulty of producing prefabricated panels, thereby reducing the production cost of assembled steel truss new concrete floor decks and improving the finished product rate of assembled steel truss new concrete floor decks.

[0015] Optionally, the inclination angle of the transition surface satisfies: 30°≤α≤60°.

[0016] By adopting the above technical solution, the inclination angle α of the transition surface is set to satisfy: 30°≤α≤60°. On the one hand, the structural strength of the prefabricated panel can be guaranteed, and on the other hand, the thickness of the concrete at the joints of the assembled steel truss new concrete floor deck can be guaranteed, so as to further reduce the risk of concrete cracking at the joints of the assembled steel truss new concrete floor deck, thereby further improving the quality of the building.

[0017] Optionally, a chamfer is provided at the edge of the prefabricated panel, and the chamfered wall forms the transition surface.

[0018] By adopting the above technical solution, after a plurality of assembled steel truss new concrete floor decks are spliced ​​together, the chamfers on two adjacent prefabricated panels are opposite to each other, so that a receiving groove is formed between the walls of the two adjacent chamfers, thereby further increasing the thickness of the concrete at the splicing position of the two adjacent prefabricated panels, and further increasing the connection area between the concrete and the prefabricated panels, thereby further reducing the risk of cracking at the splicing of the assembled steel truss new concrete floor decks, and further improving the quality of the building. At the same time, the setting of the chamfer reduces the difficulty of producing prefabricated panels, thereby reducing the production cost of assembled steel truss new concrete floor decks and improving the finished product rate of assembled steel truss new concrete floor decks.

[0019] Optionally, the radius R of the transition surface satisfies: 3mm≤R≤5mm.

[0020] By adopting the above technical solution, the radius R of the transition surface is set to satisfy: 3mm≤R≤5mm. On the one hand, the structural strength of the prefabricated panel can be guaranteed, and on the other hand, the thickness of the concrete at the joints of the assembled steel truss new concrete floor deck can be guaranteed, so as to further reduce the risk of concrete cracking at the joints of the assembled steel truss new concrete floor deck, thereby further improving the quality of the building.

[0021] Optionally, the bottom of the prefabricated board has a plastered end surface, and a connecting surface is arranged at the edge of the plastered end surface, and the connecting surface is recessed in the plastered end surface.

[0022] By adopting the above technical scheme, after a plurality of assembled steel truss new concrete floor decks are spliced ​​together, the connecting surfaces on two adjacent prefabricated panels are opposite to each other, so that an accommodating groove is formed between the two adjacent connecting surfaces, thereby increasing the thickness of the white lime at the splicing position of the two adjacent assembled steel truss new concrete floor decks when applying white lime to the plastering end surface, so as to reduce the risk of white lime cracking, thereby improving the construction quality, and at the same time, the contact area between the white lime and the prefabricated panel can be increased, so as to increase the connection stability between the white lime and the prefabricated panel, thereby further improving the construction quality.

[0023] Optionally, the upper chord and / or the lower chord has an extension section that is located outside the prefabricated panel when viewed from above.

[0024] By adopting the above technical scheme, when the assembled steel truss new concrete floor deck is spliced, since the upper chord and / or the lower chord have an extension section located outside the prefabricated panel, the assembled steel truss new concrete floor deck can be connected to the vertical supporting structure through the extension section, so as to achieve the effect of facilitating the fixing of the assembled steel truss new concrete floor deck, and at the same time, the stability of the assembled steel truss new concrete floor deck can be increased to further improve the building quality.

[0025] Optionally, the length L of the extension section satisfies: 90mm≤L≤110mm.

[0026] By adopting the above technical solution, the length L of the extension section is set to satisfy: 90mm≤L≤110mm. On the one hand, it can ensure that the assembled steel truss new concrete floor deck is conveniently connected to the vertical supporting structure. On the other hand, it can avoid the waste caused by the long length of the extension section, thereby reducing the production cost of the assembled steel truss new concrete floor deck.

[0027] Due to the adoption of the above technical solution, the beneficial effects achieved by this application are as follows:

[0028] 1. The assembled steel truss new concrete floor deck in the present application includes a precast plate, a web reinforcement extending into the precast plate at one end of the bottom, an upper chord reinforcement arranged on the upper part of the web reinforcement, and a lower chord reinforcement arranged on the lower part of the web reinforcement. The top of the precast plate has a casting end face, and a transition face is arranged at the edge of the casting end face. The transition face is recessed in the casting end face so that after splicing a plurality of assembled steel truss new concrete floor decks, the transition faces on two adjacent precast plates are opposite to each other, so that the two adjacent transition faces form a receiving groove, and then when pouring concrete, more concrete can be accommodated between the two adjacent precast plates to increase the thickness of the concrete there, thereby reducing the risk of cracking at the splicing position of the two adjacent assembled steel truss new concrete floor decks, thereby improving the quality of the building. At the same time, the formation of a receiving groove between the two adjacent transition faces can also increase the contact area between the concrete and the precast plate, thereby increasing the connection stability between the concrete and the precast plate, and further improving the quality of the building.

[0029] 2. The precast panels in the present application are provided with transition notches at their edges, and the walls of the transition notches form transition surfaces, thereby further increasing the amount of concrete that can be accommodated at the joints of two adjacent precast panels, and further increasing the thickness of the concrete at the joints of two adjacent precast panels, while further increasing the connection area between the concrete and the precast panels, thereby reducing the risk of cracking at the joints of the new concrete floor slabs of the assembled steel trusses, and further improving the quality of the building.

[0030] 3. The depth H of the transition notch in this application satisfies: 3mm≤H≤5mm, which can ensure the structural strength of the prefabricated panel on the one hand, and on the other hand, ensure the thickness of the concrete at the joints of the prefabricated steel truss new concrete floor decking, so as to further reduce the risk of concrete cracking at the joints of the prefabricated steel truss new concrete floor decking, thereby further improving the quality of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0032] Figure 1 This is a structural schematic diagram of a new type of concrete floor deck with assembled steel trusses according to one implementation mode of the present application;

[0033] Figure 2 This is a structural schematic diagram of another perspective of the assembled steel bar truss novel concrete floor deck in one implementation mode of the present application;

[0034] Figure 3This is a partial structural schematic diagram of the assembled steel bar truss new concrete floor decking slab in one implementation mode of the present application;

[0035] Figure 4 This is a schematic diagram of the connection structure of two adjacent assembled steel bar truss new concrete floor decks in one implementation mode of the present application;

[0036] Figure 5 for Figure 4 A magnified view of the middle A area;

[0037] Figure 6 This is a structural schematic diagram of a new type of assembled steel truss concrete floor deck in another embodiment of the present application;

[0038] Figure 7 This is a structural schematic diagram of another perspective of the assembled steel bar truss novel concrete floor deck in another implementation mode of the present application;

[0039] Figure 8 This is a structural schematic diagram of another perspective of the assembled steel bar truss novel concrete floor deck in another implementation mode of the present application;

[0040] Fig. 9 This is a partial structural schematic diagram of the assembled steel bar truss novel concrete floor deck in another embodiment of the present application;

[0041] Fig.10 This is a schematic diagram of the connection structure of two adjacent assembled steel bar truss new concrete floor decks in another implementation manner of the present application;

[0042] Fig.11 for Fig.10 Enlarged view of the B area;

[0043] Fig.12 This is a structural schematic diagram of a new type of assembled steel truss concrete floor deck in another embodiment of the present application;

[0044] Fig.13 This is a partial structural schematic diagram of the assembled steel bar truss new concrete floor deck in another embodiment of the present application;

[0045] Fig.14 This is a schematic diagram of the connection structure of two adjacent assembled steel bar truss new concrete floor decks in another implementation manner of the present application;

[0046] Fig.15 for Fig.14 Enlarged view of the middle C area;

[0047] Fig.16 This is a schematic structural diagram of the transition surface and the connection surface in another implementation manner of the present application;

[0048] Fig.17 for Fig.16 Enlarged view of area D in the middle.

[0049] Reference numerals:

[0050] 1. Precast slab; 11. Casting end face; 111. Transition face; 12. Plastering end face; 121. Connecting face; 2. Web reinforcement; 3. Upper chord reinforcement; 31. Extension section; 4. Lower chord reinforcement. DETAILED DESCRIPTION

[0051] In order to more clearly illustrate the overall concept of the present application, a detailed description is given below in an illustrative manner in conjunction with the accompanying drawings.

[0052] In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present application is not limited by the specific embodiments disclosed below. It should be noted that the embodiments of the present application and the features in each embodiment may be combined with each other without conflict.

[0053] In addition, in the description of the present application, it should be understood that the orientations or positional relationships indicated by the terms "top", "bottom", "inside", "outside", "axial", "circumferential", etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0054] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0055] In the present application, unless otherwise clearly specified and limited, a first feature "above" or "below" a second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.

[0056] Reference Figures 1 to 17 A new type of assembled steel truss concrete floor deck comprises a precast panel 1, a web reinforcement 2 with one end of the bottom extending into the precast panel 1, an upper chord reinforcement 3 arranged on the upper part of the web reinforcement 2, and a lower chord reinforcement 4 arranged on the lower part of the web reinforcement 2. The top of the precast panel 1 has a casting end surface 11, and a transition surface 111 is arranged at the edge of the casting end surface 11, and the transition surface 111 is recessed in the casting end surface 11.

[0057] After splicing a plurality of assembled steel truss new concrete floor slabs, the transition surfaces 111 on two adjacent precast panels 1 are opposite to each other, so that the two adjacent transition surfaces 111 form a receiving groove, and then when pouring concrete, more concrete can be accommodated between the two adjacent precast panels 1 to increase the thickness of the concrete here, thereby reducing the risk of cracking at the splicing position of the two adjacent assembled steel truss new concrete floor slabs, thereby improving the quality of the building. At the same time, the formation of a receiving groove between two adjacent transition surfaces 111 can also increase the contact area between the concrete and the precast panel 1, thereby increasing the connection stability between the concrete and the precast panel 1, and further improving the quality of the building.

[0058] The present application does not specifically limit the material of the prefabricated panel 1. Preferably, the prefabricated panel 1 is made of steel fiber concrete to increase the structural strength of the prefabricated panel 1, thereby improving the building quality. In other embodiments, the prefabricated panel 1 can also be made of ordinary concrete.

[0059] The present application does not specifically limit the thickness of the prefabricated board 1. Preferably, the thickness of the prefabricated board 1 is 15 mm, so as to reduce the production cost of the prefabricated board 1 while ensuring the structural strength of the prefabricated board 1. In other embodiments, the thickness of the prefabricated board 1 can also be other sizes, for example, 10 mm, 20 mm, 25 mm, etc.

[0060] The present application does not specifically limit the formation direction of the transition surface 111, and it can adopt any one of the following embodiments:

[0061] Embodiment 1. In this embodiment, referring to Figures 1 to 5 A transition notch is provided at the edge of the prefabricated plate 1 , and the wall surface of the transition notch forms a transition surface 111 .

[0062] Specifically, after a plurality of assembled steel truss new concrete floor decking plates are spliced ​​together, the transition notches on two adjacent prefabricated plates 1 are opposed to each other, so that the two adjacent transition notches together form a receiving groove, thereby further increasing the amount of concrete that can be accommodated at the splicing position of the two adjacent prefabricated plates 1, and further increasing the thickness of the concrete at the splicing position of the two adjacent prefabricated plates 1, while further increasing the connection area between the concrete and the prefabricated plates 1, thereby reducing the risk of cracking at the splicing positions of the assembled steel truss new concrete floor decking plates, and further improving the quality of the building.

[0063] In a preferred embodiment, referring to Figure 3 The depth H of the transition notch satisfies: 3mm≤H≤5mm, which can ensure the structural strength of the prefabricated panel 1 on the one hand, and ensure the thickness of the concrete at the joints of the assembled steel truss new concrete floor deck on the other hand, so as to further reduce the risk of concrete cracking at the joints of the assembled steel truss new concrete floor deck, thereby further increasing the quality of the building.

[0064] Preferably, the depth of the transition notch is H=4 mm, so as to reduce the production difficulty of the precast panel 1 while ensuring the concrete thickness at the joints of the assembled steel truss new concrete floor deck.

[0065] Implementation method 2. In this implementation method, refer to Figures 6 to 11 A slope cutout is provided at the edge of the prefabricated panel 1 , and the wall surface of the slope cutout forms a transition surface 111 .

[0066] Specifically, after a plurality of assembled steel truss new concrete floor decks are spliced ​​together, the slope cuts on two adjacent prefabricated panels 1 are opposite to each other, so that a receiving groove is formed between the walls of the two adjacent slope cuts, thereby further increasing the thickness of the concrete at the splicing position of the two adjacent prefabricated panels 1, and further increasing the connection area between the concrete and the prefabricated panels 1, thereby further reducing the risk of cracking at the splicing of the assembled steel truss new concrete floor decks, and further improving the quality of the building. At the same time, the setting of the slope cut reduces the production difficulty of the prefabricated panels 1, thereby reducing the production cost of the assembled steel truss new concrete floor decks and improving the finished product rate of the assembled steel truss new concrete floor decks.

[0067] In a preferred embodiment, referring to Fig. 9The inclination angle α of the transition surface 111 satisfies: 30°≤α≤60°, which can ensure the structural strength of the prefabricated panel 1 on the one hand, and ensure the thickness of the concrete at the joints of the assembled steel truss new concrete floor deck on the other hand, so as to further reduce the risk of concrete cracking at the joints of the assembled steel truss new concrete floor deck, thereby further increasing the quality of the building.

[0068] Preferably, the inclination angle α of the transition surface 111 is 45°, so that when pouring concrete on the casting end surface 11, the concrete can enter the receiving groove more easily, and then the concrete can fill the receiving groove, so as to further reduce the risk of concrete cracking at the joints of the new concrete floor slab of the assembled steel truss.

[0069] It should be noted that, in other embodiments, the inclination angle α of the transition surface 111 may also be other values, such as 5°, 10°, 15°, etc.

[0070] Implementation method 3. In this implementation method, refer to Figures 12 to 15 The edge of the prefabricated panel 1 is provided with a chamfer, and the chamfered wall surface forms a transition surface 111.

[0071] Specifically, after a plurality of assembled steel truss new concrete floor decks are spliced ​​together, the chamfers on two adjacent prefabricated panels 1 are opposite to each other, so that a receiving groove is formed between the walls of the two adjacent chamfers, thereby further increasing the thickness of the concrete at the splicing position of the two adjacent prefabricated panels 1, and further increasing the connection area between the concrete and the prefabricated panels 1, thereby further reducing the risk of cracking at the splicing of the assembled steel truss new concrete floor decks, and further improving the quality of the building. At the same time, the setting of the chamfer reduces the production difficulty of the prefabricated panels 1, thereby reducing the production cost of the assembled steel truss new concrete floor decks and improving the finished product rate of the assembled steel truss new concrete floor decks.

[0072] In a preferred embodiment, referring to Fig.13 The radius R of the transition surface 111 satisfies: 3mm≤R≤5mm, which can ensure the structural strength of the prefabricated panel 1 on the one hand, and ensure the thickness of the concrete at the joints of the assembled steel truss new concrete floor deck on the other hand, so as to further reduce the risk of concrete cracking at the joints of the assembled steel truss new concrete floor deck, thereby further increasing the quality of the building.

[0073] Preferably, the radius R of the transition surface 111 is 4 mm, so as to ensure that the receiving groove can accommodate the amount of concrete while ensuring the contact area of ​​adjacent precast panels 1 to avoid the concrete from dripping through the precast panels 1.

[0074] In a preferred embodiment, referring to Figures 1 to 17The bottom of the prefabricated board 1 has a plastered end surface 12 , and a connecting surface 121 is arranged at the edge of the plastered end surface 12 , and the connecting surface 121 is recessed in the plastered end surface 12 .

[0075] Specifically, after a plurality of assembled steel truss new concrete floor decks are spliced ​​together, the connecting surfaces 121 on two adjacent prefabricated panels 1 are opposite to each other, so that a receiving groove is formed between the two adjacent connecting surfaces 121, thereby increasing the thickness of the white lime at the splicing position of the two adjacent assembled steel truss new concrete floor decks when applying white lime to the plaster end surface 12, so as to reduce the risk of white lime cracking, thereby improving the construction quality, and at the same time, the contact area between the white lime and the prefabricated panel 1 can also be increased, so as to increase the connection stability between the white lime and the prefabricated panel 1, thereby further improving the construction quality.

[0076] The present application does not specifically limit the formation method of the connection surface 121 , and it can adopt any one of the formation methods of the above-mentioned transition surface 111 .

[0077] In a preferred embodiment, referring to Figure 1 and Figure 6 The upper chord 3 and / or the lower chord 4 has an extension section 31 which is located outside the precast panel 1 when viewed from above.

[0078] Specifically, when the assembled steel truss new concrete floor deck is spliced, since the upper chord 3 and / or the lower chord 4 have an extension section 31 located outside the prefabricated panel 1, the assembled steel truss new concrete floor deck can be connected to the vertical supporting structure through the extension section 31, so as to facilitate the fixing of the assembled steel truss new concrete floor deck, and at the same time, the stability of the assembled steel truss new concrete floor deck can be increased to further improve the building quality.

[0079] Better, refer to Figure 1 and Figure 6 The upper chord 3 and the lower chord 4 both have an extension section 31 which is located outside the precast panel 1 when viewed from above.

[0080] In a preferred embodiment, referring to Figure 1 and Figure 6 The length L of the extension section 31 satisfies: 90mm≤L≤110mm. On the one hand, it can ensure that the assembled steel truss new concrete floor deck is conveniently connected to the vertical supporting structure. On the other hand, it can avoid the waste caused by the long length of the extension section 31, thereby reducing the production cost of the assembled steel truss new concrete floor deck.

[0081] Preferably, the length L of the extension section 31 is 100 mm, so as to facilitate the installation of the assembled steel truss new concrete floor deck and reduce the production cost of the assembled steel truss new concrete floor deck.

[0082] Furthermore, the web reinforcement 2 also has a portion that is located outside the prefabricated panel 1 when viewed from above, so as to further increase the stability of the assembled steel truss new concrete floor deck.

[0083] The present application does not specifically limit the position of the lower chord 4. Preferably, refer to Figures 1 to 17 The lower chord bar 4 is located outside the precast panel 1, so that the lower chord bar 4 is located in the concrete cast on the casting end surface 11, so that the lower chord bar 4 strengthens the concrete to increase the structural strength of the concrete cast on the casting end surface 11, thereby improving the building quality. In other embodiments, the lower chord bar 4 can also be embedded in the precast panel 1 to increase the structural strength of the precast panel 1.

[0084] Anything not described in this application can be achieved by adopting or drawing on existing technologies.

[0085] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

[0086] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A new type of assembled steel truss concrete floor deck, characterized in that: The precast plate (1) comprises a web rib (2) with one end of the bottom extending into the precast plate (1), an upper chord rib (3) arranged above the web rib (2), and a lower chord rib (4) arranged below the web rib (2); the top of the precast plate (1) comprises a casting end surface (11); a transition surface (111) is arranged at the edge of the casting end surface (11); and the transition surface (111) is arranged to be recessed in the casting end surface (11).

2. The assembled steel bar truss new concrete floor deck according to claim 1 is characterized in that: A transition notch is provided at the edge of the prefabricated plate (1), and the wall surface of the transition notch forms the transition surface (111).

3. The assembled steel bar truss new concrete floor deck according to claim 2 is characterized in that: The depth H of the transition notch satisfies: 3mm≤H≤5mm.

4. The assembled steel bar truss new concrete floor deck according to claim 1 is characterized in that: A slope cutout is provided at the edge of the prefabricated plate (1), and the wall surface of the slope cutout forms the transition surface (111).

5. The assembled steel bar truss new concrete floor deck according to claim 4 is characterized in that: The inclination angle α of the transition surface (111) satisfies: 30°≤α≤60°.

6. The assembled steel bar truss new concrete floor deck according to claim 1 is characterized in that: The edge of the prefabricated plate (1) is provided with a chamfer, and the wall surface of the chamfer forms the transition surface (111).

7. The assembled steel bar truss new concrete floor deck according to claim 6 is characterized in that: The radius R of the transition surface (111) satisfies: 3mm≤R≤5mm.

8. The assembled steel bar truss new concrete floor deck according to claim 1 is characterized in that: The bottom of the prefabricated board (1) has a plastered end surface (12), and a connecting surface (121) is arranged at the edge of the plastered end surface (12), and the connecting surface (121) is recessed in the plastered end surface (12).

9. The assembled steel bar truss new concrete floor deck according to claim 1, characterized in that: The upper chord rib (3) and / or the lower chord rib (4) have an extension section (31) which is located outside the prefabricated panel (1) in a top view.

10. The assembled steel bar truss new concrete floor deck according to claim 9, characterized in that: The length L of the extension section (31) satisfies: 90 mm ≤ L ≤ 110 mm.