Prestressed concrete steel structure type composite floor slab

By replacing prefabricated truss steel bars with inverted T-shaped or industrial steel structures, directly pouring concrete, solving the problems of complex construction and high cost in the existing technology, achieving more efficient production and lower costs, and at the same time improving the laminated plate Stiffness.

CN222101245UActive Publication Date: 2024-12-03XINYU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420662366.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-12-03
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

The construction of existing prestressed concrete steel-type stacked floor slabs is complex and costly, mainly due to the complex production process of prefabricated truss steel bars.

Method used

Inverted T-shaped or industrial steel structures are used to replace traditional prefabricated truss steel bars, transport them directly from the steel mill to the production plant, and concrete is poured on the prefabricated base plate, reducing assembly and processing steps and facilitating lifting through the hanging hole design.

Benefits of technology

It reduces production costs, simplifies construction processes, improves production efficiency, and increases the stiffness of the laminated plates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101245U_ABST
    Figure CN222101245U_ABST
Patent Text Reader

Abstract

The utility model discloses a prestressed concrete steel structure type composite floor slab which comprises a prefabricated bottom plate, prestressed steel bars, distributed steel bars and a cast-in-place concrete layer, wherein the prestressed steel bars and the distributed steel bars are vertically and horizontally mounted in the prefabricated bottom plate; the cast-in-place concrete layer is arranged above the prefabricated bottom plate; a steel structure is arranged above the distribution steel bars, and the upper end of the steel structure penetrates through the top face of the prefabricated bottom plate. According to the prestressed concrete steel structure type composite floor slab, traditional prefabricated truss steel bars are replaced by inverted T-shaped steel structures or I-shaped steel structures, and the two types of steel structures are common in a steel mill, do not need to be additionally assembled and machined and are directly transported to a concrete prestressed composite slab manufacturing plant from the steel mill; the steel structure is arranged on the distribution steel bars and then is formed in the prefabricated bottom plate by pouring concrete, the upper portion of the steel structure protrudes out of the prefabricated bottom plate, the lifting hole of the steel structure is located above the prefabricated bottom plate, the concrete prestress laminated plate is conveniently produced, meanwhile, the lifting work of the concrete prestress laminated plate is not affected, and therefore construction is convenient while the cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of composite slabs, in particular to a prestressed concrete steel structure composite floor slab. Background Art

[0002] Prestressed concrete steel composite floor is composed of prefabricated prestressed thin plates and on-site cast concrete composite layers. It can be applied to buildings for various purposes. The span and load-bearing load of the floor can have a large range of use. The commonly used prefabricated concrete (PC) composite slabs currently use prefabricated truss steel bars as the load-bearing skeleton. This method is relatively mature in technology, but generally speaking, there are still some problems. The biggest problem is that the construction is complicated and the cost is high. This is mainly because the prefabricated truss steel bars are a steel skeleton composed of three groups of steel bars, namely, upper chord steel bars, lower chord steel bars and web steel bars. The skeleton consists of two bent web steel bars that weld the upper chord steel bars and the lower chord steel bars together to form a triangular cross-section. This results in the problem that the prefabricated truss steel bars have more prefabrication production processes, are more complicated, and have higher costs. Utility Model Content

[0003] The purpose of the utility model is to overcome the defects of the prior art and provide a prestressed concrete steel structure composite floor slab to solve the problems existing in the above-mentioned background technology.

[0004] A prestressed concrete steel structure composite floor slab, comprising a prefabricated bottom plate, prestressed steel bars and distribution steel bars installed vertically and horizontally inside the prefabricated bottom plate, and a cast-in-place concrete layer arranged above the prefabricated bottom plate;

[0005] A steel structure is arranged above the distribution steel bars, and the upper end of the steel structure passes through the top surface of the prefabricated bottom plate.

[0006] Preferably, the steel structure is an inverted T-shaped steel structure.

[0007] Preferably, the steel structure is an I-shaped steel structure.

[0008] Preferably, hanging holes are provided at both ends of the steel structure.

[0009] Preferably, the hanging hole is located above the prefabricated bottom plate.

[0010] Preferably, the prestressed steel bars are arranged below the distribution steel bars and are tied together with the distribution steel bars.

[0011] Beneficial effects: The prestressed concrete steel-structured composite floor replaces the traditional prefabricated truss steel bars with an inverted T-shaped steel structure or an I-shaped steel structure. These two types of steel structures are more common in steel mills and do not require additional assembly and processing. They can be directly transported from the steel mill to the concrete prestressed composite slab production plant, and placed on the distribution steel bars before pouring concrete to form a prefabricated bottom plate. The upper part of the steel structure protrudes from the prefabricated bottom plate, and its lifting holes are located above the prefabricated bottom plate, which facilitates the production of the concrete prestressed composite slab without affecting the lifting of the concrete prestressed composite slab, thereby reducing costs and facilitating construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a schematic diagram of Embodiment 1 of the present utility model;

[0013] Figure 2 For this utility model Figure 1 Schematic cross-sectional view of ;

[0014] Figure 3 This is a schematic diagram of Embodiment 2 of the present utility model;

[0015] Figure 4 For this utility model Figure 3 Schematic cross-section diagram of .

[0016] In the figure: 1-prefabricated base plate, 2-prestressed steel bars, 3-cast-in-place concrete layer, 4-distributed steel bars, 5-steel structure, 6-hanging holes. DETAILED DESCRIPTION

[0017] Example 1, please refer to Figure 1-Figure 2 A prestressed concrete steel structure composite floor slab, comprising a prefabricated bottom plate 1, prestressed steel bars 2 and distribution steel bars 4 installed vertically and horizontally inside the prefabricated bottom plate 1, and a cast-in-place concrete layer 3 arranged above the prefabricated bottom plate 1, wherein the prestressed steel bars 2 are arranged below the distribution steel bars 4 and are tied with the distribution steel bars 4, wherein the prestressed steel bars 2 are evenly arranged at the lower part of the prefabricated bottom plate 1, and the spacing between the prestressed steel bars 2 is about 150-200 mm, and the distribution steel bars 4 perpendicular to the prestressed steel bars 2 are arranged on the prestressed steel bars 2;

[0018] A steel structure 5 is arranged above the distribution steel bars 4, and the steel structure 5 is an inverted T-shaped steel structure. Lifting holes 6 are opened at both ends of the steel structure 5, and the lifting holes 6 are located above the precast base plate 1. The upper end of the steel structure 5 passes through the top surface of the precast base plate 1. When the precast base plate 1 of the concrete prestressed composite plate is produced, the traditional precast truss steel bars are replaced by an inverted T-shaped steel structure. This type of steel structure is more common in steel mills and does not require additional assembly and processing. Moreover, the steel structure 5 can also play a role in increasing the rigidity of the composite plate. In this way, it is directly transported from the steel mill to the concrete prestressed composite plate production plant, and placed on the distribution steel bars 4 and then poured with concrete to form it in the precast base plate 1. The upper part of the steel structure 5 protrudes from the precast base plate 1, and the lifting holes 6 are located above the precast base plate 1. In this way, while facilitating the production of the concrete prestressed composite plate, it does not affect the lifting work of the concrete prestressed composite plate, thereby reducing costs and facilitating construction.

[0019] Example 2, please refer to Figure 3-Figure 4 The steel structure 5 can also be an I-shaped steel structure. Both ends of the steel structure 5 are provided with lifting holes 6, and the lifting holes 6 are located above the prefabricated bottom plate 1. When the prefabricated bottom plate 1 of the concrete prestressed composite plate is produced, the traditional prefabricated truss steel bars are replaced with I-shaped steel structures. This type of steel structure is more common in steel plants and does not require additional assembly and processing. The steel structure 5 can also play a role in increasing the rigidity of the composite plate. It is directly transported from the steel plant to the concrete prestressed composite plate production plant, and placed on the distribution steel bars 4 to form concrete in the prefabricated bottom plate 1. The upper part of the steel structure 5 protrudes from the prefabricated bottom plate 1, and the lifting holes 6 are located above the prefabricated bottom plate 1. In this way, while facilitating the production of the concrete prestressed composite plate, it does not affect the lifting work of the concrete prestressed composite plate, thereby reducing costs and facilitating construction.

Claims

1. A prestressed concrete steel structure composite floor slab, comprising a prefabricated base plate (1), prestressed steel bars (2) and distribution steel bars (4) installed vertically and horizontally inside the prefabricated base plate, and a cast-in-place concrete layer (3) arranged above the prefabricated base plate (1), characterized in that: A steel structure (5) is arranged above the distribution steel bars (4); the steel structure (5) is an inverted T-shaped steel structure or an I-shaped steel structure; the upper end of the steel structure (5) passes through the top surface of the prefabricated bottom plate (1).

2. The prestressed concrete steel composite floor slab according to claim 1, characterized in that: Both ends of the steel structure (5) are provided with hanging holes (6).

3. The prestressed concrete steel composite floor slab according to claim 2, characterized in that: The hanging hole (6) is located above the prefabricated bottom plate (1).

4. The prestressed concrete steel composite floor slab according to claim 1, characterized in that: The prestressed steel bars (2) are arranged below the distribution steel bars (4) and are tied together with the distribution steel bars (4).