Floor settlement joint pouring supporting formwork

By using a combination of outer formwork and inner formwork at the floor settlement joints, the pull-on connection components and lightweight materials are used to solve the problems of low construction efficiency and insufficient safety in the prior art, and the efficient support of the wall is achieved. The smoothness is improved, reducing construction costs and complexity.

CN222101447UActive Publication Date: 2024-12-03CHINA HUASHI ENTERPRISES CO LTD (SICHUAN) +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323576352.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-12-03
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The existing floor settlement joint casting support formwork is inefficient in construction, insufficient safety, and high cost in high-rise buildings or geologically complex areas, which cannot effectively resist high pressure, which can easily lead to bursting of formwork and uneven walls.

Method used

The design of a combination of the outer formwork and the inner formwork is adopted to achieve stable connection through pulling connection components, including the outer frame, the inner frame and multi-layer board. It uses lightweight materials and an overall assembly design to reduce self-weight and simplify the installation and removal process.

Benefits of technology

It improves the flatness and verticality of the wall, reduces construction costs and resource waste, ensures the safety and efficiency of the construction process, and is suitable for thick wall or high wall buildings, avoiding formwork bursts and unevenness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101447U_ABST
    Figure CN222101447U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building supporting, in particular to a floor settlement joint pouring supporting formwork which comprises an outer side formwork, an inner side formwork and an opposite-pulling connecting assembly, the outer side formwork and the inner side formwork are arranged in parallel, the outer side formwork is located on the outer side of a poured wall body, and the inner side formwork is located on the inner side of the poured wall body; the outer side formwork comprises an outer side frame and an outer side multi-layer plate, and the outer side multi-layer plate is arranged between the outer side frame and a poured wall body; the inner side formwork comprises an inner side frame and an inner side multi-layer plate, and the inner side multi-layer plate is arranged between the inner side frame and a poured wall. The outer side frames are detachably connected through a plurality of opposite-pulling connecting assemblies, and the concrete is poured between the outer side multi-layer plate and the inner side multi-layer plate; the design of the outer side formwork, the inner side formwork and the opposite-pull connecting assembly is adopted, so that the formwork can effectively support a wall body at a settlement joint when concrete is poured, and flatness and perpendicularity of the wall body are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building supports, in particular to a floor settlement joint casting support template. Background Art

[0002] Floor settlement joints play a vital role in construction projects, especially in high-rise buildings or areas with complex geological conditions. The design and construction of settlement joints have a direct impact on the long-term stability and safety of the building. In these gaps, the concrete structure needs to be poured accurately to ensure the integrity and continuity of the structure.

[0003] Traditional formwork systems for pouring support for floor settlement joints face several challenges in practical applications. First, these formwork systems need to provide stable and accurate support in a limited space, which is quite complicated in operation. In addition, for buildings with thick walls or high heights, existing formwork systems may not be able to effectively resist high pressure, and are prone to formwork bursting or uneven wall surfaces, which may lead to damage to structural integrity.

[0004] In the prior art, the materials and designs commonly used in formwork systems cannot effectively reduce their own weight, resulting in the need for additional mechanical equipment (such as tower cranes) for support and hoisting during the construction process, which increases construction costs and complexity. At the same time, the use of such heavy formwork also increases the risks for workers during installation and disassembly.

[0005] Therefore, there is still significant room for improvement in the prior art in terms of formwork support design and material selection at floor settlement joints. Utility Model Content

[0006] The technical problem to be solved by the utility model is poor construction efficiency and low safety. The purpose is to provide a support formwork for pouring floor settlement joints, which can improve the flatness and verticality of the wall, reduce the economic cost and waste of resources in construction, and ensure the safety and efficiency of the construction process.

[0007] The utility model is realized by the following technical solutions:

[0008] A floor settlement joint casting support formwork, comprising: an outer formwork, an inner formwork and a tension connection assembly, wherein the outer formwork and the inner formwork are arranged in parallel, and the outer formwork is located on the outer side of the wall after casting, and the inner formwork is located on the inner side of the wall after casting;

[0009] The outer formwork comprises an outer frame and an outer multilayer board, and the outer multilayer board is arranged between the outer frame and the poured wall;

[0010] The inner formwork comprises an inner frame and an inner multilayer board, and the inner multilayer board is arranged between the inner frame and the poured wall;

[0011] The outer frame and the inner frame are detachably connected through a plurality of the tension connection components, and concrete is poured between the outer multi-layer board and the inner multi-layer board.

[0012] Specifically, the outer frame includes: an outer secondary keel, an outer main keel and a wooden beam, a plurality of the outer secondary keels are vertically arranged, and the wooden beam is arranged between two adjacent outer secondary keels, a plurality of the outer main keels are horizontally arranged, and the outer main keels are vertically fixedly connected to the outer secondary keels;

[0013] The outer multilayer board is fitted with the outer secondary keel and the wooden beam, and the tension connection assembly is connected with the outer main keel.

[0014] Specifically, the inner frame includes: an inner secondary keel and an inner main keel, a plurality of the inner secondary keels are vertically arranged, a plurality of the inner main keels are horizontally arranged, and the inner main keel is vertically fixedly connected to the inner secondary keels;

[0015] The inner multilayer board is connected to the inner secondary keel, and the tension connection assembly is connected to the inner main keel.

[0016] Specifically, the outer frame also includes an upper wooden beam and a lower wooden beam, the upper wooden beam is horizontally arranged, and the upper ends of multiple outer secondary keels are connected to the upper wooden beam, the lower wooden beam is parallel to the upper wooden beam, and the lower ends of multiple outer secondary keels are connected to the lower wooden beam.

[0017] Optionally, the outer secondary keel is a square steel tube, the outer main keel is a double steel tube, and the inner main keel is a double steel tube.

[0018] Specifically, the pulling connection assembly includes: an outer mountain-shaped card, an inner mountain-shaped card and a pulling device, the outer mountain-shaped card is fixedly connected to the outer main keel, the inner mountain-shaped card is fixedly connected to the inner main keel, the outer mountain-shaped card and the inner mountain-shaped card are arranged opposite to each other, and the outer mountain-shaped card and the inner mountain-shaped card are connected through the pulling device, and the pulling device applies opposite forces to the outer mountain-shaped card and the inner mountain-shaped card.

[0019] Preferably, the pulling device comprises: an outer nut, an inner nut and a pulling screw, the outer end of the pulling screw is provided with a thread adapted to the outer nut, the inner end of the pulling screw is provided with a thread adapted to the inner nut, the outer nut is fixedly connected to the outer mountain-shaped clamp, the outer end of the pulling screw passes through the inner mountain-shaped clamp and is threadedly connected to the outer nut, the inner nut is threadedly connected to the inner end of the pulling screw, and the inner nut applies an outward force to the inner mountain-shaped clamp.

[0020] Optionally, the pulling device further comprises a PVC sleeve, the PVC sleeve is sleeved on the pulling screw, and the PVC sleeve is located in the cast wall.

[0021] Optionally, a lifting ring for lifting the outer formwork is connected to the upper wooden beam.

[0022] Compared with the prior art, the utility model has the following advantages and beneficial effects:

[0023] The utility model adopts the design of outer formwork, inner formwork and tension connection assembly, so that the formwork can effectively support the wall at the settlement joint when pouring concrete, ensuring the flatness and verticality of the wall. The parallel arrangement of the outer formwork and the inner formwork, and their positions relative to the wall after pouring, provide a stable and effective support structure.

[0024] Through the design of the outer frame and the inner frame, including the outer secondary keel, the outer main keel, the inner secondary keel and the inner main keel, the overall stability and durability of the formwork are enhanced. It is suitable for buildings with thicker walls or higher heights, and effectively prevents formwork explosion and uneven wall surfaces.

[0025] The tension connection assembly provides a reliable connection method for the stable installation of the formwork, which not only enhances the mutual support between the formworks, but also makes the installation and removal process easier and safer.

[0026] In addition, the design of the formwork system takes weight and installation efficiency into consideration. The use of lightweight materials and overall assembly design reduces the weight of the formwork and the reliance on heavy equipment such as tower cranes, thereby reducing construction costs and complexity. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The accompanying drawings illustrate exemplary embodiments of the present invention and, together with the description thereof, are used to explain the principles of the present invention. These drawings are included to provide a further understanding of the present invention, and the accompanying drawings are included in and constitute a part of this specification and do not constitute a limitation on the embodiments of the present invention.

[0028] Figure 1 It is a front view of a support formwork for pouring floor settlement joints according to the utility model.

[0029] Figure 2 It is a side view of a support formwork for pouring floor settlement joints according to the utility model.

[0030] Figure numerals: 1-outer formwork, 2-inner formwork, 3-tension connection assembly, 4-outer secondary keel, 5-outer main keel, 6-wooden beam, 7-outer mountain-shaped clamp, 8-upper wooden beam, 9-lower wooden beam, 10-lifting ring. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and implementation methods. It is understood that the specific implementation methods described here are only used to explain the relevant content, rather than to limit the utility model.

[0032] It should also be noted that, for the convenience of description, only the parts related to the present utility model are shown in the drawings.

[0033] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0034] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0035] In the absence of conflict, the embodiments and features of the embodiments of the present invention can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0036] Embodiment 1

[0037] like Figure 1 and Figure 2 As shown, this embodiment provides a support formwork for casting floor settlement joints, including: an outer formwork 1, an inner formwork 2 and a tension connection assembly 3, the outer formwork 1 and the inner formwork 2 are arranged in parallel, and the outer formwork 1 is located on the outside of the wall after casting, and the inner formwork 2 is located on the inside of the wall after casting.

[0038] Before pouring, a cavity is formed between the outer formwork 1 and the inner formwork 2, and then concrete is poured into the cavity. After the concrete solidifies, a poured wall is formed. Therefore, the distance between the outer formwork 1 and the inner formwork 2 is determined according to the thickness of the wall to be poured.

[0039] The outer formwork 1 includes an outer frame and an outer multilayer board, and the outer multilayer board is arranged between the outer frame and the poured wall; the inner formwork 2 includes an inner frame and an inner multilayer board, and the inner multilayer board is arranged between the inner frame and the poured wall; the concrete is restricted by the multilayer board to prevent it from flowing out to the outer frame and the inner frame.

[0040] The outer frame and the outer frame are detachably connected through a plurality of the tension connection components 3, and concrete is poured between the outer multilayer board and the inner multilayer board. The outer formwork 1 and the inner formwork 2 are connected through the tension connection components 3. After the pouring is completed, the tension connection components 3 are disassembled, and the outer formwork 1 and the inner formwork 2 can be separated from the poured wall.

[0041] In this embodiment, the outer multilayer board and the inner multilayer board can be made of boards with various thicknesses such as 1.5 mm, 2 mm, and 2.5 mm.

[0042] The outer frame includes: an outer secondary keel 4, an outer main keel 5 and a wooden beam 6, a plurality of the outer secondary keels 4 are vertically arranged, and the wooden beam 6 is arranged between two adjacent outer secondary keels 4, a plurality of the outer main keels 5 are horizontally arranged, and the outer main keels 5 are vertically fixedly connected to the outer secondary keels 4; the outer multilayer board is fitted with the outer secondary keels 4 and the wooden beam 6, and the tension connection assembly 3 is connected to the outer main keel 5.

[0043] In this embodiment, the outer secondary keel 4 is a square steel tube, and the outer main keel 5 is a double steel tube. The wooden beam 6 is 50mm×100mm, the square steel tube is 50mm×50mm×2mm, and the double steel tube is 48.3×3.0mm.

[0044] In addition, in order to fix the outer secondary keel 4, the outer frame further includes an upper wooden beam 8 and a lower wooden beam 9. The upper wooden beam 8 is horizontally arranged, and the upper ends of the plurality of outer secondary keels 4 are connected to the upper wooden beam 8. The lower wooden beam 9 is arranged parallel to the upper wooden beam 8, and the lower ends of the plurality of outer secondary keels 4 are connected to the lower wooden beam 9. In order to facilitate the removal of the outer formwork 1 after pouring, a lifting ring 10 for lifting the outer formwork 1 is connected to the upper wooden beam 8.

[0045] The inner frame includes: inner secondary keels and inner main keels, a plurality of the inner secondary keels are arranged vertically, a plurality of the inner main keels are arranged horizontally, and the inner main keels are vertically fixedly connected to the inner secondary keels; the inner multilayer board is connected to the inner secondary keels, and the tension connection assembly 3 is connected to the inner main keels. The inner main keels are double steel pipes.

[0046] Embodiment 2

[0047] This embodiment provides the structure of the pulling connection assembly 3, including: an outer mountain-shaped card 7, an inner mountain-shaped card and a pulling device, the outer mountain-shaped card 7 is fixedly connected to the outer main keel 5, the inner mountain-shaped card is fixedly connected to the inner main keel, the outer mountain-shaped card 7 and the inner mountain-shaped card are arranged opposite to each other, and the outer mountain-shaped card 7 and the inner mountain-shaped card are connected by the pulling device, and the pulling device applies opposite forces to the outer mountain-shaped card 7 and the inner mountain-shaped card.

[0048] The pulling device includes: an outer nut, an inner nut and a pulling screw. The outer end of the pulling screw is provided with a thread adapted to the outer nut, and the inner end of the pulling screw is provided with a thread adapted to the inner nut. The outer nut is fixedly connected to the outer mountain-shaped clamp 7, and the outer end of the pulling screw passes through the inner mountain-shaped clamp and is threadedly connected to the outer nut. The inner nut is threadedly connected to the inner end of the pulling screw, and the inner nut applies an outward force to the inner mountain-shaped clamp.

[0049] The mountain-shaped clamp has an arc shape that matches the double steel pipe. After the mountain-shaped clamp and the double steel pipe are attached, they are fixed by welding. In addition, a through hole is set in the middle of the mountain-shaped clamp, and the through hole corresponds to the gap between the double steel pipes. When the wire drawing rod passes through, there is no interference between the wire drawing rod and the double steel pipe.

[0050] When in use, the wire drawing rod is threadedly connected with the outer nut, and a force is applied by rotating the inner nut. In addition, in order to facilitate the disassembly and assembly of the wire drawing rod, an extension rod with a diameter smaller than that of the wire drawing rod is welded at the inner end of the wire drawing rod.

[0051] In order to prevent the wire drawing rod from being integrated with the poured wall, the pulling device further comprises a PVC sleeve, which is sleeved on the wire drawing rod and is located in the poured wall, so as to facilitate the removal of the wire drawing rod.

[0052] Embodiment 3

[0053] This embodiment provides specific construction and use methods.

[0054] Preparation stage: Prepare the required materials, including the outer formwork 1, the inner formwork 2, and the tension connection assembly 3. Ensure that the required tools and equipment (such as tower cranes) are in good working condition and can be used for operation.

[0055] Installation of the outer formwork 1: Use wooden beams 6 to fix the vertical gaps of the outer secondary keels 4 to ensure that the upper end of the outer formwork 1 is stable in the horizontal direction. Arrange and set the outer secondary keels 4 according to the predetermined vertical spacing, and then use the lower wooden beams 9 to fix the lower ends of the outer secondary keels 4 in the horizontal direction to ensure the stability of the square steel tube secondary keels. Install the outer main keel 5 on the vertical outer secondary keel 4 by welding. Arrange and weld the outer mountain clips 7 and nuts on the outer main keel 5 according to a certain spacing.

[0056] Installation of inner formwork 2: Complete the installation of inner formwork 2 to ensure its structural stability. Including inner secondary keel, inner main keel and inner mountain-shaped card. Pass the wire rod through the inner mountain-shaped card and through the PVC sleeve of corresponding length.

[0057] Hoisting and fixing of the formwork system: Use a tower crane to hoist the outer formwork 1 and ensure that the holes of the tie rods of the formwork systems on both sides are correctly aligned. The construction personnel screw the tie rods into the outer nuts of the outer formwork 1 on the inside, and then select the inner nuts on the inside of the inner formwork 2, and adjust the positions of the inner nuts until the formwork systems on both sides are tightened and firmly fixed.

[0058] Concrete pouring: After the formwork on both sides is stable, start concrete pouring work until the pouring is completed and reaches the designed strength.

[0059] Dismantling and turnover of the formwork system: After the concrete pouring is completed and reaches the designed strength, the construction personnel rotate the tie rod on the inside and unscrew the tie rod. Use a tower crane to lift out the outer formwork 1 for subsequent turnover.

[0060] In the description of this specification, the description with reference to the terms "one embodiment / method", "some embodiments / methods", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment / method or example are included in at least one embodiment / method or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment / method or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments / methods or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments / methods or examples described in this specification and the features of the different embodiments / methods or examples, unless they are contradictory.

[0061] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0062] Those skilled in the art should understand that the above embodiments are only for the purpose of clearly illustrating the present invention, and are not intended to limit the scope of the present invention. For those skilled in the art, other changes or modifications may be made based on the above utility model, and these changes or modifications are still within the scope of the present utility model.

Claims

1. A support formwork for pouring floor settlement joints, characterized in that: include: An outer formwork (1), an inner formwork (2) and a tension connection assembly (3), wherein the outer formwork (1) and the inner formwork (2) are arranged in parallel, and the outer formwork (1) is located on the outer side of the wall after pouring, and the inner formwork (2) is located on the inner side of the wall after pouring; The outer formwork (1) comprises an outer frame and an outer multilayer board, wherein the outer multilayer board is arranged between the outer frame and the poured wall; The inner formwork (2) comprises an inner frame and an inner multilayer board, wherein the inner multilayer board is arranged between the inner frame and the poured wall; The outer frame and the inner frame are detachably connected via a plurality of the tension connection components (3), and concrete is poured between the outer multilayer board and the inner multilayer board.

2. A floor settlement joint casting support formwork according to claim 1, characterized in that: The outer frame comprises: an outer secondary keel (4), an outer main keel (5) and a wooden beam (6); a plurality of the outer secondary keels (4) are arranged vertically, and a wooden beam (6) is arranged between two adjacent outer secondary keels (4); a plurality of the outer main keels (5) are arranged horizontally, and the outer main keels (5) are vertically fixedly connected to the outer secondary keels (4); The outer multilayer board is fitted with the outer secondary keel (4) and the wooden beam (6), and the tension connection assembly (3) is connected with the outer main keel (5).

3. A floor settlement joint casting support formwork according to claim 2, characterized in that: The inner frame comprises: an inner secondary keel and an inner main keel, a plurality of the inner secondary keels are arranged vertically, a plurality of the inner main keels are arranged horizontally, and the inner main keel is vertically fixedly connected to the inner secondary keels; The inner multilayer board is connected to the inner secondary keel, and the tension connection assembly (3) is connected to the inner main keel.

4. A floor settlement joint casting support formwork according to claim 2, characterized in that: The outer frame further comprises an upper wooden beam (8) and a lower wooden beam (9), wherein the upper wooden beam (8) is arranged horizontally, and the upper ends of the plurality of outer secondary keels (4) are connected to the upper wooden beam (8), and the lower wooden beam (9) is arranged parallel to the upper wooden beam (8), and the lower ends of the plurality of outer secondary keels (4) are connected to the lower wooden beam (9).

5. A floor settlement joint casting support formwork according to claim 2, characterized in that: The outer secondary keel (4) is a square steel tube, and the outer main keel (5) is a double steel tube.

6. A floor settlement joint casting support formwork according to claim 3, characterized in that: The inner main keel is a double steel pipe.

7. A floor settlement joint casting support formwork according to claim 3, characterized in that: The pulling connection assembly (3) comprises: an outer mountain-shaped clamp (7), an inner mountain-shaped clamp and a pulling device, wherein the outer mountain-shaped clamp (7) is fixedly connected to the outer main keel (5), and the inner mountain-shaped clamp is fixedly connected to the inner main keel, the outer mountain-shaped clamp (7) and the inner mountain-shaped clamp are arranged opposite to each other, and the outer mountain-shaped clamp (7) and the inner mountain-shaped clamp are connected via the pulling device, and the pulling device applies forces acting in opposite directions to the outer mountain-shaped clamp (7) and the inner mountain-shaped clamp.

8. A support formwork for pouring floor settlement joints according to claim 7, characterized in that: The pulling device comprises: an outer nut, an inner nut and a pulling screw, the outer end of the pulling screw is provided with a thread adapted to the outer nut, the inner end of the pulling screw is provided with a thread adapted to the inner nut, the outer nut is fixedly connected to the outer mountain-shaped clamp (7), the outer end of the pulling screw passes through the inner mountain-shaped clamp and is threadedly connected to the outer nut, the inner nut is threadedly connected to the inner end of the pulling screw, and the inner nut applies an outward force to the inner mountain-shaped clamp.

9. A floor settlement joint casting support formwork according to claim 8, characterized in that: The pulling device also includes a PVC sleeve, which is sleeved on the pulling screw and is located in the cast wall.

10. A support formwork for pouring floor settlement joints according to claim 4, characterized in that: The upper wooden beam (8) is connected with a lifting ring (10) for lifting the outer formwork (1).