Mine drainage pipeline mounting bracket

By designing the mine drainage pipeline installation bracket and using support arms and U-shaped pipe clamps to fix the drainage pipeline, the problem of tortuous drainage pipelines caused by uneven side walls of the downhole tunnel is solved, and the linear installation of the drainage pipeline is achieved to avoid blockage and ensure downhole Work safety.

CN222102985UActive Publication Date: 2024-12-03INNER MONGOLIA HUANGTAOLEGAI COAL CO LTD SHI LIN CHEM BRANCH
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323664249.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-12-03
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

During the mine construction process, the side walls of the underground tunnel are uneven due to geological problems, resulting in tortuous laying of drainage pipes, which is prone to pipeline blockage, affecting sewage discharge and endangering the safety of underground workers.

Method used

Design a mine drainage pipeline installation bracket, including square support cylinder, support arm, column, support slat and arc-shaped placement groove. The drainage pipeline is installed in a straight line through the adjustment of the support arm, and the U-shaped pipe card and rubber pad are used. The drainage pipe is fixed and the support force is increased to prevent blockage.

Benefits of technology

Through the design of the bracket, the drainage pipe can be installed in a straight line, reducing bends, ensuring rapid discharge of sewage, avoiding pipeline blockage, and improving underground operation safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222102985U_ABST
    Figure CN222102985U_ABST
Patent Text Reader

Abstract

The utility model discloses a mine drainage pipeline installation support which comprises an installation vertical plate, a square supporting cylinder is vertically installed on the side wall of the installation vertical plate, a supporting arm is connected in an inner cavity of the square supporting cylinder in a sliding mode, a stand column is vertically installed at the outer end of the supporting arm, a supporting batten is horizontally installed on the stand column, and the supporting batten is connected with the square supporting cylinder in a sliding mode. The supporting batten is fixedly connected with the drainage pipeline through a U-shaped pipe clamp; the utility model has the beneficial effects that the installation position of the drainage pipeline can be adjusted by stretching out the support arm in the square support cylinder, so that the drainage pipeline can be installed in a straight line, thereby reducing the generation of bending parts of the drainage pipeline, facilitating the rapid drainage of sewage in the drainage pipeline, avoiding the pipeline blockage phenomenon, and improving the safety of the drainage pipeline. And safe mining operation of underground operating personnel is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The utility model belongs to the field of mine drainage pipeline installation, in particular to a mine drainage pipeline installation bracket. Background technology:

[0002] Mine construction project refers to mine construction project, which mainly includes the construction of main and auxiliary shafts, air shafts, bottom parking lots, drainage systems, pump rooms, substations, waiting rooms and other chambers, as well as the main ventilation, transportation, pedestrian tunnels, and mining areas and other related mine infrastructure projects.

[0003] Taking the construction of the drainage system as an example, during the mine construction process, as tunnels are continuously generated, drainage pipes will be laid on both sides of the tunnels. Their main function is to discharge the wastewater generated during the mining process in the mine, thereby ensuring the safety of underground mining. However, in the actual process of laying drainage pipes, due to geological problems, the side walls of the underground tunnels cannot be completely straight during the mining process, and uneven side walls will be produced, resulting in uneven drainage pipes laid along the way. There are many bends in the drainage pipes, and pipe blockages are prone to occur during use, resulting in the sewage generated during underground mining being unable to be discharged in time, causing mine leakage accidents, and seriously endangering the lives of underground workers. Utility model content:

[0004] The utility model aims to provide a mine drainage pipeline installation bracket, and overcomes the shortcomings of the above-mentioned prior art, and effectively solves the existing problem that the underground drainage pipeline is not laid straight.

[0005] The content of the utility model: A mine drainage pipeline installation bracket includes a mounting plate, a square support tube is vertically installed on the side wall of the mounting plate, a support arm is slidably connected in the inner cavity of the square support tube, a column is vertically installed on the outer end of the support arm, and a support strip is horizontally installed on the column, and the support strip is fixedly connected to the drainage pipe by a U-shaped pipe clamp.

[0006] Furthermore, an arc-shaped placement groove is provided on the top wall of the support slat.

[0007] Furthermore, arc-shaped auxiliary support plates are provided at both ends of the arc-shaped placement groove, and the arc-shaped auxiliary support plates are fixedly mounted on the side walls of the support strips.

[0008] Furthermore, rubber gaskets are installed in the arc-shaped placement groove and the groove of the arc-shaped auxiliary support plate.

[0009] Furthermore, a plurality of U-shaped pipe clamp mounting holes are provided at both ends of the support strip.

[0010] Furthermore, a screw hole is opened on the side wall of the square support tube, and a screw is screwed into the screw hole.

[0011] Furthermore, reinforcing support arms are installed on the top wall and the bottom wall of the square support tube, and the outer ends of the reinforcing support arms are fixedly connected to the side walls of the mounting vertical plate.

[0012] The beneficial effects of the utility model are as follows: by extending the support arm in the square support tube, the installation position of the drainage pipe can be adjusted so that the drainage pipe can be installed in a straight line, thereby reducing the generation of bends in the drainage pipe, facilitating the rapid discharge of sewage in the drainage pipe, avoiding pipe blockage, and ensuring the safety of mining operations for underground workers. Description of the drawings:

[0013] Figure 1 This is a diagram of the use state of the utility model;

[0014] Figure 2 It is a partial cross-sectional view of the main view of the utility model;

[0015] Figure 3 It is a top view of the utility model;

[0016] In the figure, 1 is a mounting plate, 2 is a square support tube, 3 is a support arm, 4 is a column, 5 is a support slat, 6 is a drainage pipe, 7 is a U-shaped pipe clamp, 8 is an arc-shaped placement groove, 9 is an arc-shaped auxiliary support plate, 10 is a U-shaped pipe clamp mounting hole, 11 is a screw, and 12 is a reinforced support arm. Specific implementation method:

[0017] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation of the present invention is now described with reference to the accompanying drawings:

[0018] like Figures 1 to 3 As shown, a mine drainage pipeline installation bracket includes a mounting plate 1, a square support tube 2 is vertically installed on the side wall of the mounting plate 1, a support arm 3 is slidably connected in the inner cavity of the square support tube 2, a column 4 is vertically installed on the outer end of the support arm 3, a support slat 5 is horizontally installed on the column 4, the support slat 5 is fixedly connected to the drainage pipe 6 by a U-shaped pipe clamp 7, an arc-shaped placement groove 8 is opened on the top wall of the support slat 5, and arc-shaped auxiliary support plates 9 are arranged at both ends of the arc-shaped placement groove 8, the arc-shaped auxiliary support plate 9 is fixedly installed on the side wall of the support slat 5, and rubber gaskets are installed in the arc-shaped placement groove 8 and the grooves of the arc-shaped auxiliary support plate 9.

[0019] Specifically, by stretching the support arm 3, the installation position of the drainage pipe 6 can be adjusted so that the drainage pipe 6 can be installed in a straight line.

[0020] During actual use, the mounting plate 1 is first fixed on the grooved side wall of the mine tunnel by bolts, and then the support arm 3 is pulled out from the inner cavity of the square support tube 2, so that the support slat 5 located at the outer end of the support arm 3 is in the same straight line with the installed drainage pipe. At this time, the drainage pipe 6 to be installed is placed on the support slat 5, and it is fixedly connected to the support slat 5 with a U-shaped pipe clamp 7; the arc-shaped placement groove 8 makes the installed drainage pipe 6 more stably placed, and the arc-shaped auxiliary support plate 9 further reinforces the stability of the drainage pipe 6.

[0021] like Figures 1 to 3 As shown, a plurality of U-shaped pipe clamp mounting holes 10 are provided at both ends of the support strip 5, screw holes are provided on the side walls of the square support tube 2, screws 11 are screwed into the screw holes, and reinforcing support arms 12 are installed on the top and bottom walls of the square support tube 2, and the outer ends of the reinforcing support arms 12 are fixedly connected to the side walls of the mounting vertical plate 1.

[0022] Specifically, a plurality of U-shaped pipe clamp installation holes 10 can be correspondingly installed with U-shaped pipe clamps of different sizes, so that drainage pipes of different diameters can be fixed on the support slats 5 in a timely manner.

[0023] During actual use, the corresponding U-shaped pipe clamps can be selected according to the different diameters of the drainage pipes, and they can be installed in the U-shaped pipe clamp installation holes 10 accordingly, so that the support strips 5 can timely fix the drainage pipes 6 of different diameters; when the extended position of the support arm 3 is determined, the screws 11 are screwed into the screw holes, and the positions of the square support tube 2 and the support arm 3 can remain unchanged under the tightening of the screws 11; strengthening the support arm 12 can strengthen the overall supporting force of the bracket.

[0024] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A mine drainage pipeline mounting bracket, characterized in that: The invention comprises a mounting plate (1), a square support tube (2) being vertically mounted on the side wall of the mounting plate (1), a support arm (3) being slidably connected in the inner cavity of the square support tube (2), a column (4) being vertically mounted on the outer end of the support arm (3), a support strip (5) being horizontally mounted on the column (4), and the support strip (5) being fixedly connected to a drainage pipe (6) via a U-shaped pipe clamp (7).

2. A mine drainage pipeline mounting bracket according to claim 1, characterized in that: An arc-shaped placement groove (8) is provided on the top wall of the supporting strip (5).

3. A mine drainage pipeline mounting bracket according to claim 2, characterized in that: Arc-shaped auxiliary support plates (9) are provided at both ends of the arc-shaped placement groove (8), and the arc-shaped auxiliary support plates (9) are fixedly mounted on the side walls of the support strip (5).

4. A mine drainage pipeline mounting bracket according to claim 3, characterized in that: Rubber gaskets are installed in the arc-shaped placement groove (8) and the groove of the arc-shaped auxiliary support plate (9).

5. A mine drainage pipeline mounting bracket according to claim 1, characterized in that: A plurality of U-shaped pipe clamp mounting holes (10) are provided at both ends of the support strip (5).

6. A mine drainage pipeline mounting bracket according to claim 1, characterized in that: A screw hole is provided on the side wall of the square support tube (2), and a screw (11) is screwed into the screw hole.

7. A mine drainage pipeline mounting bracket according to claim 1, characterized in that: Reinforced support arms (12) are installed on the top wall and the bottom wall of the square support tube (2), and the outer ends of the reinforced support arms (12) are fixedly connected to the side walls of the mounting vertical plate (1).