Waste heat recovery device for raw gas reformed gas of high-temperature coke oven
By designing a waste heat recovery device for reforming gas in high-temperature coke oven waste gas, the reforming gas is cooled by boiler feed water and high-parameter steam is generated, the problems of sensible and latent heat recovery of reforming gas in coke oven waste gas are solved, and high efficiency is achieved waste heat utilization and energy conservation.
Patent Information
- Application Number
- CN202420602087.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In the direct reforming of high-temperature waste gas for coking by-products, the huge sensible heat and latent heat of the coking oven waste gas reforming gas cannot be effectively recovered, resulting in waste of energy and unreasonable design costs in subsequent stages.
A waste heat recovery device for reforming gas in high-temperature coke oven waste gas is designed. Through the reforming furnace boiler feeding pump station unit and steam turbine power generation unit, the boiler feeding water is used to cool the high-temperature reforming gas and generate high-parameter steam. The latter uses Power generation in steam turbines can be achieved effectively using waste heat.
It realizes effective cooling and waste heat recovery of coke oven waste gas reforming gas, generates high-temperature and high-pressure steam for power generation, reduces equipment investment and operation and maintenance costs, and improves energy utilization efficiency.
Smart Images

Figure CN222104491U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of waste heat recovery, and in particular relates to a waste heat recovery device for high-temperature coke oven raw gas reforming gas. Background Art
[0002] Energy structure reform is the key to achieving the dual-carbon strategy, and hydrogen energy as a new generation of green energy has received widespread attention. On the other hand, the steel industry is a basic industry of the national economy, with high energy consumption, high CO2 emissions, and huge pressure to reduce carbon emissions. The steel industry generally recognizes that the direction of carbon reduction is hydrogen metallurgy. The amount of reducing gas required for hydrogen metallurgy is huge, and it is advisable to supply it nearby. Coke oven gas in the steel industry is a by-product of coking, with an H2 content of up to 53% to 59% and a CH4 content of 26%. In addition, my country's coke oven gas has scale advantages, with an annual output of more than 200 billion m 3 Therefore, coke oven gas is the best source of large-scale, low-cost, low-carbon hydrogen-rich reducing gas required by my country's steel industry. The process of directly reforming high-temperature waste gas, a by-product of coking, to produce hydrogen-rich reducing gas can achieve low-cost, high-efficiency, large-scale steelmaking co-production of hydrogen-rich reducing gas.
[0003] In the process of directly reforming the high-temperature waste gas, a byproduct of coking, to produce hydrogen-rich reducing gas, the temperature of the reaction center of the coke oven waste gas reforming gas in the reforming furnace can reach 2000℃. The coke oven waste gas, as the raw gas, reacts in the reforming furnace to generate high-temperature reforming gas with a temperature of 1200-1300℃. The sensible heat of this part of the reforming gas is very huge. If it is not recovered and directly enters the subsequent water washing section, it will not only waste a huge amount of waste heat energy, but also cause great pressure on the subsequent sections. The design and implementation costs of the water washing section are very unreasonable. In addition, the water washing section also causes waste if the reforming gas is not recovered and directly enters the water washing section. Therefore, it is necessary to find a method for recovering the waste heat of the high-temperature coke oven waste gas reforming gas, convert the latent heat of the reforming gas into effectively utilized high-parameter steam, and use less investment cost to complete the waste heat utilization. Using the waste heat boiler of the high-temperature waste gas reforming gas to recover and utilize the high-temperature sensible heat of the reforming gas can not only increase the economic benefits of the enterprise, save energy, and increase the income of the enterprise. Summary of the invention
[0004] The utility model aims to provide a high-temperature coke oven raw gas reforming gas waste heat recovery device, which can recover the latent heat of high-temperature coke oven raw gas reforming gas, and cooperate with the coke oven dry quenching unit to jointly use the steam turbine power station to generate electricity and realize waste heat utilization.
[0005] To achieve the above purpose, the utility model is implemented through the following technical solutions:
[0006] A high-temperature coke oven raw gas reforming gas waste heat recovery device, comprising a reforming furnace boiler feed water pump station unit, a steam turbine power generation unit, a plurality of reforming furnaces and boiler units;
[0007] The reforming furnace boiler feed water pump station unit includes a deaerator, a boiler feed water pump, a deionized water tank, and a deionized water supply pump. The outlet of the deionized water tank is connected to the deaerator via the deaerator feed water pump, and the outlet of the deaerator is connected to the reforming furnace and the boiler unit via the boiler feed water pump.
[0008] The reforming furnace and boiler unit include a reforming gas pipe, a reforming gas waste heat boiler, and a steam pipeline. A reforming gas pipe is connected between the reforming gas waste heat boiler and the reforming furnace. The reforming gas enters the pre-evaporator in the reforming gas waste heat boiler from the reforming furnace through the reforming gas pipe; the reforming gas waste heat boiler is provided with a pre-evaporator, a superheater, an evaporator, an economizer, a water spray desuperheater, and a steam drum. The pre-evaporator is arranged on the top of the reforming gas waste heat boiler, and the superheater, the evaporator, and the economizer are arranged in the furnace of the reforming gas waste heat boiler; the steam drum is connected with the superheater, the evaporator, and the economizer; the reforming gas waste heat boiler is connected with the steam pipeline, and the boiler feed water in the reforming gas waste heat boiler is heated to superheated steam by the high-temperature reforming gas and enters the steam turbine power generation unit through the steam pipeline;
[0009] The steam turbine power generation unit includes a steam turbine generator set, a condenser, and a condensate pump; the steam turbine generator set is connected to the condenser, the condenser is connected to the condensate pump, and the condensate in the condenser is pressurized by the condensate pump and sent to the desalted water tank of the reforming furnace boiler feed water pump station unit.
[0010] The superheater, evaporator and economizer are arranged in sequence from top to bottom in the furnace of the reforming gas waste heat boiler.
[0011] The steam pipes of the multiple reforming furnaces and boiler units are all connected to the steam main pipe, and the steam main pipe is connected to the steam turbine power generation unit.
[0012] The steam main pipe is connected to the superheated steam pipeline of the dry coke quenching boiler.
[0013] The steam pipeline is connected with a cut-off valve and a regulating valve.
[0014] There are two steam turbine power generation units.
[0015] The pipeline between the reforming furnace and the boiler unit to the boiler feed water pump is connected with a cut-off valve and a regulating valve.
[0016] The superheated steam inlet of the steam turbine generator set and the water outlet of the condenser are both provided with cut-off valves.
[0017] Compared with the prior art, the beneficial effects of the utility model are:
[0018] 1. The utility model realizes the effective cooling of high-temperature coke oven raw gas reforming gas. The utility model sets up a waste heat boiler based on the physical and chemical characteristics of the coke oven raw gas reforming gas, such as the composition and cooling temperature limit, and uses boiler feed water to cool the high-temperature reforming gas, so that its temperature is greatly reduced before entering the subsequent water washing section, thereby realizing the production of reforming gas at a reasonable temperature.
[0019] 2. The utility model realizes the waste heat recovery and effective utilization of the latent heat of the high-temperature coke oven raw gas reforming gas. The utility model is provided with a reforming furnace waste heat boiler, which realizes the cooling of the high-temperature coke oven raw gas reforming gas, and at the same time, this part of the waste heat is recovered more efficiently to generate superheated steam with high temperature and high pressure parameters (rated temperature 545°C, rated pressure 9.81MPa). The superheated steam generated by the reforming furnace waste heat boiler is transported to the steam turbine power generation unit, and combined with the superheated steam of the dry quenching boiler to generate electricity, so as to realize the more efficient utilization of waste heat.
[0020] 3. The utility model meets the requirement of continuous and uninterrupted cooling of all coke oven raw gas reforming gas. Due to the continuous production of coke ovens, the production of raw gas is also continuous throughout the year, which also leads to the necessity of continuous production of high-temperature coke oven raw gas reforming gas. However, the equipment of the reforming furnace and boiler unit needs to be overhauled every year. A single reforming furnace and boiler unit cannot meet the requirements of continuous production. Therefore, multiple reforming furnaces and boiler units need to be set up.
[0021] 4. The utility model cooperates with the CDQ waste heat recovery to reduce the investment in waste heat utilization equipment and ensure uninterrupted waste heat power generation. The high-temperature and high-pressure superheated steam produced by multiple reforming furnaces and boiler units is sent to the steam turbine power generation unit, and then combined with the high-temperature and high-pressure superheated steam produced by the CDQ boiler after the steam main pipe is combined, and then sent to two steam turbine power generation units for power generation. In this way, the steam turbine power generation unit can be fully utilized, and the waste heat of high-temperature raw coal gas reforming gas and the waste heat of CDQ can be coordinated, which can jointly share the equipment investment cost and effectively reduce the equipment operation and maintenance cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of a waste heat recovery device for high-temperature coke oven raw gas reforming gas.
[0023] In the figure: 1-coke oven raw gas reforming furnace 2-reforming gas pipe 3-pre-evaporator 4-secondary superheater 5-primary superheater 6-secondary evaporator 7-primary evaporator 8-economizer 9-water spray desuperheater 10-steam drum 11-boiler feed water pump 12-deaerator 13-deaerator water supply pump 14-desalting water tank 15-steam turbine generator set 16-condenser 17-condensate pump 18-shut-off valve one 19-steam pipeline 20-steam main pipe 21-shut-off valve two 22-regulating valve one 23-regulating valve two 24-shut-off valve three 25-shut-off valve four 26-superheated steam pipeline of dry coke quenching boiler. DETAILED DESCRIPTION
[0024] The present invention is described in detail below in conjunction with the accompanying drawings of the specification, but it should be noted that the implementation of the present invention is not limited to the following embodiments.
[0025] See Figure 1 A method for recovering waste heat from high-temperature coke oven raw gas reforming gas, wherein the high-temperature coke oven raw gas reforming gas exchanges heat with boiler feed water in a waste heat boiler, recovers the latent heat of the high-temperature coke oven raw gas reforming gas, and realizes stable cooling of the reforming gas; at the same time, superheated steam is continuously produced to realize waste heat recovery; and the coke oven dry quenching unit is coordinated to jointly use the steam turbine power station to realize efficient energy utilization. The high-temperature coke oven raw gas reforming gas waste heat recovery device includes 3 reforming furnaces and boiler units, 1 reforming furnace boiler feed water pump station unit, and 2 steam turbine power generation units.
[0026] The reforming furnace boiler feed water pump station unit includes a deaerator 12, a boiler feed water pump 11, a desalted water tank 14, and a deaerator feed water pump 13. The outlet of the desalted water tank 14 is connected to the deaerator 12 via the deaerator feed water pump 13, and the outlet of the deaerator 12 is connected to the reforming furnace and boiler unit via the boiler feed water pump 11. The steam pipes 19 of multiple reforming furnaces and boiler units are all connected to the steam main pipe 20, and the steam main pipe 20 is connected to the steam turbine power generation unit. The steam main pipe 20 is connected to the superheated steam pipe 26 of the dry quenching boiler. A shut-off valve 21 is connected to the steam pipe 19, and a shut-off valve 18 is connected to the pipe between each reforming furnace and boiler unit and the boiler feed water pump. When the corresponding reforming furnace is shut down for maintenance, the steam-water system can be completely cut off to ensure the safety of the maintenance and the stability of the operation of the other two units. In addition, a regulating valve 1 22 is connected to the pipeline between each reforming furnace and boiler unit to the boiler feed water pump, and a regulating valve 2 23 is connected to the steam pipeline 19, so that the boiler feed water and superheated steam flow rates can be adjusted accordingly.
[0027] The reforming furnace and boiler unit includes a reforming gas pipe 2, a reforming gas waste heat boiler, and a steam pipe 19. The reforming gas pipe 2 is connected between the reforming gas waste heat boiler and the reforming furnace 1. The reforming gas enters the pre-evaporator 3 in the reforming gas waste heat boiler from the reforming furnace 1 through the reforming gas pipe 2. The reforming gas waste heat boiler is provided with a pre-evaporator 3, a secondary superheater 4, a primary superheater 5, a secondary evaporator 6, a primary evaporator 7, an economizer 8, a water spray cooler 9, and a steam drum 10 from top to bottom. The pre-evaporator 3 is arranged on the top of the reforming gas waste heat boiler, and the superheater, evaporator, and economizer 8 are arranged in the furnace of the reforming gas waste heat boiler. The steam drum 10 is connected to the superheater, evaporator, and economizer 8; the reforming gas waste heat boiler is connected to the steam pipe 19, and the boiler feed water in the reforming gas waste heat boiler is heated to superheated steam by the high-temperature reforming gas and enters the steam turbine power generation unit through the steam pipe 19.
[0028] The steam turbine generator unit includes a steam turbine generator set 15, a condenser 16, and a condensate pump 17; the steam turbine generator set 15 is connected to the condenser 16, and the condenser 16 is connected to the condensate pump 17. The condensate in the condenser is pressurized by the condensate pump 17 and sent to the desalted water tank 14 of the reforming furnace boiler feed water pump station unit. A cut-off valve 3 24 is provided at the superheated steam inlet of each steam turbine generator unit, and a cut-off valve 4 25 is provided at the condenser outlet. When the corresponding steam turbine generator set is shut down for maintenance, the steam inlet and water outlet can be completely cut off to ensure the safety of maintenance and the stability of the operation of another steam turbine generator unit. The device selects two steam turbine generator units to achieve uninterrupted waste heat utilization. During normal operation, each steam turbine generator set 15 operates at 50% load. When the steam turbine generator set 15 is planned for maintenance or an accident occurs, the other unit operates at 100% load, which can take on all steam power generation, so that the entire system can achieve uninterrupted waste heat utilization.
[0029] There are two or more desalted water tanks 14, deaerators 12, deaerator water supply pumps 13, boiler feed water pumps 11, and condensate pumps 17 for a single steam turbine generator set 15. Two or more devices are in operation at the same time or any one of them is a standby device. Cut-off valves are set before and after the same type of devices.
[0030] The 1250℃ reformed gas produced by the coke oven gas reforming furnace 1 of each reforming furnace and boiler unit enters the inlet of the reforming gas waste heat boiler through the reforming gas pipe 2, and first passes through the pre-evaporator 3 to cool down, and at the same time cools the softened ash in the reformed gas to a solid state. Then the reformed gas passes through the secondary superheater 4, the primary superheater 5, the secondary evaporator 6, the primary evaporator 7, and the economizer 8 to cool down, and the temperature drops to 180℃, and is led out of the boiler outlet to the water washing section. The power for the reformed gas flow of the entire system is the negative pressure formed by the induced draft fan after the water washing section.
[0031] On the other hand, the desalted water and condensate in the desalted water tank 14 are pressurized by the deaerator water supply pump 13, sent to the deaerator 12 for heating and deoxygenation, and then pressurized to 14MPa by the boiler feed water pump 11 and sent to the boiler feed water main pipe, and then enter the 1#~3# reforming gas waste heat boilers respectively. For each reforming gas waste heat boiler, the boiler feed water enters the steam drum 10 through the economizer 8. The saturated water in the steam drum 10 is heated by the primary evaporator 7 and the secondary evaporator 6 to form a steam-water mixture, and the steam-water separation is carried out through the steam drum 10. The saturated steam is heated by the primary superheater and the secondary superheater to become 9.81MPa, 545℃ superheated steam, and is led to the steam turbine power generation unit after pressure regulation by the regulating valve 23. A regulating valve 22 is set on the boiler feed water pipeline to perform three-impulse regulation according to the liquid level of the steam drum 10, the main steam flow rate and the main feed water flow rate (the water inlet flow rate of each boiler). The boiler feed water outlet branch of each reforming furnace and boiler unit is led to the water spray desuperheater 9 between the first superheater and the second superheater to adjust the boiler main steam temperature to prevent overheating.
[0032] The superheated steam produced by the three-way reforming furnace and boiler unit is led to the steam main pipe 20 through the steam pipe 19, and then merged with the superheated steam produced by the one-way dry coke quenching boiler (the superheated steam is transported by the superheated steam pipe 26 of the dry coke quenching boiler). After the pipeline loss, the steam parameters of both are 8.83MPa(a), 535℃. They enter the two steam turbine generator sets 15 to generate power. The low-pressure cylinder exhaust steam enters the condenser 16 to cool into condensate, which is pressurized by the corresponding condensate pump 17 and sent back to the desalted water tank 14 of the reforming furnace boiler feed water pump station unit to realize the circulation of the steam-water system.
[0033] Among them, the reforming gas waste heat boiler of the reforming furnace and boiler unit selected a water tube boiler with a steam drum 10, which is conducive to reducing the resistance of the reforming gas in the furnace and reducing the operating cost of the induced draft fan in the downstream process; it is also more conducive to the production of high-parameter superheated steam. The steam parameters selected high temperature and high pressure parameters (high temperature and high pressure boiler main steam rated parameters: 9.81MPa, 545℃), which improves the efficiency of steam turbine power generation and the efficiency of waste heat recovery. In the design and installation of the waste heat boiler, the sealing welding of the header tube bundle workshop and modular design are adopted to ensure the installation quality and sealing of the boiler, so that the furnace and the pipes operating under negative pressure will not leak.
[0034] Due to the continuous production of coke ovens, the production of raw gas is also continuous throughout the year, which also leads to the continuous production of high-temperature coke oven raw gas reforming gas. However, the equipment of the reforming furnace and boiler unit needs to be inspected and maintained every year, and a single reforming furnace and boiler unit cannot meet the requirements of continuous production. If two reforming furnaces and boiler units are set up, in order to deal with emergencies such as accidents, the two reforming furnaces and boiler units must be operated at the same time, and each unit operates at 50% of the rated load condition, and 50% of the rated load condition is the minimum stable operating condition of the boiler. This requires the coke oven to operate at full load, otherwise the output of coke oven raw gas cannot meet the stable operation of the reforming furnace boiler, which is difficult to achieve in actual production. Therefore, three reforming furnaces and boiler units are set up. During normal operation, all three units operate at 67% of the rated load. When one reforming furnace and boiler unit undergoes planned maintenance or an accident occurs, the unit stops working and the other two units operate at 100% load. This can ensure uninterrupted cooling of all coke oven raw gas and reforming gas, and can also ensure uninterrupted recovery of all reforming gas waste heat.
[0035] The utility model can meet the requirement of stable cooling of high-temperature coke oven raw gas reforming gas and at the same time recover and utilize the waste heat more efficiently; at the same time, it cooperates with the superheated steam of the dry coke quenching boiler to generate electricity, fully recovers and utilizes all the high-temperature waste heat produced by the coke oven, and reduces equipment investment, equipment plant area and operating costs.
[0036] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A high-temperature coke oven raw gas reforming gas waste heat recovery device, characterized in that: It includes a reformer boiler feed water pump station unit, a steam turbine power generation unit, and multiple reformers and boiler units; The reforming furnace boiler feed water pump station unit includes a deaerator, a boiler feed water pump, a deionized water tank, and a deionized water supply pump. The outlet of the deionized water tank is connected to the deaerator via the deaerator feed water pump, and the outlet of the deaerator is connected to the reforming furnace and the boiler unit via the boiler feed water pump. The reforming furnace and boiler unit include a reforming gas pipe, a reforming gas waste heat boiler, and a steam pipeline. A reforming gas pipe is connected between the reforming gas waste heat boiler and the reforming furnace, and the reforming gas enters the pre-evaporator in the reforming gas waste heat boiler from the reforming furnace through the reforming gas pipe; the reforming gas waste heat boiler is provided with a pre-evaporator, a superheater, an evaporator, an economizer, a water spray desuperheater, and a steam drum, the pre-evaporator is arranged on the top of the reforming gas waste heat boiler, and the superheater, the evaporator, and the economizer are arranged in the furnace of the reforming gas waste heat boiler; the steam drum is connected with the superheater, the evaporator, and the economizer; the reforming gas waste heat boiler is connected with the steam pipeline, and the boiler feed water in the reforming gas waste heat boiler is heated to superheated steam by the high-temperature reforming gas and enters the steam turbine power generation unit through the steam pipeline; The steam turbine power generation unit includes a steam turbine generator set, a condenser, and a condensate pump; the steam turbine generator set is connected to the condenser, the condenser is connected to the condensate pump, and the condensate in the condenser is pressurized by the condensate pump and sent to the desalted water tank of the reforming furnace boiler feed water pump station unit.
2. A high-temperature coke oven raw gas reforming gas waste heat recovery device according to claim 1, characterized in that: The superheater, evaporator and economizer are arranged in sequence from top to bottom in the furnace of the reforming gas waste heat boiler.
3. The high-temperature coke oven raw gas reforming gas waste heat recovery device according to claim 1, characterized in that: The steam pipes of the multiple reforming furnaces and boiler units are all connected to the steam main pipe, and the steam main pipe is connected to the steam turbine power generation unit.
4. A high-temperature coke oven raw gas reforming gas waste heat recovery device according to claim 3, characterized in that: The steam main pipe is connected to the superheated steam pipeline of the dry coke quenching boiler.
5. The high-temperature coke oven raw gas reforming gas waste heat recovery device according to claim 3, characterized in that: The steam pipeline is connected with a cut-off valve and a regulating valve.
6. The high-temperature coke oven raw gas reforming gas waste heat recovery device according to claim 1, characterized in that: There are two steam turbine power generation units.
7. The high-temperature coke oven raw gas reforming gas waste heat recovery device according to claim 1, characterized in that: The pipeline between the reforming furnace and the boiler unit to the boiler feed water pump is connected with a cut-off valve and a regulating valve.
8. The high-temperature coke oven raw gas reforming gas waste heat recovery device according to claim 1, characterized in that: The superheated steam inlet of the steam turbine generator set and the water outlet of the condenser are both provided with cut-off valves.
Citation Information
Cited By
High-temperature coke oven raw gas reformed gas waste heat recovery device and method
CN118224885A