Foundation pit supporting system

By using water stop support components and anchor components in deep foundation pit support, the problem of insufficient anchoring strength caused by too close distance between the foundation pit and the river channel is solved, the shear strength and anchoring strength are improved, and the foundation pit support is ensured stability and safety.

CN222120253UActive Publication Date: 2024-12-06NO 1 CONSTR ENG CO LTD BEIJING CITY CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420284608.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-12-06
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

In the existing deep foundation pit support, the distance between the foundation pit and the river channel is too close to the insufficient anchoring strength of the anchor column, affecting the shear strength of the foundation pit.

Method used

Water stop support components are adopted, including cast-in piles and high-pressure rotary spray piles. The axis line is on the same vertical plane, combining anchor components, prefabricated retaining walls, concrete bases, inserts and post-cast concrete limit strips to enhance anchoring strength and shear strength.

Benefits of technology

Through the setting of anchoring components and limit strips, the shear strength of the water stop support components is improved, the firmness and stability of the prefabricated retaining wall is enhanced, the anchoring strength is improved, and the safety and stability of foundation pit support is ensured. sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120253U_ABST
    Figure CN222120253U_ABST
Patent Text Reader

Abstract

The utility model discloses a foundation pit supporting system which comprises a foundation pit and a river channel, the river channel is located on one side of the foundation pit, a water stop supporting assembly is arranged on the side wall, close to the river channel, of the foundation pit and comprises a plurality of cast-in-place piles and a plurality of high-pressure jet grouting piles, the cast-in-place piles are distributed at equal intervals, and gaps exist between the adjacent cast-in-place piles. The multiple high-pressure jet grouting piles are distributed at equal intervals, the adjacent high-pressure jet grouting piles are in lap joint with each other, and the axial leads of the multiple cast-in-place piles and the axial leads of the multiple high-pressure jet grouting piles are located on the same vertical plane; by arranging the anchoring assembly, shearing force borne by the water stop supporting assembly can be transmitted to the heavy prefabricated retaining wall, so that the shearing strength of the water stop supporting assembly is greatly improved, and the firmness and the stability of the prefabricated retaining wall are greatly improved by arranging the joint bars and the post-pouring concrete limiting strips; therefore, the shearing strength of the water stop support assembly is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, in particular to a foundation pit supporting system. Background Art

[0002] Foundation pit refers to the space below the ground excavated for the construction of the foundation and basement of a building (including structures), and is used in construction projects. Foundation pit is a temporary project, and its function is to provide a space so that the foundation masonry work can be carried out in the position specified by the design. The amount of foundation pit excavation is calculated according to the volume of the foundation pit. Generally speaking, a deep foundation pit refers to a foundation pit with an excavation depth greater than or equal to 5m. Common structures of water-stop curtains in deep foundation pit projects include deep mixing pile water-stop curtains, rotary jet pile water-stop curtains, and high-pressure rotary jet piles. In recent years, there have also been spiral drilling rigs, plain concrete, or grouting water-stop curtains.

[0003] At present, most of the cast-in-place piles in deep foundation pit support are fixedly connected with anchor columns and the soil outside the foundation pit.

[0004] However, in an existing project, due to the total thickness of the cast-in-place piles and high-pressure rotary jet piles in the foundation pit support being relatively thick and the distance between the foundation pit and the river channel being too close, the thin soil between the foundation pit and the river channel cannot guarantee the anchoring strength of the anchor column, thus affecting the shear strength of the foundation pit support. Utility Model Content

[0005] The utility model aims to provide a foundation pit support system to solve the technical problem that the thin soil between the foundation pit and the river channel of an existing project cannot ensure the anchoring strength of the anchoring column.

[0006] The technical solution of the utility model for solving the above-mentioned technical problems is as follows: a foundation pit support system, which includes a foundation pit and a river channel, the river channel is located on one side of the foundation pit, and a side wall of the foundation pit close to the river channel is provided with a water-stop support assembly, the water-stop support assembly includes a plurality of cast-in-place piles and a plurality of high-pressure rotary jet piles, the plurality of cast-in-place piles are equidistantly distributed, there are gaps between adjacent cast-in-place piles, the plurality of high-pressure rotary jet piles are equidistantly distributed, adjacent high-pressure rotary jet piles overlap each other, the axis lines of the plurality of cast-in-place piles and the axis lines of the plurality of high-pressure rotary jet piles are all located on the same vertical plane, a crown beam is fixedly provided on the upper ends of the plurality of cast-in-place piles and the plurality of high-pressure rotary jet piles, prefabricated retaining walls are symmetrically provided on both sides of the river channel, backfill soil is provided in the gap between the water-stop support assembly and the prefabricated retaining wall close to the foundation pit, and an anchor assembly is provided between the water-stop support assembly and the prefabricated retaining wall close to the foundation pit.

[0007] The utility model adopts the above-mentioned foundation pit support system, and further: the anchoring assembly includes a reinforcing beam, the reinforcing beam is fixedly arranged on the side of the water stop support assembly close to the foundation pit, the side of the reinforcing beam close to the river channel is fixedly provided with an anchoring column, the anchoring column passes through the water stop support assembly close to the river channel and is fixedly connected to the prefabricated retaining wall close to the foundation pit.

[0008] The utility model adopts the above-mentioned foundation pit support system, and further: a steel bar is arranged in the anchor column, a channel steel is welded to one end of the steel bar, the channel steel is located in the reinforcement beam, and an angle steel is welded to the other end of the steel bar, and the angle steel is embedded in the prefabricated retaining wall close to the foundation pit.

[0009] The utility model adopts the above-mentioned foundation pit support system, and further: a plurality of bending ribs are welded on one side of the angle steel piece, and the angle steel piece can be embedded in the prefabricated retaining wall with the same bending ribs.

[0010] The utility model adopts the above-mentioned foundation pit support system, and further: a concrete base is arranged at the lower side of the prefabricated retaining wall, a cushion layer is arranged at the lower side of the concrete base, and the cushion layer is cast at the bottom of the river channel.

[0011] The utility model adopts the above-mentioned foundation pit support system, and further: dowel bars are arranged between the prefabricated retaining wall and the concrete base, a groove is opened on the side of the prefabricated retaining wall close to the river channel, and a post-cast concrete limit strip located in the groove is cast on the upper side of the concrete base.

[0012] The utility model adopts the above-mentioned foundation pit support system, and further: the upper side of the prefabricated retaining wall is cast with a cap, and the upper side of the cap is fixedly provided with a railing.

[0013] The beneficial effects of the utility model are:

[0014] 1. The utility model can transfer the shear force borne by the water-stop support assembly to the heavy prefabricated retaining wall through the setting of the anchoring assembly, thereby greatly improving the shear strength of the water-stop support assembly, and greatly improve the firmness and stability of the prefabricated retaining wall through the setting of the dowel bar and the post-cast concrete limit strip, thereby further improving the shear strength of the water-stop support assembly.

[0015] 2. The axis lines of the bored piles and high-pressure jet-jet piles in the present invention are arranged on the same vertical plane, thereby reducing the thickness of the water-stop support assembly, relatively increasing the thickness of the backfill soil, and further increasing the anchoring strength of the water-stop support assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The above and / or other advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only schematic and do not limit the present invention, wherein:

[0017] Figure 1 This is a front cross-sectional structural schematic diagram of an embodiment of the utility model;

[0018] Figure 2 for Figure 1 A local enlarged schematic diagram of the middle A;

[0019] Figure 3 for Figure 1 A partial enlarged schematic diagram of point B in the middle;

[0020] Figure 4 The present invention is a schematic diagram of a top-down cross-sectional structure of a water-stop support assembly according to an embodiment of the present invention.

[0021] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0022] 1. Foundation pit; 2. River channel; 3. Cast-in-place piles; 4. High-pressure jet jet piles; 5. Crown beam; 6. Prefabricated retaining wall; 7. Backfill soil; 8. Reinforced beam; 9. Anchor column; 10. Steel bar; 11. Channel steel; 12. Angle steel; 13. Bent bar; 14. Concrete base; 15. Cushion layer; 16. Top pressure; 17. Inserted bar; 18. Groove; 19. Post-cast concrete limit strip; 20. Handrail. DETAILED DESCRIPTION

[0023] Hereinafter, embodiments of the foundation pit supporting system of the present invention will be described with reference to the accompanying drawings.

[0024] The embodiments described herein are specific embodiments of the present invention, which are used to illustrate the concept of the present invention, are explanatory and exemplary, and should not be interpreted as limiting the embodiments of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the claims and the contents disclosed in the specification of this application, including technical solutions that adopt any obvious replacement and modification of the embodiments described herein.

[0025] The drawings of this specification are schematic diagrams, which assist in explaining the concept of the utility model and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structure of various components of the embodiments of the utility model, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.

[0026] Figure 1-4A foundation pit support system of an embodiment of the utility model is shown, which comprises: a foundation pit 1 and a river channel 2, wherein the river channel 2 is located at one side of the foundation pit 1, and a water-stopping support assembly is arranged on one side wall of the foundation pit 1 close to the river channel 2, wherein the water-stopping support assembly comprises a plurality of cast-in-place piles 3 and a plurality of high-pressure rotary jet piles 4, wherein the cast-in-place piles 3 are equidistantly distributed, and there are gaps between adjacent cast-in-place piles 3, the plurality of high-pressure rotary jet piles 4 are equidistantly distributed, and adjacent high-pressure rotary jet piles 4 overlap each other, and the axis lines of the plurality of cast-in-place piles 3 and the axis lines of the plurality of high-pressure rotary jet piles 4 are all located on the same vertical plane, and a crown beam 5 is fixedly arranged on the upper ends of the plurality of cast-in-place piles 3 and the plurality of high-pressure rotary jet piles 4, and prefabricated retaining walls 6 are symmetrically arranged on both sides of the interior of the river channel 2, and backfill soil 7 is arranged in the gap between the water-stopping support assembly and the prefabricated retaining wall 6 close to the foundation pit 1, and an anchoring assembly is arranged between the water-stopping support assembly and the prefabricated retaining wall 6 close to the foundation pit 1.

[0027] The anchoring assembly includes a reinforcing beam 8, which is fixedly arranged on the side of the water-stopping support assembly close to the foundation pit 1. An anchoring column 9 is fixedly arranged on the side of the reinforcing beam 8 close to the river channel 2. The anchoring column 9 passes through the water-stopping support assembly close to the river channel 2 and is fixedly connected to the prefabricated retaining wall 6 close to the foundation pit 1.

[0028] A steel bar 10 is arranged in the anchor column 9 , and a channel steel 11 is welded to one end of the steel bar 10 . The channel steel 11 is located in the reinforcement beam 8 , and an angle steel 12 is welded to the other end of the steel bar 10 . The angle steel 12 is embedded in the prefabricated retaining wall 6 near the foundation pit 1 .

[0029] A plurality of bending ribs 13 are welded on one side of the angle steel piece 12, and the angle steel piece 12 can be embedded in the prefabricated retaining wall 6 together with the bending ribs 13; through the provision of the bending ribs 13, the angle steel piece 12 can be firmly embedded in the prefabricated retaining wall 6.

[0030] A concrete base 14 is disposed at the lower side of the prefabricated retaining wall 6 , and a cushion layer 15 is disposed at the lower side of the concrete base 14 . The cushion layer 15 is cast at the bottom of the river channel 2 .

[0031] Dowel bars 17 are arranged between the prefabricated retaining wall 6 and the concrete base 14, a groove 18 is opened on the side of the prefabricated retaining wall 6 close to the river channel 2, and a post-cast concrete limiting strip 19 located in the groove 18 is cast on the upper side of the concrete base 14; by setting the dowel bars 17 and the post-cast concrete limiting strip 19, the connection strength between the prefabricated retaining wall 6 and the concrete base 14 can be greatly improved.

[0032] A capping 16 is cast on the upper side of the prefabricated retaining wall 6 , and a railing 20 is fixedly arranged on the upper side of the capping 16 ; the railing 20 is arranged to prevent people from falling into the river channel 2 .

[0033] Working principle:

[0034] The system is under construction:

[0035] 1. Construction of water-stop support components is carried out at the set position. Specifically, bored piles 3 are firstly drilled and poured, wherein the bottom of bored piles 3 is set as an enlarged head to improve the pull-out resistance and anchoring force of bored piles 3, and then high-pressure rotary jet piles 4 are drilled and poured, and finally the top of bored piles 3 and high-pressure rotary jet piles 4 and the pouring construction of crown beams 5 are carried out;

[0036] 2. Excavate the river channel 2. After the excavation of the river channel 2 is completed, cast the cushion layer 15 and the concrete base 14 on both sides of the bottom of the river channel 2 in sequence. After the concrete base 14 is finalized, implant the dowel 17 at the set position on the concrete base 14.

[0037] 3. Apply adhesive on the upper side of the concrete base 14, then hoist the prefabricated retaining wall 6 onto the concrete base 14, and insert the dowel bar 17 into the insertion hole at the bottom of the prefabricated retaining wall 6. The prefabricated retaining wall 6 is hoisted in sections, and longitudinal connecting steel bars are arranged between adjacent prefabricated retaining walls 6. Then, cast the post-cast concrete limit strip 19 in the groove 18 on the upper side of the concrete base 14;

[0038] Fourth, excavate the foundation pit 1, and carry out the construction of the anchoring assembly as the foundation pit 1 is excavated. Specifically, drill holes at the set positions on the water-stop support assembly, insert the steel bars 10 into the holes, and weld one end of the steel bars 10 to the angle steel piece 12 on the prefabricated retaining wall 6, and weld the other end of the steel bars 10 to the channel steel 11 on the side of the water-stop support assembly close to 1, and finally carry out the formwork and casting construction of the reinforcement beam 8 and the anchoring column 9;

[0039] 5. Backfill the gap between the water-stop support assembly and the prefabricated retaining wall 6 close to the foundation pit 1 with backfill soil 7.

[0040] The number of anchor components in the system in the vertical direction needs to be set according to the excavation depth of the foundation pit 1. When the number of anchor components is greater than or equal to two, a vertical concrete connecting beam is arranged between the upper and lower adjacent anchor columns 9 to enhance the firmness and stability of the upper and lower adjacent anchor columns 9; the connection between the upper side of the concrete base 14 and the lower side of the prefabricated retaining wall 6 in the system is arranged as a serrated structure to improve the bite force and connection performance between the concrete base 14 and the prefabricated retaining wall 6; in the system, a rainwater expansion water stop strip is arranged in the gap between the bending part at the top of the post-cast concrete limit strip 19 and the inner wall of the groove 18 to improve the anti-seepage performance.

[0041] To sum up, the system can transfer the shear force borne by the water-stop support assembly to the heavy prefabricated retaining wall 6 through the setting of the anchoring assembly, thereby greatly improving the shear strength of the water-stop support assembly, and greatly improve the firmness and stability of the prefabricated retaining wall 6 through the setting of the inserted reinforcement 17 and the post-cast concrete limit strip 19, thereby further improving the shear strength of the water-stop support assembly; the axial lines of the bored piles 3 and the high-pressure rotary jet piles 4 in the system are all arranged on the same vertical plane, thereby reducing the thickness of the water-stop support assembly, relatively increasing the thickness of the backfill soil 7, and further improving the anchoring strength of the water-stop support assembly; the system uses bored bored piles plus high-pressure rotary jet water-stop curtains to block the exchange of water layers on both sides of the foundation pit, so that the river channel 2 and the foundation pit 1 can be excavated on a large scale and directly excavated to the support without worrying about the risks of slope collapse and water seepage, creating conditions for foundation construction.

[0042] The technical features disclosed above are not limited to the disclosed combinations with other features. Those skilled in the art may also make other combinations between the technical features according to the purpose of the utility model to achieve the purpose of the utility model.

Claims

1. A foundation pit support system, characterized in that: include: A foundation pit (1) and a river channel (2), wherein the river channel (2) is located on one side of the foundation pit (1), and a water stop support component is provided on a side wall of the foundation pit (1) close to the river channel (2), wherein the water stop support component comprises a plurality of cast-in-place piles (3) and a plurality of high-pressure rotary jet piles (4), wherein the plurality of cast-in-place piles (3) are distributed at equal intervals, and gaps exist between adjacent cast-in-place piles (3), and the plurality of high-pressure rotary jet piles (4) are distributed at equal intervals, and adjacent high-pressure rotary jet piles (4) overlap each other, and the plurality of cast-in-place piles (3) are connected to each other. The axis line and the axis lines of the plurality of high-pressure rotary jet piles (4) are located on the same vertical plane; a crown beam (5) is fixedly arranged at the upper ends of the plurality of cast-in-place piles (3) and the plurality of high-pressure rotary jet piles (4); prefabricated retaining walls (6) are symmetrically arranged on both sides of the river channel (2); backfill soil (7) is arranged in the gap between the water stop support assembly and the prefabricated retaining wall (6) near the foundation pit (1); and an anchor assembly is arranged between the water stop support assembly and the prefabricated retaining wall (6) near the foundation pit (1).

2. A foundation pit support system according to claim 1, characterized in that: The anchoring assembly comprises a reinforcement beam (8), the reinforcement beam (8) being fixedly arranged on a side of the water stop support assembly close to the foundation pit (1), the reinforcement beam (8) being fixedly arranged on a side of the water stop support assembly close to the river channel (2) with an anchoring column (9), the anchoring column (9) passing through the water stop support assembly close to the river channel (2) and being fixedly connected to a prefabricated retaining wall (6) close to the foundation pit (1).

3. A foundation pit support system according to claim 2, characterized in that: A steel bar (10) is arranged in the anchor column (9), a channel steel (11) is welded to one end of the steel bar (10), the channel steel (11) is located in the reinforcement beam (8), and an angle steel piece (12) is welded to the other end of the steel bar (10), the angle steel piece (12) is pre-buried in a prefabricated retaining wall (6) close to the foundation pit (1).

4. A foundation pit support system according to claim 3, characterized in that: A plurality of bending ribs (13) are welded to one side of the angle steel piece (12), and the angle steel piece (12) can be pre-embedded in the prefabricated retaining wall (6) together with the bending ribs (13).

5. A foundation pit support system according to claim 1, characterized in that: A concrete base (14) is provided on the lower side of the prefabricated retaining wall (6), a cushion layer (15) is provided on the lower side of the concrete base (14), and the cushion layer (15) is cast on the bottom of the river channel (2).

6. A foundation pit support system according to claim 5, characterized in that: A dowel bar (17) is provided between the prefabricated retaining wall (6) and the concrete base (14); a groove (18) is provided on a side of the prefabricated retaining wall (6) close to the river channel (2); and a post-cast concrete limiting strip (19) located in the groove (18) is cast on the upper side of the concrete base (14).

7. A foundation pit support system according to claim 1, characterized in that: A capping (16) is cast on the upper side of the prefabricated retaining wall (6), and a railing (20) is fixedly provided on the upper side of the capping (16).