Steel beam clamping horse capable of being rapidly assembled and disassembled

By designing the matching structure of the shaped kama base and the kama base, and using bolts to fix the kama and the steel beam, the problems of inconvenient fixation and poor stability of the kama in the prior art are solved, and rapid and stable installation and Disassembly improves construction efficiency.

CN222120983UActive Publication Date: 2024-12-06CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323539746.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-12-06
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

In the existing steel structure installation, the fixing form of steel beam kimma is mostly welding, which leads to inconvenient installation, poor structural stability and long-term use. The existing improvement plans still lack the fixing reliability and disassembly and assembly convenience.

Method used

A quick installation and disassembly steel beam kama is designed, using a structure where the shaped kama base I and the shaped kama base II cooperate with each other, and the base is supported by bolt holes and bolts. The fixing bolts pass through the bolt holes and bolt holes B to Fix the koma and steel beams to avoid welding and enable rapid installation and disassembly.

Benefits of technology

The rapid and stable installation and disassembly of steel beam kamas is achieved, which reduces on-site construction time and labor, improves construction efficiency, and kamas can be reused.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120983U_ABST
    Figure CN222120983U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel beam clamping device capable of being rapidly assembled and disassembled. The steel beam clamping device comprises a clamping device body, a U-shaped clamping device base I and a U-shaped clamping device base II. The clamping horse comprises a clamping horse fixing plate and a clamping horse hook plate which are connected with each other; at least two bolt holes A corresponding to the U-shaped clamping horse base I and the U-shaped clamping horse base II respectively are formed in the clamping horse fixing plate; the clamping base fixing plate is arranged above the U-shaped clamping base I and the U-shaped clamping base II, an opening of the U-shaped clamping base I is aligned with an opening of the U-shaped clamping base II, and bolt holes B matched with the bolt holes A are formed in upper plates of the U-shaped clamping base I and the U-shaped clamping base II. And the screw rod part of the fixing bolt sequentially penetrates through the bolt hole A and the bolt hole B and then is fixed with the bolt supporting base positioned in the U-shaped clamping base I and the U-shaped clamping base II. The fast assembling and disassembling steel beam clamping device is reasonable in structural design, the bolt supporting base is driven by the fixing bolt to abut against the steel beam, the clamping device and the steel beam can be firmly fixed, and assembling and disassembling are convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel structure installation, in particular to a quick-installing and -removing steel beam clamp, and particularly to a quick-installing and -removing steel beam clamp which is convenient for installation and removal operations, has good stability and can be reused. Background Art

[0002] During the installation of a steel structure, after a steel beam is hoisted to a designated position, it usually needs to be temporarily fixed. As a fixing device, a clamp can provide reliable support between steel beams. After the connecting bolts of the steel beam are installed, the clamp must be removed. Generally, the clamp has a relatively simple structure and is made of a high-strength steel plate. The lower part of the steel plate is arched, and one end is welded to the hoisted steel beam. After being hoisted to the installation node, it is fixed to the node through the other end. This kind of clamp is simple and reliable, but it needs to be welded to the steel beam, consuming labor, and both installation and removal require a lot of man-hours.

[0003] CN 103088913 A discloses an improved steel structure clamp, which solves the defects of tensile failure at the closure joint and large welding amount at the closure joint by optimizing the structure, but it still needs to be welded to the steel beam and the operation is cumbersome; CN 204800211 U discloses a multi-directional adjustable clamp, and the clamping groove is arranged on its fixed seat to avoid welding between the clamp and the longitudinal and cross beam bodies, and the disassembly and assembly are convenient, but it is fixed to the steel beam through a single fixed seat clamping groove, and its reliability needs to be improved.

[0004] Therefore, it is of great practical significance to develop a steel beam clamp with firm fixation, convenient disassembly and assembly and good structural stability. Content of the Utility Model

[0005] Due to the above-mentioned defects in the prior art, the utility model provides a steel beam clamp with firm fixation, convenient disassembly and assembly and good structural stability, which overcomes the defects that the current fixing form of the steel beam clamp is welding, the installation and removal are inconvenient, and the structural stability of the clamping connection is not good.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A quick-installing and -removing steel beam clamp, comprising a clamp, a U-shaped clamp base I and a U-shaped clamp base II;

[0008] The clamp includes a clamp fixing plate and a clamp hook plate which are connected to each other, and at least two bolt holes A corresponding to the U-shaped clamp base I and the U-shaped clamp base II are opened on the clamp fixing plate;

[0009] The cam fixing plate is arranged above the U-shaped cam base I and the U-shaped cam base II. The U-shaped cam base I and the U-shaped cam base II are integrally U-shaped and the openings of the two are aligned. Bolt holes B matching the bolt holes A are opened on the upper plates of the U-shaped cam base I and the U-shaped cam base II. The screw part of the fixing bolt passes through the bolt hole A and the bolt hole B in sequence and is fixed to the bolt support base located inside the U-shaped cam base I and the U-shaped cam base II. The U-shaped cam base I and the U-shaped cam base II can be customized by the processing factory according to the specifications of the steel beam to adapt to the hoisting of steel members of different sizes.

[0010] The quick-installing and disassembling steel beam cam of the present utility model has a reasonable structural design. The U-shaped cam base I and the U-shaped cam base II cooperate with each other to wrap the upper flange plate of the steel beam. By driving the bolt support base with the fixing bolt to tightly press against the steel beam, the cam can be firmly fixed to the steel beam. The installation and disassembly are convenient and fast and can be reused, and the application prospect is good.

[0011] As a preferred technical solution:

[0012] For the quick-installing and disassembling steel beam cam as described above, overlapping edges that match each other are provided at the relative positions of the upper plates of the U-shaped cam base I and the U-shaped cam base II, that is, the integrity is good after the U-shaped cam base I and the U-shaped cam base II are installed and the fixing reliability is better.

[0013] For the quick-installing and disassembling steel beam cam as described above, the internal thread structures of the bolt hole A and the bolt hole B are the same, and they match the external thread structure of the fixing bolt.

[0014] For the quick-installing and disassembling steel beam cam as described above, the cam hook plate divides the cam fixing plate equally and the cam hook plate is perpendicular to the cam fixing plate.

[0015] For the quick-installing and disassembling steel beam cam as described above, the U-shaped cam base I is stuck on one side of the upper flange plate of the steel beam and the U-shaped cam base II is stuck on the other side of the upper flange plate of the steel beam.

[0016] The installation steps of the above-mentioned quick-installing and disassembling steel beam cam are as follows:

[0017] During installation, the cam base is buckled on the web of the steel beam (the U-shaped cam base I and the U-shaped cam base II are symmetrically arranged relative to the web of the steel beam and are stuck on the upper flange plates on both sides). The bolt support base is placed below the bolt hole of the cam base, and the cam is placed above the base, so that the bolt hole A and the bolt hole B are aligned. Tighten the fixing bolt. At this time, the fixing bolt gradually presses against the bolt support base (the bolt support base and the fixing bolt have no thread connection and only serve as a support), so that the cam is tightly connected to the steel beam and the installation is completed.

[0018] The above technical solution is only a feasible technical solution of the present utility model. The protection scope of the present utility model is not limited thereto. Those skilled in the art can reasonably adjust the specific design according to actual needs.

[0019] The above-mentioned utility model has the following advantages or beneficial effects:

[0020] (1) For the quick-installing and -removing steel beam clip of the present utility model, the structural design is reasonable. The U-shaped clip base I and the U-shaped clip base II cooperate with each other to wrap the upper flange plate of the steel beam. By driving the bolt support base with the fixing bolt to tightly press against the steel beam, the clip can be firmly fixed to the steel beam. The installation and disassembly are convenient and fast and can be reused.

[0021] (2) For the quick-installing and -removing steel beam clip of the present utility model, during the hoisting operation of the steel beam, the clip can be quickly assembled. There is no need to weld between the steel beam and the clip. After installing some connecting bolts of the steel beam, the clip can be quickly removed, which can greatly reduce the on-site construction time and labor, enabling the workers to quickly engage in the next hoisting operation and greatly improving the on-site construction efficiency. It has good application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] By reading the detailed description of the non-restrictive embodiments with reference to the following drawings, the present utility model and its features, shape, and advantages will become more obvious. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and the emphasis is on showing the gist of the present utility model.

[0023] Figure 1 is a schematic structural diagram of the quick-installing and -removing steel beam clip of the present utility model;

[0024] Figure 2 is a schematic diagram of completing the installation of the steel beam by applying the quick-installing and -removing steel beam clip of the present utility model;

[0025] Reference numerals in the figures: 1, clip; 11, clip fixing plate; 12, clip hook plate; 2, fixing bolt; 3, bolt support base; 4, U-shaped clip base I; 5, U-shaped clip base II; 6, quick-installing and -removing steel beam clip; 7, steel beam to be installed; 8, bracket or fixed steel beam; 9, connecting bolt plate. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0026] The following further describes the structure in the present utility model in conjunction with the drawings and specific embodiments, but it is not a limitation to the present utility model.

[0027] Embodiment 1

[0028] A quick-installing and -removing steel beam clip, as Figure 1 shown, includes a clip 1, a U-shaped clip base I 4, and a U-shaped clip base II 5;

[0029] The clamp 1 includes a clamp fixing plate 11 and a clamp hook plate 12 which are connected to each other. The clamp hook plate 12 divides the clamp fixing plate 11 equally and is perpendicular to the clamp fixing plate 11. At least two bolt holes A corresponding to the U-shaped clamp base I 4 and the U-shaped clamp base II 5 are formed on the clamp fixing plate 11.

[0030] The clamp fixing plate 12 is arranged above the U-shaped clamp base I 4 and the U-shaped clamp base II 5. The U-shaped clamp base I 4 and the U-shaped clamp base II 5 are integrally U-shaped and their openings are aligned. Matching lapping edges are provided at the opposite positions of the upper plates of the U-shaped clamp base I 4 and the U-shaped clamp base II 5. The U-shaped clamp base I 4 is clamped on one side of the upper flange plate of the steel beam and the U-shaped clamp base II 5 is clamped on the other side of the upper flange plate of the steel beam. Bolt holes B matching the bolt holes A are formed on the upper plates of the U-shaped clamp base I 4 and the U-shaped clamp base II 5 (the internal thread structures of the bolt holes A and the bolt holes B are the same and match the external thread structure of the fixing bolt). The screw part of the fixing bolt 2 sequentially passes through the bolt holes A and the bolt holes B and is fixed to the bolt support base 3 located inside the U-shaped clamp base I 4 and the U-shaped clamp base II 5.

[0031] The installation state of the above-mentioned quick-installation and quick-removal steel beam clamp is as Figure 2 shown. The U-shaped clamp base I 4 is clamped on one side of the upper flange plate of the steel beam to be installed 7 and the U-shaped clamp base II 5 is clamped on the other side of the upper flange plate of the steel beam to be installed 7. Place the bolt support base below the bolt holes of the clamp base and place the clamp above the base so that the bolt holes A and the bolt holes B are aligned. Tighten the fixing bolt. At this time, the fixing bolt gradually presses against the bolt support base, making the clamp tightly connected to the steel beam. After the installation is completed, hoist the steel beam to be installed 7. After hoisting in place, bolt-fix the steel beam to be installed 7 and the corbel or the fixed steel beam 8 through the connecting bolt plate 9, and then the quick-installation and quick-removal steel beam clamp 6 can be removed.

[0032] Verified, the quick-installation and quick-removal steel beam clamp of the utility model has a reasonable structural design. The U-shaped clamp base I and the U-shaped clamp base II cooperate with each other to wrap the upper flange plate of the steel beam. By driving the bolt support base with the fixing bolt to press tightly against the steel beam, the clamp can be firmly fixed to the steel beam. The installation and disassembly are convenient, fast and reusable; for the steel beam hoisting operation, the clamp can be quickly assembled. There is no need to weld between the steel beam and the clamp. After installing some steel beam connection bolts, the clamp can be quickly removed, which can greatly reduce the on-site construction time and labor, enabling the workers to quickly engage in the next hoisting operation and greatly improving the on-site construction efficiency. It has a good application prospect.

[0033] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present utility model, and will not be described in detail here.

[0034] The above describes the preferred embodiments of the utility model. It should be understood that the utility model is not limited to the above-mentioned specific implementation methods, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the utility model without departing from the scope of the technical solution of the utility model, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the utility model. Therefore, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the utility model without departing from the content of the technical solution of the utility model still falls within the scope of protection of the technical solution of the utility model.

Claims

1. A fast installation and removal steel beam card, characterized by: It includes a clip, a U-shaped clip base I and a U-shaped clip base II; The clip includes a clip fixing plate and a clip hook plate which are connected to each other. At least two bolt holes A corresponding to the U-shaped clip base I and the U-shaped clip base II are formed in the clip fixing plate; The clip fixing plate is arranged above the U-shaped clip base I and the U-shaped clip base II. The U-shaped clip base I and the U-shaped clip base II are integrally U-shaped and the openings of the two are aligned. Bolt holes B matching the bolt holes A are formed in the upper plates of the U-shaped clip base I and the U-shaped clip base II. The screw part of the fixing bolt sequentially passes through the bolt hole A and the bolt hole B and is fixed to the bolt support base located inside the U-shaped clip base I and the U-shaped clip base II.

2. The fast installation and removal steel beam cama according to claim 1 is characterized in that: Lap edges which match each other are arranged at positions on the upper plates of the U-shaped clip base I and the U-shaped clip base II which face each other.

3. The fast installation and removal steel beam cama according to claim 1 is characterized in that: The internal thread structures of the bolt hole A and the bolt hole B are the same and are matched with the external thread structure of the fixing bolt.

4. The fast installation and removal steel beam cama according to claim 1 is characterized in that: The clip hook plate divides the clip fixing plate equally and the clip hook plate is perpendicular to the clip fixing plate.

5. The fast installation and removal steel beam cama according to claim 1 is characterized in that: The U-shaped clip base I is clamped on one side of the upper flange plate of the steel beam and the U-shaped clip base II is clamped on the other side of the upper flange plate of the steel beam.