Slope jumbolter construction platform
Through standardized channel steel frames and traction equipment, the problem of poor stability of traditional slope anchor construction platforms is solved, rapid installation and efficient construction are achieved, and costs and risks are reduced.
Patent Information
- Application Number
- CN202420867051.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-24
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-24
AI Technical Summary
In the case of high slopes and graded slopes, traditional slope anchor construction platforms have problems such as poor stability, high material costs, long construction cycles, and easy overturning and loosening under the influence of dynamic loads.
A slope anchor drilling rig construction platform was designed, using frames and traction equipment composed of standardized channel steel, which can achieve rapid installation and disassembly through bolt connections. The pulling force of the traction rope makes the trolley walk along the slope, increasing structural stability. and security.
It reduces material and labor costs, improves installation and disassembly efficiency, avoids fire operations, ensures structural stability and safety, and avoids the risk of loosening.
Smart Images

Figure CN222121422U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of slope construction, in particular to a slope anchor drill construction platform. Background Art
[0002] Traditional slope anchor construction usually uses anchor drilling rigs. In the case of high slopes and graded slopes, there is no walking route and working platform for the anchor drilling rigs, and the coverage of the anchor drilling rigs is limited. For such situations, there are two related technical solutions. The first is to set up a floor-standing scaffolding on the slope, and the second is to connect the trolley and the steel pipe frame with fasteners.
[0003] The first solution mentioned above requires high labor and material costs, a long construction period, and requires repeated installation and removal. In addition, during the anchor construction process, the frame is subjected to dynamic loads and is prone to overturning. The frame foundation cannot be hardened and the overall stability is poor. In the second solution mentioned above, the model and wall thickness of the steel pipes in the steel pipe frame are unstable. Most of the steel pipes on the construction site are severely corroded and cannot guarantee stable stress performance. The fastener connection method is affected by the dynamic load of the anchor construction and is prone to loosening, posing a safety risk. Utility Model Content
[0004] In view of this, the utility model provides a slope anchor drilling rig construction platform to solve the problem of poor stability of the construction platform in the related art.
[0005] The utility model provides a slope anchor drilling rig construction platform, comprising:
[0006] The trolley comprises a frame and wheels arranged at the four corners of the bottom of the frame, the bottom of the frame comprises a square frame surrounded by four first channel steels of the same length, any two adjacent first channel steels are connected by bolts, the left and right sides of the frame are respectively triangular frames surrounded by two second channel steels and one first channel steel in the square frame, the length and model of the second channel steel are the same as the length and model of the first channel steel, the first channel steel and the second channel steel, and two adjacent second channel steels are connected by bolts, the top of the frame is a third channel steel, the third channel steel connects the tops of the two triangular frames, the length and model of the third channel steel are the same as the length and model of the first channel steel, the third channel steel and the second channel steel are connected by bolts, and the front side of the frame is suitable for setting an anchor drilling rig;
[0007] The traction device is fixedly arranged on the frame body, and the traction device is connected with a traction rope, and one end of the traction rope is suitable for being connected to an anchor frame fixed on the top of the slope.
[0008] Beneficial effects: Any two adjacent first channel steels are connected by bolts, the first channel steel and the second channel steel, as well as the two adjacent second channel steels are connected by bolts, and the third channel steel and the second channel steel are connected by bolts. Compared with the related technology of setting up ground-type scaffolding on the slope, the damage to the materials during the erection and dismantling process is reduced, the installation and disassembly efficiency can be improved, and the material cost and labor cost can be reduced. The structure is also more stable. Compared with welding, hot work is avoided, and the recyclability of the material is improved. Compared with the connection method using fasteners in the related technology, the bolt connection is more stable and not easy to loosen. The length and model of the first channel steel, the length and model of the second channel steel, and the length and model of the third channel steel are consistent. The use of standardized materials can achieve rapid installation. Specifically, during the construction process, the traction rope applies tension to the trolley, which allows the trolley to move along the slope.
[0009] In an optional embodiment, two traction devices are symmetrically provided, and correspondingly, two traction ropes are provided.
[0010] Beneficial effect: Two traction devices are symmetrically arranged, so that the trolley can be evenly stressed.
[0011] In an optional embodiment, the traction device is fixedly arranged on the bottom of the frame.
[0012] Beneficial effect: The traction device is arranged at the bottom of the frame, which can prevent the frame from tipping over when the pulling force of the traction rope is large.
[0013] In an optional embodiment, the bottom of the frame also includes two fourth channel steels that are parallel to each other and symmetrically arranged in the square frame, the length extension direction of the fourth channel steel is perpendicular to the axis of the wheel, the length and model of the fourth channel steel are the same as the length and model of the first channel steel, the two ends of the fourth channel steel are respectively connected to the first channel steel by bolts, and the traction equipment is arranged on the first channel steel and the fourth channel steel.
[0014] Beneficial effect: The fourth channel steel cooperates with the first channel steel to facilitate the fixed installation of the traction equipment. In addition, the length and model of the fourth channel steel are the same as those of the first channel steel. Both ends of the fourth channel steel are connected to the first channel steel by bolts. The use of standardized materials can achieve rapid installation and improve installation and disassembly efficiency.
[0015] In an optional embodiment, a first switch box, a second switch box and a third switch box are fixed to the rear side of the frame, the first switch box is used to control one of the traction devices, the second switch box is used to control another of the traction devices, and the third switch box is used to control the anchor drilling rig.
[0016] Beneficial effect: The first switch box, the second switch box and the third switch box are arranged on the rear side of the frame, which facilitates the control operation of the traction equipment and the anchor drilling rig and is safer.
[0017] In an optional embodiment, a fifth channel steel and two sixth channel steels are provided on the rear side of the frame, the length and model of the fifth channel steel are the same as those of the first channel steel, the upper end of the fifth channel steel is connected to the third channel steel by bolts, the lower end of the fifth channel steel is connected to the first channel steel located on the rear side by bolts, the two sixth channel steels are parallel to each other, the two ends of the sixth channel steel are connected to the second channel steel located on the rear side by bolts, the sixth channel steel is perpendicular to the fifth channel steel, the length of the sixth channel steel is the same as that of the first channel steel, the first switch box and the second switch box are both arranged on the two sixth channel steels, and the third switch box is arranged on the fifth channel steel.
[0018] Beneficial effects: The fifth channel steel increases the strength and stability of the frame, and facilitates the fixing of the third switch box. The sixth channel steel increases the strength and stability of the frame, and facilitates the fixing of the first switch box and the second switch box.
[0019] In an optional embodiment, a seventh channel steel is provided on the front side of the frame, the length and model of the seventh channel steel are the same as the length and model of the first channel steel, the upper end of the seventh channel steel is connected to the third channel steel by bolts, and the lower end of the seventh channel steel is connected to the first channel steel located on the front side by bolts.
[0020] Beneficial effects: The setting of the seventh channel steel increases the strength and stability of the frame, and the length and model of the seventh channel steel are the same as those of the first channel steel. The upper end of the seventh channel steel is connected to the third channel steel by bolts, and the lower end of the seventh channel steel is connected to the first channel steel located on the front side by bolts. The use of standardized materials can achieve quick installation and improve installation and disassembly efficiency.
[0021] In an optional embodiment, the back sides of the two second channel steels located on the front side are connected by multiple angle steels, and the multiple angle steels are arranged at intervals in the up and down directions. The front side of the frame includes an anchor drilling rig construction area and a drill rod stacking area. A drill rod operation area is provided on one side of one of the second channel steels, and the drill rod operation area is formed by welding multiple eighth channel steels, and the eighth channel steel is connected to the second channel steel by bolts.
[0022] Beneficial effects: The front side of the frame is divided into partitions, and the drill rod stacking area is used to stack drill rods. Different drill rods can be selected according to needs during construction, which is more convenient for construction. The drill rod operation area is located on one side of the second channel steel, which is safer.
[0023] In an optional embodiment, an angle adjustment device is provided on the front side of the frame, and the anchor drilling rig is connected to the angle adjustment device.
[0024] Beneficial effect: The angle adjustment device is used to adjust the angle of the anchor drilling rig.
[0025] In an optional embodiment, the frame is further provided with a brake device, and the brake device is suitable for being embedded in the slope.
[0026] Beneficial effect: When the anchor drilling rig is in construction, the brake device is embedded in the slope to improve the safety of the construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0028] Figure 1 A schematic diagram of a slope anchor drilling rig construction platform in specific use according to an embodiment of the utility model;
[0029] Figure 2 for Figure 1 The enlarged view of point A in the middle;
[0030] Figure 3 for Figure 1 Left side view of the small and medium car;
[0031] Figure 4 for Figure 1 Front view of the small and medium car without the angle steel and the eighth channel steel connected;
[0032] Figure 5 for Figure 1 Bottom view of the small and medium-sized vehicle when it is not connected to the traction equipment;
[0033] Figure 6 for Figure 1 Bottom view of the small and medium-sized vehicle after being connected to the traction equipment;
[0034] Figure 7 for Figure 1 Rear view of small and medium-sized cars;
[0035] Figure 8 for Figure 1 Front view of the small and medium cars after connecting the angle steel and the eighth channel steel.
[0036] Description of reference numerals:
[0037] 1. Wheel; 2. First channel steel; 3. Second channel steel; 4. Third channel steel; 5. Fourth channel steel; 6. Fifth channel steel; 7. Sixth channel steel; 8. Seventh channel steel; 9. Eighth channel steel; 10. Anchor drilling rig; 11. Drill rod storage area; 12. Drill rod operation area; 13. Angle steel; 14. Traction equipment; 15. Traction rope; 16. Steel pipe rack; 17. Rebar; 18. Counterweight; 19. Angle adjustment device; 20. Braking device; 21. First switch box; 22. Second switch box; 23. Third switch box. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0039] Traditional slope anchor construction usually uses anchor drilling rigs. For high slopes and graded slopes, there is no walking route and working platform for the anchor drilling rigs, and the coverage of the anchor drilling rigs is limited. For such situations, there are two traditional ways to deal with them. The first is to set up a floor-standing scaffolding on the slope, and the second is to connect the trolley and the steel pipe frame with fasteners.
[0040] The first solution mentioned above requires high labor and material costs, a long construction period, and requires repeated installation and removal. In addition, during the anchor construction process, the frame is subjected to dynamic loads and is prone to overturning. The frame foundation cannot be hardened and the overall stability is poor. In the second solution mentioned above, the model and wall thickness of the steel pipes in the steel pipe frame are unstable. Most of the steel pipes on the construction site are severely corroded and cannot guarantee stable stress performance. The fastener connection method is affected by the dynamic load of the anchor construction and is prone to loosening, posing a safety risk.
[0041] Combine the following Figures 1 to 8 , describing an embodiment of the utility model.
[0042] According to an embodiment of the utility model, a slope anchor drilling rig construction platform is provided, comprising a trolley and a traction device 14 .
[0043] The trolley includes a frame and wheels 1 arranged at the four corners of the bottom of the frame. The bottom of the frame includes a square frame surrounded by four first channel steels 2 of the same length. Any two adjacent first channel steels 2 are connected by bolts. The left and right sides of the frame are triangular frames surrounded by two second channel steels 3 and one first channel steel 2 in the square frame. The length and model of the second channel steel 3 are the same as those of the first channel steel 2. The first channel steel 2 and the second channel steel 3, as well as two adjacent second channel steels 3 are connected by bolts. The top of the frame is a third channel steel 4, which connects the tops of the two triangular frames. The length and model of the third channel steel 4 are the same as those of the first channel steel 2. The third channel steel 4 and the second channel steel 3 are connected by bolts. The front side of the frame is suitable for setting an anchor drilling rig 10; a traction device 14 is fixedly arranged on the frame, and the traction device 14 is connected to a traction rope 15, and one end of the traction rope 15 is suitable for being connected to an anchor frame fixed on the top of the slope.
[0044] In this embodiment, any two adjacent first channel steels 2 are connected by bolts, the first channel steel 2 and the second channel steel 3, and the two adjacent second channel steels 3 are connected by bolts, and the third channel steel 4 and the second channel steel 3 are connected by bolts. Compared with the related art of erecting a ground-type scaffold on the slope, the damage to the material during the erection and dismantling process is reduced, the installation and disassembly efficiency can be improved, and the material cost and labor cost can be reduced. The structure is also more stable. Compared with welding, hot work is avoided, and the recyclability of the material is improved. Compared with the connection method using fasteners in the related art, the bolt connection is more stable and not easy to loosen. The length and model of the first channel steel 2, the length and model of the second channel steel 3, and the length and model of the third channel steel 4 are consistent. The use of standardized materials can achieve rapid installation. Specifically, during the construction process, the traction rope 15 applies tension to the trolley, which can make the trolley walk along the slope.
[0045] Specifically in one embodiment, the first channel steel 2 is a No. 10 channel steel, and the length of the first channel steel 2 is 2 meters. The second channel steel 3 and the third channel steel 4 are of the same model as the first channel steel 2 .
[0046] Specifically in one embodiment, each component is connected by two M10 bolts.
[0047] In one embodiment, two traction devices 14 are symmetrically provided, and correspondingly, two traction ropes 15 are provided.
[0048] In this embodiment, two traction devices 14 are symmetrically provided so that the trolley can be evenly stressed.
[0049] Specifically in one embodiment, the traction device 14 is a winch, which can wind up the traction rope 15 .
[0050] Specifically in one embodiment, the traction rope 15 is a steel wire rope.
[0051] Specifically in one embodiment, the anchor frame includes a steel pipe frame 16, steel bars 17 and a counterweight 18. The steel pipe frame 16 is formed by arranging steel pipes, the steel bars 17 are inserted into the soil, the counterweight 18 is connected to the steel bars 17, and the steel wire rope passes around the steel pipe frame 16 and is fixedly connected to the steel bars 17. After the steel bars 17 are fixed in the soil, a test pull is performed. When the force on each steel wire rope is not less than 5KN, the anchor frame should remain stable.
[0052] In one embodiment, the traction device 14 is fixedly disposed at the bottom of the frame.
[0053] In this embodiment, the traction device 14 is arranged at the bottom of the frame, which can prevent the frame from tipping over when the pulling force of the traction rope 15 is large.
[0054] In one embodiment, the bottom of the frame also includes two fourth channel steels 5 that are parallel to each other and symmetrically arranged in a square frame. The length extension direction of the fourth channel steel 5 is perpendicular to the axis of the wheel 1. The length and model of the fourth channel steel 5 are the same as the length and model of the first channel steel 2. The two ends of the fourth channel steel 5 are respectively connected to the first channel steel 2 by bolts, and the traction equipment 14 is arranged on the first channel steel 2 and the fourth channel steel 5.
[0055] In this embodiment, the fourth channel steel 5 cooperates with the first channel steel 2 to facilitate the fixed installation of the traction device 14. In addition, the length and type of the fourth channel steel 5 are the same as those of the first channel steel 2, and both ends of the fourth channel steel 5 are respectively connected to the first channel steel 2 by bolts. The use of standardized materials can achieve rapid installation and improve installation and disassembly efficiency.
[0056] In one embodiment, a first switch box 21, a second switch box 22 and a third switch box 23 are fixed to the rear side of the frame, the first switch box 21 is used to control one of the traction devices 14, the second switch box 22 is used to control another of the traction devices 14, and the third switch box 23 is used to control the anchor drilling rig 10.
[0057] In this embodiment, a first switch box 21, a second switch box 22 and a third switch box 23 are arranged on the rear side of the frame, so as to facilitate the control operation of the traction device 14 and the anchor drill rig 10 and make it safer.
[0058] It should be noted that the specific structures and working principles of the first switch box 21 , the second switch box 22 and the third switch box 23 are not the focus of this embodiment and will not be described in detail in this embodiment.
[0059] In one embodiment, a fifth channel steel 6 and two sixth channel steels 7 are provided on the rear side of the frame. The length and model of the fifth channel steel 6 are the same as those of the first channel steel 2. The upper end of the fifth channel steel 6 is connected to the third channel steel 4 by bolts, and the lower end of the fifth channel steel 6 is connected to the first channel steel 2 located on the rear side by bolts. The two sixth channel steels 7 are parallel to each other, and both ends of the sixth channel steel 7 are connected to the second channel steel 3 located on the rear side by bolts. The sixth channel steel 7 is perpendicular to the fifth channel steel 6, and the length of the sixth channel steel 7 is the same as that of the first channel steel 2. The first switch box 21 and the second switch box 22 are both arranged on the two sixth channel steels 7, and the third switch box 23 is arranged on the fifth channel steel 6.
[0060] In this embodiment, the fifth channel steel 6 increases the strength and stability of the frame, and facilitates fixing the third switch box 23. The sixth channel steel 7 increases the strength and stability of the frame, and facilitates fixing the first switch box 21 and the second switch box 22.
[0061] Specifically in one embodiment, the sixth channel steel 7 is a No. 8 channel steel.
[0062] In one embodiment, a seventh channel steel 8 is provided on the front side of the frame, and the length and model of the seventh channel steel 8 are the same as the length and model of the first channel steel 2. The upper end of the seventh channel steel 8 is connected to the third channel steel 4 by bolts, and the lower end of the seventh channel steel 8 is connected to the first channel steel 2 located on the front side by bolts.
[0063] In this embodiment, the provision of the seventh channel steel 8 increases the strength and stability of the frame, and the length and model of the seventh channel steel 8 are the same as the length and model of the first channel steel 2. The upper end of the seventh channel steel 8 is connected to the third channel steel 4 by bolts, and the lower end of the seventh channel steel 8 is connected to the first channel steel 2 located on the front side by bolts. The use of standardized materials can achieve quick installation and improve installation and disassembly efficiency.
[0064] In one embodiment, the back sides of the two second channel steels 3 located on the front side are connected by multiple angle steels 13, and the multiple angle steels 13 are arranged at intervals in the up and down directions. The front side of the frame includes an anchor drilling rig 10 construction area and a drill rod stacking area 11. A drill rod operation area 12 is provided on one side of one of the second channel steels 3. The drill rod operation area 12 is formed by welding multiple eighth channel steels 9, and the eighth channel steel 9 is connected to the second channel steel 3 by bolts.
[0065] In this embodiment, the front side of the frame is divided into partitions, and the drill rod stacking area 11 is used to stack drill rods. Different drill rods can be selected according to needs during construction, which is more convenient for construction. The drill rod operation area 12 is arranged on one side of the second channel steel 3, which is safer.
[0066] Specifically in one embodiment, the distance between two adjacent angle steels 13 is 300 mm.
[0067] Specifically, in one embodiment, four eighth channel steels 9 are provided, three of which are arranged to form a U-shape, and another eighth channel steel 9 connects two opposite eighth channel steels 9 .
[0068] Specifically in one embodiment, the eighth channel steel 9 is channel steel No. 8.
[0069] In one embodiment, an angle adjustment device 19 is provided on the front side of the frame, and the anchor drill 10 is connected to the angle adjustment device 19 .
[0070] In this embodiment, the angle adjustment device 19 is provided for adjusting the angle of the roof drill 10 .
[0071] Specifically, the angle adjustment device 19 may include an adjustment platform and a hydraulic cylinder, one end of the hydraulic cylinder is hinged to the adjustment platform, and the other end of the hydraulic cylinder is hinged to the frame, and the anchor drilling rig 10 is arranged on the adjustment platform.
[0072] In one embodiment, the frame is further provided with a brake device 20, and the brake device 20 is suitable for being embedded in the slope.
[0073] In this embodiment, when the anchor drill 10 is in construction, the brake device 20 is embedded in the slope to improve the safety of the construction.
[0074] Specifically in one embodiment, the brake device 20 includes a brake pad or a brake block, and the brake pad or the brake block is rotatably arranged.
[0075] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A slope anchor drilling rig construction platform, characterized in that: include: The trolley comprises a frame and wheels (1) arranged at four corners of the bottom of the frame, the bottom of the frame comprises a square frame surrounded by four first channel steels (2) of the same length, any two adjacent first channel steels (2) are connected by bolts, the left and right sides of the frame are respectively triangular frames surrounded by two second channel steels (3) and one of the first channel steels (2) in the square frame, the length and type of the second channel steel (3) are the same as the length and type of the first channel steel (2), the first channel steel (2) and the second channel steel (3), as well as two adjacent second channel steels (3) are connected by bolts, the top of the frame is a third channel steel (4), the third channel steel (4) connects the tops of the two triangular frames, the length and type of the third channel steel (4) are the same as the length and type of the first channel steel (2), the third channel steel (4) and the second channel steel (3) are connected by bolts, and the front side of the frame is suitable for arranging an anchor drilling machine (10); A traction device (14) is fixedly arranged on the frame body, and the traction device (14) is connected to a traction rope (15), and one end of the traction rope (15) is suitable for being connected to an anchor frame fixed on the top of the slope.
2. The slope anchor drilling rig construction platform according to claim 1, characterized in that: The traction devices (14) are symmetrically provided with two, and correspondingly, the traction ropes (15) are provided with two.
3. The slope anchor drilling rig construction platform according to claim 2, characterized in that: The traction device (14) is fixedly arranged at the bottom of the frame.
4. The slope anchor drilling rig construction platform according to claim 3 is characterized in that: The bottom of the frame also includes two fourth channel steels (5) which are parallel to each other and symmetrically arranged in the square frame. The length extension direction of the fourth channel steel (5) is perpendicular to the axis of the wheel (1). The length and type of the fourth channel steel (5) are the same as the length and type of the first channel steel (2). The two ends of the fourth channel steel (5) are respectively connected to the first channel steel (2) by bolts. The traction device (14) is arranged on the first channel steel (2) and the fourth channel steel (5).
5. The slope anchor drilling rig construction platform according to any one of claims 2 to 4, characterized in that: A first switch box (21), a second switch box (22) and a third switch box (23) are fixed to the rear side of the frame, wherein the first switch box (21) is used to control one of the traction devices (14), the second switch box (22) is used to control another of the traction devices (14), and the third switch box (23) is used to control the anchor drilling machine (10).
6. The slope anchor drilling rig construction platform according to claim 5, characterized in that: A fifth channel steel (6) and two sixth channel steels (7) are provided on the rear side of the frame. The length and model of the fifth channel steel (6) are the same as those of the first channel steel (2). The upper end of the fifth channel steel (6) is connected to the third channel steel (4) by bolts, and the lower end of the fifth channel steel (6) is connected to the first channel steel (2) located at the rear side by bolts. The two sixth channel steels (7) are parallel to each other. Both ends of the sixth channel steel (7) are connected to the second channel steel (3) located at the rear side by bolts. The sixth channel steel (7) is perpendicular to the fifth channel steel (6). The length of the sixth channel steel (7) is the same as that of the first channel steel (2). The first switch box (21) and the second switch box (22) are both arranged on the two sixth channel steels (7), and the third switch box (23) is arranged on the fifth channel steel (6).
7. The slope anchor drilling rig construction platform according to any one of claims 1 to 4, characterized in that: A seventh channel steel (8) is provided on the front side of the frame, and the length and type of the seventh channel steel (8) are the same as the length and type of the first channel steel (2). The upper end of the seventh channel steel (8) is connected to the third channel steel (4) by bolts, and the lower end of the seventh channel steel (8) is connected to the first channel steel (2) located on the front side by bolts.
8. The slope anchor drilling rig construction platform according to any one of claims 1 to 4, characterized in that: The backs of the two second channel steels (3) located at the front side are connected by a plurality of angle steels (13), and the plurality of angle steels (13) are arranged at intervals in the vertical direction. The front side of the frame includes an anchor drilling rig (10) construction area and a drill rod stacking area (11), and a drill rod operation area (12) is provided on one side of one of the second channel steels (3). The drill rod operation area (12) is formed by welding a plurality of eighth channel steels (9), and the eighth channel steel (9) is connected to the second channel steel (3) by bolts.
9. The slope anchor drilling rig construction platform according to any one of claims 1 to 4, characterized in that: An angle adjustment device (19) is provided on the front side of the frame, and the anchor drilling machine (10) is connected to the angle adjustment device (19).
10. The slope anchor drilling rig construction platform according to any one of claims 1 to 4, characterized in that: The frame is also provided with a brake device (20), and the brake device (20) is suitable for being embedded in the slope.