By using galvanized steel pipes to wrap the grounding lead in the ultra-high voltage metering mutual inductance laboratory, it is solved by wrapping the grounding lead and filling it with fine sand and molten tin, and fixing it with welding, the problem of oxidation of the grounding lead is solved, and the resistance value and stability of the grounding system are improved, ensuring that The laboratory is running normally.

CN222126990UActive Publication Date: 2024-12-06CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420602239.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-12-06
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

In the ultra-high voltage metering mutual inductance laboratory, the grounding lead is easily affected by soil and moisture due to exposure to the floor, which affects the current guidance effect, and increases the resistance value of the grounding system, affects the normal operation of the laboratory.

Method used

Galvanized steel pipes are used to lead the copper grounding to the wire and wrap it with fine sand and molten tin in the galvanized steel pipe to form an isolation layer to avoid oxidation. At the same time, it is fixed with the steel mesh and shielding layer through welding to enhance the stability of the grounding system.

Benefits of technology

It effectively prevents oxidation of grounding leads, improves the conductivity and stability of the resistance value of the grounding system, reduces the resistance value of the grounding system, and ensures the normal operation of the laboratory.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222126990U_ABST
    Figure CN222126990U_ABST
Patent Text Reader

Abstract

The utility model relates to a grounding system of an extra-high voltage measurement mutual inductance laboratory, which is buried in a soil body, and comprises a galvanized steel pipe buried in the soil body, and the galvanized steel pipe is filled with fine sand to form a fine sand filling layer; the grounding leading-up wire is arranged in the galvanized steel pipe, and part of the grounding leading-up wire is exposed out of the top of the galvanized steel pipe; the grounding copper plate is fixedly installed on the portion, exposed out of the galvanized steel pipe, of the grounding leading-up wire, part of the grounding copper plate is exposed out of the surface of the soil body, the structure is simple, and the grounding effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of grounding systems, in particular to a grounding system for an ultra-high voltage metering mutual inductance laboratory. Background Art

[0002] In the UHV metering mutual inductance laboratory, it is necessary to carry out safe operation in the high voltage and high current fields, equipment development, scientific research, research and maintenance of national metrology basic standards, and metrology verification and calibration testing of high voltage and current equipment, so as to complete the construction of top-level metrology standards in all fields of high voltage. The UHV metering mutual inductance laboratory has extremely high requirements for the reliable connection and resistance value of the grounding system, and the grounding lead connecting the grounding electrode and the grounding terminal board within the test area needs to pass through the floor steel mesh and shielding layer. Therefore, the reliable connection of the grounding lead with the floor steel mesh and shielding layer and the guarantee of the grounding resistance value of the grounding system are a key and difficult point of this project, which is related to whether the working grounding of the UHV metering mutual inductance laboratory can be used normally.

[0003] The disadvantage of the prior art is that the grounding lead is directly exposed to the floor and is easily affected by the soil and moisture in the floor for a long time, causing oxidation of the grounding lead buried in the soil, resulting in a deterioration in the guiding effect of the grounding lead for current. Utility Model Content

[0004] The purpose of the utility model is to overcome the defects of the prior art and provide a grounding system for a UHV metering mutual inductance laboratory. A galvanized steel pipe is sheathed around the grounding lead, and the galvanized steel pipe is filled with molten tin and fine sand to isolate the copper grounding lead from the floor, thereby forming effective protection for the grounding lead and avoiding adverse effects such as oxidation of soil, moisture, etc. in the floor.

[0005] The technical solution to achieve the above purpose is a grounding system for a UHV metering mutual inductance laboratory, which is buried in the soil. The grounding system includes:

[0006] A galvanized steel pipe buried in the soil, wherein the galvanized steel pipe is filled with fine sand to form a fine sand filling layer;

[0007] A grounding lead is disposed in the galvanized steel pipe, wherein a portion of the grounding lead is exposed at the top of the galvanized steel pipe; and

[0008] A grounding copper plate is fixedly mounted on the portion of the grounding lead exposed from the galvanized steel pipe, wherein a portion of the grounding copper plate is exposed from the surface of the soil.

[0009] Furthermore, a steel mesh is provided in the soil body, the galvanized steel pipe passes through the steel mesh, and the galvanized steel pipe is fixed to the steel mesh by welding.

[0010] Furthermore, a bridging steel plate is fixedly installed outside the galvanized steel pipe, and the bridging steel plate is welded and fixed to the bottom of the steel mesh.

[0011] Furthermore, the steel mesh is provided with two layers, and the bridging steel plates are provided with two layers corresponding to the two layers of the steel mesh.

[0012] Furthermore, a first molten tin perfusion layer is arranged in the fine sand filling layer, and the first molten tin perfusion layer is arranged corresponding to the position of the bridging steel plate.

[0013] Furthermore, a shielding layer is provided in the soil body, the galvanized steel pipe passes through the shielding layer, and the galvanized steel pipe is fixed to the shielding layer by welding.

[0014] Furthermore, a fixed steel plate is fixedly installed outside the galvanized steel pipe, and the fixed steel plate is welded and fixed to the top of the shielding layer.

[0015] Furthermore, a second molten tin perfusion layer is arranged in the fine sand filling layer, and the second molten tin perfusion layer is arranged corresponding to the position of the fixed steel plate.

[0016] Furthermore, two grounding lead wires are provided.

[0017] Furthermore, the grounding lead is made of copper.

[0018] Compared with the prior art, the utility model has the following beneficial effects:

[0019] A galvanized steel pipe is wrapped around the outer periphery of the grounding lead, and the galvanized steel pipe is filled with molten tin and fine sand to isolate the copper grounding lead from the floor, thereby forming effective protection for the grounding lead and avoiding adverse effects such as oxidation of the soil and moisture in the floor. The galvanized steel pipe is reliably welded to the steel mesh and the shielding layer through the jumper steel plate and the fixed steel plate respectively, and the welding area of ​​the jumper steel plate, the fixed steel plate and the steel mesh and the shielding layer in the soil is greatly increased, the galvanized steel pipe is effectively fixed, and coupled with the advantage of the high rigidity of the galvanized steel pipe, the welding firmness is more stable than the existing technology, and at the same time it has a greater promoting effect on reducing the resistance value of the grounding system. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 The utility model is an overall structural diagram of a grounding system of an ultra-high voltage metering mutual inductance laboratory.

[0021] Legend: 1. Grounding copper plate; 2. Grounding lead; 3. Fine sand filling layer; 4. First molten tin perfusion layer; 5. Jumper steel plate; 6. Steel mesh; 7. Fixed steel plate; 8. Shielding layer; 9. Second molten tin perfusion layer; 10. Galvanized steel pipe. DETAILED DESCRIPTION

[0022] The utility model is further described below in conjunction with specific embodiments.

[0023] See also Figure 1 A grounding system for a UHV metering mutual inductance laboratory is buried in the soil, and the grounding system comprises: a galvanized steel pipe 10 buried in the soil, the galvanized steel pipe 10 is filled with fine sand to form a fine sand filling layer 3; a grounding lead 2 arranged in the galvanized steel pipe 10, and a portion of the grounding lead 2 is exposed from the top of the galvanized steel pipe 10; and a grounding copper plate 1 fixedly installed on the portion of the grounding lead 2 exposed from the galvanized steel pipe 10, and a portion of the grounding copper plate 1 is exposed from the surface of the soil.

[0024] In the utility model, a preferred implementation is: burying the galvanized steel pipe 10 in the soil, and vertically setting the grounding lead 2 in the galvanized steel pipe 10, filling the galvanized steel pipe 10 with fine sand to form the fine sand filling layer 3, preferably, the fine sand used is: medium-fine sand with a particle size greater than 0.25 mm and a mass exceeding 50% of the total mass, and welding the grounding copper plate 1 on the top of the grounding lead 2, the size of the grounding copper plate 1 is 200*200*20mm, the fine sand in the galvanized steel pipe 10 can effectively increase the resistance value of the grounding lead 2 to ensure that the resistance value of the grounding system of the UHV metering mutual inductance laboratory meets the rated requirements.

[0025] Further, a steel mesh 6 is provided in the soil body, the galvanized steel pipe 10 passes through the steel mesh 6, and the galvanized steel pipe 10 is fixed to the steel mesh 6 by welding. The steel mesh 6 and the galvanized steel pipe 10 are welded and fixed to effectively fix the galvanized steel pipe 10 to the soil body.

[0026] Further, a bridging steel plate 5 is fixedly installed outside the galvanized steel pipe 10, and the bridging steel plate 5 is welded and fixed to the bottom of the steel mesh 6. The bridging steel plate 5 is fixed to the outside of the galvanized steel pipe 10 by welding, and the bridging steel plate 5 is fixed to the bottom of the steel mesh 6 by welding, and the galvanized steel pipe 10 is fixed by the bridging steel plate 5.

[0027] Further, the steel mesh 6 is provided with two layers, and the bridging steel plates 5 are provided with two layers corresponding to the two layers of the steel mesh 6. Preferably, two layers of steel mesh 6 are provided in the soil body, namely, an upper steel mesh 6 close to the soil surface and a lower steel mesh 6 below the upper steel mesh 6, and the upper steel mesh 6, the lower steel mesh 6 and the galvanized steel pipe 10 are connected by the bridging steel plates 5.

[0028] Furthermore, a first molten tin perfusion layer 4 is provided in the fine sand filling layer 3, and the first molten tin perfusion layer 4 is provided corresponding to the position of the jumper steel plate 5. The first molten tin perfusion layer 4 has good electrical conductivity, and the current in the grounding lead 2 is conducted to the galvanized steel pipe 10 and the jumper steel plate 5 through the first molten tin perfusion layer 4, and is conducted to the external soil through the steel mesh 6 fixed to the galvanized steel pipe 10 and the jumper steel plate 5 by welding, thereby increasing the resistance value of the grounding lead 2 in disguised form. During construction, fine sand can be poured into the galvanized steel pipe 10 to form a first fine sand layer. When the top of the first fine sand layer is matched with the jumper steel plate 5, molten tin is poured on the top of the first fine sand layer and poured until it is flush with the top of the jumper steel pipe. After the tin solidifies, the first molten tin perfusion layer 4 is formed, and fine sand is continuously filled on the top of the first molten tin perfusion layer 4.

[0029] Furthermore, a shielding layer 8 is provided in the soil body, the galvanized steel pipe 10 passes through the shielding layer 8, and the galvanized steel pipe 10 is fixed to the shielding layer 8 by welding.

[0030] Furthermore, a fixing steel plate 7 is fixedly installed outside the galvanized steel pipe 10, and the fixing steel plate 7 is welded and fixed to the top of the shielding layer 8. The fixing steel plate 7 is fixed to the shielding layer 8 by welding, and the galvanized steel pipe 10 is fixed to the shielding layer 8 through the fixing steel plate 7.

[0031] Furthermore, a second molten tin perfusion layer 9 is provided in the fine sand filling layer 3, and the second molten tin perfusion layer 9 is provided corresponding to the position of the fixed steel plate 7. The current in the grounding lead 2 is conducted to the galvanized steel pipe 10 and the fixed steel plate 7 through the second molten tin perfusion layer 9, and is conducted to the external soil through the shielding layer 8 welded to the galvanized steel pipe 10 and the fixed steel plate 7, thereby increasing the resistance value of the grounding lead 2 in disguised form. During construction, fine sand can be first poured into the galvanized steel pipe 10 to form a second fine sand layer. When the top of the second fine sand layer is matched with the fixed steel plate 7, molten tin is poured on the top of the second fine sand layer and poured until it is flush with the top of the fixed steel pipe. After the tin solidifies, the second molten tin perfusion layer 9 is formed, and fine sand continues to be filled on the top of the second molten tin perfusion layer 9.

[0032] Furthermore, two grounding lead wires 2 are provided.

[0033] Furthermore, the grounding lead 2 is made of copper.

[0034] The following is a description of the use of the grounding system of the utility model for an ultra-high voltage metering mutual inductance laboratory.

[0035] The galvanized steel pipe 10 is buried in the soil, and the grounding lead 2 is vertically arranged in the galvanized steel pipe 10, and fine sand is filled in the galvanized steel pipe 10 to form the fine sand filling layer 3. Preferably, the fine sand used is: medium-fine sand with a particle size greater than 0.25 mm and a mass exceeding 50% of the total mass. The grounding copper plate 1 is welded on the top of the grounding lead 2, and the size of the grounding copper plate 1 is 200*200*20mm. The fine sand in the galvanized steel pipe 10 can effectively increase the resistance value of the grounding lead 2 to ensure that the resistance value of the grounding system of the UHV metering mutual inductance laboratory meets the rated requirements.

[0036] The utility model is described in detail above in combination with the embodiments. A person skilled in the art can make various variations of the utility model according to the above description. Therefore, some details in the embodiments should not constitute a limitation of the utility model, and the scope of protection of the utility model shall be defined by the scope of the attached claims.

Claims

1. A grounding system for a UHV metering mutual inductance laboratory, buried in the soil, characterized in that: The grounding system comprises: A galvanized steel pipe buried in the soil, wherein the galvanized steel pipe is filled with fine sand to form a fine sand filling layer; A grounding lead is disposed in the galvanized steel pipe, wherein a portion of the grounding lead is exposed at the top of the galvanized steel pipe; and A grounding copper plate is fixedly mounted on the portion of the grounding lead exposed from the galvanized steel pipe, wherein a portion of the grounding copper plate is exposed from the surface of the soil.

2. The grounding system of a UHV metering mutual inductance laboratory according to claim 1 is characterized in that: A steel mesh is arranged in the soil body, the galvanized steel pipe passes through the steel mesh, and the galvanized steel pipe is fixed to the steel mesh by welding.

3. The grounding system of a UHV metering mutual inductance laboratory according to claim 2 is characterized in that: A bridging steel plate is fixedly installed outside the galvanized steel pipe, and the bridging steel plate is welded and fixed to the bottom of the steel mesh.

4. The grounding system of a UHV metering mutual inductance laboratory according to claim 3 is characterized by: The steel mesh is provided with two layers, and the bridging steel plates are provided with two layers corresponding to the two layers of the steel mesh.

5. The grounding system of a UHV metering mutual inductance laboratory according to claim 3 is characterized by: A first molten tin perfusion layer is arranged in the fine sand filling layer, and the first molten tin perfusion layer is arranged corresponding to the position of the bridging steel plate.

6. The grounding system of a UHV metering mutual inductance laboratory according to claim 1 is characterized by: A shielding layer is provided in the soil body, the galvanized steel pipe passes through the shielding layer, and the galvanized steel pipe is fixed to the shielding layer by welding.

7. The grounding system of a UHV metering mutual inductance laboratory according to claim 6 is characterized by: A fixed steel plate is fixedly installed outside the galvanized steel pipe, and the fixed steel plate is welded and fixed to the top of the shielding layer.

8. The grounding system of the UHV metering mutual inductance laboratory according to claim 7 is characterized by: A second molten tin perfusion layer is arranged in the fine sand filling layer, and the second molten tin perfusion layer is arranged corresponding to the position of the fixed steel plate.

9. The grounding system of a UHV metering mutual inductance laboratory according to claim 1 is characterized by: Two grounding lead wires are provided.

10. The grounding system of the UHV metering mutual inductance laboratory according to claim 1 is characterized by: The grounding lead is made of copper.