Building construction hoisting structure

By introducing bottom buffer components and tool placement components into the building construction hoisting structure, the problem of poor tool fixation in traditional structures is solved, the smooth transportation of the base and the rapid storage of tools are achieved, and the convenience and safety of construction operations are improved. .

CN222159516UInactive Publication Date: 2024-12-13MINGSHI HAITAI (HEBEI) CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421000715.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2024-12-13
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional construction material lifting structure lacks a clamping mechanism, which causes workers to be unable to fix tools in the lifting structure, affecting construction operations.

Method used

A construction hoisting structure was designed, including base, bottom buffer assembly and tool placement assembly. Through the coordination of installation holes and adjustment holes, the fixed connection of the base and the rapid installation and storage of tools are realized, ensuring safety during transportation. Sex and convenience.

Benefits of technology

It effectively improves the stability and safety of the base during transportation, and through the cooperation of electric telescopic rods and fastening pins, the tools are quickly stored, preventing leaks during transportation, and convenient for workers to operate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222159516U_ABST
    Figure CN222159516U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction material hoisting, in particular to a building construction hoisting structure which comprises a base, two first mounting holes are formed in each of the front end and the rear end of the base, a bottom buffering assembly is fixedly mounted in the four first mounting holes jointly, and mounting plates are fixedly connected to the front end and the rear end of the base. Two first connecting holes are formed in the upper ends of the two mounting plates in a penetrating mode, an outer protection plate is fixedly connected to the upper end of the base, two lifting hooks are fixedly connected to the left end and the right end of the outer protection plate correspondingly, two first adjusting holes are formed in the rear end of the outer protection plate in a penetrating mode, and a tool containing assembly is fixedly installed in the two first adjusting holes jointly. According to the building construction hoisting structure, the bottom buffering assembly is arranged, so that the purposes that the overall operation stability of the base is kept, and the safety of carrying people or objects on the outer protection plate is improved are achieved; and by arranging the tool containing assembly, the purposes that building tools are rapidly stored, and construction operation of workers is facilitated are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction material hoisting, in particular to a building construction hoisting structure. Background Art

[0002] Building services cover many aspects and are designed to ensure the construction, maintenance and management of buildings. Glass curtain wall cleaning is often regarded as part of building services. Building services include various maintenance and cleaning work aimed at ensuring the good condition of the appearance and function of the building. Glass curtain wall cleaning is to keep the glass curtain wall clean, transparent and attractive, so it is often regarded as an important task of building services.

[0003] In the use of traditional construction material hoisting structures, there may be no clamping mechanism, which may cause workers to be unable to fix tools when constructing in the hoisting structure, affecting the workers' operation. Therefore, we propose a construction hoisting structure. Utility Model Content

[0004] The main purpose of the utility model is to provide a building construction hoisting structure, which can effectively solve the problems in the background technology.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A construction hoisting structure includes a base, wherein the front and rear ends of the base are each provided with two first mounting holes, a bottom buffer assembly is fixedly mounted on the four first mounting holes, the front and rear ends of the base are each fixedly connected with a mounting plate, the upper ends of the two mounting plates are penetrated with two first connecting holes, the upper end of the base is fixedly connected with an outer guard plate, the left and right ends of the outer guard plate are each fixedly connected with two hooks, the inner surface of the outer guard plate is fixedly connected with an inner guard plate, the rear end of the outer guard plate is penetrated with two first adjustment holes, and a tool placement assembly is fixedly mounted on the two first adjustment holes.

[0007] Preferably, the bottom buffer assembly includes a bottom plate, the lower end of the bottom plate is fixedly connected to four buffer rods, the lower ends of the four buffer rods are fixedly connected to buffer pads, the opposite ends of the four buffer pads are commonly fixedly connected to a connecting rod, the upper end of the bottom plate is fixedly connected to a connecting seat, the front and rear ends of the connecting seat are penetrated by two second mounting holes, the front and rear ends of the connecting seat are fixedly connected to fixing plates, and the upper ends of the two fixing plates are penetrated by two second connecting holes.

[0008] Preferably, the positions and sizes of the four second mounting holes are matched with those of the four first mounting holes, the size of the connecting seat is matched with that of the base, and the positions and sizes of the four second connecting holes are matched with those of the four first connecting holes.

[0009] Preferably, the tool placement assembly includes a support plate and a side plate, wherein two support plates are provided, and second adjustment holes are penetrated at the front ends of the two support plates, a top plate is fixedly installed on the upper ends of the two support plates, a shell is fixedly connected to the front end of the top plate, two electric telescopic rods are fixedly connected to the upper inner wall of the shell, a pressure plate is fixedly installed on the lower ends of the two electric telescopic rods, and two third adjustment holes are penetrated at the front end of the side plate, and fastening pins are fixedly connected to the two third adjustment holes.

[0010] Preferably, the diameter of the fastening pin is equal to the inner diameter of the third adjustment hole, the position and size of the second adjustment hole correspond to those of the third adjustment hole, and the length of the pressure plate is equal to the distance between the left and right inner walls of the shell.

[0011] Preferably, the two fastening pins are adapted to the positions and sizes of the two first adjustment holes, and the length dimension of the outer shell is smaller than the width dimension of the outer guard plate.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] 1. The utility model provides a bottom buffer assembly, inserts the base into the connecting seat for preliminary fixation, and at this time the second mounting hole corresponds to the position of the first mounting hole, thereby fixing the base, and at this time the second connecting hole corresponds to the position of the first connecting hole, so that the lateral and vertical movements of the base are limited. When the base as a whole falls to the ground, the buffer pad first contacts the ground to perform the first layer of buffering, and then is driven by the buffer rod to perform the second layer of buffering. The connecting rod enables the four buffer pads to work at the same time, so as to achieve the purpose of maintaining the stability of the overall operation of the base and improving the safety of the outer guard plate when carrying people or goods;

[0014] 2. The utility model sets a tool placement component, places the side panel at the left end of the outer guard plate, and makes the second adjustment hole correspond to the position of the first adjustment hole. At this time, the position of the second adjustment hole corresponds to the position of the third adjustment hole, and the fastening pin passes through the third adjustment hole and the second adjustment hole to quickly install the tool placement component, places the tool in the shell, starts the electric telescopic rod to drive the pressure plate to descend and press the tool to prevent it from leaking during transportation, thereby achieving the purpose of quickly storing construction tools and facilitating workers to perform construction operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the overall structure of a construction hoisting structure of the utility model;

[0016] Figure 2 This is a structural schematic diagram of a fixing component of a construction hoisting structure of the utility model;

[0017] Figure 3 This is a structural schematic diagram of a bottom buffer component of a construction hoisting structure of the utility model;

[0018] Figure 4 The utility model is a structural schematic diagram of a construction hoisting structure tool placement component.

[0019] In the figure: 1. base; 2. mounting plate; 3. outer guard plate; 4. hook; 5. inner guard plate; 6. bottom buffer assembly; 7. tool placement assembly; 11. first mounting hole; 21. first connecting hole; 31. first adjustment hole; 61. bottom plate; 62. buffer rod; 63. buffer pad; 64. connecting rod; 65. connecting seat; 66. second mounting hole; 67. fixing plate; 68. second connecting hole; 71. support plate; 72. second adjustment hole; 73. top plate; 74. outer shell; 75. electric telescopic rod; 76. pressure plate; 77. side plate; 78. third adjustment hole; 79. fastening pin. DETAILED DESCRIPTION

[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0021] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0022] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0023] like Figure 1-4As shown, a construction hoisting structure includes a base 1, and the front and rear ends of the base 1 are each provided with two first mounting holes 11, and a bottom buffer component 6 is fixedly installed on the four first mounting holes 11, and the front and rear ends of the base 1 are fixedly connected with mounting plates 2, and the upper ends of the two mounting plates 2 are penetrated with two first connecting holes 21, and the upper end of the base 1 is fixedly connected with an outer guard plate 3, and the left and right ends of the outer guard plate 3 are each fixedly connected with two hooks 4, and the inner surface of the outer guard plate 3 is fixedly connected with an inner guard plate 5, and the rear end of the outer guard plate 3 is penetrated with two first adjustment holes 31, and a tool placement component 7 is fixedly installed on the two first adjustment holes 31.

[0024] like Figure 3 As shown, in this embodiment, the bottom buffer assembly 6 includes a bottom plate 61, the lower end of the bottom plate 61 is fixedly connected to four buffer rods 62, the lower ends of the four buffer rods 62 are fixedly connected to buffer pads 63, the opposite ends of the four buffer pads 63 are commonly fixedly connected to a connecting rod 64, the upper end of the bottom plate 61 is fixedly connected to a connecting seat 65, the front and rear ends of the connecting seat 65 are penetrated with two second mounting holes 66, the front and rear ends of the connecting seat 65 are fixedly connected to a fixing plate 67, the upper ends of the two fixing plates 67 are penetrated with two second connecting holes 68, the four second mounting holes 66 are adapted to the positions and sizes of the four first mounting holes 11, the size of the connecting seat 65 is adapted to the size of the base 1, and the four second connecting holes 68 are adapted to the four first connecting holes 21 The positions and sizes correspond to each other; in order to improve the safety of the outer guard plate 3 when carrying people or goods, the base 1 is inserted into the connecting seat 65 for preliminary fixation. At this time, the second mounting hole 66 corresponds to the position of the first mounting hole 11, so that the base 1 is fixedly connected, and the second connecting hole 68 corresponds to the position of the first connecting hole 21, so that the lateral and vertical movements of the base 1 are limited. When the base 1 falls to the ground as a whole, the buffer pad 63 first contacts the ground to perform the first layer of buffering, and is then driven by the buffer rod 62 to perform the second layer of buffering. The connecting rod 64 enables the four buffer pads 63 to work at the same time to maintain the overall stability of the base 1. When workers or goods are inside the outer guard plate 3, they can be protected against collision and injury to a certain extent due to the action of the inner guard plate 5.

[0025] like Figure 4As shown, in this embodiment, the tool placement component 7 includes a support plate 71 and a side plate 77. Two support plates 71 are provided. The front ends of the two support plates 71 are penetrated with second adjustment holes 72. The upper ends of the two support plates 71 are commonly fixedly installed with a top plate 73. The front end of the top plate 73 is fixedly connected to a shell 74. The upper inner wall of the shell 74 is fixedly connected to two electric telescopic rods 75. The lower ends of the two electric telescopic rods 75 are commonly fixedly installed with a pressing plate 76. The front end of the side plate 77 is penetrated with two third adjustment holes 78. The two third adjustment holes 78 are fixedly connected with fastening pins 79. The diameter of the fastening pins 79 is equal to the inner diameter of the third adjustment hole 78. The position and size of the second adjustment hole 72 and the third adjustment hole 78 correspond to each other. The pressing plate 76 The length dimension is equal to the distance dimension between the left and right inner walls of the shell 74, the two fastening pins 79 correspond to the positions and dimensions of the two first adjustment holes 31, and the length dimension of the shell 74 is smaller than the width dimension of the outer guard plate 3; when the workers need to place construction tools, the side plate 77 is placed on the left end of the outer guard plate 3, and the second adjustment hole 72 is made to correspond to the position of the first adjustment hole 31. At this time, the position of the second adjustment hole 72 is made to correspond to the position of the third adjustment hole 78, and the fastening pin 79 is passed through the third adjustment hole 78 and the second adjustment hole 72 to quickly install the tool placement assembly 7, and the tool is placed in the shell 74, and the electric telescopic rod 75 is started to drive the pressure plate 76 to descend to press the tool to prevent it from leaking during transportation, and the construction tools can be quickly stored.

[0026] It should be noted that the utility model is a construction hoisting structure. During this process, first assemble the various components together, pass the cables through the corresponding hooks 4 and install the outer guard plate 3 as a whole, so as to facilitate the subsequent lifting of the outer guard plate 3. In order to improve the safety of the outer guard plate 3 when carrying people or objects, insert the base 1 into the connecting seat 65 for preliminary fixation. At this time, the second mounting hole 66 corresponds to the position of the first mounting hole 11, so that the base 1 is fixedly connected, and the second connecting hole 68 corresponds to the position of the first connecting hole 21, so that the lateral and vertical movements of the base 1 are limited. When the base 1 falls to the ground as a whole, the buffer pad 63 first contacts the ground to perform the first layer of buffering, and is then driven by the buffer rod 62 to perform the second layer of buffering. The connecting rod 64 enables the four buffer pads 63 to work simultaneously to maintain the stability of the overall operation of the base 1. When workers or goods are inside the outer guard plate 3, the inner guard plate 5 can provide certain protection against collision and injury. When workers need to place construction tools, the side plate 77 is placed on the left end of the outer guard plate 3, and the second adjustment hole 72 is made to correspond to the position of the first adjustment hole 31. At this time, the position of the second adjustment hole 72 is made to correspond to the position of the third adjustment hole 78, and the fastening pin 79 is passed through the third adjustment hole 78 and the second adjustment hole 72 to quickly install the tool placement component 7, and the tool is placed in the outer shell 74, and the electric telescopic rod 75 is started to drive the pressure plate 76 to descend to press the tool to prevent it from leaking during transportation, and the construction tools can be quickly stored.

[0027] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A construction hoisting structure, comprising a base (1), characterized in that: The front and rear ends of the base (1) are each provided with two first mounting holes (11), and a bottom buffer assembly (6) is fixedly mounted on the four first mounting holes (11); the front and rear ends of the base (1) are each fixedly connected with a mounting plate (2), and the upper ends of the two mounting plates (2) are provided with two first connection holes (21); the upper end of the base (1) is fixedly connected with an outer guard plate (3), and the left and right ends of the outer guard plate (3) are each fixedly connected with two hooks (4); the inner surface of the outer guard plate (3) is fixedly connected with an inner guard plate (5), and the rear end of the outer guard plate (3) is provided with two first adjustment holes (31), and a tool placement assembly (7) is fixedly mounted on the two first adjustment holes (31); The bottom buffer assembly (6) comprises a bottom plate (61), the lower end of the bottom plate (61) is fixedly connected to four buffer rods (62), the lower ends of the four buffer rods (62) are fixedly connected to buffer pads (63), the opposite ends of the four buffer pads (63) are commonly fixedly connected to a connecting rod (64), the upper end of the bottom plate (61) is fixedly connected to a connecting seat (65), the front and rear ends of the connecting seat (65) are penetrated by two second mounting holes (66), the front and rear ends of the connecting seat (65) are fixedly connected to a fixing plate (67), and the upper ends of the two fixing plates (67) are penetrated by two second connecting holes (68).

2. A construction hoisting structure according to claim 1, characterized in that: The positions and sizes of the four second mounting holes (66) are adapted to the four first mounting holes (11), the size of the connecting seat (65) is adapted to the size of the base (1), and the positions and sizes of the four second connecting holes (68) are adapted to the four first connecting holes (21).

3. A construction hoisting structure according to claim 1, characterized in that: The tool placement assembly (7) comprises a support plate (71) and a side plate (77), wherein two support plates (71) are provided, and the front ends of the two support plates (71) are penetrated with a second adjustment hole (72), and the upper ends of the two support plates (71) are fixedly mounted with a top plate (73), and the front end of the top plate (73) is fixedly connected with a shell (74), and the upper inner wall of the shell (74) is fixedly connected with two electric telescopic rods (75), and the lower ends of the two electric telescopic rods (75) are fixedly mounted with a pressing plate (76), and the front end of the side plate (77) is penetrated with two third adjustment holes (78), and the two third adjustment holes (78) are fixedly connected with a fastening pin (79).

4. A construction hoisting structure according to claim 3, characterized in that: The diameter of the fastening pin (79) is equal to the inner diameter of the third adjustment hole (78); the second adjustment hole (72) and the third adjustment hole (78) are correspondingly matched in position and size; and the length of the pressing plate (76) is equal to the distance between the left and right inner walls of the outer shell (74).

5. A construction hoisting structure according to claim 3, characterized in that: The two fastening pins (79) are adapted to the positions and sizes of the two first adjustment holes (31), and the length dimension of the outer shell (74) is smaller than the width dimension of the outer guard plate (3).