Artificial stone plate splicing assembly
Through the cooperation of mortise and tenon structure and clamping components, the health and stability problems caused by the use of glue in artificial stone slab splicing are solved, and higher splicing strength and decorative properties are achieved.
Patent Information
- Application Number
- CN202420534435.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-03-19
AI Technical Summary
In the existing artificial stone slab splicing technology, the use of a large amount of glue will have adverse effects on user health, and the aging of the glue will lead to a decrease in splicing stability.
Using mortise and tenon structure and clamping components, positioning components, installation components and auxiliary fixing components, through the matching of mortise and tenon grooves and tenon joint strips, combined with spring plungers and clamping slots, the stable splicing of the stone slabs is achieved, and through detachable decorations The panel enhances the diversity and stability of surface patterns.
It reduces the use of glue, improves the structural strength and stability of the splicing, avoids harm to user health, and improves the decorativeness and installation stability of the artificial stone slab surface.
Smart Images

Figure CN222264700U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of artificial stone slabs, in particular to an artificial stone slab splicing component. Background Art
[0002] Natural stone is not suitable for the production of large-sized countertops due to its limited mechanical properties. Generally, large-sized countertops are mostly made of artificial stone slabs. However, in order to save costs, when making super-large countertops, unlike natural stone, which is affected by the surface pattern, multiple artificial stone slabs are usually spliced together.
[0003] A Chinese patent with publication (announcement) number CN216199564U discloses an artificial stone slab that is easy to splice. Compared with the prior art, it is only necessary to keep two sets of artificial stone slabs flush with each other, and the splicing of the artificial stone slabs is more convenient and efficient. At the same time, since the upper mortise and tenon, upper tenon, lower mortise and tenon of the two sets of artificial stone slabs are respectively interlocked with each other, the structural strength of the joint of the artificial stone slabs is improved, and the tensile and bending resistance of the joint is better.
[0004] The artificial stone slab connection structure involved in the above patent is fixed by gluing. A large amount of glue used will have adverse effects on the health of users who stay in this environment for a long time. Long-term use of glue will cause aging problems and affect the stability of its splicing. Therefore, we need to propose an artificial stone slab splicing assembly. Utility Model Content
[0005] The purpose of the utility model is to provide an artificial stone slab splicing assembly, which has the advantages of splicing artificial stone slabs through mortise and tenon structures and avoiding the harm of a large amount of glue to the health of users, so as to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides an artificial stone slab splicing assembly, including a first stone slab and a second stone slab; a first clamp and a second clamp respectively installed on the inner sides of the first stone slab and the second stone slab; a mortise and tenon groove provided between the first clamp and the second clamp; a mortise and tenon strip inserted into the inner cavity of the mortise and tenon groove; a clamping assembly installed on the upper and lower sides of the mortise strip; a positioning assembly installed on both sides of the mortise and tenon strip; a decorative panel provided on the top of the first stone slab and the second stone slab; an installation assembly for installing the decorative panel on the surfaces of the first stone slab and the second stone slab; and an auxiliary fixing assembly for improving the installation stability of the decorative panel.
[0007] Preferably, the snap-on assembly includes snap-on parts fixedly mounted on the upper and lower sides of the mortise and tenon strip; and snap-on grooves opened on the surfaces of the first snap-on part and the second snap-on part, the snap-on grooves and the snap-on parts are arranged correspondingly, and the surfaces of the snap-on parts are snap-oned with the inner walls of the snap-on grooves.
[0008] Preferably, the positioning assembly includes two groups of spring plungers fixedly embedded in the inner sides of the first clamp and the second clamp; and clamping holes opened on both sides of the mortise and tenon strip, the clamping holes and the spring plungers are arranged correspondingly, and the pop-up end of the spring plunger is clamped with the inner wall of the clamping hole.
[0009] Preferably, it further comprises a mounting hole opened on the inner side of the first clamping member and the second clamping member, and one end of the spring plunger is fixedly connected to the inner wall of the mounting hole.
[0010] Preferably, it also includes sliding grooves opened on both sides of the tenon strip, the sliding grooves are adapted to the pop-up ends of the spring plungers, and the pop-up ends of the spring plungers are slidably connected to the inner walls of the sliding grooves.
[0011] Preferably, the mounting assembly includes elastic clips fixedly mounted on the four corners of the bottom of the decorative panel; and mounting grooves opened on the surfaces of the first stone slab and the second stone slab, the mounting grooves and the elastic clips are arranged correspondingly, and the surface of the elastic clips is engaged with the inner cavity of the mounting grooves.
[0012] Preferably, the auxiliary fixing assembly includes auxiliary mounting blocks fixedly installed at the four corners of the bottom of the decorative panel; and fixing holes opened on the surfaces of the first stone slab and the second stone slab, the fixing holes and the auxiliary mounting blocks are arranged correspondingly, and the surface of the auxiliary mounting blocks is clamped with the inner wall of the fixing holes.
[0013] Preferably, the clamping member is arranged in a T-shape, and the clamping groove and the clamping member are arranged in a matching T-shape.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] The utility model can splice two groups of first stone slabs and second stone slabs together through the coordinated use of the first clamp, the second clamp, the mortise and tenon groove and the mortise and tenon strip. The first stone slab and the second stone slab are installed through the mortise and tenon structure. The installation gap is small, the overall appearance is more beautiful, and the use of a large amount of glue is avoided, thereby preventing the problem of adverse effects on the health of users who are in this environment for a long time due to the use of a large amount of glue; through the setting of the clamping component, the mortise and tenon strip can be clamped and fixed together with the first clamp and the second clamp to improve the stability of the mortise and tenon; through the setting of the positioning component, the mortise and tenon strip can be clamped and fixed to the inner cavity of the mortise and tenon groove to prevent the mortise strip from slipping out of the inner cavity of the mortise and tenon groove; through the setting of the installation component, the decorative panel can be installed and fixed on the top of the first stone slab and the second stone slab to improve the diversity of the surface patterns of the artificial stone slab; and the decorative panel in the device is detachable and can be freely replaced according to the user's preferences. Through the setting of the auxiliary fixing component, the stability of the installation of the decorative panel can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the structure of the utility model;
[0017] Figure 2 It is a structural schematic diagram of the installation assembly of the utility model;
[0018] Figure 3 It is a structural schematic diagram of the positioning component of the utility model;
[0019] Figure 4 It is a structural schematic diagram of the slideway of the utility model.
[0020] In the figure: 1. first stone slab; 2. second stone slab; 3. first clamp; 4. second clamp; 5. mortise and tenon groove; 6. mortise and tenon strip; 7. veneer; 8. clamping piece; 9. clamping groove; 10. spring plunger; 11. clamping hole; 12. mounting hole; 13. slide groove; 14. elastic buckle; 15. mounting groove; 16. auxiliary mounting block; 17. fixing hole. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-Figure 4 The utility model provides an artificial stone slab splicing assembly, including a first stone slab 1 and a second stone slab 2; a first clamp 3 and a second clamp 4 respectively installed on the inner sides of the first stone slab 1 and the second stone slab 2; a mortise groove 5 provided between the first clamp 3 and the second clamp 4; and a mortise strip 6 inserted into the inner cavity of the mortise groove 5.
[0023] Specifically, when splicing the first stone slab 1 and the second stone slab 2, the user can install the two stone slabs together. At this time, the first clamp 3 will be spliced together with the second clamp 4. When they are spliced together, a mortise groove 5 is formed at the connection between the first clamp 3 and the second clamp 4. At this time, the user can insert the mortise strip 6 into the inner cavity of the mortise groove 5, thereby mortise-joining the first stone slab 1 and the second stone slab 2 together.
[0024] Preferably, it also includes a clamping assembly installed on the upper and lower sides of the mortise strip 6, the clamping assembly includes a clamping part 8 fixedly installed on the upper and lower sides of the mortise strip 6; and a clamping groove 9 opened on the surface of the first clamping part 3 and the second clamping part 4, the clamping groove 9 and the clamping part 8 are arranged correspondingly, and the surface of the clamping part 8 is clamped with the inner wall of the clamping groove 9, the clamping part 8 is arranged in a T shape, and the clamping groove 9 and the clamping part 8 are arranged in a matching T shape.
[0025] By setting the clamping assembly, the stability of the connection between the mortise strip 6 and the mortise groove 5 can be improved. In the process of inserting the mortise strip 6 into the inner cavity of the mortise groove 5, the movement of the mortise strip 6 will drive the clamping parts 8 on its upper and lower sides to slide in the inner cavity of the clamping groove 9. After the mortise strip 6 is completely clamped into the inner cavity of the mortise groove 5, the clamping parts 8 are also completely clamped and fixed together with the clamping groove 9.
[0026] It is worth mentioning that it also includes positioning components installed on both sides of the mortise and tenon strip 6, the positioning components include two groups of spring plungers 10 fixedly embedded in the inner sides of the first clamp 3 and the second clamp 4; and clamping holes 11 opened on both sides of the mortise and tenon strip 6, the clamping holes 11 are arranged corresponding to the spring plungers 10, and the pop-up end of the spring plunger 10 is clamped with the inner wall of the clamping hole 11.
[0027] By setting the positioning component, the mortise strip 6 can be clamped and fixed in the inner cavity of the mortise groove 5. During the insertion of the mortise strip 6, the slide grooves 13 on both sides of the mortise strip 6 will squeeze the pop-up end of the spring plunger 10. When the mortise strip 6 is completely inserted into the inner cavity of the mortise groove 5, the clamping holes 11 on both sides of the mortise strip 6 will move to the corresponding position of the spring plunger 10. At this time, the pop-up end of the spring plunger 10 will pop out and be clamped together with the inner cavity of the clamping hole 11, thereby clamping and fixing the use position of the mortise strip 6.
[0028] Preferably, it also includes a mounting hole 12 opened on the inner side of the first clamp 3 and the second clamp 4, one end of the spring plunger 10 is fixedly connected to the inner wall of the mounting hole 12, and also includes a slide groove 13 opened on both sides of the mortise and tenon strip 6, the slide groove 13 is adapted to the pop-up end of the spring plunger 10, and the pop-up end of the spring plunger 10 is slidably connected to the inner wall of the slide groove 13.
[0029] By setting the mounting hole 12, a mounting space can be provided for the spring plunger 10. By providing the slide grooves 13 on both sides of the mortise and tenon strip 6, the pop-up end of the spring plunger 10 can be squeezed when the mortise and tenon strip 6 is inserted.
[0030] Furthermore, a decorative panel 7 is installed on the top of the first stone slab 1 and the second stone slab 2, and the decorative panel 7 is installed and fixed on the top of the first stone slab 1 and the second stone slab 2 through an installation component, and the installation component includes elastic clips 14 fixedly installed on the four corners of the bottom of the decorative panel 7; and installation grooves 15 opened on the surfaces of the first stone slab 1 and the second stone slab 2, and the installation grooves 15 are arranged corresponding to the elastic clips 14, and the surface of the elastic clips 14 is snap-fitted with the inner cavity of the installation grooves 15.
[0031] By setting the decorative panel 7, the surface of the artificial stone slab can be decorated to make its surface more expressive in pattern. By setting the installation component, the decorative panel 7 can be installed on the top of the first stone slab 1 and the second stone slab 2. When installing the decorative panel 7, the user can press the decorative panel 7 in the direction of the first stone slab 1 and the second stone slab 2. When the bottom of the decorative panel 7 is in contact with the top of the first stone slab 1 and the second stone slab 2, the elastic buckle 14 will be inserted into the inner cavity of the installation groove 15, thereby achieving the purpose of snap-fitting and installing the decorative panel 7.
[0032] Furthermore, it also includes an auxiliary fixing component for improving the installation stability of the decorative panel 7, the auxiliary fixing component includes an auxiliary mounting block 16 fixedly installed at the four corners of the bottom of the decorative panel 7; and a fixing hole 17 opened on the surface of the first stone slab 1 and the second stone slab 2, the fixing hole 17 and the auxiliary mounting block 16 are arranged correspondingly, and the surface of the auxiliary mounting block 16 is clamped with the inner wall of the fixing hole 17.
[0033] By setting the auxiliary fixing assembly, when installing the decorative panel 7, when the bottom of the decorative panel 7 is in contact with the tops of the first stone slab 1 and the second stone slab 2, the bottom end of the auxiliary mounting block 16 will be inserted into the inner cavity of the fixing hole 17, thereby improving the installation stability of the decorative panel 7 and preventing the decorative panel 7 from being slightly misaligned during normal use of the artificial stone slab.
[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An artificial stone slab splicing assembly, characterized in that: It comprises a first stone slab (1) and a second stone slab (2); A first clamping member (3) and a second clamping member (4) respectively mounted on the inner sides of the first stone slab (1) and the second stone slab (2); A mortise and tenon groove (5) provided between the first clamping member (3) and the second clamping member (4); A tenon strip (6) inserted into the inner cavity of the tenon groove (5); A clamping assembly installed on the upper and lower sides of the tenon strip (6); Positioning components installed on both sides of the tenon strip (6); A decorative panel (7) arranged on top of the first stone slab (1) and the second stone slab (2); An installation assembly for installing a decorative panel (7) on the surface of the first stone slab (1) and the second stone slab (2); as well as An auxiliary fixing component for improving the installation stability of a decorative panel (7).
2. The artificial stone slab splicing assembly according to claim 1, characterized in that: The clamping assembly comprises: A clamping member (8) fixedly mounted on the upper and lower sides of the tenon strip (6); and A card slot (9) is provided on the surface of the first card member (3) and the second card member (4); the card slot (9) and the card connector (8) are arranged correspondingly, and the surface of the card connector (8) is card-connected with the inner wall of the card slot (9).
3. The artificial stone slab splicing assembly according to claim 1, characterized in that: The positioning component comprises: Two groups of spring plungers (10) fixedly embedded inside the first clamping member (3) and the second clamping member (4); and The clamping holes (11) are provided on both sides of the tenon strip (6), the clamping holes (11) and the spring plunger (10) are arranged correspondingly, and the pop-up end of the spring plunger (10) is clamped with the inner wall of the clamping hole (11).
4. The artificial stone slab splicing assembly according to claim 3, characterized in that: It also includes a mounting hole (12) opened inside the first clamp (3) and the second clamp (4), and one end of the spring plunger (10) is fixedly connected to the inner wall of the mounting hole (12).
5. The artificial stone slab splicing assembly according to claim 3, characterized in that: It also includes slide grooves (13) opened on both sides of the tenon strip (6), the slide grooves (13) are adapted to the pop-up end of the spring plunger (10), and the pop-up end of the spring plunger (10) is slidably connected to the inner wall of the slide groove (13).
6. The artificial stone slab splicing assembly according to claim 1, characterized in that: The installation assembly includes: Elastic buckles (14) fixedly mounted on the four corners of the bottom of the decorative panel (7); and A mounting groove (15) is provided on the surface of the first stone plate (1) and the second stone plate (2); the mounting groove (15) and the elastic buckle (14) are arranged correspondingly, and the surface of the elastic buckle (14) is engaged with the inner cavity of the mounting groove (15).
7. The artificial stone slab splicing assembly according to claim 1, characterized in that: The auxiliary fixing assembly comprises: Auxiliary mounting blocks (16) fixedly mounted at the four corners of the bottom of the veneer panel (7); and A fixing hole (17) is provided on the surface of the first stone plate (1) and the second stone plate (2), the fixing hole (17) and the auxiliary mounting block (16) are arranged correspondingly, and the surface of the auxiliary mounting block (16) is snap-fitted with the inner wall of the fixing hole (17).
8. The artificial stone slab splicing assembly according to claim 2, characterized in that: The clamping piece (8) is arranged in a T-shape, and the clamping groove (9) and the clamping piece (8) are arranged in a matching T-shape.
Citation Information
Cited By
Splicing type static pressure lathe bed based on mortise and tenon joint structure
CN120228291A