Discharging mechanism for coating preparation
By adopting a connecting structure and a shrinkage structure in the paint preparation drain pipe, the cleaning problem of the drain pipe is solved, ensuring the purity and flow control of the paint, and achieving more efficient drain processing and cleaning effects.
Patent Information
- Application Number
- CN202420844773.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-04-23
AI Technical Summary
The existing paint preparation drain pipe is difficult to completely clean after use, resulting in pigment residues that may lead to subsequent pigment mixing, and the drain pipe is too long and leads to inconvenience in cleaning.
The connecting structure and the shrinkage structure are used to separate the feed pipe through the connecting structure for cleaning. The shrinkage structure is used to control the flow size to avoid excessive flow problems, and the cleaning of the brush is combined to ensure thorough cleaning.
It facilitates cleaning of the discharge pipe, avoids mixing caused by pigment residue, reduces flow to improve cleaning efficiency, and is suitable for paint extraction treatment at different depths.
Smart Images

Figure CN222267022U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of feeding mechanisms, in particular to a feeding mechanism for coating preparation. Background Art
[0002] Paint preparation refers to the process of mixing raw materials such as pigments, resins, solvents and additives in a certain proportion and process to make paint. The purpose of paint preparation is to obtain paint products with certain properties and uses;
[0003] The authorization announcement number is CN218516459U, and the coating preparation device belongs to the technical field of coating preparation, comprising a stirring barrel, a discharge pipe is installed on one side of the bottom end of the stirring barrel through a valve, a stirring cover is installed on the top end of the stirring barrel, a stirring mechanism is installed on the top end of the stirring cover, and the stirring mechanism comprises a stirring motor, a scraper, a scraper bar, a telescopic column and a stirring piece, a stirring motor is installed on the top end of the stirring cover, a scraper is installed equidistantly on the bottom end of the stirring motor, a stirring piece is installed inside the scraper, and a telescopic column is fixedly installed on the top end of the stirring piece. Compared with the prior art, the beneficial effect achieved by the utility model is that the stirring mechanism can facilitate the cleaning of the bottom and sides of the stirring barrel, reduce the difficulty of cleaning the sides and bottom of the stirring barrel, prevent the raw materials from adhering to the inner wall of the stirring barrel, and can stir the raw materials at different depths in the stirring barrel, thereby increasing the scope of application of the stirring mechanism;
[0004] However, the above patents still have shortcomings: although it is convenient to clean the bottom and sides of the mixing barrel, reduces the difficulty of cleaning the sides and bottom of the mixing barrel, prevents the raw materials from sticking to the inner wall of the mixing barrel, and can stir the raw materials at different depths inside the mixing barrel, increasing the scope of application of the stirring mechanism, it lacks certain processing for unloading. The unloading processing needs to be achieved through a unloading pipe. The unloading pipe for paint preparation will be cleaned after one working day of use. Usually, the paint preparation is cleaned, and then the internal moisture is removed through the unloading pipe, and the purpose of flushing the unloading pipe is achieved. However, the pigment adhered to the surface of the unloading pipe may not be completely removed by flushing, and if the pigment is in the unloading pipe and is not cleaned, it may be mixed with other pigments when it is subsequently made. Although the inside of the unloading pipe can be cleaned with a brush, the unloading pipe is too long and inconvenient to clean. Utility Model Content
[0005] The purpose of the utility model is to solve the shortcomings existing in the prior art. There is a lack of certain treatment for the discharge of materials. The pigment adhered to the surface of the discharge tube may not be completely removed by flushing. If the pigment is not cleaned in the discharge tube, it may be mixed with other pigments during the subsequent production. Although the inside of the discharge tube can be cleaned with a brush, the discharge tube is too long and inconvenient to clean. A discharge mechanism for paint preparation is provided.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a feeding mechanism for paint preparation, comprising: a paint preparation body, a feeding pipe is arranged on the outer surface of the paint preparation body, a connecting structure is arranged on the outer surface of the feeding pipe, the connecting structure comprises a fixed block, a first threaded layer is arranged on the outer surface of the fixed block, a second threaded layer is connected to the outer surface of the first threaded layer by a thread, a connecting pipe is arranged on one side of the second threaded layer, a guide pipe is fixed inside the connecting pipe, and the guide pipe is fitted and connected to the inner wall of the feeding pipe.
[0007] As a preferred embodiment, the outer surface of the connecting pipe is provided with a contraction structure, and the contraction structure includes a receiving block. The outer surface of the receiving block is provided with a plurality of docking grooves, and the interior of the docking groove is connected to the docking block.
[0008] As a preferred embodiment, a first flow contraction module is fixed to the outer surface of the docking block, and a plurality of fitting grooves are provided on one side of the outer surface of the first flow contraction module.
[0009] As a preferred embodiment, a bonding block is connected to the interior of the bonding groove, and a second contraction flow module is fixed to an outer surface of one side of the bonding block.
[0010] As a preferred embodiment, the fixing block is arranged on the outer surface of the feeding tube, and the fixing block and the feeding tube are fixedly connected.
[0011] As a preferred embodiment, the receiving block is arranged at one end of the outer surface of the connecting pipe, and the receiving block and the connecting pipe are fixedly connected.
[0012] Compared with the prior art, the advantages and positive effects of the utility model are:
[0013] In order to solve the above-mentioned problems, the utility model facilitates the cleaning of the discharge pipe through the connection structure and the contraction structure, wherein the connection structure can be used to disassemble the discharge pipe part, and then clean it with a brush after disassembly, and secondly, the contraction structure can be used to control the flow size when discharging the coating preparation body, and avoid some problems caused by excessive flow. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic side view of the whole of a material feeding mechanism for coating preparation provided by the utility model;
[0015] Figure 2 A schematic diagram of the disassembly of the connection structure of a material feeding mechanism for coating preparation provided by the utility model;
[0016] Figure 3 A schematic side view of the connecting structure of a material feeding mechanism for coating preparation provided by the utility model;
[0017] Figure 4 The utility model provides a schematic diagram of the split contraction structure of a material feeding mechanism for coating preparation.
[0018] Legend:
[0019] 1. Coating preparation body; 2. Feeding pipe; 3. Connection structure; 4. Contraction flow structure;
[0020] 301, fixed block; 302, first thread layer; 303, connecting pipe; 304, second thread layer; 305, flow guide pipe;
[0021] 401, receiving block; 402, docking groove; 403, first contraction flow module; 404, docking block; 405, fitting groove; 406, fitting block; 407, second contraction flow module. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example 1
[0024] like Figure 1-4 As shown, the utility model provides a technical solution: a feeding mechanism for paint preparation, comprising: a paint preparation body 1, a feeding pipe 2 is arranged on the outer surface of the paint preparation body 1, a connecting structure 3 is arranged on the outer surface of the feeding pipe 2, the connecting structure 3 comprises a fixed block 301, a first thread layer 302 is provided on the outer surface of the fixed block 301, a second thread layer 304 is connected to the outer surface of the first thread layer 302 by a thread, a connecting pipe 303 is arranged on one side of the second thread layer 304, a guide pipe 305 is fixed inside the connecting pipe 303, and the guide pipe 305 is fitted and connected to the inner wall of the feeding pipe 2.
[0025] In this embodiment, the paint preparation body 1 mainly plays a mixing and stirring role for the paint, while the discharge pipe 2 mainly plays a discharge role, and the connecting structure 3 mainly plays a disassembly role for the discharge pipe 2 part. By manually rotating the connecting pipe 303 part, the connecting pipe 303 drives the second thread layer 304 to be threadedly linked with the first thread layer 302, and gradually separates to complete the disassembly. After disassembly, the guide pipe 305 inside the connecting pipe 303 will also be separated from the discharge pipe 2, and the installation can be done in reverse. After disassembly, the connecting pipe 303 part can be cleaned by soaking and cleaning, while the discharge pipe 2 part can be cleaned by a handheld cleaner.
[0026] Example 2
[0027] like Figure 1-4 As shown, the outer surface of the connecting pipe 303 is provided with a contraction flow structure 4, and the contraction flow structure 4 includes a receiving block 401, and the outer surface of the receiving block 401 is provided with a plurality of docking grooves 402, and the interior of the docking groove 402 is connected with a docking block 404, and the outer surface of the docking block 404 is fixed with a first contraction flow module 403, and one side of the outer surface of the first contraction flow module 403 is provided with a plurality of fitting grooves 405, and the interior of the fitting groove 405 is connected with a fitting block 406, and the outer surface of one side of the fitting block 406 is fixed with a second contraction flow module 407, the fixed block 301 is arranged on the outer surface of the discharge pipe 2, and the fixed block 301 and the discharge pipe 2 are fixedly connected, the receiving block 401 is arranged at one end of the outer surface of the connecting pipe 303, and the receiving block 401 and the connecting pipe 303 are fixedly connected.
[0028] In this embodiment, the contraction flow structure 4 is mainly connected by holding the first contraction flow module 403 to dock its internal docking block 404 and the docking groove 402 on the outer surface of the receiving block 401. There is a certain extrusion relationship between the two, and a certain amount of force is needed to complete the docking. Secondly, when it is necessary to shrink again, the second contraction flow module 407 can be held, and the fitting block 406 on its outer surface is aligned with the fitting groove 405 at the first contraction flow module 403 and inserted to make the two fit together. There is also an extrusion relationship between the fitting block 406 and the fitting groove 405, and a certain amount of force is needed to complete the installation. The disassembly of the first contraction flow module 403 and the second contraction flow module 407 is reversed, and the second contraction flow module 407 has lower fluidity than the first contraction flow module 403.
[0029] Working principle:
[0030] like Figure 1-4As shown, in actual use, the coating preparation body 1 refers to a mixing device for coatings, which mixes and stirs the coating with other additives, and the discharge pipe 2 refers to the coating discharged after being stirred by the coating preparation body 1. The discharge pipe 2 discharges the coating by the pressure of the liquid coating inside the coating preparation body 1. After discharge, the discharge pipe 2 will be in a certain idle period, and the surface of the discharge pipe 2 will be stained with a certain amount of coating and will gradually solidify. At this time, the connection structure 3 is partially disassembled, and the discharge pipe 2 is cleaned by a handheld cleaner. When discharging, the flow can be reduced by the contraction flow structure 4, which is used in some cases;
[0031] It should be noted here that the discharge pipe 2 can be cleaned after unloading, especially when the paint to be stirred next time is different from the paint stirred last time, and at the end of each working day, it can be disassembled through the connecting structure 3, which makes it easier and better to clean the discharge pipe 2. The disassembly of the connecting structure 3 is mainly achieved by manually rotating the connecting pipe 303 part, when the connecting pipe 303 part drives the second thread layer 304 inside it, and causes the second thread layer 304 and the first thread layer 302 to gradually separate through thread linkage, and when the two are separated, the disassembly is completed. At the same time, the guide pipe 305 in the connecting pipe 303 will be separated from the inside of the discharge pipe 2, and the disassembly of the connecting structure 3 part is completed. After disassembly, the connecting pipe 303 part can be cleaned by holding it or soaking it, etc., and secondly, the discharge pipe 2 part can be cleaned by extending the reciprocating motion with a handheld cleaner, and during normal discharge When there is a shrinkage discharge flow during the material preparation, it can be partially completed by the contraction flow structure 4. The contraction flow structure 4 plays a role in shrinking the flow and cooperating with the coating preparation body 1 to ensure that the flow pressure is still sufficient. The flow is mainly reduced by holding the first contraction flow module 403 to dock the docking block 404 inside it and the docking groove 402 on the outer surface of the receiving block 401. There is a certain extrusion relationship between the two, and a certain amount of force is required to complete the docking. Secondly, when it is necessary to shrink again, the second contraction flow module 407 can be held, and the fitting block 406 on the outer surface of the second contraction flow module 407 is aligned with the fitting groove 405 at the first contraction flow module 403 to insert the two so that the two can be fitted and connected. There is also an extrusion relationship between the fitting block 406 and the fitting groove 405. A certain amount of force is required during installation, and the disassembly of the first contraction flow module 403 and the second contraction flow module 407 is reversed, and the second contraction flow module 407 has less fluidity than the first contraction flow module 403.
[0032] It should be noted here that the unloading is controlled by the coating preparation body 1, and whether to unload the material is controlled through its internal part. When unloading the material, it will reach the connecting structure 3 through the unloading pipe 2, and then be processed by the contraction flow structure 4. During the contraction flow processing, the first contraction flow module 403 or the second contraction flow module 407 in the contraction flow structure 4 needs to be installed according to needs.
[0033] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A coating preparation feeding mechanism, comprising: A coating preparation body (1) is characterized in that a feed pipe (2) is provided on the outer surface of the coating preparation body (1), a connection structure (3) is provided on the outer surface of the feed pipe (2), the connection structure (3) includes a fixed block (301), a first threaded layer (302) is provided on the outer surface of the fixed block (301), the outer surface of the first threaded layer (302) is connected to a second threaded layer (304) through a thread, a connecting pipe (303) is provided on one side of the second threaded layer (304), a guide pipe (305) is fixed inside the connecting pipe (303), and the guide pipe (305) is fitted and connected to the inner wall of the feed pipe (2).
2. A coating preparation feeding mechanism according to claim 1, characterized in that: The outer surface of the connecting pipe (303) is provided with a contraction structure (4), and the contraction structure (4) includes a receiving block (401). The outer surface of each receiving block (401) is provided with a plurality of docking grooves (402), and the interior of each docking groove (402) is connected to a docking block (404).
3. A coating preparation feeding mechanism according to claim 2, characterized in that: A first flow contraction module (403) is fixed to the outer surface of the docking block (404), and a plurality of fitting grooves (405) are provided on one side of the outer surface of the first flow contraction module (403).
4. A coating preparation feeding mechanism according to claim 3, characterized in that: The interior of the bonding groove (405) is connected to a bonding block (406), and a second contraction flow module (407) is fixed to an outer surface of one side of the bonding block (406).
5. A coating preparation feeding mechanism according to claim 1, characterized in that: The fixing block (301) is arranged on the outer surface of the discharge pipe (2), and the fixing block (301) and the discharge pipe (2) are fixedly connected.
6. A coating preparation feeding mechanism according to claim 2, characterized in that: The receiving block (401) is arranged at one end of the outer surface of the connecting pipe (303), and the receiving block (401) and the connecting pipe (303) are fixedly connected.