Perpendicularity detection device for constructional engineering
By designing a verticality detection device for construction engineering including support columns, support plates, adjustment screw holes and lifting rods, the dangerous problem of climbing operation is solved and a safe and efficient verticality detection of building walls is achieved.
Patent Information
- Application Number
- CN202421335154.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-06-12
AI Technical Summary
In construction projects, verticality detection requires climbing to a high place, which is troublesome and dangerous, making it difficult to ensure construction quality and safety.
A detection device including support columns, support plates, adjustment screw holes, lifting rods, limit sliders and measuring support rods was designed. Vertical detection is achieved through a level and a suspended rope, which avoids climbing operations and improves detection. Safety and accuracy.
The device facilitates horizontal placement and height adjustment, and achieves vertical lifting through ropes and conical hammers, simplifies measurement operations and improves the safety and accuracy of verticality detection of construction project walls.
Smart Images

Figure CN222279743U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a construction engineering verticality detection device. Background Art
[0002] Construction engineering refers to the engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, living, learning, and public activities. In the process of construction engineering, in order to maintain the construction quality of the construction engineering, it is often necessary to test the verticality of the building walls.
[0003] At present, when testing the verticality of construction projects, testers are often required to climb to a high place and use a rope and a plumb bob to measure the verticality of the wall. When climbing to a high place, the operation is more troublesome and there is a certain degree of danger, which is not convenient for the safe testing of the verticality of the construction project. Therefore, we propose a construction project verticality detection device to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to provide a construction engineering verticality detection device to solve the problems raised in the above background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] The top end of the support column is provided with a toothed plate, and the bottom end of the support column is provided with a toothed plate, and the toothed plate is provided with a toothed plate, and the toothed plate is provided with a toothed plate.
[0007] In a further embodiment, a spirit level is fixedly connected to the front side of the support column, and the spirit level is located in the upper middle part of the support column.
[0008] In a further embodiment, a placement groove is provided at the top end of the support column, a support spring is fixedly connected to the inner bottom wall of the placement groove, and the top end of the support spring is fixedly connected to the bottom end of the lifting rod.
[0009] In a further embodiment, both left and right side surfaces of the support column are fixedly connected with carrying handles, and the carrying handles are located in the upper middle portion of the support column.
[0010] In a further embodiment, a positioning probe is fixedly connected to the right end of the measuring support rod, and the positioning probe is made of metal.
[0011] In a further embodiment, one end of each of the limit sliding blocks away from the lifting rod is fixedly connected to a holding handle, and the holding handle is made of stainless steel.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The device can place the verticality detection device horizontally through the support columns, support plates, adjustment screw holes, adjustment screws and spirit level, which is convenient for detecting the precise verticality of the construction project. The support columns, lifting rods, sliding openings, limit sliders, moving handles, fastening bolts, measuring support rods, lifting ropes and conical hammers can drive the measuring support rods to move upwards, realize the vertical lifting of the lifting ropes and conical hammers, avoid climbing of surveyors, and facilitate the surveyors' detection of the verticality of the walls of the construction project. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the verticality detection device for construction projects.
[0015] Figure 2 This is a schematic diagram of the internal dissection structure of the supporting vertical tube in the verticality detection device of the construction project.
[0016] Figure 3 This is a top view of the supporting vertical tube in the verticality detection device of the construction project.
[0017] Figure 4 This is a bottom view of the support column in the verticality detection device for construction projects.
[0018] In the figure: 1. Support column; 2. Level; 3. Support plate; 4. Adjustment screw; 5. Adjustment screw hole; 6. Carrying handle; 7. Support column; 8. Holding handle; 9. Limit slider; 10. Sliding mouth; 11. Fastening bolt; 12. Lifting rod; 13. Measuring support rod; 14. Scale; 15. Positioning probe; 16. Lifting rope; 17. Conical hammer; 18. Placement slot; 19. Support spring. DETAILED DESCRIPTION
[0019] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0020] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-4In the utility model, a verticality detection device for a construction project includes a support column 1, a support plate 3 arranged in a ring is fixedly connected to the outer surface of the bottom end of the support column 1, an adjusting screw hole 5 is opened on the upper surface of each support plate 3, and an adjusting screw 4 is threadedly connected to the inner wall of each adjusting screw hole 5. The adjusting screw 4 is threadedly connected to the adjusting screw hole 5, which facilitates the horizontal adjustment operation of the support column 1. The top of the support column 1 is fixedly connected to a support column 7, and a lifting rod 12 is clamped on the inner wall of the top of the support column 7. Two sliding openings 10 are opened on the outer surface of the support column 7, and two limit sliders 9 are fixedly connected to the outer surface of the bottom end of the lifting rod 12. One end of each limiting sliding block 9 away from the lifting rod 12 passes through the sliding opening 10 and extends to the outside of the supporting column 7. The front and back sides of the supporting column 7 are both threadedly connected with fastening bolts 11, and the lifting rod 12 can be fastened and positioned by the fastening bolts 11, which is convenient for the stable use of the device. The top of the lifting rod 12 is fixedly connected with a measuring support rod 13, and a scale 14 is provided on the upper surface of the measuring support rod 13. The bottom surface of the measuring support rod 13 is fixedly connected with a hanging rope 16, and the bottom end of the hanging rope 16 is fixedly connected with a conical hammer 17, and the hanging rope 16 can be hung down by the conical hammer 17, which is convenient for the verticality measurement operation of the building wall.
[0023] A spirit level 2 is fixedly connected to the front of the support column 1. The spirit level 2 is located in the upper middle part of the support column 1, which can facilitate the horizontal placement of the verticality detection device. A placement groove 18 is opened at the top of the support column 1. A support spring 19 is fixedly connected to the inner bottom wall of the placement groove 18. The top of the support spring 19 is fixedly connected to the bottom end of the lifting rod 12, which can elastically support the lifting rod 12, thereby facilitating the height adjustment of the measuring rod 13.
[0024] The left and right sides of the support column 1 are fixedly connected with a carrying handle 6, which is located in the middle and upper part of the support column 1, and can more conveniently move the support column 1, which is convenient for the movement and transportation of this verticality measuring device. The right end of the measuring support rod 13 is fixedly connected with a positioning probe 15, and the positioning probe 15 is made of metal, which can make the measuring support rod 13 come into contact with the building wall, so as to facilitate the accurate and stable measurement of the building wall. Each limit slider 9 is fixedly connected with a holding handle 8 at one end away from the lifting rod 12, and the holding handle 8 is made of stainless steel, which can conveniently move the lifting rod 12 up and down, so as to facilitate the height adjustment of this verticality measuring device.
[0025] The working principle of the utility model is:
[0026] When in use, the surveyor first moves the carrying handle 6 to carry the verticality detection device to the measurement site of the wall of the construction project, and uses the support plate 3 to support the bottom of the support column 1, and at the same time turns the adjusting screw 4 to cooperate with the thread of the adjusting screw hole 5, and observes the level meter 2 to achieve the horizontal placement of the measuring device, and makes the positioning probe 15 contact the surface of the building wall, then moves the holding handle 8 to move the limit slider 9, lifts the lifting rod 12 and the measuring support rod 13 to a high place, and then tightens the fastening bolt 11 to fix the verticality measuring device in place, and then the staff uses a measuring ruler to measure the distance between the suspension rope 16 and the surface of the building wall at multiple locations, and through cooperation with the scale 14, the verticality detection operation of the building wall is achieved.
[0027] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0028] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A construction engineering verticality detection device, characterized in that: The invention comprises a support column (1), the outer surface of the bottom end of the support column (1) is fixedly connected to a support plate (3) arranged in an annular manner, the upper surface of each support plate (3) is provided with an adjusting screw hole (5), the inner wall of each adjusting screw hole (5) is threadedly connected to an adjusting screw (4), the top end of the support column (1) is fixedly connected to a support vertical cylinder (7), the inner wall of the top end of the support vertical cylinder (7) is clamped with a lifting rod (12), the outer surface of the support vertical cylinder (7) is provided with two sliding openings (10), the outer surface of the bottom end of the lifting rod (12) is fixedly connected to two limiting screws (11), and the bottom end of the lifting rod (12) is fixedly connected to the outer surface of the support vertical cylinder (7). The invention relates to a limit slider (9), wherein one end of each limit slider (9) away from the lifting rod (12) passes through the sliding opening (10) and extends to the outside of the supporting cylinder (7), the front side of the supporting cylinder (7) and the back side of the supporting cylinder (7) are both threadedly connected with a fastening bolt (11), the top end of the lifting rod (12) is fixedly connected with a measuring support rod (13), the upper surface of the measuring support rod (13) is provided with a scale (14), the bottom surface of the measuring support rod (13) is fixedly connected with a suspension rope (16), and the bottom end of the suspension rope (16) is fixedly connected with a conical hammer (17).
2. A construction engineering verticality detection device according to claim 1, characterized in that: A level (2) is fixedly connected to the front side of the support column (1), and the level (2) is located in the upper middle part of the support column (1).
3. A construction engineering verticality detection device according to claim 1, characterized in that: The top end of the support column (1) is provided with a placement groove (18), the inner bottom wall of the placement groove (18) is fixedly connected with a support spring (19), and the top end of the support spring (19) is fixedly connected to the bottom end of the lifting rod (12).
4. A construction engineering verticality detection device according to claim 1, characterized in that: The left and right side surfaces of the support column (1) are both fixedly connected with a carrying handle (6), and the carrying handle (6) is located in the upper middle part of the support column (1).
5. A construction engineering verticality detection device according to claim 1, characterized in that: The right end of the measuring support rod (13) is fixedly connected with a positioning probe (15), and the positioning probe (15) is made of metal.
6. A construction engineering verticality detection device according to claim 1, characterized in that: One end of each of the limit sliding blocks (9) away from the lifting rod (12) is fixedly connected to a holding handle (8), and the holding handle (8) is made of stainless steel.