Clamp device for vertical installation of prefabricated hanging plate
By designing a fixture device for prefabricated hanging plates, and using steel pipe fittings and safety ropes to control the position of the suspender, the problem of difficulty in vertical installation of the hanging plates is solved, the construction efficiency and safety are improved, and the cost is reduced.
Patent Information
- Application Number
- CN202420505330.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-03-15
AI Technical Summary
In the reservoir hazard removal and reinforcement project, during the vertical installation of prefabricated hanging plates, the hanging plates are in a horizontal state, which makes it difficult to install and adjust, and increases construction costs and construction periods.
A fixture device including main body fixture and safety rope is designed. The suspender is passed through the suspension ring hole in the middle position of the inner side of the hanging plate through steel pipe fittings and auxiliary parts, and the suspension position is controlled by operating the safety rope to ensure that the suspender plate is basically vertical after lifting. Straight and adjustable position for installation.
It improves the safety and efficiency of vertical installation of prefabricated hanging plates, reduces manpower and material consumption, shortens construction period, and reduces construction costs.
Smart Images

Figure CN222293357U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of reservoir risk elimination and reinforcement engineering, in particular to a clamp device for vertical installation of prefabricated hanging plates. Background Art
[0002] During the construction of the reservoir reinforcement project, the upstream side of the power station's dam body needs to be constructed with cast-type hanging board asphalt concrete. The hanging ring on the hanging board is in the middle position on the inside, the construction risk factor is high, and the construction hanging and adjustment are difficult.
[0003] According to conventional construction practices, the hanging plate is installed by using a crane and other equipment using a sling to connect the hanging plate lifting ring. However, the lifting ring is located in the middle of the inner side of the hanging plate. After lifting, the hanging plate is in a horizontal state, which increases the difficulty of hanging and adjusting the hanging plate, consumes manpower and material resources, increases construction costs, prolongs the construction period, and greatly reduces construction efficiency.
[0004] In order to ensure the safety and high efficiency of the vertical installation of prefabricated hanging panels, the utility model provides a clamp device for the vertical installation of prefabricated hanging panels. Utility Model Content
[0005] In order to solve the problem that the hanging plates are in a horizontal state and difficult to adjust during the installation process of the hanging plates, the utility model provides a clamp device for vertical installation of prefabricated hanging plates.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A clamp device for vertical installation of prefabricated hanging panels, comprising:
[0008] A main body fixture, which is used to clamp and fix on the side of the prefabricated hanging plate, and has a steel pipe fitting for the sling to pass through;
[0009] A safety rope, one end of which is fixedly connected to the main body clamp, the safety rope is wound around the sling at least once by means of an auxiliary piece, and the end of the safety rope away from the main body clamp is the control end.
[0010] As a further description of the above technical solution:
[0011] The main body fixture comprises:
[0012] A "7"-shaped channel steel piece, wherein a screw piece is threadedly installed on the side surface of the vertical portion of the "7"-shaped channel steel piece, and the end portion of the horizontal portion of the "7"-shaped channel steel piece is fixedly connected to a steel pipe piece, forming a clamping area between the steel pipe piece and the vertical portion of the "7"-shaped channel steel piece.
[0013] As a further description of the above technical solution:
[0014] The "7"-shaped channel steel member includes a vertical channel steel member and a horizontal channel steel member. The top end of the vertical channel steel member is fixedly connected to one end of the horizontal channel steel member, and a through hole corresponding to the port of the steel pipe member is opened on the horizontal channel steel member.
[0015] As a further description of the above technical solution:
[0016] A rubber cap is sleeved on one end of the screw member located inside the clamping area, and a rubber sponge tube is sleeved on the outer side of the steel pipe member.
[0017] As a further description of the above technical solution:
[0018] A connecting ear is fixedly connected to the side surface of the steel pipe.
[0019] As a further description of the above technical solution:
[0020] The auxiliary parts include:
[0021] Inner tube, the sling is passed through the inner tube;
[0022] An outer tube, the outer tube is sleeved on the outer side of the inner tube, and an annular area is formed between the outer tube and the inner tube. Two wire holes for the safety rope to pass in and out are opened on the outer tube;
[0023] An upper gland and a lower gland are both threadedly connected to the inner tube, and the outer tube is clamped between the upper gland and the lower gland.
[0024] As a further description of the above technical solution:
[0025] An upper rubber sleeve is arranged between the upper gland and the end of the outer tube, and a lower rubber sleeve is arranged between the lower gland and the end of the outer tube.
[0026] The beneficial effects of the utility model are as follows: the utility model, by designing a main body clamp with a steel pipe fitting, when lifting, the sling is passed through the lifting ring hole in the middle position of the inner side of the prefabricated hanging plate, and then through the inner hole of the steel pipe fitting; after lifting, the prefabricated hanging plate is basically in a vertical state, and a safety rope is designed. By manipulating the control end of the safety rope, the two slings located at the height position of the main body clamp are brought close to each other. In some cases (when the prefabricated hanging plate cannot be naturally vertical), the prefabricated hanging plate can be quickly placed in a vertical state, and the position of the prefabricated hanging plate can be appropriately adjusted, which is helpful for installation operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate a clamp device for vertical installation of prefabricated siding panels, the following drawings are shown;
[0028] Figure 1 It is a schematic diagram of the utility model during lifting;
[0029] Figure 2 It is a front view of the main body clamp of the utility model;
[0030] Figure 3 It is a top view of the main body fixture of the utility model;
[0031] Figure 4 It is a three-dimensional schematic diagram of the auxiliary component of the utility model;
[0032] Figure 5 It is a cross-sectional view of the auxiliary component of the utility model.
[0033] The reference numerals in the accompanying drawings:
[0034] 1. Main body fixture; 101. Vertical channel steel parts; 102. Horizontal channel steel parts; 103. Steel pipe parts; 104. Screw parts; 105. Rubber caps; 106. Rubber sponge tubes; 107. Connecting ears; 2. Prefabricated hanging plates; 3. Suspension belts; 4. Auxiliary parts; 401. Inner tube; 402. Outer tube; 403. Upper pressure cover; 404. Lower pressure cover; 5. Safety rope. DETAILED DESCRIPTION
[0035] Please refer to the attached Figure 1-Figure 5 , showing a clamp device for vertical installation of prefabricated hanging panels provided in an embodiment of the present application, comprising: a main clamp 1, a safety rope 5 and an auxiliary component 4, wherein the main clamp 1 is used to clamp and fix on the side of the prefabricated hanging panel 2, and the main clamp 1 has a steel pipe fitting 103 for the sling 3 to pass through.
[0036] like Figure 1 As shown in the figure, when lifting, the sling 3 is passed through the lifting ring hole at the middle position of the inner side of the prefabricated hanging plate 2, and then passed through the inner hole of the steel pipe 103, and the main body clamp 1 is clamped and fixed on one side of the prefabricated hanging plate 2. After lifting, the structure is formed as shown in the figure. Figure 1 In the situation shown in FIG. 1 , the prefabricated hanging board 2 is basically in a vertical state.
[0037] One end of the safety rope 5 is fixedly connected to the main body clamp 1 , and the safety rope 5 is wound around the sling 3 at least once by means of the auxiliary component 4 , and the end of the safety rope 5 away from the main body clamp 1 is the control end.
[0038] The lifting staff manipulates the control end of the safety rope 5 to bring the two slings 3 located at the height of the main clamp 1 closer to each other. In some cases (when the prefabricated hanging board cannot be naturally vertical), the prefabricated hanging board can be quickly placed in a vertical state, and the position of the prefabricated hanging board can be appropriately adjusted, which is helpful for installation operations.
[0039] In one embodiment, the main body clamp 1 includes: a "7"-shaped channel steel member, a screw member 104 and a steel pipe member 103; wherein, the side surface of the vertical portion of the "7"-shaped channel steel member is threadedly installed with a screw member 104, and the end of the horizontal portion of the "7"-shaped channel steel member is fixedly connected to the steel pipe member 103, and a clamping area is formed between the steel pipe member 103 and the vertical portion of the "7"-shaped channel steel member.
[0040] Insert one side of the prefabricated hanging plate 2 into the inside of the clamping area, and then rotate the screw member 104 so that one end of the screw member 104 abuts against one side of the prefabricated hanging plate 2, and the steel pipe member 103 abuts against the other side of the prefabricated hanging plate 2, so as to clamp and fix the prefabricated hanging plate 2. Moreover, this structure is suitable for prefabricated hanging plates 2 of various thicknesses and has good versatility.
[0041] In one embodiment, the "7"-shaped channel steel member includes a vertical channel steel member 101 and a transverse channel steel member 102. The top of the vertical channel steel member 101 is fixedly connected to one end of the transverse channel steel member 102. The channel steel member has high structural strength and is easy to obtain. A through hole corresponding to the port of the steel pipe member 103 is opened on the transverse channel steel member 102, so that both ends of the steel pipe member 103 are not blocked.
[0042] In one embodiment, a rubber cap 105 is sleeved on one end of the screw member 104 located inside the clamping area, and a rubber sponge tube 106 is sleeved on the outer side of the steel pipe member 103. The rubber cap 105 and the rubber sponge tube 106 are both used to protect the surface of the prefabricated hanging board 2 when clamping the prefabricated hanging board 2.
[0043] In one embodiment, a connecting ear 107 is fixedly connected to the side of the steel pipe 103 for fixedly connecting to one end of the safety rope 5 .
[0044] In one embodiment, the auxiliary component 4 includes: an inner tube 401, an outer tube 402, and an upper pressure cover 403 and a lower pressure cover 404 for fixing the inner tube 401 and the outer tube 402 together.
[0045] The sling 3 is passed through the inner tube 401, and the outer tube 402 is sleeved on the outside of the inner tube 401, and an annular area is formed between the outer tube 402 and the inner tube 401. Two wire holes are opened on the outer tube 402 for the safety rope 5 to pass through and out. The safety rope 5 passes through the annular area and passes through the annular area (outside the inner tube 401) after being wound around more than one circle. The upper pressure cover 403 and the lower pressure cover 404 are both threadedly connected to the inner tube 401, and the outer tube 402 is clamped between the upper pressure cover 403 and the lower pressure cover 404.
[0046] In one embodiment, an upper rubber sleeve is provided between the upper pressure cover 403 and the end of the outer tube 402, and a lower rubber sleeve is provided between the lower pressure cover 404 and the end of the outer tube 402. By designing the upper rubber sleeve and the lower rubber sleeve, the outer tube 402 after being fixed can still move up and down relative to the inner tube 401, thereby reducing the friction and extrusion between the outer tube 40 and the safety rope 5, and making the safety rope 5 have a longer service life.
[0047] Those skilled in the art will readily come up with other embodiments of the present invention after considering the specification and practicing the disclosure of the present invention. This application is intended to cover any variations, uses or adaptations of the present invention, which follow the general principles of the present invention and include common knowledge or customary technical means in the art that are not disclosed in the present invention. The specification and examples are to be considered as exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.
[0048] It should be understood that relational terms such as "first" and "second" are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. The utility model is not limited to the precise structure described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from the scope thereof. The scope of the utility model is limited only by the appended claims.
Claims
1. A fixture device for vertical installation of prefabricated hanging panels, characterized in that: include: A main body clamp (1), the main body clamp (1) is used to clamp and fix on the side of the prefabricated hanging plate (2), and the main body clamp (1) has a steel pipe fitting (103) for the sling (3) to pass through; A safety rope (5), one end of which is fixedly connected to the main body clamp (1), the safety rope (5) is wound around the sling (3) at least once by means of an auxiliary component (4), and the end of the safety rope (5) away from the main body clamp (1) is a control end.
2. A fixture device for vertical installation of prefabricated hanging panels according to claim 1, characterized in that: The main body fixture (1) comprises: A "7"-shaped channel steel piece, wherein a screw piece (104) is threadedly installed on the side surface of the vertical portion of the "7"-shaped channel steel piece, and the end of the horizontal portion of the "7"-shaped channel steel piece is fixedly connected to a steel pipe piece (103), and a clamping area is formed between the steel pipe piece (103) and the vertical portion of the "7"-shaped channel steel piece.
3. A fixture device for vertical installation of prefabricated hanging panels according to claim 2, characterized in that: The "7"-shaped channel steel member comprises a vertical channel steel member (101) and a horizontal channel steel member (102), the top end of the vertical channel steel member (101) is fixedly connected to one end of the horizontal channel steel member (102), and the horizontal channel steel member (102) is provided with a through hole corresponding to the port of the steel pipe member (103).
4. A fixture device for vertical installation of prefabricated hanging panels according to claim 2, characterized in that: A rubber cap (105) is sleeved on one end of the screw member (104) located inside the clamping area, and a rubber sponge tube (106) is sleeved on the outer side of the steel pipe member (103).
5. A fixture device for vertical installation of prefabricated hanging panels according to claim 2, characterized in that: A connecting ear (107) is fixedly connected to the side surface of the steel pipe (103).
6. A fixture device for vertical installation of prefabricated hanging panels according to claim 1, characterized in that: The auxiliary component (4) comprises: An inner tube (401), through which the sling (3) is passed; An outer tube (402), the outer tube (402) being sleeved on the outer side of the inner tube (401), and forming an annular area between the outer tube (402) and the inner tube (401), and the outer tube (402) being provided with two wire holes for the safety rope (5) to pass in and out; An upper gland (403) and a lower gland (404) are both threadedly connected to the inner tube (401), and the outer tube (402) is clamped between the upper gland (403) and the lower gland (404).
7. A fixture device for vertical installation of prefabricated hanging panels according to claim 6, characterized in that: An upper rubber sleeve is provided between the upper pressure cover (403) and the end of the outer tube (402), and a lower rubber sleeve is provided between the lower pressure cover (404) and the end of the outer tube (402).