River channel combing and guiding structure for water conservancy project
By designing a river channel combing structure including gates, salvage mesh plates, hoisting machines and collection boxes, the labor intensity problem caused by manual salvage of garbage in water conservancy projects is solved, automatic garbage cleaning and collection is achieved, and river cleaning efficiency is improved.
Patent Information
- Application Number
- CN202421076664.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-05-17
AI Technical Summary
In water conservancy projects, in the prior art staff manually salvaged floating garbage in the river, resulting in high labor intensity, time-consuming and labor-intensive, and lack of efficient garbage cleaning solutions.
A river combing structure for water conservancy projects is designed, including gates, salvage mesh plates, hoisting machines, traction ropes, fixing frames, threaded rods, sliding blocks, connecting rods, brushes and collection boxes. Through these structures, automatic garbage cleaning and Collect, use motors to drive threaded rods and hoists, combined with filters and drawstrings to achieve automated and efficient waste disposal.
Through the automated garbage cleaning and collection process, labor intensity is reduced, garbage disposal efficiency is improved, the cleaning in the canal is ensured, and the time and energy of manual operation are reduced.
Smart Images

Figure CN222294867U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water conservancy projects, and in particular relates to a river channel combing and guiding structure for water conservancy projects. Background Art
[0002] The river channel is the route through which river water flows. In water conservancy projects, there are many artificially dug rivers that are used for irrigation of farmland. When the irrigation water flows in the river channel, the gates are opened to divert the water flow for irrigation.
[0003] Now, by opening the gates and introducing water into the canal to irrigate the crops, there will be floating garbage on the water surface in the river, which needs to be salvaged by staff to avoid the garbage from flowing into the canal. However, since the staff have to salvage the garbage manually, the labor intensity is increased and it is time-consuming and laborious.
[0004] Therefore, a river channel combing structure for water conservancy projects is needed to solve the problem in the prior art that workers have to manually salvage garbage, which increases labor intensity and is time-consuming and labor-intensive. Utility Model Content
[0005] The purpose of the utility model is to provide a river channel combing structure for water conservancy projects to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a river channel combing structure for water conservancy projects, comprising two protection blocks, a gate is slidably installed between the two protection blocks, a fixing frame is fixedly installed on the top of the two protection blocks, a cylinder is fixedly installed on the top of the fixing frame, the telescopic end of the cylinder passes through the fixing frame and is fixedly connected to the top of the gate, a salvage net is provided on one side of the gate, a winch is fixedly installed on both sides of the top of the gate, a traction rope is fixedly installed inside the winch, and one end of the traction rope is connected to the salvage net Fixed connection, a fixed block is fixedly installed on one side of the fixed frame, a groove is opened on one side of the fixed block, the fixed block is located in the groove and a threaded rod is rotatably installed, a sliding block is threadedly installed on the outer surface of the threaded rod, the sliding block is slidably connected to the groove, a connecting rod is fixedly installed on one side of the sliding block, a connecting plate is fixedly installed on the bottom end of the connecting rod, a cross bar is detachably installed on the bottom end of the connecting plate, a brush is fixedly installed on the bottom end of the cross bar, a motor is fixedly installed on one side of the fixed block, and the output end of the motor is fixedly connected to the threaded rod.
[0007] It should be noted in the solution that fixing bolts are threadedly installed on both sides of the top of the connecting plate, and the cross bar and the connecting plate are fixed by fixing bolts.
[0008] It is further worth noting that a guide groove is provided on one side of the gate, a slider is fixedly installed on one side of the salvage mesh, and the slider is slidably connected to the guide groove.
[0009] It should be further explained that a collection box is provided at the top of the protection block.
[0010] As a preferred embodiment, a filter screen is fixedly mounted on one side of the collection box.
[0011] As a preferred embodiment, a drawstring is fixedly mounted on a side of the collection box away from the filter screen, and a sponge pad is provided on the outer surface of the drawstring.
[0012] Compared with the prior art, the river channel combing structure for water conservancy projects provided by the utility model has at least the following beneficial effects:
[0013] (1) Through the arrangement of structures such as the salvage net, winch and traction rope, it is convenient to adjust the position of the salvage net according to the water level, thereby enhancing practicality. Through the arrangement of structures such as the fixed block, groove, threaded rod, sliding block, connecting rod, connecting plate, cross bar and brush, it is convenient to clean up the garbage on the salvage net.
[0014] (2) The setting of the fixing bolts facilitates the disassembly and replacement of the cross bar. The setting of the guide groove serves as a guide and limiter for the movement of the salvage net. The setting of the collection box facilitates the collection of garbage. The setting of the filter net further filters the moisture in the garbage. The setting of the pull rope facilitates the movement of the collection box. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 This is a structural schematic diagram of another viewing angle of the utility model;
[0017] Figure 3 for Figure 1 Schematic diagram of the enlarged structure of the A area in the middle;
[0018] Figure 4 for Figure 1 Schematic diagram of the enlarged structure of area B in the middle.
[0019] In the figure: 1. protective block; 2. gate; 3. fixing frame; 4. cylinder; 5. salvage net plate; 6. winch; 7. traction rope; 8. fixing block; 9. groove; 10. threaded rod; 11. sliding block; 12. connecting rod; 13. connecting plate; 14. cross bar; 15. brush; 16. fixing bolt; 17. guide groove; 18. collection box; 19. filter net; 20. pull rope; 21. motor. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-4 The utility model provides a river channel combing structure for water conservancy projects, including two protection blocks 1, a gate 2 is slidably installed between the two protection blocks 1, a fixing frame 3 is fixedly installed on the top of the two protection blocks 1, a cylinder 4 is fixedly installed on the top of the fixing frame 3, the telescopic end of the cylinder 4 passes through the fixing frame 3 and is fixedly connected to the top of the gate 2, a salvage net plate 5 is arranged on one side of the gate 2, a winch 6 is fixedly installed on both sides of the top of the gate 2, a traction rope 7 is fixedly installed inside the winch 6, and one end of the traction rope 7 is fixedly connected to the salvage net plate 5. Through the arrangement of the salvage net plate 5, the winch 6 and the traction rope 7 and other structures, it is convenient to adjust the position of the salvage net plate 5 according to the water level, thereby enhancing practicality, a fixing block 8 is fixedly installed on one side of the fixing frame 3, and the fixing block A groove 9 is provided on one side of 8, and a threaded rod 10 is rotatably installed in the fixed block 8 in the groove 9. A sliding block 11 is threadedly installed on the outer surface of the threaded rod 10, and the sliding block 11 is slidably connected to the groove 9. A connecting rod 12 is fixedly installed on one side of the sliding block 11, and a connecting plate 13 is fixedly installed on the bottom end of the connecting rod 12. A cross bar 14 is detachably installed on the bottom end of the connecting plate 13, and a brush 15 is fixedly installed on the bottom end of the cross bar 14. A motor 21 is fixedly installed on one side of the fixed block 8, and the output end of the motor 21 is fixedly connected to the threaded rod 10. Through the arrangement of structures such as the fixed block 8, the groove 9, the threaded rod 10, the sliding block 11, the connecting rod 12, the connecting plate 13, the cross bar 14 and the brush 15, it is convenient to clean up the garbage on the salvage net plate 5.
[0022] Further Figure 1 , Figure 2 and Figure 4 As shown, it is worth explaining in detail that fixing bolts 16 are threadedly installed on both sides of the top of the connecting plate 13, and the cross bar 14 and the connecting plate 13 are fixed by the fixing bolts 16. The setting of the fixing bolts 16 facilitates the disassembly and replacement of the cross bar 14.
[0023] This solution has the following working process: when the river channel is dredged during the construction of water conservancy projects, the gate 2 is opened by starting the cylinder 4 to dredge the water in the river channel to various canals. When the gate 2 opens and rises, it drives the salvage net 5 to rise and pick up the floating garbage on the river surface. When the gate 2 rises to a certain height, the brush 15 contacts the salvage net 5, and the motor 21 is started to drive the threaded rod 10 to rotate, so that the brush 15 moves on the surface of the salvage net 5 to clean the garbage on the salvage net 5.
[0024] According to the above working process, it can be known that: through the arrangement of structures such as the salvage net plate 5, the winch 6 and the traction rope 7, it is convenient to adjust the position of the salvage net plate 5 according to the water level to enhance practicality; through the arrangement of structures such as the fixing block 8, the groove 9, the threaded rod 10, the sliding block 11, the connecting rod 12, the connecting plate 13, the cross bar 14 and the brush 15, it is convenient to clean the garbage on the salvage net plate 5; through the arrangement of the fixing bolts 16, it is convenient to disassemble and replace the cross bar 14.
[0025] Further Figure 1 , Figure 2 and Figure 3 As shown, it is worth explaining in detail that a guide groove 17 is opened on one side of the gate 2, and a slider is fixedly installed on one side of the salvage mesh plate 5. The slider is slidably connected to the guide groove 17. Through the setting of the guide groove 17, the movement of the salvage mesh plate 5 is guided and limited.
[0026] Further Figure 1 , Figure 2 and Figure 3 As shown, it is worth explaining in detail that a collecting box 18 is arranged at the top of the protective block 1. The arrangement of the collecting box 18 facilitates the collection of garbage. A filter screen 19 is fixedly installed on one side of the collecting box 18. The arrangement of the filter screen 19 further filters the moisture in the garbage. A pull rope 20 is fixedly installed on the side of the collecting box 18 away from the filter screen 19. The outer surface of the pull rope 20 is provided with a sponge pad. The arrangement of the pull rope 20 facilitates the pulling of the collecting box 18 to move.
[0027] In summary: through the arrangement of structures such as the salvage net 5, the winch 6 and the traction rope 7, it is convenient to adjust the position of the salvage net 5 according to the water level to enhance practicality; through the arrangement of structures such as the fixed block 8, the groove 9, the threaded rod 10, the sliding block 11, the connecting rod 12, the connecting plate 13, the cross bar 14 and the brush 15, it is convenient to clean the garbage on the salvage net 5; through the arrangement of the fixing bolts 16, it is convenient to disassemble and replace the cross bar 14; through the arrangement of the guide groove 17, it plays a guiding and limiting role in the movement of the salvage net 5; through the arrangement of the collecting box 18, it is convenient to collect garbage; through the arrangement of the filter net 19, the moisture in the garbage can be further filtered; through the arrangement of the pull rope 20, it is convenient to pull the collecting box 18 to move.
[0028] The motor 21, the cylinder 4 and the winch 6 can be purchased on the market. The motor 21, the cylinder 4 and the winch 6 are equipped with a power supply, which is a mature technology in this field and has been fully disclosed, so they are not repeated in the specification.
[0029] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0030] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A river channel guiding structure for a water conservancy project, comprising two protection blocks (1), characterized in that: A gate (2) is slidably mounted between the two protection blocks (1); a fixing frame (3) is fixedly mounted on the top of the two protection blocks (1); a cylinder (4) is fixedly mounted on the top of the fixing frame (3); a telescopic end of the cylinder (4) passes through the fixing frame (3) and is fixedly connected to the top of the gate (2); a salvaging net plate (5) is arranged on one side of the gate (2); a winch (6) is fixedly mounted on both sides of the top of the gate (2); a traction rope (7) is fixedly mounted inside the winch (6); one end of the traction rope (7) is fixedly connected to the salvaging net plate (5); a fixing block (8) is fixedly mounted on one side of the fixing frame (3); one side of the fixing block (8) A groove (9) is provided, the fixed block (8) is located in the groove (9) and is rotatably mounted with a threaded rod (10), the outer surface of the threaded rod (10) is threadably mounted with a sliding block (11), the sliding block (11) is slidably connected to the groove (9), a connecting rod (12) is fixedly mounted on one side of the sliding block (11), a connecting plate (13) is fixedly mounted on the bottom end of the connecting rod (12), a cross bar (14) is detachably mounted on the bottom end of the connecting plate (13), a brush (15) is fixedly mounted on the bottom end of the cross bar (14), a motor (21) is fixedly mounted on one side of the fixed block (8), and the output end of the motor (21) is fixedly connected to the threaded rod (10).
2. A river channel guiding structure for water conservancy projects according to claim 1, characterized in that: Both sides of the top end of the connecting plate (13) are threadedly mounted with fixing bolts (16), and the cross bar (14) and the connecting plate (13) are fixed by the fixing bolts (16).
3. A river channel combing structure for water conservancy projects according to claim 2, characterized in that: A guide groove (17) is provided on one side of the gate (2), and a sliding block is fixedly mounted on one side of the salvage net plate (5), and the sliding block is slidably connected to the guide groove (17).
4. A river channel guiding structure for water conservancy projects according to claim 3, characterized in that: A collection box (18) is provided at the top end of the protection block (1).
5. A river channel guiding structure for water conservancy projects according to claim 4, characterized in that: A filter screen (19) is fixedly mounted on one side of the collection box (18).
6. A river channel combing structure for water conservancy projects according to claim 5, characterized in that: A drawstring (20) is fixedly mounted on one side of the collection box (18) away from the filter screen (19), and a sponge pad is sleeved on the outer surface of the drawstring (20).