Take-up and pay-off device for land planning

By designing a collection and laying device for land planning, using ground wires to contact the ground and bond lime and combining snake neck pipe and support frame structure, the problem of low lime laying efficiency in the existing technology is solved, and efficient and accurate The lime marking improves the convenience of land greening planning and construction accuracy.

CN222318049UActive Publication Date: 2025-01-07德州市土地储备整治中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421037300.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2025-01-07
Estimated Expiration
2034-05-14

AI Technical Summary

Technical Problem

In the prior art, the collection and laying device in land planning is inefficient when laying lime and requires manual spraying, which leads to time-consuming and labor-intensive and inaccurate.

Method used

A land planning collection and laying device is designed. Through the ground wire contact with the ground during laying, lime is attached to mark the ground wire path. The device is equipped with a processing cavity and a through hole structure to reduce the lime extrusion pressure and improve accuracy. and adjust the direction of lime spraying through the snake neck tube and support frame to ensure clear lime marks.

Benefits of technology

Efficient and accurate lime laying is achieved, manual operations are reduced, and measurement convenience and construction accuracy are improved during land greening planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222318049U_ABST
    Figure CN222318049U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of land planning, in particular to a take-up and pay-off device for land planning. The device comprises a main body frame used for moving on the ground, a handle is arranged at the main body frame, a cavity is formed in the main body frame, a spool wound with a ground wire is arranged at the end, close to the handle, of the cavity, a processing box is arranged at the end, away from the handle, of the cavity, a processing cavity used for containing lime is formed in the processing box, and processing channels used for sliding of the ground wire are formed in the front end and the rear end of the processing cavity. According to the utility model, the ground wire is contacted with the ground after sliding out, lime adhered to the surface of the ground wire can mark the path of the ground wire, the lime does not need to be scattered manually during the period, and the measurement convenience in the land greening planning process is improved; the ground wire makes contact with the ground for marking, compared with traditional manual lime placement, the lime placement distance is closer to the ground wire, the accuracy is higher, and the reconstruction accuracy of follow-up workers is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of land planning, in particular to a wire-retracting and -releasing device for land planning. Background Art

[0002] In land planning, the role of wire-retracting devices is very critical. They are mainly used to ensure the accuracy and efficiency of land measurement. Laying out the wires is an important step in determining the boundaries and scope of the land. One end of the ground wire is fixed inside the land by a fixing nail, and the wire-retracting device is pushed to lay the ground wire on the surface for laying out the wires.

[0003] In land greening planning, workers will spread lime on the ground line. The lime line can clearly mark the boundaries and planning lines of the land, providing visual guidance for construction layout.

[0004] In the prior art, after workers have finished laying the ground wires using the wire-retracting and -releasing device, they manually spray lime along the ground wires, which is time-consuming and labor-intensive. Utility Model Content

[0005] Aiming at the defect of low efficiency of manual lime laying in the prior art, the utility model provides a wire-retracting and releasing device for land planning, which can achieve the effect of high-efficiency lime laying.

[0006] In order to solve the above technical problems, the utility model is solved by the following technical solutions:

[0007] A wire-retracting and -releasing device for land planning comprises a main frame for moving on the ground surface, wherein a handle is provided on the main frame, a cavity is provided inside the main frame, a spool with a ground wire wound around one end of the cavity close to the handle is provided, and a processing box is provided at one end of the cavity away from the handle, a processing cavity for placing lime is formed inside the processing box, and processing channels for sliding the ground wire are formed at the front and rear ends of the processing cavity.

[0008] After the ground wire of the utility model slides out and contacts the ground, lime adhered to the surface of the ground wire will mark the path of the ground wire, and there is no need to manually sprinkle lime, thereby improving the convenience of measurement in the process of land greening planning;

[0009] Among them, marking is done by touching the ground with a ground wire. Compared with the traditional manual placement of lime, the lime is placed closer to the ground wire and has higher accuracy, which improves the accuracy of subsequent construction by subsequent staff.

[0010] Preferably, the processing channel is provided with a first through hole and a second through hole at the front and rear ends of the processing cavity respectively, a protective cover is provided between the first through hole and the second through hole in the processing cavity, a third through hole is provided outside the protective cover, and a protective cover is provided between the first through hole and the second through hole in the processing cavity, a third through hole is provided outside the protective cover.

[0011] In the utility model, the protective cover ensures the lime capacity and reduces the squeezing force of the lime on the ground wire, thereby ensuring that the ground wire can slide normally inside the processing chamber.

[0012] Preferably, the first through hole is in contact with the outer surface of the ground wire.

[0013] In the utility model, the first through hole is attached to the outside of the ground wire, so that the lime inside the processing cavity can be blocked to prevent it from flowing into the cavity through the first through hole.

[0014] Preferably, the second through hole is larger than the first through hole, and the second through hole is connected to the main frame, and the ground wire slides at the connection point between the second through hole and the main frame.

[0015] In the utility model, the second through hole is connected to the main frame, so that the amount of lime sprayed by the device is increased, and it is convenient for workers to find the lime traces.

[0016] Preferably, a bendable snake neck tube is fixedly connected to the second through hole and the main frame.

[0017] In the utility model, the snake-neck pipe is arranged so that the snake-neck pipe can adjust the lime spraying direction during the lime dispersing process through the main frame, so that the lime spraying direction is consistent with the moving direction of the ground wire, thereby improving the accuracy of lime spraying.

[0018] Preferably, a fixing sleeve is provided on the outside of the snake neck tube, a through cavity is formed inside the fixing sleeve, a plurality of supporting frames are fixedly connected to the inner wall of the through cavity, a receiving hole for sliding of the ground wire is formed at the connection between the supporting frames, and overflow ports for lime to pass through are left on both sides of the supporting frames.

[0019] In the utility model, the receiving hole ensures the accuracy of adjusting the direction of the snake neck tube and ensures that the lime can flow out normally, thereby further improving the accuracy of the direction adjustment of the device.

[0020] Preferably, the extended end of the ground wire is fixedly connected with a fixing nail, and the bottom of the fixing nail can completely cover the opening of the through cavity.

[0021] In the utility model, by setting the fixing nail, the bottom of the fixing nail can seal the surface of the through cavity, so as to prevent the lime inside the through cavity from overflowing when not in use, thereby improving the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a schematic diagram of the main frame in Example 1;

[0023] Figure 2 is a schematic diagram of the cavity in Example 1;

[0024] Figure 3is a schematic diagram of the processing chamber in Example 1;

[0025] Figure 4 is a schematic diagram of the snake neck tube in Example 1;

[0026] Figure 5 This is a schematic diagram of the fixing sleeve in Example 1.

[0027] The parts indicated by the numbers in the accompanying drawings are as follows:

[0028] 100, main frame; 110, snake neck tube; 210, cavity; 220, ground wire; 230, processing box; 250, first through hole; 260, bobbin; 310, processing cavity; 320, second through hole; 330, protective cover; 340, third through hole; 410, fixing sleeve; 420, fixing nail; 510, through cavity; 520, support frame; 530, receiving hole; 540, overflow port. DETAILED DESCRIPTION

[0029] In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments are only used to explain the utility model but not to limit it.

[0030] Example 1

[0031] like Figure 1-3 As shown, the present embodiment provides a wire-retracting and -releasing device for land planning, including a main frame 100 for moving on the ground surface, a handle being provided at the main frame 100, a cavity 210 being provided inside the main frame 100, a spool 260 with a ground wire 220 wound around one end of the cavity 210 close to the handle being provided, a processing box 230 being provided at one end of the cavity 210 away from the handle, a processing cavity 310 for placing lime being formed inside the processing box 230, and processing channels for sliding the ground wire 220 being formed at the front and rear ends of the processing cavity 310.

[0032] In this embodiment, the extended end of the ground wire 220 is fixed on the ground surface, and the main frame 100 is pulled to move on the ground. The ground wire 220 inside the cavity 210 will extend outside the main frame 100. During the extension process, the ground wire 220 will pass through the processing channel of the processing cavity 310. The lime inside the processing cavity 310 will adhere to the ground wire 220, and the ground wire 220 adhered to the lime part will slide out of the main frame 100. After the ground wire 220 slides out, it contacts the ground. The lime adhered to the surface of the ground wire 220 will mark the ground wire path. During this period, there is no need to manually sprinkle lime, which improves the convenience of measurement in the process of land greening planning.

[0033] Among them, the ground line 220 is touched to the ground for marking. Compared with the traditional manual placement of lime, the lime is placed closer to the ground line 220 and has higher accuracy, which improves the accuracy of subsequent construction by staff.

[0034] Combination Figure 2-3 As shown, in this embodiment, the processing channel is located at the front and rear ends of the processing cavity 310 and is respectively provided with a first through hole 250 and a second through hole 320; the processing cavity 310 is located between the first through hole 250 and the second through hole 320 and is provided with a protective cover 330; the outside of the protective cover 330 is provided with a third through hole 340; the first through hole 250 is in contact with the outer surface of the ground wire 220.

[0035] In this embodiment, the ground wire 220 enters the processing chamber 310 through the first through hole 250, and the lime inside the processing chamber 310 enters the protective cover 320 through the third through hole 340 outside the protective cover 320. The lime flowing inside the protective cover 320 will smear the ground wire 220. The smeared ground wire 220 then slides out of the processing chamber 310 through the second through hole (320). When the lime inside the protective cover 320 is reduced, it is replenished again through the third through hole 340. The protective cover 320 reduces the lime capacity while reducing the squeezing force of the lime on the ground wire 220, ensuring that the ground wire 220 can slide normally inside the processing chamber 310. When the ground wire 220 enters the processing chamber 310 through the first through hole 250, the first through hole 250 is attached to the outside of the ground wire 220 to block the lime inside the processing chamber 310, preventing it from flowing into the cavity 210 through the first through hole 250.

[0036] Combination Figure 2-3 As shown, in this embodiment, the second through hole 320 is larger than the first through hole 250, and the second through hole 320 is connected to the main frame 100, and the ground wire 220 slides at the connection between the second through hole 320 and the main frame 100; the connection between the second through hole 320 and the main frame 100 is fixedly connected with a bendable snake neck tube 110.

[0037] In this embodiment, the second through hole 320 is larger than the first through hole 250. During the outward extension of the ground wire 220, part of the lime in the processing chamber 310 can be dispersed through the main frame 100, thereby increasing the amount of lime sprayed by the device and making it easier for staff to find traces of lime. During the dispersion of lime through the main frame 100, the snake neck tube 110 will adjust the spraying direction of the lime so that it is consistent with the moving direction of the ground wire 220, thereby improving the accuracy of the lime spraying.

[0038] The above-mentioned snake-neck tube 110 can adjust the direction of lime spraying, but considering that during the actual operation, a gap must be left between the snake-neck tube 110 and the ground wire 220 for the lime to pass through. When the direction of the ground wire 220 is fine-tuned, the inclination direction of the snake-neck tube 110 will produce an error with the extension direction of the ground wire 220. Therefore, the problem is solved through the following embodiment.

[0039] Combination Figure 3-5As shown, in this embodiment, a fixing sleeve 410 is provided on the outside of the snake neck tube 110, a through cavity 510 is formed inside the fixing sleeve 410, a plurality of support frames 520 are fixedly connected to the inner wall of the through cavity 510, and a receiving hole 530 for sliding of the ground wire 220 is formed at the connection between the support frames 520, and overflow ports 540 for lime to pass through are left on both sides of the support frames 520.

[0040] During the tilting process of the ground wire 220 inside the accommodating hole 530 in this embodiment, the support frame 520 will be driven to move, and the support frame 520 will drive the fixing sleeve 410 to move, thereby adjusting the tilting direction of the snake neck tube 110. At the same time, the lime flows out through the overflow port 540 and is sprayed on the ground. The accommodating hole 530 ensures the accuracy of the direction adjustment of the snake neck tube 110 while ensuring that the lime can flow out normally, thereby further improving the accuracy of the direction adjustment of the device.

[0041] Combination Figure 2-5 As shown, in this embodiment, the extending end of the ground wire 220 is fixedly connected to a fixing nail 420 , and the bottom of the fixing nail 420 can completely cover the opening of the through cavity 510 .

[0042] After the ground wire 220 is recovered in this embodiment, the bottom of the fixing nail 420 will seal the surface of the through cavity 510, so as to prevent the lime inside the through cavity 510 from overflowing when not in use, thereby improving the practicality of the device.

[0043] In short, the above is only a preferred embodiment of the present utility model, and all equivalent changes and modifications made according to the scope of the patent application of the present utility model should fall within the scope of the present utility model patent.

Claims

1. A wire-retracting and releasing device for land planning, characterized in that: The invention comprises a main frame (100) for moving on the ground surface, wherein the main frame (100) is provided with a handle, a cavity (210) is provided inside the main frame (100), a spool (260) wound with a ground wire (220) is provided at one end of the cavity (210) close to the handle, a processing box (230) is provided at one end of the cavity (210) away from the handle, a processing cavity (310) is formed inside the processing box (230) for placing lime, and processing channels for sliding the ground wire (220) are formed at the front and rear ends of the processing cavity (310).

2. A land planning retractable wire device according to claim 1, characterized in that: A first through hole (250) and a second through hole (320) are respectively provided at the front and rear ends of the processing channel located in the processing cavity (310); a protective cover (330) is provided between the first through hole (250) and the second through hole (320) in the processing cavity (310); and a third through hole (340) is provided outside the protective cover (330).

3. A land planning retractable wire device according to claim 1 or 2, characterized in that: The first through hole (250) is in contact with the outer surface of the ground wire (220).

4. A land planning retractable wire device according to claim 2, characterized in that: The second through hole (320) is larger than the first through hole (250), and the second through hole (320) is connected to the main frame (100), and the ground wire (220) slides at the connection point between the second through hole (320) and the main frame (100).

5. A land planning retractable wire device according to claim 4, characterized in that: A bendable snake neck tube (110) is fixedly connected at the point where the second through hole (320) and the main frame (100) pass through.

6. A land planning retractable wire device according to claim 5, characterized in that: A fixing sleeve (410) is provided outside the snake neck tube (110), a through cavity (510) is formed inside the fixing sleeve (410), a plurality of support frames (520) are fixedly connected to the inner wall of the through cavity (510), a receiving hole (530) for sliding of the ground wire (220) is formed at the connection between the support frames (520), and overflow ports (540) for lime to pass through are left on both sides of the support frames (520).

7. A land planning retractable wire device according to claim 6, characterized in that: The extended end of the ground wire (220) is fixedly connected to a fixing nail (420), and the bottom of the fixing nail (420) can completely cover the opening of the through cavity (510).