Variable-section trolley shared by tunnel car avoiding section and main tunnel
By designing a deformable tunnel vehicle avoidance section and a public trolley with a main hole, the support rod and articulated seat are used to adjust the top mold arc with a hydraulic rod, the efficiency and economical problems of the vehicle avoidance section and main hole lining in the tunnel project are solved, and the efficiency and economical problems of the vehicle avoidance section and main hole lining in the tunnel project are achieved. A variety of efficient and low-cost solutions for cross-section lining.
Patent Information
- Application Number
- CN202421308696.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-06-11
AI Technical Summary
In the existing tunnel projects, it takes a long time and takes a lot of labor to replace the top mold when lining the avoiding section, or the use of the avoiding section trolley is not economical and cannot be suitable for lining multiple sections.
Design a common variable section of the tunnel avoidance section and the main hole. Through the combination of the main trolley, the auxiliary frame, the top mold, the support rod and the side mold, the conversion of the two lining forms is achieved. It is suitable for In the lining of the avoidance section and the main hole, the removable supporting rod and articulated seat are used to match the hydraulic rod to achieve arc-shaped structure adjustment of the top mold.
It greatly improves work efficiency, some components can be shared, reduces production costs, is simple in structure, is convenient to use, saves manpower, and is suitable for lining of multiple sections.
Smart Images

Figure CN222333806U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of tunnel engineering equipment, and in particular relates to a variable-section trolley commonly used in a tunnel avoidance section and a main tunnel. Background Art
[0002] In my country, longer tunnels are all equipped with emergency parking strips, also known as avoidance sections. There is an extra lane, which is used for the safety of parking the car when a malfunction occurs after the car enters the tunnel. In this case, a tunnel will have two sections with large differences. In the past, when lining the tunnel, a back mold was generally added to the main tunnel trolley, or the portal was widened and a whole set of top molds were replaced. In this way, some parts of the main tunnel trolley were shared, which was more economical. However, after lining a avoidance section, it was necessary to change back to the main tunnel trolley and then change back to the next avoidance section. Each replacement took a long time and consumed a lot of manpower. Later, a avoidance section trolley appeared in the industry, which only lined the avoidance section. After lining the avoidance section, the trolley was reduced to the size of passing through the main tunnel, and then went to the next avoidance section to participate in the lining of the next avoidance section. This trolley can only line the avoidance section, not the main tunnel, and is only suitable for tunnels with more avoidance sections. The economy of this solution is not as good as the previous one. Utility Model Content
[0003] In view of the shortcomings of the prior art, the purpose of the utility model is to design a variable-section trolley for use in the tunnel avoidance section and the main tunnel, which is used to deal with the situation mentioned in the background technology that the main tunnel trolley is used to replace the top mold when the tunnel lining encounters the avoidance section, which is time-consuming and consumes a lot of manpower, or the use of the avoidance section trolley is not economical.
[0004] To achieve the above purpose, the utility model adopts the following technical scheme: a variable cross-section trolley for use in a tunnel avoidance section and a main tunnel, comprising a main trolley, a secondary trolley, an auxiliary frame, a top mold, a support rod A, a support rod B and a side mold, the variable cross-section trolley has two combination forms, one for lining the avoidance section, and the other for lining the main tunnel;
[0005] Lining shelter section form: the main trolley and the auxiliary trolley are arranged in parallel, and a detachable support rod A is vertically spaced above the main trolley and the auxiliary trolley, and the upper end of the support rod A is connected to a top mold. The outer side of the main trolley is spaced apart by an articulated seat F, and the articulated seat F cooperates with a screw rod to support the side mold on one side, and the outer side of the auxiliary trolley is spaced apart by an articulated seat G, and the articulated seat G cooperates with a screw rod to support the side mold on the other side;
[0006] Lining main tunnel form: A detachable support rod B is vertically spaced above the main trolley, and the upper end of the support rod B is connected to a top mold. The outer side of the main trolley is used to support the side mold on the outer side of the main trolley through an articulated seat F and a screw rod. A detachable auxiliary frame is provided on the inner side of the main trolley, one side of the auxiliary frame is connected to the main trolley, and an articulated seat H is spaced apart on the other side of the auxiliary frame. The articulated seat H cooperates with the screw rod to support the side mold on the other side.
[0007] The top mold is an overall arc-shaped structure, the outer arc surface of the top mold matches the arc surface of the top inner wall of the tunnel, the outer arc surface of the side mold matches the arc surface of the inner wall of the tunnel, and the two ends of the top mold are connected to the side molds on both sides through connecting pieces.
[0008] The top mold is composed of multiple arc modules connected together, and the multiple arc modules are connected by connecting parts. The connecting parts are divided into single pin hole connecting parts and double pin hole connecting parts. The single pin hole connecting parts are used to connect the side mold and the arc modules at both ends, and the double pin hole connecting parts are used to connect the arc modules in the middle section of the top mold.
[0009] The number of the arc modules is N, and the arc modules are module No. 1 to module No. N in clockwise direction, wherein an articulated seat A is provided under the N-2 module, and a hydraulic rod is connected to the articulated seat A, one end of the hydraulic rod is connected to the articulated seat A under the N-2 module, and the other end of the hydraulic rod is connected to the articulated seat B provided above the main trolley; an articulated seat D is provided under the N-1 module, and an articulated seat C is provided above the auxiliary trolley, and the articulated seat C and the articulated seat D are used to cooperate with the hydraulic rod to support the N-1 module; an articulated seat E is provided under the N-3 module.
[0010] The top mold is provided with a connecting seat A and a connecting seat B for connecting with the support rod A and the support rod B at its bottom.
[0011] The beneficial effects of the utility model are as follows: by changing the shape of the trolley so that it can line both the avoidance section and the main tunnel, the work efficiency is greatly improved, most of the components can be shared, the production cost is reduced, the structure is simple, the use is convenient, the operation is easy for the operators, and manpower is saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 The utility model is a schematic diagram of the morphological structure of the lining of the vehicle shelter section.
[0013] Figure 2 Schematic diagram of the replacement process of the utility model ①.
[0014] Figure 3 Schematic diagram of the replacement process of the utility model ②.
[0015] Figure 4 Schematic diagram of the replacement process of the utility model ③.
[0016] Figure 5 Schematic diagram of the replacement process of the utility model ④.
[0017] Figure 6 The utility model is a schematic diagram of the morphological structure used for lining a main tunnel.
[0018] Figure 7 for Figure 1 A partial enlarged schematic diagram of the X in the middle.
[0019] Figure 8 for Figure 6 A partial enlarged schematic diagram of point Y in the middle.
[0020] Fig. 9 It is a schematic diagram of the auxiliary trolley after being separated from the main trolley in the utility model.
[0021] In the figure: 1. main trolley, 2. auxiliary trolley, 3. auxiliary frame, 4. top mold, 5. side mold, 6. articulated seat A, 7. articulated seat B, 8. articulated seat C, 9. articulated seat D, 10. articulated seat E, 11. articulated seat F, 12. articulated seat G, 13. support rod A, 14. support rod B, 15. hydraulic rod, 16. module N, 17. module N-1, 18. module N-2, 19. module N-3, 20. single pin hole connector, 21. double pin hole connector, 22. connecting seat A, 23. connecting seat B, 24. articulated seat H. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings of this specification to clearly and completely describe the technical solution of the utility model. It should be noted that the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-Figure 9A variable-section trolley for use in a tunnel shelter section and a main tunnel comprises a main trolley 1, an auxiliary trolley 2, an auxiliary frame 3, a top mold 4, a support rod A13, a support rod B14 and a side mold 5. The variable-section trolley has two combination forms, one is used for lining the shelter section, and the other is used for lining the main tunnel; the form of lining the shelter section: the main trolley 1 and the auxiliary trolley 2 are arranged in parallel, and a detachable support rod A13 is vertically spaced above the main trolley 1 and the auxiliary trolley 2, and a top mold 4 is connected to the upper end of the support rod A13, and an articulated seat F11 is spaced apart on the outer side of the main trolley 1, and the articulated seat F11 cooperates with a screw rod to support the side mold 5 on one side, and the The outer side of the auxiliary trolley 2 is provided with an articulated seat G12, which cooperates with the screw rod to support the side mold 5 on the other side; the shape of the lining main tunnel: the upper part of the main trolley 1 is vertically provided with a detachable support rod B14, the upper end of the support rod B14 is connected to the top mold 4, the outer side of the main trolley 1 is used to support the side mold 5 on the outer side of the main trolley 1 through the articulated seat F11 and the screw rod, and the inner side of the main trolley 1 is provided with a detachable auxiliary frame 3, one side of the auxiliary frame 3 is connected to the main trolley 1, and the other side of the auxiliary frame 3 is provided with an articulated seat H24, which cooperates with the screw rod to support the side mold 5 on the other side. The top mold 1 is an overall arc-shaped structure, the outer arc surface of the top mold 1 cooperates with the arc surface of the top of the inner wall of the tunnel, the outer arc surface of the side mold 5 cooperates with the arc surface of the inner wall of the tunnel, and the two ends of the top mold 4 are respectively connected to the side molds 5 on both sides through connecting pieces. The top mold 4 is composed of multiple arc modules connected together, and the multiple arc modules are connected by connecting parts. The connecting parts are divided into single pin hole connecting parts 20 and double pin hole connecting parts 21. The single pin hole connecting parts 20 are used to connect the side mold 5 and the arc modules at both ends, and the double pin hole connecting parts 21 are used to connect the arc modules in the middle section of the top mold 4. The number of arc modules is N, and the arc modules are module No. 1 to module No. N 16 in clockwise direction, wherein an articulated seat A6 is provided below module No. N-2, and a hydraulic rod 15 is connected to the articulated seat A6. One end of the hydraulic rod 15 is connected to the articulated seat A6 below module No. N-2, and the other end of the hydraulic rod 15 is connected to the articulated seat B7 provided above the main trolley 1; an articulated seat D9 is provided below module No. N-1, and an articulated seat C8 is provided above the auxiliary trolley 2. The articulated seat C8 and the articulated seat D9 are used to cooperate with the hydraulic rod 15 to receive module No. N-1; an articulated seat E10 is provided below module No. N-3. The top mold 4 is provided with a connecting seat A22 and a connecting seat B23 at its bottom for connecting with the support rod A13 and the support rod B14.
[0024] When the utility model is in use:
[0025] When lining the avoidance section, if attached Figure 1As shown, the main trolley 1 and the auxiliary trolley 2 are arranged side by side. At this time, a support rod A13 is installed above the main trolley 1 and the auxiliary trolley 2. The top of the support rod A13 cooperates with the connecting seat A22 at the bottom of the top mold 4. The outer side of the main trolley 1 supports the side plate 5 with the screw rod through the hinge seat F11, and the outer side of the auxiliary trolley 2 supports the side plate 5 with the screw rod through the hinge seat G12. The side plates 5 on the left and right sides are connected to the two ends of the top mold 4 through a single pin hole connector 20. At this time, the double pin hole connector 21 in the middle of the top mold 4 is as shown Figure 7 As shown, both upper and lower pin holes are provided with pins, so that the curvature of the upper part of the top mold 4 matches the curvature of the inner wall of the tunnel shelter section;
[0026] When lining the main tunnel, if attached Figure 6 As shown, an auxiliary frame 3 is installed on one side of the main trolley 1, and the support rod B14 above the main trolley 1 and the auxiliary frame 3 cooperates with the connecting seat B23 at the bottom of the top mold 4. The outer side of the main trolley 1 supports the side plate 5 with the screw rod through the hinge seat F11, and the outer side of the auxiliary frame 3 supports the side plate 5 with the screw rod through the hinge seat H24. The side plates 5 on the left and right sides are connected to the two ends of the top mold 4 through the single pin hole connector 20. At this time, the double pin hole connector 21 in the middle of the top mold 4 is as shown in FIG. Figure 8 As shown, the upper pin hole is provided with a pin, and the lower pin hole is not provided with a pin, so that the curvature of the upper part of the top mold 4 matches the curvature of the inner wall of the tunnel main hole;
[0027] The process of changing from the lined shelter section to the lined main tunnel:
[0028] like Figures 2 to 5 As shown, first disassemble the pin of the single pin hole connector 20 between the N-2 module 18 and the N-1 module 17, then remove the support rod A13 on the auxiliary trolley 2 below the N-1 module 17, and use the hydraulic rod 15 to cooperate with the articulated seat D9 below the N-1 module 17 and the articulated seat C8 above the auxiliary trolley 2 to support the N-1 module 17 and the N module 16, and then disassemble the connector between the N module 16 and the side plate 5, and then support the N module 16 and the N-1 module 17 on the support rod A13 on the auxiliary trolley 2, and then remove the hydraulic rod 15 from the articulated seat C8 and the articulated seat D9 and move it to the articulated seat B7 of the main trolley 1 and the articulated seat A6 below the N-2 module 18;
[0029] Then as Fig. 9 As shown, after the side plate 5 is removed from the auxiliary trolley 2, the auxiliary trolley 2 is moved to the next shelter section (if the trolley is not needed to line the tunnel, the side plate 5 on the auxiliary trolley 2 does not need to be removed);
[0030] Install the auxiliary frame 3 on the other side of the main trolley 1, then move the upper end of the hydraulic rod 15 from the hinge seat A6 under the N-2 module 18 to the hinge seat E10 under the N-3 module 19, prop up the top mold 4 as a whole, then remove the support rod A13 above the main trolley, and then install the support rod B14 above the main trolley 1;
[0031] Next, the double pin hole connector 21 provided between the arc modules in the middle of the top mold 4 is removed from the pins of the lower pin holes of the double pin hole connector 21 in a clockwise direction. At the same time, the connection seat B23 below the top mold 4 is connected to the support rod B14 above the main trolley 1 in a clockwise direction, and then the upper end of the hydraulic rod 15 is moved back from the articulated seat E10 to the articulated seat A6 below the N-2 module 18, and the curvature of the top mold 4 is changed to match the upper curved surface of the inner wall of the tunnel of the main tunnel;
[0032] Finally, the side form 5 removed from the auxiliary trolley 2 is installed on the auxiliary frame 3 through the hinge seat H23 and the screw rod, and the N-2 module 18 is connected to the side form 5 using a pin to complete the process of changing from the lining shelter section to the lining main tunnel.
[0033] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0034] The parts not described in detail in this utility model are prior art.
Claims
1. A variable cross-section trolley for use in a tunnel avoidance section and a main tunnel, comprising a main trolley (1), an auxiliary trolley (2), an auxiliary frame (3), a top mold (4), a support rod A (13), a support rod B (14) and a side mold (5), wherein: The variable cross-section trolley has two combined forms, one is used for lining the shelter section, and the other is used for lining the main tunnel; Lining shelter section form: the main trolley (1) and the auxiliary trolley (2) are arranged in parallel, and a detachable support rod A (13) is vertically spaced above the main trolley (1) and the auxiliary trolley (2), and the upper end of the support rod A (13) is connected to a top mold (4), and an articulated seat F (11) is spaced outside the main trolley (1), and the articulated seat F (11) cooperates with a screw rod to support a side mold (5) on one side, and an articulated seat G (12) is spaced outside the auxiliary trolley (2), and the articulated seat G (12) cooperates with a screw rod to support a side mold (5) on the other side; Lining main tunnel form: a detachable support rod B (14) is vertically spaced above the main trolley (1), the upper end of the support rod B (14) is connected to a top mold (4), the outer side of the main trolley (1) is used to support the side mold (5) on the outer side of the main trolley (1) through an articulated seat F (11) and a screw rod, and a detachable auxiliary frame (3) is provided on the inner side of the main trolley (1), one side of the auxiliary frame (3) is connected to the main trolley (1), and the other side of the auxiliary frame (3) is spaced apart by an articulated seat H (24), and the articulated seat H (24) cooperates with the screw rod to support the side mold (5) on the other side.
2. According to claim 1, a variable cross-section trolley for use in the tunnel avoidance section and the main tunnel is characterized by: The top mold (4) is an overall arc-shaped structure, the outer arc surface of the top mold (4) matches the arc surface of the top inner wall of the tunnel, the outer arc surface of the side mold (5) matches the arc surface of the inner wall of the tunnel, and the two ends of the top mold (4) are connected to the side molds (5) on both sides through connecting pieces.
3. The variable cross-section trolley for use in the tunnel avoidance section and the main tunnel according to claim 1 is characterized by: The top mold (4) is composed of a plurality of arc-shaped modules connected to each other, and the plurality of arc-shaped modules are connected to each other via connecting pieces, wherein the connecting pieces are divided into single-pin hole connecting pieces (20) and double-pin hole connecting pieces (21). The single-pin hole connecting pieces (20) are used to connect the side mold (5) and the arc-shaped modules at both ends, and the double-pin hole connecting pieces (21) are used to connect the arc-shaped modules in the middle section of the top mold (4).
4. The variable cross-section trolley for use in the tunnel avoidance section and the main tunnel according to claim 3 is characterized by: The number of the arc modules is N, and the arc modules are module No. 1 to module No. N (16) in the clockwise direction, wherein an articulated seat A (6) is provided below the N-2 module (18), and a hydraulic rod (15) is connected to the articulated seat A (6), one end of the hydraulic rod (15) is connected to the articulated seat A (6) below the N-2 module (18), and the other end of the hydraulic rod (15) is connected to the articulated seat B (7) provided above the main trolley (1); an articulated seat D (9) is provided below the N-1 module (17), and an articulated seat C (8) is provided above the auxiliary trolley (2), and the articulated seat C (8) and the articulated seat D (9) are used to cooperate with the hydraulic rod (15) to receive the N-1 module (17); an articulated seat E (10) is provided below the N-3 module (19).
5. The variable cross-section trolley for use in the tunnel avoidance section and the main tunnel according to claim 1 is characterized by: The top mold (4) is provided with a connecting seat A (22) and a connecting seat B (23) at its bottom for connecting with the support rod A (13) and the support rod B (14).