Building pipe hoisting device
By designing a building pipe lifting device, the clamping force of the flip parts, pushing heads and contact heads is used to solve the complex problems of pipe sliding and bundling, improving the safety and efficiency of lifting, and simplifying the operation process.
Patent Information
- Application Number
- CN202421260262.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-06-04
AI Technical Summary
Building pipes are easy to slide during lifting and moving, which poses safety risks, and the process of binding the wire rope is cumbersome, so the pipes need to be turned to fix the wire rope.
A construction pipe hoisting device is designed, using a reversible control panel and pushing head and contact head. It is bound and pulled by the wire rope and the round rod, and the clamping force of the flip and pushing head is used to prevent slipping effect with the rubber contact head. Fix building pipes to avoid sliding, and simplify the lifting process through automatic splicing of the clamp and guide rods.
It improves the safety and efficiency of building pipe lifting, avoids pipe sliding, simplifies the bundling process, and reduces operational complexity.
Smart Images

Figure CN222348512U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe hoisting, in particular to a building pipe hoisting device. Background Art
[0002] Building pipes refer to tubular materials used to transport fluids in buildings. They are usually made of metal, plastic, composite materials or other materials. These pipes play a key role in transporting and distributing fluids in buildings. Building pipes are a multifunctional building material that can meet the needs of all walks of life. Although its main function is to transport media, in actual applications, building pipes are usually directly hoisted by binding with wire ropes during the lifting and moving process. However, in the process of lifting building pipes with wire ropes, there is a chance of sliding, which poses a safety hazard. In addition, when bundling the wire rope, the building pipe needs to be turned over to make the wire rope at the bottom of the building pipe, which is more cumbersome. Utility Model Content
[0003] The disclosed embodiment relates to a construction pipe lifting device, during the lifting process, the steel wire rope can be controlled in advance to be bound with the round rod outside the control panel, during the lifting process, the steel wire rope is pulled, and with the help of the pulling force, the steel wire rope pushes the flip part inside the control panel to rotate, so that the flip part generates a force to clamp the construction pipe, and at the same time continuously squeezes the pushing head and the contact head to make anti-slip contact with the outside of the construction pipe, thereby improving the contact and fixing effect, so that the construction pipe will not slide during the lifting process, thereby improving the lifting efficiency and safety.
[0004] According to a first aspect of the present disclosure, there is provided a construction pipe lifting device, which specifically comprises: a main body; the main body is a positionable splicing structure, a freely flippable flipping piece is installed on the upper side of the main body through a connecting shaft, two control plates are fixed on the outer side of the flipping piece, a round rod is fixed to the bottom of the outer end of the control plate, the round rod is tied with a steel wire rope, the steel wire rope is embedded between the two control plates, and a contact head is installed on the top of the flipping piece through a pushing head; an outer plate; the outer plate and the splicing piece are installed on the side of the main body through a clamping plate, the outer plate and the splicing piece are spliced together, and a freely movable clamping head is installed on the inner end of the outer plate through a sliding head, and the side of the clamping head is a wedge-shaped structure.
[0005] In at least some embodiments, a support member is welded and fixed to the bottom of the outer side of the main body, an inner groove is provided on the inner side of the main body, and a connecting shaft is fixed to the top end of the side of the main body; a pushing member that can move freely laterally is embedded in the inner groove of the main body, an anti-slip groove is provided on the inner side of the pushing member, a force-bearing member is welded to the bottom end of the pushing member, a spring is mounted on the outside of the force-bearing member, the force-bearing member passes through the interior of the main body, and the spring continuously pushes the force-bearing member and the pushing member to move inward; the connecting shaft is rotatably connected to the flipping member, a freely pullable pushing head passes through the top of the flipping member, a pyramidal rod is provided on the inner side of the pushing head, and the contact head is made of rubber.
[0006] In at least some embodiments, a top plate is welded above the inner ends of the outer plate and the splicing piece, the inner ends of the outer plate and the splicing piece are connected to the clamping plate by bolts, and the clamping plate is welded to the side of the main body; a sliding head is welded to the inner end of the outer plate, a guide rod is inserted through the interior of the sliding head, a spring is mounted on the outside of the guide rod, and the inner end of the spring is in contact with the clamping head; the side of the guide rod is welded and fixed to the control rod, the control rod is embedded in the side of the sliding head to guide the movement, the guide rod and the control rod are welded and fixed to the clamping head, the side of the splicing piece is provided with a slot, and the clamping head is inserted into the slot.
[0007] The utility model provides a construction pipe hoisting device, which has the following beneficial effects:
[0008] When hoisting the pipes, the main body can be controlled to separate and then docked on both sides of the bottom of the building pipes to conveniently push the pipes up so that the main body can be conveniently placed and positioned. At the same time, the clamp head can be displaced with the help of the spring outside the guide rod, so that the clamp head can be automatically inserted into the internal clamping slot, so that the main body can be firmly spliced at the bottom of the building pipes for use, without turning over the building pipes, thereby improving work efficiency.
[0009] During the lifting process, the steel wire rope can be controlled in advance to be bound with the round rod outside the control panel. During the lifting process, the steel wire rope is pulled, and with the help of the pulling force, the steel wire rope pushes the flip part inside the control panel to rotate, so that the flip part generates a force to clamp the building pipe, and at the same time continuously squeezes the pushing head and the contact head to make anti-slip contact with the outside of the building pipe, thereby improving the contact and fixing effect, so that the building pipe will not slide during the lifting process, thereby improving the lifting efficiency and safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] In order to more clearly illustrate the technical solution of the embodiment of the utility model, the drawings of the embodiment will be briefly introduced below.
[0011] The drawings described below only relate to some embodiments of the present invention, but are not intended to limit the present invention.
[0012] In the attached picture:
[0013] Figure 1 A three-dimensional structural schematic diagram of the present application is shown;
[0014] Figure 2 A schematic diagram of the three-dimensional structure of the present application in a hoisting state is shown;
[0015] Figure 3 The exploded three-dimensional structure diagram of the present application is shown;
[0016] Figure 4 A schematic diagram of the main body of the present application is shown;
[0017] Figure 5 A schematic diagram of the exploded three-dimensional structure of the outer panel of the present application is shown;
[0018] Figure 6 A schematic diagram of the exploded bottom view of the outer panel of the present application is shown;
[0019] Reference numerals list
[0020] 1. Main body; 101. Support member; 102. Connecting shaft; 103. Pushing member; 104. Force-bearing member; 105. Turning member; 106. Control panel; 107. Pushing head; 108. Contact head;
[0021] 2. Outer plate; 201. Top plate; 202. Clamping plate; 203. Sliding head; 204. Guide rod; 205. Control rod; 206. Clamping head; 207. Joint piece; 208. Clamping slot. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution of the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings of the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the described embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example 1: Please refer to Figures 1 to 6 :
[0024] The utility model proposes a construction pipe lifting device, comprising: a main body 1; the main body 1 is a positionable splicing structure, a freely flippable flipping piece 105 is installed on the upper side of the main body 1 through a connecting shaft 102, two control boards 106 are fixed on the outer side of the flipping piece 105, a round rod is fixed on the outer bottom of the control board 106, and the round rod is tied with a steel wire rope, so that after the steel wire rope is stressed, the flipping piece 105 is pushed to flip under stress, clamping the construction pipe to improve the fixing effect, the steel wire rope is embedded between the two control boards 106, and a contact head 108 is installed on the top of the flipping piece 105 through a pushing head 107, which is used to contact the construction pipe The outer side of the material has anti-slip contact, firmly clamps and fixes the building pipe, avoids the building pipe from sliding during the hoisting process, and improves the safety of hoisting; the outer panel 2; the outer panel 2 and the splicing piece 207 are installed on the side of the main body 1 through the clamping plate 202, the outer panel 2 and the splicing piece 207 are spliced together, and the inner end of the outer panel 2 is installed with a freely movable clamping head 206 through a sliding head 203. The side of the clamping head 206 is a wedge-shaped structure, which is automatically inserted into the internal clamping of the clamping slot 208, so that the outer panel 2 can be automatically spliced with the splicing piece 207 for use, so that the main body 1 is firmly at the bottom of the building pipe for use, thereby improving the hoisting effect.
[0025] In the present disclosure, Figure 3 and Figure 4 As shown, a support member 101 is welded and fixed to the bottom of the outer side of the main body 1, so that the main body 1 is supported for use. An inner groove is provided on the inner side of the main body 1, so that the pusher 103 can be displaced inside the inner groove. A connecting shaft 102 is fixed to the top of the side of the main body 1 to support the flip member 105 to be flipped freely for use; a pusher 103 that can move freely laterally is embedded in the inner groove of the main body 1, and an anti-skid groove is provided on the inner side of the pusher 103 to prevent skidding contact with the outside of the building pipe to improve the fixing effect. A force-bearing member 104 is welded to the bottom end of the pusher 103, and the force-bearing member 104 is welded to the bottom end of the pusher 103. 04 is sheathed with a spring on the outside, and the displacement of the pushing member 103 is continuously controlled by means of the spring elasticity. The force-bearing member 104 runs through the inside of the main body 1, and the spring continuously pushes the force-bearing member 104 and the pushing member 103 to move inward; the connecting shaft 102 is rotatably connected with the flip member 105, and a freely pullable pushing head 107 runs through the top of the flip member 105. A pyramidal rod is provided on the inner side of the pushing head 107. The pushing head 107 drives the pyramidal rod to make anti-slip contact with the outside of the building pipe to further improve the anti-slip effect. The contact head 108 is made of rubber.
[0026] In the present disclosure, Figure 5 and Figure 6As shown, a top plate 201 is welded above the inner ends of the outer plate 2 and the splicing piece 207, and the inner ends of the outer plate 2 and the splicing piece 207 are connected to the clamping plate 202 by bolts, so that the outer plate 2 can be easily installed and used, and the clamping plate 202 is welded to the side of the main body 1 to drive the outer plate 2 to be installed and used; a sliding head 203 is welded to the inner end of the outer plate 2, and a guide rod 204 is inserted through the interior of the sliding head 203, and a spring is sleeved on the outside of the guide rod 204, and the inner end of the spring is in contact with the clamping head 206, continuously pushing the clamping head 206 to move, and continuously inserting it into the internal clamping of the slot 208; the side of the guide rod 204 is welded and fixed to the control rod 205, and the control rod 205 is embedded in the side of the sliding head 203 to guide the movement and prevent the clamping head 206 from rotating, the guide rod 204 and the control rod 205 are welded and fixed to the clamping head 206, and the side of the splicing piece 207 is provided with a slot 208, and the clamping head 206 is inserted into the slot 208.
[0027] The working principle of this embodiment is as follows: when in use, the steel wire rope can be controlled in advance to connect with the round rod inside the control panel 106. When it is necessary to hoist the building pipe, the main body 1 can be directly controlled to dock on both sides of the bottom of the building pipe. The clamping head 206 is automatically inserted into the internal clamping of the clamping slot 208 with the help of the spring displacement outside the guide rod 204, so that the outer plate 2 and the splicing piece 207 are spliced together. At the same time, the main body 1 is controlled to be spliced and fixed at the bottom of the building pipe for use, and then the steel wire rope is pulled up and moved by a crane. After the steel wire rope is stressed, the pulling force is used to push the flipping piece 105 to continue to flip under force. The flipping piece 105 drives the pushing head 107 and the contact head 108 to move continuously, and the pyramid rod and the contact head 108 are in anti-slip contact with the outside of the building pipe to firmly fix the building pipe to avoid sliding of the building pipe during the hoisting process, thereby improving safety.
[0028] In this article, there are a few points to note:
[0029] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.
[0030] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0031] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A construction pipe lifting device, characterized in that: include: A main body (1); the main body (1) is a positionable splicing structure, a freely flippable flipping piece (105) is installed on the upper side of the main body (1) through a connecting shaft (102), two control panels (106) are fixed on the outer side of the flipping piece (105), a round rod is fixed to the bottom of the outer end of the control panel (106), the round rod is tied with a steel wire rope, the steel wire rope is embedded between the two control panels (106), and a contact head (108) is installed on the top of the flipping piece (105) through a pushing head (107); an outer plate (2); the outer plate (2) and the splicing piece (207) are installed on the side of the main body (1) through a clamping plate (202), the outer plate (2) and the splicing piece (207) are spliced together, and a freely movable clamping head (206) is installed on the inner end of the outer plate (2) through a sliding head (203), and the side of the clamping head (206) is a wedge-shaped structure.
2. A construction pipe lifting device according to claim 1, characterized in that: A support member (101) is welded and fixed to the bottom of the outer side of the main body (1), an inner groove is provided on the inner side of the main body (1), and a connecting shaft (102) is fixed to the top end of the side edge of the main body (1).
3. A construction pipe lifting device according to claim 2, characterized in that: A pushing member (103) capable of free transverse movement is embedded in the inner groove of the main body (1), an anti-slip groove is provided on the inner side of the pushing member (103), a force-bearing member (104) is welded to the bottom end of the pushing member (103), a spring is sleeved on the outside of the force-bearing member (104), the force-bearing member (104) runs through the inside of the main body (1), and the spring continuously pushes the force-bearing member (104) and the pushing member (103) to move inwards.
4. A construction pipe hoisting device according to claim 3, characterized in that: The connecting shaft (102) is rotatably connected to the flip member (105); a freely pullable push head (107) penetrates the top end of the flip member (105); a pyramid-shaped rod is provided on the inner side of the push head (107); and the contact head (108) is made of rubber.
5. A construction pipe hoisting device according to claim 4, characterized in that: A top plate (201) is welded above the inner ends of the outer plate (2) and the splicing piece (207); the inner ends of the outer plate (2) and the splicing piece (207) are connected to a clamping plate (202) via bolts; and the clamping plate (202) is welded to the side of the main body (1).
6. A construction pipe hoisting device according to claim 5, characterized in that: A sliding head (203) is welded to the inner end of the outer plate (2), a guide rod (204) is inserted through the interior of the sliding head (203), a spring is sleeved on the exterior of the guide rod (204), and the inner end of the spring is in contact with the clamping head (206).
7. A construction pipe hoisting device according to claim 6, characterized in that: The side of the guide rod (204) is welded and fixed to the control rod (205), the control rod (205) is embedded in the side of the sliding head (203) for guiding movement, the guide rod (204) and the control rod (205) are welded and fixed to the clamping head (206), the side of the splicing piece (207) is provided with a clamping groove (208), and the clamping head (206) is inserted into the inside of the clamping groove (208).