River regulation gabion net
By adopting the cooperation of stable mechanisms and components in the river channel management gabion net, the problem of unstable connection between the existing gabion net and the ground is solved, and higher stability and practicality are achieved, ensuring the effectiveness of river channel governance.
Patent Information
- Application Number
- CN202421156204.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-25
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-05-25
AI Technical Summary
The connection stability of the existing gabion net and the ground is poor, which affects its working effect in river management.
A river channel management gabion net was designed, adopting the cooperation of a stabilizing mechanism and a stabilizing component, including components such as insertion rods, sliding rods, press plates, springs, stabilizing rods and rubber pads. It enters the ground through the insertion rods and stabilizing rods, combining bolts and The rubber pad realizes a stable connection between the gabion net and the ground.
It improves the connection stability of the gabion net and the ground, enhances its practicality and stability in river management, and ensures the effective work of the gabion net.
Smart Images

Figure CN222349582U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of river management, and specifically to a gabion mesh for river management. Background Art
[0002] Gabion mesh is one of the important construction methods in river bank protection and inland river regulation, and has unique ecological functions. Gabion mesh is a mesh structure woven from galvanized steel wire, commonly used in slope protection, embankment protection, wave protection and other projects in earth and stone engineering. Gabion mesh is characterized by high compressive strength and impact resistance, and can effectively resist the scouring and erosion of soil and stone bodies. Gabion mesh is widely used in earth and stone engineering, and common application scenarios include river bank protection, embankment slope protection, highway protection, coastal wave protection, etc.
[0003] It is found during the use of the existing gabion mesh that its connection stability with the ground is poor, thereby reducing the working effect of the gabion mesh. Therefore, a river management gabion mesh is needed to improve the above problem. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the present application provides a river management gabion mesh that achieves the connection between the gabion mesh and two first mounting plates and the ground through the cooperation of a stabilizing mechanism and a stabilizing component, thereby achieving a stable effect and having high practicality.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the present application provides the following technical solutions: A river management gabion mesh, comprising a gabion mesh, on which two first mounting plates are symmetrically fixedly installed;
[0008] Two stabilizing mechanisms are arranged on the two first mounting plates, one of which comprises an insert rod, the insert rod is screwed with the first mounting plate, a second mounting plate is fixedly mounted on the insert rod, two through holes are symmetrically provided on the insert rod, a sliding rod is slidably mounted on the insert rod, a pressure plate is fixedly mounted on the sliding rod, a first spring is fixedly mounted on the bottom end of the pressure plate, an end of the first spring away from the pressure plate is fixedly connected to the second mounting plate, the first spring is sleeved on the sliding rod, the pressure plate and the second mounting plate are connected by two bolts, a limiting plate is fixedly mounted inside the insert rod, and a plurality of stabilizing components are symmetrically arranged on the outer side wall of the sliding rod;
[0009] One of the stabilizing components also includes a stabilizing rod, which is rotatably connected to the sliding rod. A second spring is fixedly installed on the stabilizing rod, and one end of the second spring away from the stabilizing rod is fixedly connected to the sliding rod. One of the stabilizing rods is slidably connected to one of the through holes.
[0010] Preferably, two moving blocks are symmetrically fixedly mounted on each of the two first mounting plates.
[0011] Furthermore, rubber pads are provided on both pressing plates.
[0012] Furthermore, auxiliary rods are slidably mounted on the two first mounting plates.
[0013] Based on the above solution, anti-slip grooves are arranged on the outer side walls of the two second mounting plates.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, this application provides a river management gabion mesh, which has the following beneficial effects:
[0016] The river channel management gabion mesh is arranged on the ground, and each second mounting plate is rotated in sequence to allow each insertion rod to enter the ground, thereby performing a position limiting operation on the two first mounting plates and the gabion mesh, and the pressing plate is pressed downward so that the sliding rod drives a plurality of stabilizing rods to slide downward, and when two of the stabilizing rods encounter two through holes, the two stabilizing rods pass through the two through holes and extend out of the first mounting plate, and are inserted into the ground for connection, and the pressing plate and the second mounting plate are connected by two bolts, so that the sliding rod is more stable, thereby realizing the connection operation between the gabion mesh and the two first mounting plates and the ground, achieving a stable effect, and having high practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of this application;
[0018] Figure 2 This is a schematic diagram of the structure of the connection between the first mounting plate and the plug rod of the present application;
[0019] Figure 3 This is a schematic diagram of the structure of the plug rod and the through hole of this application;
[0020] Figure 4 This is a schematic diagram of the cross-sectional structure of some of the present applications.
[0021] Markings in the attached drawings: 1. Gabion mesh; 2. First mounting plate; 3. Insert rod; 4. Second mounting plate; 5. Through hole; 6. Sliding rod; 7. Pressing plate; 8. First spring; 9. Bolt; 10. Limiting plate; 11. Stabilizing rod; 12. Moving block; 13. Rubber pad; 14. Auxiliary rod. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0023] Example
[0024] See also Figure 1 A river management gabion mesh comprises a gabion mesh 1, on which two first mounting plates 2 are symmetrically fixedly installed, and the gabion mesh 1 is placed on the ground.
[0025] See also Figure 1-4 Two stabilizing mechanisms are provided on the two first mounting plates 2, one of which includes an insert rod 3, which is screwed with the first mounting plate 2, and a second mounting plate 4 is fixedly mounted on the insert rod 3. By rotating each second mounting plate 4 in turn, each insert rod 3 enters the ground, thereby limiting the two first mounting plates 2 and the gabion mesh 1. Two through holes 5 are symmetrically provided on the insert rod 3, a sliding rod 6 is slidably mounted on the insert rod 3, a pressing plate 7 is fixedly mounted on the sliding rod 6, a first spring 8 is fixedly mounted on the bottom end of the pressing plate 7, and one end of the first spring 8 away from the pressing plate 7 is fixedly connected to the second mounting plate 4, the first spring 8 is sleeved on the sliding rod 6, the pressing plate 7 and the second mounting plate 4 are connected by two bolts 9, and a limiting plate 10 is fixedly mounted in the insert rod 3.
[0026] See also Figure 4 A plurality of stabilizing components are symmetrically arranged on the outer wall of the sliding rod 6, one of which also includes a stabilizing rod 11, which is rotatably connected to the sliding rod 6, and a second spring is fixedly installed on the stabilizing rod 11, and one end of the second spring away from the stabilizing rod 11 is fixedly connected to the sliding rod 6, one of the stabilizing rods 11 is slidably connected to one of the through holes 5, and by pressing the pressing plate 7 downward, the sliding rod 6 drives the plurality of stabilizing rods 11 to slide downward, and when two of the stabilizing rods 11 encounter two of the through holes 5, the two stabilizing rods 11 pass through the two through holes 5 and extend out of the first mounting plate 2, and are inserted into the ground for connection, and the pressing plate 7 and the second mounting plate 4 are connected by two bolts 9, so that the sliding rod 6 is more stable, thereby realizing the connection operation of the gabion mesh 1 and the two first mounting plates 2 with the ground, and achieving a stable effect.
[0027] See also Figure 1 and Figure 2 Two moving blocks 12 are symmetrically fixedly installed on the two first mounting plates 2. The arrangement of multiple moving blocks 12 facilitates the movement of the gabion mesh 1.
[0028] See also Figure 1-4 The two pressure plates 7 are both provided with rubber pads 13. The provision of the two rubber pads 13 increases the friction force and prevents the hand from slipping.
[0029] See also Figure 1 and Figure 2 It should also be noted that 15 is slidably mounted on the two first mounting plates 2. Through the arrangement of the two 15, the contact between the two first mounting plates 2 and the ground is more stable.
[0030] See also Figure 1-4 The outer side walls of the two second mounting plates 4 are both provided with anti-skid patterns, and the provision of the two anti-skid patterns facilitates better rotation of the two second mounting plates 4 .
[0031] In summary, when the river management gabion mesh is in use, the gabion mesh 1 is moved to the working area by multiple moving blocks 12, the gabion mesh 1 and the two first mounting plates 2 are placed on the ground, and each second mounting plate 4 is rotated in turn to make each insertion rod 3 enter the ground, so as to limit the two first mounting plates 2 and the gabion mesh 1, and the pressing plate 7 is pressed downward and the hand is prevented from slipping by the setting of the rubber pad 13, so that the sliding rod 6 drives the multiple stabilizing rods 11 to slide downward, and when two of the stabilizing rods 11 encounter two of the through holes 5, the two stabilizing rods 11 pass through the two through holes 5 and extend out of the first mounting plate 2, and are inserted into the ground for connection, and the pressing plate 7 and the second mounting plate 4 are connected by two bolts 9, so that the sliding rod 6 is more stable, thereby realizing the connection operation of the gabion mesh 1 and the two first mounting plates 2 with the ground, and achieving a stable effect.
[0032] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A river management gabion mesh, comprising a gabion mesh (1), characterized in that: Two first mounting plates (2) are symmetrically fixedly mounted on the gabion mesh (1); Two stabilizing mechanisms are arranged on the two first mounting plates (2), one of the stabilizing mechanisms comprises an insert rod (3), the insert rod (3) is screwed with the first mounting plate (2), a second mounting plate (4) is fixedly mounted on the insert rod (3), two through holes (5) are symmetrically provided on the insert rod (3), a sliding rod (6) is slidably mounted on the insert rod (3), a pressure plate (7) is fixedly mounted on the sliding rod (6), a first spring (8) is fixedly mounted on the bottom end of the pressure plate (7), an end of the first spring (8) away from the pressure plate (7) is fixedly connected to the second mounting plate (4), the first spring (8) is sleeved on the sliding rod (6), the pressure plate (7) and the second mounting plate (4) are connected by two bolts (9), a limiting plate (10) is fixedly mounted inside the insert rod (3), and a plurality of stabilizing components are symmetrically arranged on the outer side wall of the sliding rod (6); One of the stabilizing assemblies further comprises a stabilizing rod (11), the stabilizing rod (11) being rotatably connected to the sliding rod (6), a second spring being fixedly mounted on the stabilizing rod (11), an end of the second spring away from the stabilizing rod (11) being fixedly connected to the sliding rod (6), and one of the stabilizing rods (11) being slidably connected to one of the through holes (5).
2. A river management gabion mesh according to claim 1, characterized in that: Two moving blocks (12) are symmetrically fixedly mounted on each of the two first mounting plates (2).
3. A river management gabion mesh according to claim 2, characterized in that: Rubber pads (13) are provided on both of the pressing plates (7).
4. A river management gabion mesh according to claim 3, characterized in that: Auxiliary rods (14) are slidably mounted on both of the first mounting plates (2).
5. A river management gabion mesh according to claim 4, characterized in that: Anti-slip grooves are provided on the outer side walls of the two second mounting plates (4).