Handle device and battery carrying equipment

By setting up multiple connection hole groups and jamming slots in the battery handle device, and combining the jamming connector, the connection friction between the lanyard part and the handle part is enhanced, and the problem of insolidity of the existing battery handle device is solved, and the realization of the realization of the Higher safety and stability.

CN222365663UActive Publication Date: 2025-01-17SHANGHAI PYLON TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420191383.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2025-01-17
Estimated Expiration
2034-01-25

AI Technical Summary

Technical Problem

The existing battery handle device is not firm in structure and is prone to fall off, resulting in safety hazards when handling the battery.

Method used

A handle device is designed, by providing multiple spaced connecting hole groups in the handle part, the lanyard part is arranged in the connection hole, and combining the jammed joint and the jammed joint, the connection between the lanyard part and the handle part is lifted. The friction force ensures that the lanyard is not easy to disengage.

Benefits of technology

It effectively improves the structural strength and safety of the handle device, ensures that the lanyard part is not easy to disengage during the battery handling process, and improves the safety and stability of battery handling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222365663U_ABST
    Figure CN222365663U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of battery transportation devices, in particular to a handle device and battery carrying equipment. The handle device comprises a handle part and a hanging rope part; the handle part is provided with two fixing parts which are used for fixing the two ends of the rope hanging part respectively; the fixing part comprises a connecting hole set, the connecting hole set comprises a plurality of connecting holes formed in the handle part at intervals, and the rope hanging part is arranged in the connecting holes in a coiled and penetrating mode. And the end part of the rope hanging part is connected with the handle part. According to the lifting handle device, the rope hanging part is installed on the lifting handle part in the penetrating mode through multiple times of bending deformation, and then the end of the rope hanging part is connected with the lifting handle part, so that the friction force of installation is improved. No matter which direction the hanging rope is subjected to force, the hanging rope part is not easy to separate from the handle part, so that the safety is improved when the battery is carried.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of battery transport devices, and in particular to a handle device and battery handling equipment. Background Art

[0002] As the battery capacity increases, the battery weight becomes heavier, and a handle tool is needed in the process of carrying the battery. There are two solutions on the market. One is to directly mold the handle and the shell. This method is expensive, complex in structure, and increases the size of the product. The other is to install plastic lanyard handles on both sides of the battery. This method has a simple structure, low cost, and high applicability. However, the existing plastic lanyard handle structure is not firm and is easy to fall off during use, which is prone to accidents in the process of carrying batteries. Utility Model Content

[0003] The purpose of the present application is to provide a handle device and a battery handling device, which can improve the structural strength of the handle device, avoid falling off during use, and improve the safety of handling batteries.

[0004] The present application provides a handle device, comprising a handle portion and a lanyard portion;

[0005] The handle portion is provided with two fixing portions to respectively fix the two ends of the hanging rope portion;

[0006] The fixing portion includes a connection hole group, the connection hole group includes a plurality of connection holes spaced apart from each other in the handle portion, the hanging rope portion is wound through the plurality of connection holes, and an end of the hanging rope portion is connected to the handle portion.

[0007] In the above technical solution, further, the plurality of connection holes of the connection hole group are arranged at intervals along the length direction of the handle portion, and the hanging rope portion is sequentially passed through the plurality of connection holes along the length direction of the handle portion;

[0008] The connecting hole passes through the first side and the second side of the handle; in two adjacent connecting holes, the lanyard part passes through one of the connecting holes from the first side to the second side, and passes through the other connecting hole from the second side to the first side.

[0009] In the above technical solution, further, the side of the handle portion facing the middle portion of the lanyard portion is the first side portion, and the other side of the handle portion is the second side portion;

[0010] The number of the connecting holes in the connecting hole group is an even number; from the middle to the end of the hanging rope part, the hanging rope part passes through the multiple connecting holes in sequence from the end to the middle of the handle part; the hanging rope part passes through the first connecting hole from the first side part to the second side part, and finally passes through the last connecting hole from the second side part to the first side part.

[0011] In the above technical solution, further, the fixing portion further includes a first clamping groove provided on the handle portion;

[0012] The first side portion is provided with a first clamping piece, the first clamping piece is located at one side of the connecting hole group close to the middle of the handle portion, and the first clamping piece is provided with the first clamping groove.

[0013] In the above technical solution, further, the lanyard portion includes a clamping joint and a lanyard body;

[0014] The two ends of the lanyard body are coiled and passed through the corresponding connecting holes of the fixing part in sequence;

[0015] The clamping joints are installed at both ends of the lanyard body. The clamping joints are provided with an annular groove, and the annular groove is clamped at the corresponding first clamping groove of the fixing part.

[0016] In the above technical solution, further, the fixing portion further includes a fixing hole provided on the handle portion;

[0017] The first side portion is provided with a fixing sheet, and the fixing sheet is located at a side of the first clamping sheet away from the connecting hole group;

[0018] The fixing plate is provided with the fixing hole, and the end of the clamping joint is fixed in the fixing hole.

[0019] In the above technical solution, further, the fixing portion further includes a second clamping groove provided on the handle portion;

[0020] The first side portion is provided with a second clamping piece, and the second clamping piece is located between the connection hole group and the first clamping piece; the second clamping piece is provided with the second clamping groove, and the second clamping groove is clamped with the end of the lanyard body.

[0021] In the above technical solution, further, the first side portion of the handle portion is provided with a receiving cavity, and the end of the hanging rope portion can be hidden in the receiving cavity;

[0022] A reinforcing rib is arranged in the accommodating cavity, and the reinforcing rib is arranged between two adjacent connecting holes.

[0023] In the above technical solution, further, the two fixing parts are symmetrically arranged at two ends of the handle part.

[0024] The present application also provides a battery handling device, comprising the handle device described in the above solution.

[0025] Compared with the prior art, the beneficial effects of this application are:

[0026] The handle device provided by the present application is installed on the handle by setting the hanging rope part to be bent and deformed multiple times, and then the end of the hanging rope part is connected to the handle part to improve the friction of the installation. No matter which direction the hanging rope is subjected to force, the hanging rope part is not easy to be separated from the handle part, which improves the safety when carrying the battery.

[0027] The present application also provides a battery handling device, including the handle device described in the above solution. Based on the above analysis, it can be seen that the battery handling device also has the above beneficial effects, which will not be described in detail here. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the specific implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0029] Figure 1 A first structural schematic diagram of the handle device provided in this application;

[0030] Figure 2 A second structural schematic diagram of the handle device provided in this application;

[0031] Figure 3 A third structural schematic diagram of the handle device provided in this application;

[0032] Figure 4 for Figure 3 A magnified schematic diagram of center A.

[0033] In the figure: 101-handle portion; 102-hanging rope portion; 103-connecting hole group; 104-connecting hole; 105-first side portion; 106-second side portion; 107-first snap-in plate; 108-first snap-in groove; 109-snap-in joint; 110-hanging rope body; 111-annular groove; 112-fixing plate; 113-fixing hole; 114-second snap-in plate; 115-second snap-in groove; 116-accommodating cavity; 117-reinforcing rib. DETAILED DESCRIPTION

[0034] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0035] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0036] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0037] Embodiment 1

[0038] See also Figures 1 to 4 As shown, the handle device provided in the present application can be used to carry batteries. The handle device includes a handle portion 101 and a hanging rope portion 102. Hooking protrusions are provided on both sides of the battery. Both ends of the hanging rope portion 102 are connected to the handle portion 101 so that the hanging rope portion 102 can be hooked on the hooking protrusions. The battery can be carried by holding the handle portion 101. Optionally, the handle portion 101 and the hanging rope portion 102 are made of plastic.

[0039] The handle portion 101 is provided with two fixing portions to fix the two ends of the hanging rope portion 102 respectively, so that the hanging rope portion 102 is annular, so that the hooking protrusion can be lifted. Specifically, the fixing portion includes a connection hole group 103, and the connection hole group 103 includes a plurality of connection holes 104 spaced apart in the handle portion 101. The hanging rope portion 102 is sequentially coiled and passed through the plurality of connection holes 104, and the end of the hanging rope portion 102 is connected to the handle portion 101. In other words, when the handle portion 101 and the hanging rope portion 102 are installed, the hanging rope portion 102 is first bent and deformed for multiple times and passed through the handle portion 101, and then the end of the hanging rope portion 102 is connected to the handle portion 101, which can improve the friction of the installation. No matter which direction the hanging rope is subjected to force, the hanging rope portion 102 is not easy to detach from the handle portion 101, which improves safety when carrying batteries.

[0040] Preferably, the two fixing parts are symmetrically arranged at the two ends of the handle part 101. When carrying the battery, the middle part of the handle part 101 can be grasped, and the two ends of the hanging rope part 102 are respectively connected to the two ends of the handle part 101, so that the force on the hanging rope part 102 can be more balanced, thereby improving the stability of carrying the battery.

[0041] In the optional solution of this embodiment, specifically, the handle portion 101 is in the shape of an elongated strip, the multiple connection holes 104 of the connection hole group 103 are arranged at intervals along the length direction of the handle portion 101, and the hanging rope portion 102 is sequentially passed through the multiple connection holes 104 along the length direction of the handle portion 101. Preferably, the distances between the multiple connection holes 104 of each connection hole group 103 are equal.

[0042] Furthermore, the connection hole 104 passes through the first side portion 105 and the second side portion 106 of the handle portion 101. In two adjacent connection holes 104, the hanging rope portion 102 passes through one of the connection holes 104 from the first side portion 105 to the second side, and passes through the other connection hole 104 from the second side portion 106 to the first side portion 105. In other words, the hanging rope portion 102 is sequentially passed through each connection hole 104 along the length direction of the handle portion 101, and in two adjacent connection holes 104, the passing directions of the hanging rope portion 102 are opposite.

[0043] Optionally, there are two ways to thread the hanging rope 102: the first is to thread the hanging rope 102 through a plurality of connection holes 104 in sequence from both ends of the handle 101 to the middle, and the second is to thread the hanging rope 102 through a plurality of connection holes 104 in sequence from the middle of the handle 101 to both ends. Figure 1 As shown, the preferred solution is the first threading method, which increases the distance between the two ends of the hanging rope part 102. When the hanging rope part 102 naturally droops due to gravity, the range surrounded by the hanging rope part 102 is larger, thereby facilitating the hanging rope part 102 to be put on the hooking protrusions on both sides of the battery.

[0044] In an optional scheme of this embodiment, the side of the handle portion 101 facing the middle of the lanyard portion 102 is the first side portion 105, and the other side of the handle portion 101 is the second side portion 106; the number of connecting holes 104 in the connecting hole group 103 is an even number; from the middle to the end of the lanyard portion 102, the lanyard portion 102 passes through the multiple connecting holes 104 in sequence from the end to the middle of the handle portion 101; the lanyard portion 102 passes through the first connecting hole 104 from the first side portion 105 to the second side portion 106, and finally passes through the last connecting hole 104 from the second side portion 106 to the first side portion 105.

[0045] In this embodiment, when the end of the hanging rope part 102 is connected to the multiple connection holes 104, the direction in which the hanging rope part 102 passes through the first connection hole 104 determines the position of the middle part of the hanging rope part 102. The present application defines that the number of connection holes 104 is an even number. Under this premise, the hanging rope part 102 is passed through the first connection hole 104 from the first side part 105 to the second side part 106. After multiple passes, the end of the hanging rope part 102 can finally pass back to the first side part 105, and the end of the hanging rope part 102 cannot be seen from the second side part 106. When holding the handle part 101, the second side part 106 faces upward, and the middle part of the hanging rope part 102 located on the first side part 105 faces downward and is connected to the hooking protrusion. The end of the hanging rope part 102 is hidden in the first side part 105, which can make the appearance of the handle device more beautiful.

[0046] like Figure 1 and Figure 2 As shown, each fixing portion shown in the figure is provided with two connection holes 104, so that the hanging rope portion 102 is bent twice at the connection hole group 103. The present application is not limited to the two connection holes 104 structure shown in the figure, and four, six, etc. connection holes 104 can also be provided according to actual conditions, and the hanging rope portion 102 can be bent accordingly.

[0047] In an optional solution of this embodiment, the fixing portion further includes a first clamping groove 108 provided on the handle portion 101. Specifically, the first side portion 105 is provided with a first clamping piece 107, and the first clamping piece 107 is vertically connected to the surface of the first side portion 105. The first clamping piece 107 is located on one side of the connection hole group 103 close to the middle of the handle portion 101, and the first clamping piece 107 is provided with a first clamping groove 108. After the lanyard portion 102 is passed through the connection hole group 103, the end of the lanyard portion 102 can be pulled toward the middle of the handle portion 101 to clamp the end of the lanyard portion 102 with the first clamping groove 108. When the lanyard portion 102 is subjected to force, the lanyard portion 102 will be clamped by the first clamping groove 108, so that the lanyard portion 102 cannot fall off from the handle portion 101.

[0048] In the optional solution of this embodiment, specifically, the hanging rope part 102 includes a clamping joint 109 and a hanging rope body 110. The hanging rope body 110 is relatively soft and thinner than the clamping joint 109, so that the two ends of the hanging rope body 110 can be coiled and passed through the corresponding multiple connection holes 104 of the fixed part in sequence. The clamping joints 109 are installed at both ends of the hanging rope body 110. The clamping joints 109 are thicker and have higher strength. The annular groove 111 is provided on the clamping joint 109 and does not affect the strength. The annular groove 111 is used to clamp at the first clamping groove 108 of the corresponding fixed part, so that the connection between the clamping joint 109 and the first clamping groove 108 is more reliable.

[0049] In an optional solution of this embodiment, in order to further improve the reliability of the connection between the hanging rope part 102 and the handle part 101, the fixing part further includes a fixing hole 113 provided on the handle part 101. Specifically, the first side part 105 is provided with a fixing sheet 112, and the fixing sheet 112 is vertically connected to the surface of the first side part 105. The fixing sheet 112 is located on the side of the first clamping sheet 107 away from the connection hole group 103; the fixing sheet 112 is provided with a fixing hole 113, and the end of the clamping joint 109 is fixed to the fixing hole 113. Optionally, the end of the clamping joint 109 is interference fit with the fixing hole 113, so that the hanging rope part 102 is not easy to be separated from the handle part 101.

[0050] In an optional solution of this embodiment, the fixing portion further includes a second snap-fitting groove 115 disposed on the handle portion 101. Specifically, the first side portion 105 is provided with a plurality of second snap-fitting pieces 114 disposed at intervals, and the second snap-fitting pieces 114 are vertically connected to the surface of the first side portion 105. Figure 3 and Figure 4 As shown in the figure, two second snap-in plates 114 are shown, and the two second snap-in plates 114 are both located between the connecting hole group 103 and the first snap-in plate 107. The second snap-in plate 114 is provided with a second snap-in groove 115, and the second snap-in groove 115 is used to snap-in with the end of the lanyard body 110 to fix the end of the lanyard body 110, and also make the end position of the lanyard body 110 more neat.

[0051] When the hanging rope part 102 of the present application is installed with the handle part 101, the two ends of the hanging rope part 102 are firstly penetrated with a plurality of connection holes 104 in sequence. Since the clamping joint 109 of the hanging rope part 102 and the hanging rope body 110 both have a certain elasticity, the end of the clamping joint 109 of the hanging rope part 102 can be inserted into the fixing hole 113 of the fixing plate 112, and then the clamping joint 109 is clamped into the first clamping groove 108 from the notch of the first clamping groove 108, so that the annular groove 111 is clamped with the first clamping groove 108; the hanging rope body 110 is clamped into the second clamping groove 115 from the notch of the second clamping groove 115, thereby completing the installation.

[0052] Embodiment 2

[0053] The handle device in the second embodiment is an improvement on the above embodiment, and the technical contents disclosed in the above embodiment will not be described repeatedly, and the contents disclosed in the above embodiment also belong to the contents disclosed in the second embodiment.

[0054] See also Figure 3 As shown, in an optional solution of this embodiment, the first side portion 105 of the handle portion 101 is provided with a housing cavity 116, and the housing cavity 116 is provided with a first clamping piece 107, a second clamping piece 114 and a fixing piece 112. When the end of the hanging rope portion 102 is fixed, the end of the hanging rope portion 102 can be hidden and installed in the housing cavity 116, so that the appearance of the handle device is more neat and beautiful. A reinforcing rib 117 is also provided in the housing cavity 116. Specifically, a reinforcing rib 117 is provided between two adjacent connecting holes 104. When the hanging rope portion 102 is twisted and passed through a plurality of connecting holes 104, the position between the connecting holes 104 of the handle portion 101 is stressed. The provision of the reinforcing rib 117 can increase the strength of this position and improve the overall stability of the device.

[0055] Embodiment 3

[0056] Embodiment 3 of the present application provides a battery transport device, including the handle device of any of the above embodiments, and thus has all the beneficial technical effects of the handle device of any of the above embodiments, which will not be repeated here.

[0057] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them; although the present application is described in detail with reference to the above embodiments, a person skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some or all of the technical features can be replaced by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application. In addition, a person skilled in the art can understand that although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments means being within the scope of the present application and forming different embodiments.

Claims

1. A handle device, characterized in that: Including a handle portion and a lanyard portion; The handle portion is provided with two fixing portions to fix the two ends of the hanging rope portion respectively; The fixing portion includes a connection hole group, the connection hole group includes a plurality of connection holes spaced apart from each other in the handle portion, the hanging rope portion is wound through the plurality of connection holes, and an end of the hanging rope portion is connected to the handle portion.

2. The handle device according to claim 1, characterized in that: The plurality of connection holes of the connection hole group are arranged at intervals along the length direction of the handle portion, and the hanging rope portion is sequentially passed through the plurality of connection holes along the length direction of the handle portion; The connecting hole passes through the first side and the second side of the handle; in two adjacent connecting holes, the lanyard part passes through one of the connecting holes from the first side to the second side, and passes through the other connecting hole from the second side to the first side.

3. The handle device according to claim 2, characterized in that: The side of the handle portion facing the middle portion of the lanyard portion is the first side portion, and the other side of the handle portion is the second side portion; The number of the connecting holes in the connecting hole group is an even number; from the middle to the end of the hanging rope part, the hanging rope part passes through the multiple connecting holes in sequence from the end to the middle of the handle part; the hanging rope part passes through the first connecting hole from the first side part to the second side part, and finally passes through the last connecting hole from the second side part to the first side part.

4. The handle device according to claim 3, characterized in that: The fixing portion further comprises a first clamping groove arranged on the handle portion; The first side portion is provided with a first clamping piece, the first clamping piece is located at one side of the connecting hole group close to the middle of the handle portion, and the first clamping piece is provided with the first clamping groove.

5. The handle device according to claim 4, characterized in that: The lanyard portion includes a clamping joint and a lanyard body; The two ends of the lanyard body are coiled and passed through the corresponding connecting holes of the fixing part in sequence; The clamping joints are installed at both ends of the lanyard body. The clamping joints are provided with an annular groove, and the annular groove is clamped at the corresponding first clamping groove of the fixing part.

6. The handle device according to claim 5, characterized in that: The fixing portion further comprises a fixing hole arranged on the handle portion; The first side portion is provided with a fixing sheet, and the fixing sheet is located at a side of the first clamping sheet away from the connecting hole group; The fixing plate is provided with the fixing hole, and the end of the clamping joint is fixed in the fixing hole.

7. The handle device according to claim 5, characterized in that: The fixing portion further comprises a second clamping groove arranged on the handle portion; The first side portion is provided with a second clamping piece, and the second clamping piece is located between the connection hole group and the first clamping piece; the second clamping piece is provided with the second clamping groove, and the second clamping groove is clamped with the end of the lanyard body.

8. The handle device according to claim 3, characterized in that: The first side portion of the handle portion is provided with a receiving cavity, and the end of the hanging rope portion can be hidden in the receiving cavity; A reinforcing rib is arranged in the accommodating cavity, and the reinforcing rib is arranged between two adjacent connecting holes.

9. The handle device according to claim 1, characterized in that: The two fixing parts are symmetrically arranged at two ends of the handle part.

10. A battery handling device, characterized in that: Comprising a handle arrangement as claimed in any one of claims 1 to 9.