Reinforcing structure for embankment top pavement

By adopting the combined structure of the main reinforcement mechanism and the side reinforcement mechanism on the dyke road surface, the embankment road surface sedimentation, cracking, or collapse of the dyke top road surface is solved, and the effect of improving the intensity and stability of the pavement.

CN222390157UActive Publication Date: 2025-01-24HUBEI ZHIHONG WATER CONSERVANCY & HYDROPOWER DESIGN CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420284730.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2025-01-24
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

The pavement surface on the top of the embankment may be due to the instability of the foundation, such as loose or collapse of the soil, resulting in settlement, cracking or instability, and then collapse easily after use or being impacted by floods.

Method used

A kind of dyke road surface reinforcement structure is adopted, including the main reinforcement mechanism and the side reinforcement mechanism. The main reinforcement institution enhances the intensity of pavement foundation and prevent water penetration through the combination of the first and second reinforcement layers, enhanced columns, connection layers, anti -seepage layers, and road surface layers. The side reinforcement mechanism increases the stabilization of the embankment through the vertical and horizontal reinforcement bars to increase the side support capacity and stability of the embankment.

Benefits of technology

It effectively improves the strength of the embankment top pavement foundation, prevents lateral sliding and collapse, improves the overall safety and stability, and avoids structural instability caused by loose soil or water erosion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390157U_ABST
    Figure CN222390157U_ABST
Patent Text Reader

Abstract

The utility model relates to an embankment top pavement reinforcing structure which comprises a foundation, an embankment body is arranged on the upper side of the foundation, the upper surface of the embankment body is partially lost to form an opening, and a main reinforcing mechanism for improving the strength of the embankment top pavement is arranged in the opening. Lateral reinforcing mechanisms for assisting in improving the strength of the road surface of the levee top are arranged on the left side and the right side of the levee body. According to the embankment top pavement reinforcing structure, firstly, the main reinforcing structure is adopted, and the first reinforcing layer and the second reinforcing layer are subjected to multiple positioning through the first reinforcing columns and the second reinforcing columns correspondingly, so that a pavement base layer and a subbase layer structure of a pavement can effectively support a pavement surface layer, sliding is not prone to occurring, and the strength of a pavement foundation is effectively improved; meanwhile, the anti-seepage layer and the drainage groove are matched, so that water is effectively prevented from permeating into roadbed soil, the soil body below is further prevented from being eroded by the water, and the soil body is prevented from loosening, losing and possibly causing unstable structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of embankment top road surface reinforcement, in particular to an embankment top road surface reinforcement structure. Background Art

[0002] The embankment pavement refers to the pavement structure laid on the embankment surface during the embankment construction project. Its main function is to provide road access, increase the stability of the embankment, and prevent soil erosion. The selection and design of the embankment pavement usually need to consider many factors, including traffic load, soil characteristics, environmental conditions, engineering economy, etc.

[0003] A dike top walkway structure is disclosed in Chinese patent CN212834849U, including a pedestrian walkway arranged on the dike top, the pedestrian walkway including a road surface and curbs fixed on both sides of the road surface in the width direction, the road surface including a first road surface located in the upstream section and a second road surface located in the downstream section. The utility model arranges two different road surfaces to adapt to the actual conditions of different river sections, improve the overall performance, and enhance the versatility of the pedestrian walkway. However, the establishment of the walkway structure cannot guarantee the stability of the entire dike top. The dike top road surface may face various problems, the most important of which is foundation instability. If the foundation of the dike is unstable, for example, there is loose soil or collapse, it may cause the dike top road surface to sink, crack or become unstable. Therefore, the dike top walkway structure in the above application is prone to collapse after being used for a long time or being impacted by floods. Utility Model Content

[0004] In response to the shortcomings of the prior art, the utility model provides a levee pavement reinforcement structure with the advantages of high strength, etc., which solves the problem that loose or collapsed soil may cause the levee pavement to sink, crack or become unstable. Therefore, the levee pavement structure in the above application is prone to collapse after being used for a long time or being impacted by floods.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a levee top road surface reinforcement structure, comprising a foundation, a levee body is provided on the upper side of the foundation, a portion of the upper surface of the levee body is missing to form an opening, and a main reinforcement mechanism for improving the strength of the levee top road surface is provided in the opening, and side reinforcement mechanisms for auxiliary improvement of the strength of the levee top road surface are provided on both the left and right sides of the levee body;

[0006] Among them, the main reinforcement mechanism includes a first reinforcement layer, a first reinforcement column, a connecting layer, a second reinforcement layer, a second reinforcement column, an anti-seepage layer and a road surface layer. The first reinforcement layer is fixed at the bottom wall of the opening, and one end of the first reinforcement column penetrates the first reinforcement layer and extends into the embankment. The connecting layer is fixed to the upper surface of the first reinforcement layer, and the second reinforcement layer is fixed to the side of the connecting layer away from the first reinforcement layer. One end of the second reinforcement column penetrates the second reinforcement layer, the connecting layer and the first reinforcement layer in sequence and extends into the embankment. The anti-seepage layer and the road surface layer are fixed to the second reinforcement layer in sequence from bottom to top.

[0007] Furthermore, the first reinforcement layer and the second reinforcement layer are a gravel layer and a crushed stone layer respectively, and the connection layer is a concrete layer.

[0008] Furthermore, the anti-seepage layer is a composite layer, which includes a high-density polyethylene film layer, a cement slurry wall layer and a geomembrane layer, and the high-density polyethylene film layer and the geomembrane layer are respectively arranged on the upper and lower sides of the cement slurry wall layer.

[0009] Furthermore, drainage grooves are provided on the upper surface of the embankment and on both sides of the opening, a drainage pipe is connected to the bottom of the drainage groove, a filter screen is provided in the drainage groove, and a connecting pipe is connected between the drainage groove and the anti-seepage layer.

[0010] Furthermore, the side reinforcement mechanism includes a number of equidistantly distributed and inclined longitudinal reinforcement ribs fixed on both sides of the embankment body, the outer side of the longitudinal reinforcement ribs is provided with a stabilizing frame a fixed to both sides of the embankment body by bolts, transverse reinforcement ribs are placed inside the stabilizing frame a, and the outer side of the transverse reinforcement ribs is provided with a stabilizing frame b fixed to both sides of the embankment body.

[0011] Furthermore, the number of the transverse reinforcement ribs and the longitudinal reinforcement ribs is no less than two, and the two are staggered at 90 degrees, and the angle of the longitudinal reinforcement ribs is parallel to the slope of both sides of the embankment.

[0012] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0013] 1. The embankment road reinforcement structure first adopts the main reinforcement structure, and uses the first reinforcement column and the second reinforcement column to perform multiple positioning on the first reinforcement layer and the second reinforcement layer respectively, so that the base layer and the subbase structure of the road surface can effectively support the road surface layer and are not easy to slide, which effectively improves the strength of the road foundation, which is crucial to the entire road structure. At the same time, the anti-seepage layer and the cooperation between the drainage ditch are adopted to effectively prevent moisture from penetrating into the roadbed soil, further protect the underlying soil from moisture erosion, prevent soil loosening, loss and possible structural instability, thereby effectively ensuring the high strength of the ground.

[0014] 2. The embankment top road surface reinforcement structure fixes the longitudinal reinforcement ribs and the transverse reinforcement ribs on the stabilizing frame a and the stabilizing frame b respectively, and the longitudinal reinforcement ribs and the transverse reinforcement ribs are vertically staggered to increase the lateral support capacity and stability of the embankment. This method can effectively prevent lateral sliding and collapse of the embankment top road surface and improve its overall safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the main reinforcement mechanism of the utility model;

[0017] Figure 3 This is a schematic diagram of the side reinforcement mechanism of the utility model;

[0018] Figure 4 It is a side view of the side reinforcement mechanism of the utility model.

[0019] In the figure: 1 foundation, 2 embankment, 3 main reinforcement mechanism, 301 first reinforcement layer, 302 first reinforcement column, 303 connection layer, 304 second reinforcement layer, 305 second reinforcement column, 306 anti-seepage layer, 307 road surface layer, 4 side reinforcement mechanism, 401 longitudinal reinforcement ribs, 402 stabilizing frame a, 403 transverse reinforcement ribs, 404 stabilizing frame b, 5 drainage trough, 6 drainage pipe, 7 filter retaining net, 8 connecting pipe. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1 A levee top pavement reinforcement structure in this embodiment includes a foundation 1, a levee body 2 is provided on the upper side of the foundation 1, a portion of the upper surface of the levee body 2 is missing to form an opening, and a main reinforcement mechanism 3 for improving the strength of the levee top pavement is provided in the opening, and side reinforcement mechanisms 4 for auxiliary improving the strength of the levee top pavement are provided on the left and right sides of the levee body 2.

[0022] Drainage grooves 5 are provided on the upper surface of the embankment body 2 and on both sides of the opening. The bottom of the drainage groove 5 is connected to a drainage pipe 6. A filter screen 7 is provided in the drainage groove 5. A connecting pipe 8 is connected between the drainage groove 5 and the anti-seepage layer 306.

[0023] Among them, installing the filter screen 7 in the drainage trough 5 can effectively filter impurities and avoid clogging and collapse of the drainage system.

[0024] See also Figure 2 In order to improve the stability of the road surface, the main reinforcement mechanism 3 in this embodiment includes a first reinforcement layer 301, a first reinforcement column 302, a connection layer 303, a second reinforcement layer 304, a second reinforcement column 305, an anti-seepage layer 306 and a road surface layer 307. The first reinforcement layer 301 is fixed to the bottom wall of the opening, and one end of the first reinforcement column 302 penetrates the first reinforcement layer 301 and extends into the embankment body 2. The connection layer 303 is fixed to the upper surface of the first reinforcement layer 301, and the second reinforcement layer 304 is fixed to the side of the connection layer 303 away from the first reinforcement layer 301. One end of the second reinforcement column 305 penetrates the second reinforcement layer 304, the connection layer 303 and the first reinforcement layer 301 in sequence and extends into the embankment body 2. The anti-seepage layer 306 and the road surface layer 307 are fixed to the second reinforcement layer 304 from bottom to top in sequence.

[0025] In this embodiment, the first reinforcement layer 301 and the second reinforcement layer 304 are respectively a gravel layer and a crushed stone layer, and the connecting layer 303 is a concrete layer. After an opening is formed on the upper surface of the embankment 2, the first reinforcement layer 301, the connecting layer 303, the second reinforcement layer 304, the anti-seepage layer 306 and the road surface layer 307 are laid in the opening in sequence, and are used to disperse the load and stabilize the road surface, while preventing moisture from penetrating into the roadbed soil.

[0026] It should be noted that the anti-seepage layer 306 is a composite layer, which includes a high-density polyethylene film layer, a cement slurry wall layer and a geomembrane layer, and the high-density polyethylene film layer and the geomembrane layer are respectively arranged on the upper and lower sides of the cement slurry wall layer, and the anti-seepage layer 306 includes a high-density polyethylene film layer, a cement slurry wall layer and a geomembrane layer, and the cooperation between the three can effectively block moisture and avoid moisture penetration, and the cooperation between the anti-seepage layer 306 and the drainage ditch 5 can effectively prevent moisture from penetrating into the roadbed soil.

[0027] The first reinforcement column 302 and the second reinforcement column 305 are used to perform multiple positioning on the first reinforcement layer 301 and the second reinforcement layer 304 respectively, so that the base layer and the subbase structure of the road surface can effectively support the road surface layer 307 and are not easy to slide.

[0028] Among them, the main reinforcement structure is firstly adopted, and the first reinforcement column 302 and the second reinforcement column 305 are used to perform multiple positioning on the first reinforcement layer 301 and the second reinforcement layer 304 respectively, so that the base layer and the subbase structure of the road surface can effectively support the road surface layer 307 and are not easy to slide, which effectively improves the strength of the road foundation, which is crucial to the entire road surface structure. At the same time, the anti-seepage layer 306 and the cooperation between the drainage ditch 5 are adopted to effectively prevent moisture from penetrating into the roadbed soil, further protect the underlying soil from moisture erosion, prevent soil loosening, loss and possible structural instability, thereby effectively ensuring the high strength of the ground.

[0029] See also Figure 3-4 In order to further improve the stability of the road surface, the side reinforcement mechanism 4 in this embodiment includes a plurality of equally spaced and inclined longitudinal reinforcement ribs 401 fixed on both sides of the embankment body 2, and the outer side of the longitudinal reinforcement ribs 401 is provided with a stabilizing frame a402 fixed to both sides of the embankment body 2 by bolts, and a transverse reinforcement rib 403 is placed inside the stabilizing frame a402, and the outer side of the transverse reinforcement rib 403 is provided with a stabilizing frame b404 fixed to both sides of the embankment body 2, and the longitudinal reinforcement ribs 401 and the transverse reinforcement ribs 403 are fixed by the stabilizing frames a402 and b404 respectively, and the longitudinal reinforcement ribs 401 and the transverse reinforcement ribs 403 are vertically staggered to increase the lateral support capacity and stability of the embankment body 2.

[0030] In this embodiment, the number of transverse reinforcing ribs 403 and longitudinal reinforcing ribs 401 is no less than two, and the two are staggered at 90 degrees. The angle of the longitudinal reinforcing ribs 401 is parallel to the slope of both sides of the embankment body 2. The longitudinal reinforcing ribs 401 are positioned by the stabilizing frame a402, and the transverse reinforcing ribs 403 can be placed in the stabilizing frame a402 again and positioned by the stabilizing frame b404, so that the two are positioned relative to each other to ensure the stability of the side protection of the embankment body 2. This method can effectively prevent lateral sliding and collapse of the embankment top road surface and improve its overall safety.

[0031] It should be noted that the longitudinal reinforcement ribs 401 and the transverse reinforcement ribs 403 are fixed on the stabilizing frame a402 and the stabilizing frame b404 respectively, and the longitudinal reinforcement ribs 401 and the transverse reinforcement ribs 403 are vertically staggered to increase the lateral support capacity and stability of the embankment 2. This method can effectively prevent lateral sliding and collapse of the embankment top road surface and improve its overall safety.

[0032] The working principle of the above embodiment is:

[0033] (1) After an opening is formed on the upper surface of the embankment 2, the first reinforcement layer 301, the connecting layer 303, the second reinforcement layer 304, the anti-seepage layer 306 and the road surface layer 307 are laid in sequence in the opening to disperse the load and stabilize the road surface, while preventing water from penetrating into the roadbed soil. In order to further ensure the strength and stability of the road surface, the first reinforcement column 302 and the second reinforcement column 305 are used to perform multiple positioning on the first reinforcement layer 301 and the second reinforcement layer 304, respectively, so that the base layer and the subbase structure of the road surface can be positioned on the road surface layer 307. It provides effective support and is not easy to slide, which effectively improves the strength of the road foundation and is crucial to the entire road structure. The anti-seepage layer 306 includes a high-density polyethylene film layer, a cement slurry wall layer and a geomembrane layer, and the cooperation between the three can effectively block moisture and prevent moisture penetration. The cooperation between the anti-seepage layer 306 and the drainage ditch 5 can effectively prevent moisture from penetrating into the roadbed soil, further protect the underlying soil from moisture erosion, prevent soil loosening, loss and possible structural instability, thereby effectively ensuring the high strength of the ground.

[0034] (2) The longitudinal reinforcing ribs 401 and the transverse reinforcing ribs 403 are fixed on the stabilizing frame a402 and the stabilizing frame b404 respectively, and the longitudinal reinforcing ribs 401 and the transverse reinforcing ribs 403 are vertically staggered to increase the lateral support capacity and stability of the embankment 2. The longitudinal reinforcing ribs 401 are positioned by the stabilizing frame a402, and the transverse reinforcing ribs 403 can be placed in the stabilizing frame a402 again and positioned by the stabilizing frame b404, so that the two are positioned relative to each other to ensure the stability of the side protection of the embankment 2. This method can effectively prevent lateral sliding and collapse of the embankment top road surface and improve its overall safety.

[0035] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0036] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention.

Claims

1. A levee top road reinforcement structure, comprising a foundation (1), characterized in that: An embankment body (2) is provided on the upper side of the foundation (1), a portion of the upper surface of the embankment body (2) is missing to form an opening, and a main reinforcement mechanism (3) for improving the strength of the embankment top road surface is provided in the opening, and side reinforcement mechanisms (4) for auxiliary improvement of the strength of the embankment top road surface are provided on both the left and right sides of the embankment body (2); The main reinforcement mechanism (3) comprises a first reinforcement layer (301), a first reinforcement column (302), a connection layer (303), a second reinforcement layer (304), a second reinforcement column (305), an anti-seepage layer (306) and a road surface layer (307), wherein the first reinforcement layer (301) is fixed to the bottom wall of the opening, and one end of the first reinforcement column (302) passes through the first reinforcement layer (301) and extends into the embankment (2), and the connection layer (303) is fixed to the bottom wall of the opening. The second reinforcement column (305) is fixed on the upper surface of the first reinforcement layer (301), the second reinforcement layer (304) is fixed to the side of the connection layer (303) away from the first reinforcement layer (301), one end of the second reinforcement column (305) passes through the second reinforcement layer (304), the connection layer (303) and the first reinforcement layer (301) in sequence and extends into the embankment (2), and the anti-seepage layer (306) and the road surface layer (307) are fixed to the second reinforcement layer (304) in sequence from bottom to top.

2. The embankment top road reinforcement structure according to claim 1, characterized in that: The first reinforcement layer (301) and the second reinforcement layer (304) are respectively a gravel layer and a crushed stone layer, and the connection layer (303) is a concrete layer.

3. The embankment top road reinforcement structure according to claim 1, characterized in that: The anti-seepage layer (306) is a composite layer, which includes a high-density polyethylene film layer, a cement slurry wall layer and a geomembrane layer, and the high-density polyethylene film layer and the geomembrane layer are respectively arranged on the upper and lower sides of the cement slurry wall layer.

4. The embankment top road reinforcement structure according to claim 1, characterized in that: Drainage grooves (5) are provided on the upper surface of the embankment body (2) and on both sides of the opening. The bottom end of the drainage groove (5) is connected to a drainage pipe (6). A filter screen (7) is provided in the drainage groove (5). A connecting pipe (8) is connected between the drainage groove (5) and the anti-seepage layer (306).

5. The embankment top road reinforcement structure according to claim 1, characterized in that: The side reinforcement mechanism (4) comprises a plurality of longitudinal reinforcement ribs (401) fixed to both sides of the embankment body (2) and distributed at equal intervals and in an inclined shape, the outer side of the longitudinal reinforcement ribs (401) is provided with a stabilizing frame a (402) fixed to both sides of the embankment body (2) by bolts, the interior of the stabilizing frame a (402) is provided with a transverse reinforcement rib (403), and the outer side of the transverse reinforcement rib (403) is provided with a stabilizing frame b (404) fixed to both sides of the embankment body (2) by bolts.

6. The embankment top road surface reinforcement structure according to claim 5, characterized in that: The number of the transverse reinforcing ribs (403) and the longitudinal reinforcing ribs (401) is no less than two, and the two are staggered at 90 degrees, and the angle of the longitudinal reinforcing ribs (401) is parallel to the slopes of both sides of the embankment (2).

Citation Information

Patent Citations

  • Dike top footpath structure

    CN212834849U