Tunnel construction rack structure

By designing a tunnel construction bench structure with troughs and protective components, the problem of impurities and construction materials falling in the existing bench structure is solved, and the guarantee of normal processing and the practicality of protective components are achieved.

CN222436372UActive Publication Date: 2025-02-07JINAN HAIHE CONSTR PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420902916.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2025-02-07
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

In use, the existing tunnel construction bench structure has a spacing between the layered structures on both sides of the bench and the inner wall of the tunnel, impurities and construction materials on the upper side frame are easily dropped to the lower side frame, affecting normal processing.

Method used

A tunnel construction bench structure is designed, including the main frame, two sets of side frames and protective components. The end of the side frame facing away from the main frame is provided with a through groove. The protective component is composed of a baffle and a limiting member. The baffle is movably arranged in the through groove. The limiting member and the side frame are locked and the baffle are pulled out by pulling out the baffle. To prevent impurities from falling off.

Benefits of technology

It effectively avoids impurities and construction materials on the upper side frame falling to the lower side frame, ensuring a normal processing process. At the same time, the protective components are simple in structure, convenient for processing and manufacturing, and have strong practicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222436372U_ABST
    Figure CN222436372U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel construction rack structure which comprises a main frame. The two sets of side frames are welded to the two sides of the main frame, each set of side frames comprises at least two side frames, the lengths of the two side frames are different, and through grooves are formed in the ends, away from the direction of the main frame, of the side frames; the protection assembly is composed of a baffle and limiting pieces, the baffle is movably arranged in the through groove, the limiting pieces are located on the upper end face and the lower end face of the two ends of the baffle respectively, and the limiting pieces and the side frames are clamped in a limiting mode; by means of the designed protection assembly, the distance between the side frame and the tunnel can be covered, impurities on the upper-layer side frame are prevented from falling onto the lower-layer side frame, meanwhile, the protection assembly is simple in structure, convenient to machine and manufacture and high in overall practicability, buffering protection can be achieved in the pulling protection assembly, and the service life of the tunnel is prolonged. And the problem that fingers of workers are pinched due to too high pulling speed is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel construction, and in particular relates to a tunnel construction bench structure. Background Art

[0002] Tunnels can be divided into traffic tunnels, hydraulic tunnels, municipal tunnels, and mining tunnels. When constructing tunnels, a gantry is needed to provide an operating platform for workers to build the tunnels. In order to facilitate use, the gantry can generally be moved.

[0003] The two sides of the existing gantry structure will extend in layers toward the inside of the tunnel, and the extended area will appear in different lengths due to the shape of the tunnel, so as to get close to the curved surface inside the tunnel and carry out subsequent processing. However, during processing, due to the distance between the layered structures on both sides of the gantry structure and the inner wall of the tunnel, during processing, impurities, construction materials, etc. on the side frame in the upper position will fall onto the lower side frame, thereby affecting the normal processing at the bottom position. Therefore, there are great limitations in actual use and there is room for improvement. Utility Model Content

[0004] The utility model aims to provide a tunnel construction platform structure to solve the problem that in the existing platform structure proposed in the above background technology, impurities on the upper side frame fall to the lower side frame during use, thus affecting normal processing.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a tunnel construction platform structure, including a main frame; two groups of side frames are arranged and welded on both sides of the main frame, each group of side frames is provided with at least two side frames, and the lengths of the two side frames are unequal, and a through groove is opened at the end of the side frame away from the main frame; a protective component, composed of a baffle and a limiter, wherein the baffle is movably arranged in the through groove, and the limiter is respectively located at the upper and lower end surfaces of the two ends of the baffle, and the limiter is locked with the side frame. During processing, the baffle in the side frame at the top position is pulled out, so as to protect the workers on the bottom side frame.

[0006] Preferably, the limiting member includes a toggle plate fixed on the top of one end of the baffle, a rubber block is bonded to the inside of the toggle plate, and the toggle plate is located outside the side frame. During protection, the baffle is pulled out of the through groove by the toggle plate and protection is performed.

[0007] Preferably, a screw hole is provided at one end of the baffle plate facing the side frame, and the limiting member also includes a limiting bolt screwed into the screw hole, which abuts against the interior of the side frame to prevent the baffle plate from being completely pulled out of the through groove. At the same time, this structure can also ensure the normal installation of the baffle plate in the early stage.

[0008] Preferably, the side frame is formed by welding a plurality of square tubes, and the limiting bolts and the rubber blocks are respectively abutted against the inner and outer surfaces of one of the square tubes of the side frame.

[0009] Preferably, a protective cloth is also provided on the bottom end surface of the side frame, and a magnet is bonded to the protective cloth (not shown in the figure). The protective cloth is adsorbed on the side frame by the magnet. During use, the protective cloth is used to protect the upper unknown side frame to prevent dust from falling and affecting the workers on the lower side frame.

[0010] Preferably, a placement plate is installed on the main frame and the side frame. During operation, the staff will stand on the placement plate. A side diagonal brace is welded between each side frame and the main frame, a main diagonal brace is welded on the inner side of the main frame, and walking wheels are also installed on the bottom end of the main frame.

[0011] Preferably, an external ladder is installed on the rear surface of the plurality of side frames, and the external ladder is welded and fixed to all the side frames.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The designed protective component can cover the gap between the measuring frame and the tunnel to prevent impurities on the upper side frame from falling onto the lower side frame. At the same time, the protective component has a simple structure, is easy to process and manufacture, and has strong overall practicality. At the same time, in the pull-out protective component, buffer protection can also be performed to avoid the problem of pinching the fingers of workers due to excessive pulling speed. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 It is a rear view of the utility model;

[0016] Figure 3 It is a bottom view of the utility model;

[0017] Figure 4 This is a bottom view of the utility model with the protective cloth removed;

[0018] Figure 5 It is a structural schematic diagram of the protective component of the utility model.

[0019] In the figure:

[0020] 100, main frame; 101, running wheels; 102, main diagonal brace; 103, external escalator;

[0021] 200, side frame; 200a, through slot; 201, side brace; 202, baffle; 202a, screw hole; 203, toggle plate; 204, protective cloth; 205, limit bolt; 207, rubber block;

[0022] 300. Place the board. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figures 1 to 5 The utility model provides a technical solution: a tunnel construction platform structure, including

[0025] Main frame 100;

[0026] The side frames 200 are provided in two groups and are welded to both sides of the main frame 100. Each group of side frames 200 is provided with at least two, and the lengths of the two side frames 200 are different. A through groove 200a is provided at the end of the side frame 200 away from the main frame 100;

[0027] The protection component is composed of a baffle 202 and a limit piece, wherein the baffle 202 is movably arranged in the through groove 200a, and the limit pieces are respectively located at the upper and lower end surfaces at both ends of the baffle 202. The limit pieces are limited and locked with the side frame 200. During processing, the baffle 202 in the side frame 200 at the top position is pulled out, thereby protecting the staff on the bottom side frame 200.

[0028] In this embodiment, preferably, the limiting member includes a toggle plate 203 fixed on the top of one end of the baffle 202, and a rubber block 207 is bonded to the inside of the toggle plate 203. The toggle plate 203 is located outside the side frame 200. During protection, the baffle 202 is pulled out of the through groove 200a through the toggle plate 203 for protection.

[0029] In this embodiment, preferably, a screw hole 202a is provided at one end of the baffle 202 facing the side frame 200, and the limiting member also includes a limiting bolt 205 screwed into the screw hole 202a. The limiting bolt 205 abuts against the interior of the side frame 200 to prevent the baffle 202 from being completely pulled out of the through groove 200a. At the same time, this structure can also ensure the normal installation of the baffle 202 in the early stage.

[0030] In this embodiment, preferably, the side frame 200 is formed by welding a plurality of square tubes, and the limiting bolts 205 and the rubber blocks 207 are respectively abutted against the inner and outer surfaces of one of the square tubes of the side frame 200 .

[0031] In this embodiment, preferably, a protective cloth 204 is also provided on the bottom end surface of the side frame 200. A magnet is bonded to the protective cloth 204, which is not shown in the figure. The protective cloth 204 is adsorbed on the side frame 200 by the magnet. During use, the protective cloth 204 is used to protect the upper unknown side frame 200 to prevent dust from falling and affecting the staff on the lower side frame 200.

[0032] In this embodiment, preferably, a placement plate 300 is installed on the main frame 100 and the side frame 200. During operation, the staff will stand on the placement plate 300. A side diagonal brace 201 is welded between each side frame 200 and the main frame 100, a main diagonal brace 102 is welded on the inner side of the main frame 100, and a walking wheel 101 is also installed on the bottom end of the main frame 100.

[0033] In this embodiment, preferably, an external ladder 103 is also installed on the rear surface of the plurality of side frames 200 , and the external ladder 103 is welded and fixed to all the side frames 200 .

[0034] Although the embodiments of the present invention have been shown and described (see the above detailed description for details), it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A tunnel construction platform structure, characterized in that: include MainFrame(100); Two groups of side frames (200) are provided and welded to both sides of the main frame (100), each group of side frames (200) is provided with at least two side frames (200), and the lengths of the two side frames (200) are different, and a through groove (200a) is provided at the end of the side frame (200) away from the main frame (100); A protection component, comprising a baffle (202) and a limiting member, wherein the baffle (202) is movably arranged in the through slot (200a), and the limiting member is respectively located at the upper and lower end surfaces at both ends of the baffle (202), and the limiting member is locked with the side frame (200) in a limiting manner; The limiting member comprises a toggle plate (203) fixed on the top of one end of the baffle plate (202), a rubber block (207) being bonded inside the toggle plate (203), and the toggle plate (203) is located outside the side frame (200); A screw hole (202a) is provided at one end of the baffle plate (202) facing the side frame (200), and the limiting member further comprises a limiting bolt (205) screwed into the screw hole (202a), and the limiting bolt (205) abuts against the inside of the side frame (200); The side frame (200) is formed by welding a plurality of square tubes, and the limiting bolt (205) and the rubber block (207) are respectively abutted against the inner and outer surfaces of one of the square tubes of the side frame (200); The bottom end surface of the side frame (200) is also provided with a protective cloth (204), a magnet is bonded to the protective cloth (204), and the protective cloth (204) is adsorbed on the side frame (200) via the magnet; A placement plate (300) is installed on the main frame (100) and the side frame (200), a side diagonal brace (201) is welded between each side frame (200) and the main frame (100), a main diagonal brace (102) is welded on the inner side of the main frame (100), and a walking wheel (101) is also installed at the bottom end of the main frame (100); An external ladder (103) is also installed on the rear surface of the plurality of side frames (200), and the external ladder (103) is welded and fixed to all the side frames (200).

Citation Information

Cited By

  • Construction rack for tunnel engineering

    CN224174091U