Pipeline placement damping support for civil engineering

By designing a 45-degree isosceles triangle support structure with a civil engineering pipeline with a curved support plate and a spring shock absorber, the problem of load balancing imbalance in the prior art is solved, and a more stable reduction is achieved Shock effects and diversity installation.

CN222502956UActive Publication Date: 2025-02-18TIANJIN JIANCHENG CONSTRUCTION ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421421872.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2025-02-18
Estimated Expiration
2034-06-20

AI Technical Summary

Technical Problem

In the prior art, the placement of a single pipe in the triangularly supported tube shell causes load balancing to be misaligned, making it difficult to provide stable support.

Method used

A shock absorbing bracket for civil engineering is designed, including the first pipe clamp, the second pipe clamp and the shock absorbing base. The 45-degree isosceles triangle support structure is formed through arc-shaped support plates and spring shock absorbers to ensure the pipe clamps. Keep it evenly to reduce vibration and displacement.

Benefits of technology

It realizes uniform stress and balance of the shock absorbing bracket, strengthens the overall shock absorbing support force and stability, is suitable for diverse installations, and improves the practicality of the shock absorbing bracket.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222502956U_ABST
    Figure CN222502956U_ABST
Patent Text Reader

Abstract

The utility model provides a pipeline placement damping support for civil engineering, which relates to the field of civil engineering and comprises a first pipeline clamping plate, a second pipeline clamping plate and a damping base. Damping bases are inserted into the lower ends of the first pipeline clamping plate and the second pipeline clamping plate, spring dampers are fixedly embedded into the inner sides of the damping bases, arc-shaped supporting plates are connected to the upper ends of the spring dampers through connecting plates, and the side ends of the arc-shaped supporting plates are fixed to the side faces of the first pipeline clamping plate and the second pipeline clamping plate through studs. And an inserting convex block is welded to the left side of the damping base. The problem that in the prior art, a single pipeline is placed in a pipe shell of a triangular support, so that load imbalance is caused, and stable supporting is difficult to achieve is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of civil engineering, in particular to a pipeline placement shock-absorbing bracket for civil engineering. Background Art

[0002] The application of shock-absorbing brackets in civil engineering is intended to protect pipeline systems from damage caused by earthquakes, wind loads and other impacts. They absorb and disperse impact forces, reduce the force, vibration and displacement of the pipeline, and thus protect the integrity and safety of the pipeline. After searching, the prior art (application number: CN202321539754.5) records that "a kind of shock-absorbing bracket for placing pipelines in civil engineering is provided with a structure that cooperates with each other, such as a triangular column and a flat plate. The surface of the triangular column is equipped with multiple flat plates. The number of flat plates is proportional to the support strength and support point position of the shock-absorbing bracket for the pipeline, that is, the stronger the shock-absorbing support effect, the bracket can evenly distribute the load of the pipeline to more support points, reduce the load borne by each support point, provide more support force and rigidity, and avoid the bending and falling of the pipe body of the long pipeline workpiece, reduce the vibration and displacement of the long pipeline, increase the stability of the long pipeline, and reduce the risk of damage." However, the prior art places a single pipeline in the pipe shell of the triangular support, which causes load imbalance and is difficult to provide stable support. Utility Model Content

[0003] In order to overcome the defects of the prior art, a shock-absorbing bracket for placing pipes in civil engineering is provided to solve the problem that placing a single pipe in a triangularly supported pipe shell in the prior art causes load imbalance and is difficult to provide stable support.

[0004] To achieve the above purpose, a pipe placement shock-absorbing bracket for civil engineering is provided, comprising: a first pipe clamp, a second pipe clamp and a shock-absorbing base, wherein the upper end of the first pipe clamp is fixedly fitted to the second pipe clamp by fixing bolts.

[0005] A shock-absorbing base is plugged into the lower ends of the first pipe clamp and the second pipe clamp, a spring shock absorber is embedded and fixed inside the shock-absorbing base, the upper end of the spring shock absorber is connected to an arc-shaped support plate through a connecting plate, the side ends of the arc-shaped support plate are fixed to the side surfaces of the first pipe clamp and the second pipe clamp through studs, and a plug-in protrusion is welded on the left side of the shock-absorbing base.

[0006] Furthermore, shock-absorbing pipe sleeves are bonded to the inner sides of the first pipe clamp and the second pipe clamp, a bottom plate is welded to the lower end surface of the shock-absorbing base, and a suspension bracket is screwed and installed on the upper end surface of the shock-absorbing base.

[0007] Furthermore, a fixed top plate is welded to the upper end of the suspension bracket; and the suspension bracket is symmetrically attached to the front and rear sides of the first pipe clamping plate and the second pipe clamping plate.

[0008] Furthermore, the first pipe clamp plate and the second pipe clamp plate have side arc surfaces with fixing holes, and the upper surface of the shock-absorbing base is fitted with the first pipe clamp plate and the second pipe clamp plate via a shock-absorbing pad.

[0009] Furthermore, a splicing slot block is welded on the right end of the shock-absorbing base, and a rectangular slot is arranged on the right end of the splicing slot block; and a damping block is inserted into the rectangular slot.

[0010] Furthermore, a positioning hole is provided on the surface of the splicing slot block; and the splicing slot block and the plug-in protrusion are in a horizontal plug-in combination.

[0011] Furthermore, the arc-shaped support plate and the spring shock absorber form a 45-degree isosceles triangle support structure, and are symmetrically fixed on the lower end surfaces of the first pipe clamping plate and the second pipe clamping plate.

[0012] The beneficial effect of the utility model is that the civil engineering pipeline placement shock-absorbing bracket of the utility model utilizes the arc-shaped support plate on the inner side of the shock-absorbing base to fix it with the pipeline clamp, and the pipeline is clamped and placed on the shock-absorbing base, so that the arc-shaped support plate and the spring shock absorber form a 45-degree isosceles triangle support structure, which is convenient for the shock-absorbing bracket to be evenly and balancedly stressed, and enhances the overall shock-absorbing support strength and stability of the shock-absorbing bracket. Through the hanging bracket, the plug-in protrusion and the splicing groove block, the pipeline can be suspended or placed or multiple groups of horizontal splicing combinations can be performed, which facilitates the diversified installation of the shock-absorbing bracket and improves the practicality of the shock-absorbing bracket. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a front view structural schematic diagram of a pipeline-placed shock-absorbing bracket according to an embodiment of the utility model.

[0014] Figure 2 It is a schematic diagram of the front cross-sectional structure of the pipeline placement shock-absorbing bracket according to an embodiment of the utility model.

[0015] Figure 3 It is a side structural schematic diagram of a pipeline-placed shock-absorbing bracket according to an embodiment of the utility model.

[0016] Figure 4 The figure is a schematic top view of the structure of the splicing slot block according to the embodiment of the utility model.

[0017] In the figure: 1. first pipe clamp; 11. second pipe clamp; 12. fixing bolt; 13. shock-absorbing pipe sleeve; 14. fixing hole; 2. suspension bracket; 21. fixed top plate; 3. shock-absorbing base; 31. bottom plate; 32. shock-absorbing pad; 4. plug-in protrusion; 41. splicing groove block; 42. damping block; 43. positioning hole; 5. arc support plate; 51. spring shock absorber; 52. connecting plate. DETAILED DESCRIPTION

[0018] Reference Figures 1 to 4 As shown, the utility model provides a pipe placement shock-absorbing bracket for civil engineering, comprising: a first pipe clamping plate 1, a second pipe clamping plate 11 and a shock-absorbing base 3, wherein the upper end of the first pipe clamping plate 1 is fixedly fitted with the second pipe clamping plate 11 by a fixing bolt 12.

[0019] A shock-absorbing base 3 is inserted into the lower end of the first pipe clamp 1 and the second pipe clamp 11, and a spring shock absorber 51 is embedded and fixed inside the shock-absorbing base 3. The upper end of the spring shock absorber 51 is connected to an arc-shaped support plate 5 through a connecting plate 52. The side end of the arc-shaped support plate 5 is fixed to the side of the first pipe clamp 1 and the second pipe clamp 11 through a stud, and a plug-in protrusion 4 is welded on the left side of the shock-absorbing base 3.

[0020] Working principle: first, the shock-absorbing base 3 is hung or installed horizontally and fixed, and the first pipe clamp 1 and the second pipe clamp 11 are clamped and fixed to the pipe, so that the clamped first pipe clamp 1 and the second pipe clamp 11 are plugged and placed on the surface of the shock-absorbing base 3, and the arc support plate 5 is fixed to the first pipe clamp 1 and the second pipe clamp 11 with studs to complete the installation of the pipe and the shock-absorbing bracket. When subjected to external vibration, the arc support plate 5 and the spring shock absorber 51 form a 45-degree isosceles triangle support structure, which is convenient for the shock-absorbing bracket to be evenly and balancedly stressed, and to enhance the overall shock-absorbing support strength and stability of the shock-absorbing bracket.

[0021] In this embodiment, the first pipe clamp plate 1 and the second pipe clamp plate 11 are bonded with shock-absorbing sleeves 13 on their inner sides, the bottom plate 31 is welded to the lower end surface of the shock-absorbing base 3, and the suspension bracket 2 is screwed and installed on the upper end surface of the shock-absorbing base 3.

[0022] As a preferred implementation, the first pipe clamp 1 and the second pipe clamp 11 are pressed and clamped against the pipe via the shock-absorbing sleeve 13 to prevent the pipe from detaching from and rolling off the shock-absorbing bracket.

[0023] In this embodiment, a fixed top plate 21 is welded to the upper end of the suspension bracket 2 ; and the suspension bracket 2 is symmetrically attached to the front and rear sides of the first pipe clamping plate 1 and the second pipe clamping plate 11 .

[0024] As a preferred embodiment, the hanging bracket 2 can be fixed to the wall by fixing the top plate 21, so that the pipeline can be hung and placed, which is convenient for various installation locations in geotechnical engineering construction.

[0025] In this embodiment, fixing holes 14 are formed on the side arc surfaces of the first pipe clamping plate 1 and the second pipe clamping plate 11 , and the upper surface of the shock-absorbing base 3 is fitted with the first pipe clamping plate 1 and the second pipe clamping plate 11 via the shock-absorbing pad 32 .

[0026] As a preferred embodiment, the fixing holes 14 facilitate the fixing of the first pipe clamping plate 1 and the second pipe clamping plate 11 to the two sets of arc-shaped support plates 5 , so that the pipes are firmly clamped and placed on the shock-absorbing base 3 .

[0027] In this embodiment, a splicing groove block 41 is welded on the right end of the shock-absorbing base 3 , and a rectangular groove is provided on the right end of the splicing groove block 41 ; and a damping block 42 is inserted into the rectangular groove.

[0028] As a preferred implementation, the damping block 42 is in contact with the plug-in protrusion 4 plugged into the slot of the splicing slot block 41, so as to buffer the force of the plug-in protrusion 4 colliding with the slot wall and reduce the conduction of vibration.

[0029] In this embodiment, a positioning hole 43 is formed on the surface of the splicing slot block 41 ; and the splicing slot block 41 and the plug-in protrusion 4 are in a horizontal plug-in combination.

[0030] As a preferred embodiment, the positioning holes 43 facilitate fixing the plug-in splicing slot blocks 41 and the plug-in protrusions 4, and facilitate installation and support of multiple groups of horizontally placed pipes.

[0031] In this embodiment, the arc-shaped support plate 5 and the spring shock absorber 51 form a 45-degree isosceles triangle support structure, and are symmetrically fixed on the lower end surfaces of the first pipe clamping plate 1 and the second pipe clamping plate 11 .

[0032] As a preferred implementation method, the 45-degree isosceles triangle support structure facilitates the stable support of the clamped pipe, making the shock-absorbing bracket more evenly and balanced in force, and facilitating the enhancement of the overall shock-absorbing support strength and stability of the shock-absorbing bracket.

[0033] The utility model discloses a shock-absorbing bracket for placing pipes in civil engineering, which can effectively solve the problem in the prior art that a single pipe is placed in a pipe shell with a triangular support, causing load imbalance and difficulty in providing stable support. It is convenient for the shock-absorbing bracket to be subjected to uniform and balanced force, strengthens the overall shock-absorbing support strength and stability of the shock-absorbing bracket, facilitates the diversified installation of the shock-absorbing bracket, improves the practicality of the shock-absorbing bracket, and is suitable for placing shock-absorbing brackets for pipes in civil engineering.

Claims

1. A pipe placement shock-absorbing support for civil engineering, comprising: A first pipe clamp (1), a second pipe clamp (11) and a shock-absorbing base (3), wherein the upper end of the first pipe clamp (1) is fixedly fitted to the second pipe clamp (11) by means of a fixing bolt (12), and is characterized in that: A shock-absorbing base (3) is plugged into the lower ends of the first pipe clamp (1) and the second pipe clamp (11); a spring shock absorber (51) is embedded and fixed inside the shock-absorbing base (3); the upper end of the spring shock absorber (51) is connected to an arc-shaped support plate (5) via a connecting plate (52); the side ends of the arc-shaped support plate (5) are fixed to the side surfaces of the first pipe clamp (1) and the second pipe clamp (11) via studs; and a plug-in protrusion (4) is welded on the left side of the shock-absorbing base (3).

2. A pipe placement shock-absorbing support for civil engineering according to claim 1, characterized in that: A shock-absorbing pipe sleeve (13) is bonded to the inner side of the first pipe clamp (1) and the second pipe clamp (11), a bottom plate (31) is welded to the lower end surface of the shock-absorbing base (3), and a suspension bracket (2) is screwed and mounted to the upper end surface of the shock-absorbing base (3).

3. A pipe placement shock-absorbing support for civil engineering according to claim 2, characterized in that: A fixed top plate (21) is welded to the upper end of the suspension bracket (2); and the suspension bracket (2) is symmetrically fitted to the front and rear sides of the first pipe clamping plate (1) and the second pipe clamping plate (11).

4. A pipe placement shock-absorbing support for civil engineering according to claim 1, characterized in that: The first pipe clamp plate (1) and the second pipe clamp plate (11) are provided with fixing holes (14) on their side arc surfaces, and the upper surface of the shock-absorbing base (3) is fitted with the first pipe clamp plate (1) and the second pipe clamp plate (11) via a shock-absorbing pad (32).

5. The pipe placement shock-absorbing support for civil engineering according to claim 1, characterized in that: A splicing slot block (41) is welded to the right end of the shock-absorbing base (3), and a rectangular slot is provided at the right end of the splicing slot block (41); and a damping block (42) is inserted into the rectangular slot.

6. A pipe placement shock-absorbing support for civil engineering according to claim 5, characterized in that: A positioning hole (43) is provided on the surface of the splicing slot block (41); and the splicing slot block (41) and the plug-in protrusion (4) are in a horizontal plug-in combination.

7. A pipe placement shock-absorbing support for civil engineering according to claim 1, characterized in that: The arc-shaped support plate (5) and the spring shock absorber (51) form a 45-degree isosceles triangle support structure, and are symmetrically fixed on the lower end surfaces of the first pipe clamping plate (1) and the second pipe clamping plate (11).