Lift shaft construction lifting operation platform
By designing an elevator shaft construction and lifting operation platform including construction frames and lifting platforms, the problems of low construction efficiency and high cost caused by the difference in elevator shaft heights in the existing technology are solved, and the effect of flexibly adjusting the height and reducing construction costs is achieved. .
Patent Information
- Application Number
- CN202421720841.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2034-07-19
AI Technical Summary
The height of the existing elevator shaft construction platform is fixed, and it cannot adapt to the differences in elevator shaft heights in different buildings, resulting in the need to build additional scaffolding during construction of excessive elevator shafts, increasing construction costs and reducing efficiency.
A lifting operation platform for elevator shafts including construction frames and lifting platforms is designed. The construction frame consists of a roof plate, reinforced inclined rod, vertical support rod and stair plate. The lifting platform is composed of support columns, construction tables, fixed columns and tightening. Screws are composed of, through these components, the height can be flexibly adjusted to meet the needs of different elevator shafts.
By using the lifting platform, the need to build and dismantle additional scaffolding is avoided, construction costs are reduced, construction efficiency is improved, and load on elevator shafts is reduced, and construction safety is improved.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a lifting operation platform for elevator shaft construction. Background Art
[0002] With the increase in industrial and civil construction projects and the increasing height of buildings, the construction of the interior of the elevator shaft is becoming more and more difficult, and safety hazards are emerging one after another. In the past construction process, workers usually used a large number of steel pipes to build a full-height frame as a support and protection device, which has the following disadvantages: First, the erection of the full-height frame requires a lot of manpower and material resources, which not only has low construction efficiency, but also brings too much concentrated load to the structure itself; secondly, during the erection process, due to the small space of the elevator shaft, the construction difficulty and cost are further increased, causing delays in the construction period; finally, when the support is dismantled after the project is completed, each steel pipe dismantled must be transported out of the elevator shaft, which is not only a large workload, but also poses a major safety hazard. For this reason, the existing technology has developed work platforms for the construction of elevator shafts, such as Figure 5 The existing work platform has the following problems:
[0003] The work platform is an integrated structure with a fixed height, while the height of the elevator shafts of different buildings may vary. For some elevator shafts that are too high, if the construction frame is not high enough, the only solution is to build a scaffold on the construction frame, which increases the construction cost and reduces the construction efficiency. Utility Model Content
[0004] The purpose of the utility model is to overcome the above-mentioned deficiencies in the prior art and to provide an elevator shaft construction lifting operation platform with a rationally designed structure, which has little construction impact, high underground space utilization, and can realize remote storage and access.
[0005] The technical solution adopted by the utility model to solve the above-mentioned problems is: an elevator shaft construction lifting work platform, including a construction frame, the construction frame includes a top plate, a reinforcing diagonal rod, a vertical support rod and a stair plate; the top plate is fixed to the top of the vertical support rod; one end of the reinforcing diagonal rod is fixed to the top plate, and the other end is fixed to the vertical support rod; the stair plate is fixed to the vertical support rod; it is characterized in that: it also includes a lifting platform; the lifting platform includes a support column, a construction platform, a fixed column and a fastening screw; the fixed column is fixed to the top plate; the support column is plugged into the fixed column, the fastening screw is installed on the support column, and the fixed column is fixed to the support column by the fastening screw; the construction platform is fixed to the top of the support column.
[0006] The front bottom of the vertical support rod of the utility model is fixedly connected with an anti-slipping clamping block.
[0007] The upper surface of the stair tread of the utility model is provided with anti-skid patterns.
[0008] A drawstring hook is fixed on the top of the top plate of the utility model.
[0009] The lifting platform described in the utility model also includes a cross rod, and the cross rod is fixed on the supporting column.
[0010] The construction frame described in the utility model also comprises tightening screws and a cross bar. The cross bar is slidably mounted on the side of the top plate, the tightening screws are mounted on the top plate, and the cross bar is fixed to the top plate by the tightening screws.
[0011] Compared with the prior art, the utility model has the following advantages and effects: if the construction site is too high and the construction frame is not high enough, a lifting platform can be used, and there is no need to spend a lot of steel pipes to build the scaffolding layer by layer as before, and there is no need to spend a lot of manpower to carry it when dismantling, which reduces construction costs and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a three-dimensional structural schematic diagram of an embodiment of the utility model.
[0013] Figure 2 It is a front structural schematic diagram of an embodiment of the utility model.
[0014] Figure 3 It is a schematic diagram of the local structure of an embodiment of the utility model.
[0015] Figure 4 It is a structural schematic diagram of a lifting platform according to an embodiment of the utility model.
[0016] Figure 5 The present invention is a schematic diagram of a lifting work platform for elevator shaft construction in the prior art. DETAILED DESCRIPTION
[0017] The present invention will be further described in detail below with reference to the accompanying drawings and through examples. The following examples are provided to explain the present invention, but the present invention is not limited to the following examples.
[0018] The embodiment of the utility model comprises a construction frame and a lifting platform.
[0019] The construction frame comprises a top plate 1, a pull rope hook 2, a cross bar 3, a tightening screw 4, a reinforcing diagonal bar 5, a vertical supporting bar 6, a stair tread 8 and an anti-slip block 9.
[0020] The top plate 1 is fixed on the top of the vertical support rod 6, and the material of the top plate 1 is steel. One end of the reinforcing diagonal rod 5 is fixed to the top plate 1, and the other end is fixed to the vertical support rod 6 to enhance firmness. The stair tread 8 is fixed to the vertical support rod 6, and the upper surface of the stair tread 8 is provided with anti-skid grooves, which can prevent workers from slipping when passing the stair tread 8. The front bottom of the vertical support rod 6 is fixedly connected with an anti-skid block 9, and the anti-skid block 9 can be used to clamp the entire construction frame on the elevator shaft opening to prevent the construction frame from slipping, thereby achieving a safety effect. A pull rope hook 2 is fixed to one side of the top of the top plate 1.
[0021] The cross bar 3 is slidably mounted on the side of the top plate 1 , and the tightening screws 4 are mounted on the top plate 1 . The cross bar 3 is fixed to the top plate 1 by tightening the screws 4 .
[0022] The lifting platform includes a supporting column 7 , a construction platform 10 , a cross rod 11 , a fixed column 12 and a fastening screw 13 .
[0023] The fixed column 12 is fixed to the top of the top plate 1. The support column 7 is plugged into the fixed column 12, and the fastening screw 13 is installed on the support column 7. The fixed column 12 is fixed to the support column 7 by the fastening screw 13, so that the support column 7 can remain stable.
[0024] The construction platform 10 is fixed on the top of the support column 7. The cross bar 11 is welded and fixed on the support column 7 to enhance the firmness.
[0025] The utility model is made of steel as a whole. The steel has high strength and stability, can bear a large load, and has a long service life.
[0026] The working mode of the utility model is as follows:
[0027] 1. Connect the rope hook 2 with the crane by the rope, put the construction frame into the elevator shaft by the crane, and fix it at the opening of the elevator shaft by the anti-slip block 9; then pull the cross bar 3 outward so that the cross bar 3 contacts the two sides of the elevator shaft, so that the construction frame can be kept stable in the elevator shaft, avoiding the shaking of the construction frame and affecting the safety of the workers, thus improving the safety; then tighten the screws 4 to fix the cross bar 3 and the top plate 1 to ensure the stability of the entire construction frame;
[0028] 2. Workers can move up and down through the stair slab 8, and they can stand on the top slab 1 to perform construction work;
[0029] 3. If the construction site is too high and the construction frame is not high enough, a lifting platform is required; plug the support column 7 into the fixed column 12, and then tighten the fastening screws 13 to fix the fixed column 12 and the support column 7. Workers can stand on the construction platform 10 to carry out construction work. There is no need to spend a lot of steel pipes to build scaffolding layer by layer as before, and there is no need to spend a lot of manpower to carry it when dismantling, which reduces construction costs and improves construction efficiency.
[0030] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the utility model. All equivalent changes or simple changes made based on the structure, features and principles described in the patent concept of the utility model are included in the protection scope of the utility model patent. Technicians in the technical field of the utility model can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, as long as they do not deviate from the structure of the utility model or exceed the scope defined by the claims, they should all fall within the protection scope of the utility model.
Claims
1. An elevator shaft construction lifting work platform includes a construction frame, which includes a top plate, a reinforcing diagonal rod, a vertical support rod and a staircase plate; the top plate is fixed to the top of the vertical support rod; one end of the reinforcing diagonal rod is fixed to the top plate, and the other end is fixed to the vertical support rod; the staircase plate is fixed to the vertical support rod; the characteristics are: It also includes a lifting platform; the lifting platform includes support columns, a construction platform, fixed columns and fastening screws; the fixed columns are fixed on the top plate; the support columns are plugged into the fixed columns, the fastening screws are installed on the support columns, and the fixed columns are fixed to the support columns by the fastening screws; the construction platform is fixed on the top of the support columns.
2. The elevator shaft construction lifting work platform according to claim 1 is characterized in that: The front bottom of the vertical support rod is fixedly connected with an anti-slip block.
3. The elevator shaft construction lifting work platform according to claim 1, characterized in that: The upper surface of the stair tread is provided with anti-slip grooves.
4. The elevator shaft construction lifting work platform according to claim 1, characterized in that: A drawstring hook is fixed on the top of the top plate.
5. The elevator shaft construction lifting work platform according to claim 1, characterized in that: The lifting platform also includes a cross rod, which is fixed on the support column.
6. The elevator shaft construction lifting work platform according to claim 1, characterized in that: The construction frame also includes tightening screws and a cross bar, the cross bar is slidably mounted on the side of the top plate, the tightening screws are mounted on the top plate, and the cross bar is fixed to the top plate by the tightening screws.