High-rise building steel corridor hoisting device

By installing cleaning components on the bottom of the load-bearing pulley of the steel corridor hoisting device of the high-rise building, and using an annular wire brush to clean the particles and impurities on the rope, the wear problem of the rope on the pulley is solved, extending the service life of the pulley and reducing the cost of use.

CN222540360UActive Publication Date: 2025-02-28CHINA CONSTR SEVENTH ENG DIVISION CORP LTD

Patent Information

Application Number
CN202420871903.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2025-02-28
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

During the lifting of steel corridors in high-rise buildings, the contact force generated by the rope to the pulley causes wear, especially when granular impurities are attached to the rope surface, the wear is even more serious, reducing the service life of the pulley and the overall lifting cost.

Method used

A high-rise building steel corridor hoisting device is designed, which includes a cleaning assembly arranged at the bottom of the load-bearing pulley. The cleaning assembly includes an annular steel wire brush for cleaning particles and impurities on the rope surface and reducing wear on the pulley.

Benefits of technology

Through the use of cleaning components, the wear of the pulley by particles impurities is reduced, the service life of the pulley is extended, and the reliability of the overall lifting device is improved and the cost of use is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model discloses a high-rise building steel corridor hoisting device which comprises a hoisting mechanism installed on a building body, the hoisting mechanism comprises a winch, a guide pulley, a bearing pulley, a steel beam and a rope, and the guide pulley is rotationally connected with a first pulley body through a rotating shaft; the bearing pulley is rotatably connected with a second pulley body through a rotating shaft, the end part of the rope passes through the surfaces of the first pulley body and the second pulley body, a cleaning assembly is arranged at the bottom of the bearing pulley, and the cleaning assembly comprises a cleaning part and a replacement part; by means of the designed cleaning assembly, particle impurities attached to a rope in the steel gallery lifting process can be cleaned in the using process, the probability that the first pulley body and the second pulley body are abraded by the particle impurities is reduced, and the service life of the first pulley body and the service life of the second pulley body are prolonged; therefore, the service lives of the bearing pulley and the guide pulley are prolonged, and the use cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of steel corridor hoisting, and in particular relates to a high-rise building steel corridor hoisting device. Background Art

[0002] A high-rise building steel corridor generally refers to two high-rise buildings connected by an overhead steel connector to meet the requirements of building shape and functional use. The connector is the steel corridor. During the construction of high-rise buildings, the steel corridor will be hoisted to a suitable height position through a hoisting device.

[0003] Chinese patent application No. 202122614205.7 discloses a hoisting device for a high-rise steel corridor, in which the bottom of the rope on the hoisting device is fixed on the steel corridor, and the rope passing through the guide pulley and the load-bearing pulley is driven by a winch to move and lift the steel corridor. However, the rope will contact the first pulley body on the load-bearing pulley and the second pulley body on the load-bearing pulley. When the rope is fixed to the steel corridor and then lifted by the winch, the rope will exert a large contact force on the second pulley body and the first pulley body. If granular impurities are attached to the outer surface of the rope, the granular impurities will cause wear on the parts of the second pulley body and the first pulley body that are in contact with the rope, thereby reducing the service life of the second pulley body and the first pulley body, thereby reducing the service life of the load-bearing pulley and the guide pulley, and increasing the cost of use. For this reason, we propose a hoisting device for a high-rise steel corridor. Utility Model Content

[0004] The purpose of the utility model is to provide a high-rise building steel corridor hoisting device to solve the problem proposed in the above background technology that when the steel corridor is fixed by ropes and lifted by a winch, the ropes will produce a large contact force on the second pulley body and the first pulley body. If granular impurities are attached to the outer surface of the ropes, the granular impurities will cause wear on the parts of the second pulley body and the first pulley body that are in contact with the ropes.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high-rise building steel corridor hoisting device, comprising a hoisting mechanism installed on the main body of the building, the hoisting mechanism comprising a winch, a guide pulley, a load-bearing pulley, a steel beam and a rope, the guide pulley is rotatably connected to a first pulley body via a rotating shaft, the load-bearing pulley is rotatably connected to a second pulley body via a rotating shaft, the end of the rope passes through the surface of the first pulley body and the second pulley body, a cleaning assembly is provided at the bottom of the load-bearing pulley, the cleaning assembly comprises a cleaning part and a replacement part, the cleaning part comprises an annular wire brush, the annular wire brush is located on the outside of the rope, and two groups of outer rings are fixedly provided on the outside of the annular wire brush.

[0006] Preferably, a mounting plate is fixedly provided on the outside of the outer ring, and the replacement part includes a screw and a T-shaped plate.

[0007] Preferably, a through hole is opened inside the T-shaped plate, and the end of the screw rod passes through the inside of the through hole.

[0008] Preferably, two sets of nuts are arranged outside the screw rod, and the screw rod is fixed on the mounting plate.

[0009] Preferably, fixing plates are fixedly provided at both ends of the T-shaped plate, and the fixing plates are fixedly connected to the load-bearing pulley by screws.

[0010] Preferably, the steel beam is fixed on the building body, a lifting lug is fixedly provided on the bottom of the steel beam, and the lifting lug is fixedly connected to the load-bearing pulley via a connecting rope.

[0011] Preferably, a lower bracket and an upper bracket are respectively fixedly provided on the building body, a hand winch is fixedly provided between the upper bracket and the guide pulley, the guide pulley is fixed on the lower bracket, and the winch is fixed on the building body.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] (1) The cleaning component designed in the utility model can clean the particulate impurities attached to the rope during the lifting of the steel corridor, thereby reducing the probability of the particulate impurities causing wear on the first pulley body and the second pulley body, thereby increasing the service life of the first pulley body and the second pulley body, and further increasing the service life of the load-bearing pulley and the guide pulley, thereby reducing the cost of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of the utility model;

[0015] Figure 2 This is a schematic diagram of the structure of the guide pulley and the load-bearing pulley of the utility model;

[0016] Figure 3 This is a schematic diagram of the cleaning component structure of the utility model;

[0017] Figure 4 This is a schematic diagram of the screw and nut structure of the utility model;

[0018] Figure 5 This is a left-side structural schematic diagram of the load-bearing pulley of the utility model;

[0019] Figure 6 This is a schematic diagram of the mounting plate and outer ring structure of the utility model;

[0020] In the figure: 100, building body; 101, winch; 102, guide pulley; 103, rope; 104, load-bearing pulley; 105, lifting lug; 106, steel beam; 107, hand hoist; 108, first pulley body; 109, second pulley body; 200, annular wire brush; 201, mounting plate; 202, screw; 203, T-plate; 204, nut; 205, outer ring; 300, fixing plate. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example

[0022] See also Figure 1-Figure 6The utility model provides a technical solution: a high-rise building steel corridor hoisting device, including a hoisting mechanism installed on a building main body 100. When in use, the building main body 100 and the hoisting mechanism are both provided with two groups, and are symmetrically arranged. The hoisting mechanism includes a winch 101, a guide pulley 102, a load-bearing pulley 104, a steel beam 106 and a rope 103. When in use, the steel beam 106 is fixed on the building main body 100. The guide pulley 102 is rotatably connected to a first pulley body 108 through a rotating shaft. The load-bearing pulley 104 is rotatably connected to a second pulley body 109 through a rotating shaft. The end of the rope 103 passes through the surface of the first pulley body 108 and the second pulley body 109. A cleaning component is provided at the bottom of the load-bearing pulley 104. The cleaning component includes a cleaning part and a replacement part. The cleaning part includes an annular wire brush 200. The annular wire brush 200 is located outside the rope 103. When in use, the annular wire brush 200 can clean the rope 103 surface to clean the granular impurities, the outside of the annular wire brush 200 is fixedly provided with two groups of outer rings 205, the outside of the outer ring 205 is fixedly provided with a mounting plate 201, the replacement parts include a screw 202 and a T-shaped plate 203, when in use, the screw 202 and the nut 204 are connected by threaded engagement, the inside of the T-shaped plate 203 is provided with a through hole, the end of the screw 202 passes through the inside of the through hole, and two groups of nuts 204 are provided on the outside of the screw 202, and the screw 202 is fixed on the mounting plate 201. Through the designed cleaning component, the granular impurities attached to the rope 103 during the lifting of the steel corridor can be cleaned during use, reducing the probability of granular impurities causing wear to the first pulley body 108 and the second pulley body 109, thereby improving the service life of the first pulley body 108 and the second pulley body 109, thereby improving the service life of the load-bearing pulley 104 and the guide pulley 102, and reducing the cost of use.

[0023] In the present embodiment, preferably, both ends of the T-shaped plate 203 are fixedly provided with fixing plates 300, and the fixing plate 300 is fixedly connected to the load-bearing pulley 104 by screws. The fixing plate 300 can be disassembled and assembled by the screws during use. The designed fixing plate 300 and the screws are combined to facilitate the disassembly and assembly of the T-shaped plate 203 during use, and thus the disassembly and assembly of the mounting plate 201 and the annular wire brush 200 can also be performed, so that it is convenient to use according to the situation.

[0024] In this embodiment, preferably, the steel beam 106 is fixed on the building body 100, and a lifting lug 105 is fixedly provided at the bottom of the steel beam 106, and the lifting lug 105 is fixedly connected to the load-bearing pulley 104 by a connecting rope.

[0025] In this embodiment, preferably, a lower bracket and an upper bracket are fixedly provided on the building body 100 , a hand winch 107 is fixedly provided between the upper bracket and the guide pulley 102 , the guide pulley 102 is fixed on the lower bracket, and the winch 101 is fixed on the building body 100 .

[0026] The working principle and use process of this utility model:

[0027] When the utility model is in use, when the bottom of the rope 103 is fixed to the steel corridor for lifting and hoisting, if there are some granular impurities attached to the surface of the rope 103, when the rope 103 rises, the granular impurities attached to the surface of the rope 103 will be cleaned by the annular wire brush 200 when passing through the annular wire brush 200, thereby reducing the probability of the granular impurities on the rope 103 contacting the second pulley body 109 and the first pulley body 108, thereby reducing the probability of the second pulley body 109 and the first pulley body 108 being worn, and prolonging the service life of the second pulley body 109 and the first pulley body 108. When the annular wire brush 200 is seriously worn, the annular wire brush 200 can be replaced. When replacing, first lift the rope 103, then the end of the rope 103 is separated from the inside of the annular wire brush 200, then the two sets of nuts 204 on the screw rod 202 are turned outward to loosen, and the nut 204 on the left side of the screw rod 202 is removed from the screw rod 202, then the screw rod 202 is moved to the right direction, and then the end of the screw 202 is separated from the through hole in the T-shaped plate 203, and the annular wire brush 200 can be removed, and then a new annular wire brush 200 is taken out and the replacement is completed according to the above-mentioned reverse principle;

[0028] The T-shaped plate 203 can be removed by unscrewing the screws on the fixing plate 300 , and the annular wire brush 200 can also be removed.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A hoisting device for a steel corridor of a high-rise building, comprising a hoisting mechanism installed on a building main body (100), the hoisting mechanism comprising a winch (101), a guide pulley (102), a load-bearing pulley (104), a steel beam (106) and a rope (103), the guide pulley (102) being rotatably connected to a first pulley body (108) via a rotating shaft, the load-bearing pulley (104) being rotatably connected to a second pulley body (109) via a rotating shaft, the end of the rope (103) passing through the surface of the first pulley body (108) and the second pulley body (109), characterized in that: A cleaning assembly is provided at the bottom of the load-bearing pulley (104), the cleaning assembly comprising a cleaning part and a replacement part, the cleaning part comprising an annular steel wire brush (200), the annular steel wire brush (200) being located outside the rope (103), and two groups of outer rings (205) are fixedly provided outside the annular steel wire brush (200).

2. A high-rise building steel corridor hoisting device according to claim 1, characterized in that: A mounting plate (201) is fixedly provided on the outside of the outer ring (205), and the replacement part comprises a screw rod (202) and a T-shaped plate (203).

3. A high-rise building steel corridor hoisting device according to claim 2, characterized in that: A through hole is provided inside the T-shaped plate (203), and the end of the screw rod (202) passes through the inside of the through hole.

4. A high-rise building steel corridor hoisting device according to claim 3, characterized in that: Two sets of nuts (204) are arranged outside the screw rod (202), and the screw rod (202) is fixed on the mounting plate (201).

5. A high-rise building steel corridor hoisting device according to claim 4, characterized in that: A fixing plate (300) is fixedly provided at both ends of the T-shaped plate (203), and the fixing plate (300) is fixedly connected to the load-bearing pulley (104) by means of screws.

6. A high-rise building steel corridor hoisting device according to claim 5, characterized in that: The steel beam (106) is fixed on the building body (100); a lifting lug (105) is fixedly provided at the bottom of the steel beam (106); the lifting lug (105) is fixedly connected to the load-bearing pulley (104) via a connecting rope.

7. The high-rise building steel corridor hoisting device according to claim 1 is characterized by: A lower bracket and an upper bracket are respectively fixedly arranged on the building body (100); a hand chain hoist (107) is fixedly arranged between the upper bracket and the guide pulley (102); the guide pulley (102) is fixed on the lower bracket; and the winch (101) is fixed on the building body (100).