Building material lifting device for building installation
By designing a building material lifting device for building installation including lifting mechanism, worm gear, worm, second motor, first pulley group and material pushing mechanism, the problem of discontinuous and inefficient plate conveying in the prior art is solved, continuous lifting and conveying of plates is realized, and the efficiency of building construction is improved.
Patent Information
- Application Number
- CN202421390014.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-06-18
AI Technical Summary
The existing plate lifting conveying devices have problems such as discontinuous conveying and inefficient efficiency during construction installation, which cannot meet the efficient needs of modern building construction.
A building material lifting device for building installation is designed, including a lifting mechanism, a worm gear, a worm, a second motor, a first pulley set and a material pushing mechanism. Through the synergy of these components, continuous lifting and conveying of the plate is achieved.
The device realizes continuous lifting and conveying of the sheets through the coordination of the lifting mechanism and the material pushing mechanism, improves the conveying efficiency of the sheets, and can meet the efficient needs of modern building construction.
Smart Images

Figure CN222556493U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building installation, in particular to a building material lifting device for building installation. Background Art
[0002] Building installation refers to the construction of buildings and structures and the installation of various equipment and facilities. Specifically, it includes the construction of housing buildings and their ancillary facilities, such as foundation engineering, main structure construction, etc. It also covers the installation of various equipment such as electrical, water supply and drainage, heating, ventilation, air conditioning, fire protection, as well as the installation and commissioning of lines, pipelines, and equipment related to buildings.
[0003] According to the Chinese patent announcement number CN219057503U, the utility model relates to a plate lifting device, which mainly includes a frame, the frame is provided with a lower plate entrance and an upper plate entrance, the frame is provided with a plate conveying mechanism, a first lifting mechanism, a multi-layer plate bearing frame, a second lifting mechanism, the first lifting mechanism is connected to the plate conveying mechanism, the first lifting mechanism is used to convey the plate conveying mechanism from the lower plate entrance to the upper plate entrance, the second lifting mechanism is connected to the multi-layer plate bearing frame, the multi-layer plate bearing frame includes a plurality of plate bearing layers arranged sequentially from top to bottom, and the second lifting mechanism is used to make each plate bearing layer pass through the plate conveying mechanism in sequence. The device of the present application is conducive to improving production efficiency, but: in the process of building installation, a certain amount of plates are needed, and the existing lifting and conveying device has problems such as discontinuous conveying and low efficiency when lifting and conveying plates, and cannot well meet the high-efficiency requirements of modern building construction. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the utility model provides a building material lifting device for construction installation.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a building material lifting device for construction installation includes a support leg frame, a lifting mechanism is arranged on the support leg frame, the lifting mechanism includes a storage box, the storage box is fixedly installed on the top of the support leg frame, a support plate is also fixedly installed on the support leg frame, a threaded cylinder is rotatably connected to the support plate through a bearing, a threaded rod is threadedly connected to the inner wall of the threaded cylinder, a lifting plate is slidably connected to the inner wall of the storage box, and the top end of the threaded rod is fixedly connected to the lifting plate.
[0008] Preferably, a material pushing mechanism is provided at one side of the material storage box, and the material pushing mechanism includes a support block, and the support block is fixedly mounted at one side of the material storage box, and a first motor is fixedly mounted on the top of the support block, and a screw rod is fixedly connected to the output end of the first motor, and a screw rod slider is provided on the threaded sleeve of the outer wall of the screw rod. According to this preference, by starting the first motor, the output end of the first motor drives the fixedly connected screw rod to rotate.
[0009] Preferably, the push mechanism further comprises a push rod, one end of which is fixedly connected to the screw slider, the other end of which is fixedly mounted with a push plate, a limit block is also fixedly mounted on the top of the support block, one side of the limit block is provided with a limit slot, and one end of the screw slider is slidably connected to the inner wall of the limit slot. According to this preference, the screw slider pushes the push plate to move through the push rod.
[0010] Preferably, the outer wall of the threaded barrel is threadedly sleeved with a worm gear, and the outer wall of the worm gear is meshedly connected with a worm. According to this preference, the worm gear rotates, thereby driving the threaded barrel fixedly sleeved on the inner wall of the worm gear to rotate.
[0011] Preferably, a second motor is fixedly mounted on the support plate, an output end of the second motor is fixedly connected to one end of the worm, and a first pulley set is fixedly sleeved on the outer wall of one end of the worm. According to this preference, by starting the second motor, the output end of the second motor drives the fixedly connected worm to rotate.
[0012] Preferably, a baffle is fixedly mounted on the storage box, a third motor is fixedly mounted on the baffle, an output end of the third motor is fixedly connected to a conveyor roller, an outer wall of the conveyor roller is sleeved with a conveyor belt, and an outer wall of one end of the conveyor roller is fixedly sleeved with a second belt pulley set. According to this preference, the second belt pulley set rotates, and the conveyor roller drives the conveyor belt to run under the transmission connection of the belt.
[0013] (III) Beneficial effects
[0014] Compared with the prior art, the utility model provides a building material lifting device for construction installation, which has the following beneficial effects:
[0015] 1. This kind of building material lifting device for construction installation, through the cooperation of the lifting mechanism, worm wheel, worm, second motor and first pulley group, the fixedly connected worm is driven to rotate through the output end of the second motor, so as to drive the first pulley group to rotate, and through the transmission connection of the belt, the two worms are rotated synchronously, thereby driving the worm wheel meshing connected to the outer wall of the worm to rotate, thereby driving the threaded barrel to rotate, and then the threaded rod threadedly sleeved on the inner wall of the threaded barrel drives the lifting plate to move upward, and the lifting plate can drive the plate material inside the storage box to lift, so as to facilitate the subsequent conveying of materials, thereby improving the subsequent conveying efficiency of the plate.
[0016] 2. This kind of building material lifting device for construction installation, through the cooperation of the pushing mechanism, the third motor, the conveyor belt, and the second pulley group, drives the fixedly connected screw to rotate through the output end of the first motor, thereby driving the screw slider to move, and the two ends of the screw slider slide on the inner wall of the limit groove opened in the limit block, and the screw slider pushes the pushing plate to move through the push rod, and the pushing plate can push the plate material onto the conveyor belt. By starting the third motor, the third motor drives the conveyor roller to rotate, thereby driving the second pulley group fixedly mounted on the outer wall of the conveyor roller to rotate, and the conveyor roller drives the conveyor belt to run under the transmission connection of the belt, so that continuous material transportation can be carried out to meet the high-efficiency requirements of modern building construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0018] Figure 1 It is a three-dimensional diagram of the structure of the utility model;
[0019] Figure 2 This is a schematic diagram of the front cross-sectional structure of the material storage box of the utility model;
[0020] Figure 3 It is a structural schematic diagram of the pusher mechanism of the utility model.
[0021] In the figure: 1, supporting leg frame; 21, lifting mechanism; 211, storage box; 212, supporting plate; 213, threaded cylinder; 214, threaded rod; 215, lifting plate; 31, pushing mechanism; 311, supporting block; 312, first motor; 313, screw rod; 314, screw rod slider; 315, pushing rod; 316, pushing plate; 317, limiting block; 4, worm gear; 5, worm; 6, second motor; 7, first pulley group; 8, baffle; 9, third motor; 10, conveyor belt; 11, second pulley group. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0023] Example 1
[0024] like Figure 1-3As shown, the utility model provides a building material lifting device for construction installation, including a support leg frame 1, on which a lifting mechanism 21 is arranged, the lifting mechanism 21 includes a storage box 211, the storage box 211 is fixedly mounted on the top of the support leg frame 1, a support plate 212 is also fixedly mounted on the support leg frame 1, a threaded cylinder 213 is rotatably connected to the support plate 212 through a bearing, a threaded rod 214 is threadedly connected to the inner wall of the threaded cylinder 213, a lifting plate 215 is slidably connected to the inner wall of the storage box 211, the top of the threaded rod 214 is fixedly connected to the lifting plate 215, a worm gear 4 is threadedly sleeved on the outer wall of the threaded cylinder 213, a worm 5 is meshedly connected to the outer wall of the worm gear 4, a second motor 6 is fixedly mounted on the support plate 212, an output end of the second motor 6 is fixedly connected to one end of the worm 5, and a first pulley group 7 is fixedly sleeved on the outer wall of one end of the worm 5.
[0025] In this embodiment, by starting the second motor 6, the output end of the second motor 6 drives the fixedly connected worm 5 to rotate, which drives the first pulley group 7 fixedly mounted on the outer wall of the worm 5 to rotate, and the two worms 5 rotate synchronously under the transmission connection of the belt, thereby driving the worm wheel 4 meshingly connected to the outer wall of the worm 5 to rotate, thereby driving the threaded barrel 213 fixedly mounted on the inner wall of the worm wheel 4 to rotate, and then the threaded rod 214 threadedly mounted on the inner wall of the threaded barrel 213 drives the lifting plate 215 to move upward, and the lifting plate 215 can drive the plate material inside the storage box 211 to be lifted, so as to facilitate the subsequent conveying of materials.
[0026] Example 2
[0027] like Figure 1-3 As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, a material pushing mechanism 31 is provided on one side of the material storage box 211, and the material pushing mechanism 31 includes a support block 311, and the support block 311 is fixedly installed on one side of the material storage box 211. A first motor 312 is fixedly installed on the top of the support block 311, and a screw rod 313 is fixedly connected to the output end of the first motor 312. A screw rod slider 314 is provided on the outer wall of the screw rod 313. The material pushing mechanism 31 also includes a push rod 315, and one end of the push rod 315 is connected to the screw rod 314. The rod slider 314 is fixedly connected, and a push plate 316 is fixedly installed on the other end of the push rod 315. A limit block 317 is also fixedly installed on the top of the support block 311. A limit slide groove is provided on one side of the limit block 317. One end of the screw slider 314 is slidably connected to the inner wall of the limit slide groove. A baffle 8 is fixedly installed on the storage box 211, and a third motor 9 is fixedly installed on the baffle 8. The output end of the third motor 9 is fixedly connected to a conveying roller. A conveying belt 10 is provided on the outer wall of the conveying roller, and a second pulley group 11 is fixedly provided on the outer wall of one end of the conveying roller.
[0028] In this embodiment, by starting the first motor 312, the output end of the first motor 312 drives the fixedly connected screw 313 to rotate, thereby driving the screw slider 314 threadedly sleeved on the outer wall of the screw 313 to move, and the two ends of the screw slider 314 slide on the inner wall of the limit groove opened by the limit block 317. The screw slider 314 pushes the push plate 316 to move through the push rod 315, and the push plate 316 can push the plate material onto the conveyor belt 10. By starting the third motor 9, the third motor 9 drives the conveyor roller to rotate, thereby driving the second pulley group 11 fixedly sleeved on the outer wall of the conveyor roller to rotate. Through the transmission connection of the belt, the conveyor roller drives the conveyor belt 10 to run, so that continuous material transportation can be carried out to meet the high-efficiency requirements of modern construction.
[0029] The working principle of this building material lifting device for construction installation will be described in detail below.
[0030] like Figure 1-3 As shown, when in use, by starting the second motor 6, the output end of the second motor 6 drives the fixedly connected worm 5 to rotate, so that the first pulley group 7 fixedly sleeved on the outer wall of the worm 5 is driven to rotate, and the two worms 5 are synchronously rotated under the transmission connection of the belt, thereby driving the worm wheel 4 meshingly connected to the outer wall of the worm 5 to rotate, thereby driving the threaded cylinder 213 fixedly sleeved on the inner wall of the worm wheel 4 to rotate, and then the threaded rod 214 threadedly sleeved on the inner wall of the threaded cylinder 213 drives the lifting plate 215 to move upward, and the lifting plate 215 can drive the plate material inside the storage box 211 to lift, so as to facilitate the subsequent conveying of materials, and by starting the first motor 312, the first motor 312 is driven The output end drives the fixedly connected screw rod 313 to rotate, thereby driving the screw rod slider 314 threadedly sleeved on the outer wall of the screw rod 313 to move, and the two ends of the screw rod slider 314 slide on the inner wall of the limit groove opened by the limit block 317. The screw rod slider 314 pushes the push plate 316 to move through the push rod 315, and the push plate 316 can push the plate material onto the conveyor belt 10. By starting the third motor 9, the third motor 9 drives the conveyor roller to rotate, thereby driving the second pulley group 11 fixedly sleeved on the outer wall of the conveyor roller to rotate. Through the transmission connection of the belt, the conveyor roller drives the conveyor belt 10 to run, so that continuous material transportation can be carried out to meet the high-efficiency requirements of modern building construction.
Claims
1. A building material lifting device for construction installation, comprising a support leg frame (1), characterized in that: The support leg frame (1) is provided with a lifting mechanism (21), and the lifting mechanism (21) comprises a material storage box (211), and the material storage box (211) is fixedly mounted on the top of the support leg frame (1); a support plate (212) is also fixedly mounted on the support leg frame (1); a threaded cylinder (213) is rotatably connected to the support plate (212) via a bearing; a threaded rod (214) is threadedly connected to the inner wall of the threaded cylinder (213); a lifting plate (215) is slidably connected to the inner wall of the material storage box (211), and the top end of the threaded rod (214) is fixedly connected to the lifting plate (215).
2. A building material lifting device for construction installation according to claim 1, characterized in that: A material pushing mechanism (31) is provided on one side of the material storage box (211), and the material pushing mechanism (31) comprises a support block (311), the support block (311) is fixedly mounted on one side of the material storage box (211), a first motor (312) is fixedly mounted on the top of the support block (311), a screw rod (313) is fixedly connected to the output end of the first motor (312), and a screw rod slider (314) is threadedly sleeved on the outer wall of the screw rod (313).
3. A building material lifting device for construction installation according to claim 2, characterized in that: The pushing mechanism (31) further comprises a push rod (315), one end of which is fixedly connected to the screw slider (314), and the other end of which is fixedly mounted with a push plate (316). A limiting block (317) is also fixedly mounted on the top of the support block (311), and one side of the limiting block (317) is provided with a limiting sliding groove, and one end of the screw slider (314) is slidably connected to the inner wall of the limiting sliding groove.
4. A building material lifting device for construction installation according to claim 1, characterized in that: A worm wheel (4) is threadedly sleeved on the outer wall of the threaded barrel (213), and a worm (5) is meshingly connected to the outer wall of the worm wheel (4).
5. A building material lifting device for construction installation according to claim 4, characterized in that: A second motor (6) is fixedly mounted on the support plate (212); an output end of the second motor (6) is fixedly connected to one end of the worm (5); and a first pulley set (7) is fixedly sleeved on the outer wall of one end of the worm (5).
6. A building material lifting device for construction installation according to claim 1, characterized in that: A baffle (8) is fixedly mounted on the material storage box (211), a third motor (9) is fixedly mounted on the baffle (8), an output end of the third motor (9) is fixedly connected to a conveying roller, an outer wall of the conveying roller is sleeved with a conveyor belt (10), and an outer wall of one end of the conveying roller is fixedly sleeved with a second pulley group (11).
Citation Information
Patent Citations
Plate lifting device
CN219057503U
Cited By
Building material lifting device for building installation
CN224185309U