Detachable assembly type building steel structure

By using components such as adjustment piles, screws and fixing bolts in building steel structures, the problem that existing building steel structures do not have the height difference adjustment function and poor cross beam stability is solved, and the height difference adjustment and stable reinforcement of cross beams are achieved, which improves the load-bearing capacity and safety of the structure.

CN222595171UActive Publication Date: 2025-03-11FUJIAN XINGUANGXIA ENG DESIGN & RES INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420582116.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2025-03-11
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The existing building steel structures do not have the function of height difference adjustment during use, and the cross beams are poorly stable, which is prone to deformation and affects the load-bearing capacity.

Method used

A detachable assembly-type building steel structure is designed, using components such as adjustment piles, screws and fixing bolts to achieve height difference adjustment and stable reinforcement of cross beams.

Benefits of technology

The height difference adjustment function is realized, the operation is simplified, the stability of the beam is improved, deformation is avoided, and the load-bearing capacity and safety of the structure are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222595171U_ABST
    Figure CN222595171U_ABST
Patent Text Reader

Abstract

The utility model discloses a detachable assembly type building steel structure which is applied to the field of steel structures and comprises a beam column, an adjusting pile is arranged at the top of the beam column, first screws are symmetrically welded in the adjusting pile, first grooves used in cooperation with the first screws are formed in the top of the beam column, and the first screws are symmetrically welded in the first grooves. The surface of the first screw rod is in threaded connection with a first nut, a mounting pile is mounted at the top of the adjusting pile, four cross beams are placed at the top of the adjusting pile, a first fixing bolt is in threaded connection between one side of each cross beam and the mounting pile in a penetrating mode, and a top plate is placed at the top of the mounting pile; second fixing bolts are connected between the top of the top plate and the mounting piles in a penetrating and threaded mode, the height difference adjusting function can be achieved, operation is easy, labor is saved, the workload of workers is reduced, meanwhile, the stability of the cross beam can be improved, deformation of the connecting position of the cross beam is avoided, and safety is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of steel structures, in particular to a detachable assembled building steel structure. Background Art

[0002] At present, a Chinese utility model with the announcement number CN212478094U discloses a detachable assembled building steel structure, including a base, the four corners of the inner bottom wall of the base are fixedly connected with a fixing seat, the tops of the four fixing seats are all penetrated and extended to the top of the base, the insides of the four fixing seats are plugged with square steel columns, a main beam is arranged between two adjacent square steel columns, the two inner sides of the four square steel columns are provided with fixing openings, the two ends of the four main beams are respectively plugged with the adjacent fixing openings, the two sides of the bottom of the four main beams are fixedly connected with a connecting plate, the side of the connecting plate away from the main beam is fixedly connected to the square steel column, the inner sides of the four fixing seats are provided with through openings, and the inner sides of the four square steel columns are provided with sockets. This utility model solves the problem that the assembly by welding is not easy to disassemble in temporary construction projects, which is not conducive to the recycling of steel structure components.

[0003] Although the existing building steel structure can fix the beams on the beams and columns by bolts to achieve prefabricated installation, there are still other problems during use. For example, it does not have a height difference adjustment function. The beam will be in a fixed position after installation. If there is a difference between the other end of the beam and the other beam and column and they cannot correspond, the bottom can only be paved by removing the beam and column. Not only is the operation cumbersome, it also has a certain impact on the construction progress, and the stability of the beam is poor. The beam and the beam are fixed by only two bolts. The bottom of the beam is in a suspended state and there is no reinforcement component on the top, which can easily cause deformation at the connection position and weaken the bearing capacity. In order to solve the above problems, we propose a detachable prefabricated building steel structure. Utility Model Content

[0004] The utility model aims to provide a detachable assembled building steel structure, which solves the problem that the existing building steel structure has no height difference adjustment function and has poor stability of the cross beam.

[0005] The above technical purpose of the utility model is achieved through the following technical solutions: a detachable assembled building steel structure, including a beam column, an adjusting pile is arranged on the top of the beam column, a first screw is symmetrically welded inside the adjusting pile, a first groove used in conjunction with the first screw is opened on the top of the beam column, a first nut is threadedly connected to the surface of the first screw, a mounting pile is installed on the top of the adjusting pile, four cross beams are placed on the top of the adjusting pile, a first fixing bolt is threadedly connected between one side of the cross beam and the mounting pile, a top plate is placed on the top of the mounting pile, and a second fixing bolt is threadedly connected between the top of the top plate and the mounting pile.

[0006] The above technical solution can provide a height difference adjustment function, which is simple and labor-saving to operate, reduces the workload of personnel, and can also improve the stability of the beam, avoid deformation of the connection position of the beam, and has high safety.

[0007] The utility model is further configured as follows: a second screw is welded on the top of the beam, a second groove is opened on the top of the adjusting pile, the other end of the second screw extends into the inside of the second groove, and a second nut is threadedly connected on the surface of the second screw.

[0008] By adopting the above technical solution, the adjustment pile can be fixed by providing the second screw rod, the second groove and the second nut, thereby improving the stability between the adjustment pile and the beam column.

[0009] The utility model is further configured as follows: reinforcement plates are welded on the four surfaces of the adjustment pile, a third fixing bolt is penetrated through the bottom of the reinforcement plate, the other end of the third fixing bolt penetrates and extends to the interior of the crossbeam, and a third nut threadedly connected to the third fixing bolt is embedded in the interior of the crossbeam.

[0010] By adopting the above technical solution, the crossbeam can be supported and reinforced by arranging the reinforcement plate, the third fixing bolts and the third nuts, thereby reducing the bearing pressure of the crossbeam.

[0011] The utility model is further configured as follows: the length and width of the beam column and the installation pile are the same, and the length and width of the adjustment pile and the top plate are the same.

[0012] By adopting the above technical solution, the end of the beam can be loaded and reinforced.

[0013] The utility model is further configured as follows: the first screw rod, the first nut, the first fixing bolt and the second fixing bolt are all made of stainless steel.

[0014] By adopting the above technical solution, the first screw rod, the first nut, the first fixing bolt and the second fixing bolt have the characteristics of high strength, low density and excellent corrosion resistance.

[0015] The utility model is further configured as follows: the top of the top plate is in a solid state.

[0016] By adopting the above technical solution, rainwater or dust can be prevented from falling into the interior of the second groove.

[0017] The utility model is further configured that surfaces of the beams, adjustment piles, installation piles, cross beams and top plates are all coated with anti-corrosion paint.

[0018] By adopting the above technical solution and setting the anti-corrosion coating, the anti-corrosion effect of the surface of beams, columns, adjustment piles, installation piles and beams can be improved, thereby extending their service life.

[0019] In summary, the utility model has the following beneficial effects:

[0020] 1. The utility model has the following steps: when the adjusting pile is placed and is lower than other adjusting piles, the adjusting pile is first removed from the beam column, and then a tool is put on the first nut and rotated. The first nut moves upward when it rotates, and when the first nut on the first screw rod moves up to a specified position, the adjusting pile is placed back on the beam column, and finally the second nut is grasped with a tool and rotated downward to the bottom. The utility model has the function of height difference adjustment, is simple and labor-saving to operate, and reduces the workload of personnel.

[0021] 2. The utility model places one end of the beam on the adjusting pile first, then pushes the beam inward to make it fit with the mounting pile, then puts the first fixing bolt into the beam and fixes it to the mounting pile, after the first fixing bolt is fixed, takes out the third fixing bolt, inserts it from the bottom of the reinforcement plate and screws it into the third nut, finally places the top plate on the mounting pile and fixes it with the second fixing bolt, which can improve the stability of the beam, avoid deformation of the connection position of the beam, and has high safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a three-dimensional diagram of the structure of the utility model;

[0023] Figure 2 It is a front sectional view of the structure of the utility model;

[0024] Figure 3 This utility model Figure 2 A magnified view of the structure in the middle.

[0025] Figure numerals: 1. beam column; 2. adjustment pile; 3. first screw rod; 4. first groove; 5. first nut; 6. mounting pile; 7. cross beam; 8. first fixing bolt; 9. top plate; 10. second fixing bolt; 11. second screw rod; 12. second groove; 13. second nut; 14. reinforcement plate; 15. third fixing bolt; 16. third nut. DETAILED DESCRIPTION

[0026] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0027] Embodiment 1:

[0028] refer to Figure 1 , Figure 2 and Figure 3 A detachable assembled building steel structure includes a beam column 1, an adjusting pile 2 is arranged on the top of the beam column 1, a first screw 3 is symmetrically welded inside the adjusting pile 2, a first groove 4 used in conjunction with the first screw 3 is opened on the top of the beam column 1, and a first nut 5 is threadedly connected to the surface of the first screw 3. When the adjusting pile 2 is placed and lower than other adjusting piles 2, the adjusting pile 2 is first removed from the beam column 1, and then the tool is put on the first nut 5 and rotated. The first nut 5 moves upward when it rotates. When the first nut 5 on the first screw 3 moves up to the specified position, the adjusting pile 2 is placed back on the beam column 1, and finally the second nut 13 is grasped with a tool and turned downward to the bottom. It can have the function of height difference adjustment, is simple and labor-saving to operate, and reduces the workload of personnel.

[0029] refer to Figure 2 A second screw 11 is welded on the top of the beam 1, and a second groove 12 is opened on the top of the adjusting pile 2. The other end of the second screw 11 extends into the inside of the second groove 12, and a second nut 13 is threadedly connected to the surface of the second screw 11. Through the arrangement of the second screw 11, the second groove 12 and the second nut 13, the adjusting pile 2 can be fixed, thereby improving the stability between the adjusting pile 2 and the beam 1.

[0030] refer to Figure 1 , Figure 2 and Figure 3 The first screw rod 3, the first nut 5, the first fixing bolt 8 and the second fixing bolt 10 are all made of stainless steel. The first screw rod 3, the first nut 5, the first fixing bolt 8 and the second fixing bolt 10 have the characteristics of high strength, low density and excellent corrosion resistance.

[0031] refer to Figure 1 , Figure 2 and Figure 3 The surfaces of the beam column 1, the adjustment pile 2, the installation pile 6, the cross beam 7 and the top plate 9 are all coated with anti-corrosion coating. By setting the anti-corrosion coating, the anti-corrosion effect of the surface of the beam column 1, the adjustment pile 2, the installation pile 6 and the cross beam 7 can be improved, and their service life can be extended.

[0032] Brief description of the usage process: when the adjusting pile 2 is placed lower than other adjusting piles 2, first remove the adjusting pile 2 from the beam 1, then put the tool on the first nut 5 and rotate it. The first nut 5 will move upward when it rotates. When the first nut 5 on the first screw rod 3 moves up to the specified position, put the adjusting pile 2 back on the beam 1, and finally use the tool to grab the second nut 13 and turn it down to the bottom.

[0033] Embodiment 2:

[0034] refer to Figure 1 and Figure 2 , a detachable assembled steel structure for building, a mounting pile 6 is installed on the top of the adjusting pile 2, four cross beams 7 are placed on the top of the adjusting pile 2, a first fixing bolt 8 is threadedly connected between one side of the cross beam 7 and the mounting pile 6, a top plate 9 is placed on the top of the mounting pile 6, and a second fixing bolt 10 is threadedly connected between the top of the top plate 9 and the mounting pile 6. By first placing one end of the cross beam 7 on the adjusting pile 2, and then pushing the cross beam 7 inward to make it fit with the mounting pile 6, and then inserting the first fixing bolt 8 into the cross beam 7 and fixing it with the mounting pile 6, when the first fixing bolt 8 is fixed, take out the third fixing bolt 15, insert it from the bottom of the reinforcement plate 14 and screw it into the third nut 16, and finally place the top plate 9 on the mounting pile 6 and fix it with the second fixing bolt 10, which can improve the stability of the cross beam 7, avoid deformation of the connection position of the cross beam 7, and have high safety.

[0035] refer to Figure 1 and Figure 2 Reinforcement plates 14 are welded to the four surfaces of the adjustment pile 2, a third fixing bolt 15 is penetrated through the bottom of the reinforcement plate 14, the other end of the third fixing bolt 15 penetrates and extends to the inside of the cross beam 7, and a third nut 16 threadedly connected to the third fixing bolt 15 is inlaid in the interior of the cross beam 7. By arranging the reinforcement plate 14, the third fixing bolt 15 and the third nut 16, the cross beam 7 can be supported and reinforced, thereby reducing the bearing pressure of the cross beam 7.

[0036] refer to Figure 1 and Figure 2 The length and width of the beam column 1 and the installation pile 6 are the same, and the length and width of the adjustment pile 2 and the top plate 9 are the same, which can carry and reinforce the end of the cross beam 7.

[0037] refer to Figure 1 and Figure 2 The top of the top plate 9 is in a solid state, which can prevent rainwater or dust from falling into the interior of the second groove 12.

[0038] A brief description of the usage process: first place one end of the crossbeam 7 on the adjustment pile 2, then push the crossbeam 7 inward to make it fit with the mounting pile 6, then put the first fixing bolt 8 into the crossbeam 7 and fix it to the mounting pile 6. After the first fixing bolt 8 is fixed, take out the third fixing bolt 15, insert it from the bottom of the reinforcement plate 14 and screw it into the third nut 16. Finally, place the top plate 9 on the mounting pile 6 and fix it with the second fixing bolt 10.

[0039] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.

Claims

1. A detachable assembled building steel structure, comprising beams and columns (1), characterized in that: An adjusting pile (2) is arranged on the top of the beam column (1), a first screw rod (3) is symmetrically welded inside the adjusting pile (2), a first groove (4) for use with the first screw rod (3) is opened on the top of the beam column (1), a first nut (5) is threadedly connected on the surface of the first screw rod (3), a mounting pile (6) is installed on the top of the adjusting pile (2), four cross beams (7) are placed on the top of the adjusting pile (2), a first fixing bolt (8) is threadedly connected between one side of the cross beam (7) and the mounting pile (6), a top plate (9) is placed on the top of the mounting pile (6), and a second fixing bolt (10) is threadedly connected between the top of the top plate (9) and the mounting pile (6).

2. A detachable assembled building steel structure according to claim 1, characterized in that: A second screw rod (11) is welded to the top of the beam column (1), a second groove (12) is opened at the top of the adjustment pile (2), the other end of the second screw rod (11) extends into the inside of the second groove (12), and a second nut (13) is threadedly connected to the surface of the second screw rod (11).

3. The detachable assembled building steel structure according to claim 1, characterized in that: The four surfaces of the adjustment pile (2) are welded with reinforcement plates (14), the bottom of the reinforcement plate (14) is penetrated by a third fixing bolt (15), the other end of the third fixing bolt (15) penetrates and extends to the inside of the cross beam (7), and the inside of the cross beam (7) is embedded with a third nut (16) threadedly connected to the third fixing bolt (15).

4. The detachable assembled building steel structure according to claim 1, characterized in that: The length and width of the beam column (1) and the installation pile (6) are the same, and the length and width of the adjustment pile (2) and the top plate (9) are the same.

5. The detachable assembled building steel structure according to claim 1, characterized in that: The first screw rod (3), the first nut (5), the first fixing bolt (8) and the second fixing bolt (10) are all made of stainless steel.

6. The detachable assembled building steel structure according to claim 1, characterized in that: The top of the top plate (9) is in a solid state.

7. The detachable assembled building steel structure according to claim 1, characterized in that: The surfaces of the beam column (1), the adjustment pile (2), the installation pile (6), the cross beam (7) and the top plate (9) are all coated with anti-corrosion paint.

Citation Information

Patent Citations

  • Detachable assembly type building steel structure

    CN212478094U