Air film steel cable tensioning clamp

By designing a gas film cable tensioning clamp, the tensioning force is transmitted to the aluminum sleeve by using the structures of the first and second sleeves to protect the PE layer and prevent the aluminum sleeve from deformation, the problems of PE layer damage and aluminum sleeve deformation during the installation of the gas film cable are solved.

CN222595551UActive Publication Date: 2025-03-11SHENZHEN ZHONGDE MEMBRANE STRUCTURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420685183.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2025-03-11
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

During the installation or replacement of gas-film steel cables, the tensioning process can easily cause damage to the PE layer by stress or friction, and the aluminum sleeve is easily deformed due to stress.

Method used

An air-film steel cable tensioning clamp is designed, which is connected to an aluminum sleeve through a first sleeve, and the second sleeve is connected to the steel cable, and is abutted with the first sleeve, one end of the tensioning assembly is connected to the second sleeve, and the other end is connected to the anchor point. The design transmits tensioning force to the aluminum sleeve to avoid stress on the PE layer and limits the shape of the aluminum sleeve through the first sleeve to avoid deformation.

Benefits of technology

It effectively protects the PE layer, avoids damage to the PE layer during the tensioning process, and prevents the aluminum sleeve from deforming due to uneven stress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222595551U_ABST
    Figure CN222595551U_ABST
Patent Text Reader

Abstract

The utility model relates to an air film steel cable tensioning clamp. One end of a steel cable is sleeved with an aluminum sleeve. The tensioning clamp comprises a first sleeve, a second sleeve and a third sleeve, wherein the aluminum sleeve is sleeved with the first sleeve; the second sleeve is connected to the steel cable in a sleeving mode and abuts against the first sleeve; one end of the tensioning assembly is connected with the second sleeve, and the other end is connected with the anchor point. In the tensioning process, damage to the PE layer can be avoided, and deformation of the aluminum sleeve is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel cable tensioning, and in particular to an air film steel cable tensioning clamp. Background Art

[0002] The air membrane structure uses an air membrane as the outer shell, and inflates the air membrane to form a positive pressure, thereby supporting the main body of the membrane. In order to enhance the stability of the air membrane, it is necessary to set an outer cover steel cable net on the outside of the air membrane. The outer cover steel cable net includes multiple steel cables, which span the surface of the air membrane and are connected to anchor points on the ground at both ends. Multiple steel cables are arranged at different angles to form a staggered outer cover steel cable net. The steel cable usually includes a steel wire rope and a PE layer wrapped around the surface of the steel wire rope. The end of the steel cable is bent to form a heart-shaped cable head, and the bent end of the steel cable and the main body are connected by an aluminum sleeve to tighten it.

[0003] During the actual installation of the steel cable, some of the steel cables need to be installed after the air film is inflated, or the steel cables need to be replaced during the construction process; during the installation or replacement of the steel cable, the cable head needs to be stretched to the anchor point on the ground with tools, and then the cable head and the anchor point are connected. During the tensioning process, the PE layer is easily damaged by force or friction, and the aluminum sleeve is also easily deformed due to force. Utility Model Content

[0004] Based on this, it is necessary to provide an air film steel cable tensioning clamp, and its specific technical solution is as follows.

[0005] An air film steel cable tensioning fixture, wherein one end of the steel cable is sleeved with an aluminum sleeve; the tensioning fixture comprises:

[0006] A first sleeve is sleeved on the aluminum sleeve;

[0007] A second sleeve is sleeved on the steel cable and butted against the first sleeve;

[0008] The tensioning component has one end connected to the second sleeve and the other end connected to the anchor point.

[0009] Optionally, the first sleeve includes a cylinder and a first end plate; a cavity for surrounding the aluminum sleeve is formed in the cylinder; the first end plate is located on the end face of the cylinder, and a through hole for accommodating the steel cable to pass through is provided on the first end plate; the diameter of the through hole is smaller than the outer diameter of the aluminum sleeve, so that the first end plate is abutted against the end face of the aluminum sleeve.

[0010] Optionally, the first sleeve includes a cylinder, and the cylinder clamps the aluminum sleeve.

[0011] Furthermore, the first sleeve includes a first sleeve body and a second sleeve body which are symmetrically arranged along its axial direction, and the first sleeve body is detachably connected to the second sleeve body.

[0012] Furthermore, one side of the first sleeve is hinged to the second sleeve via a hinge, and the other side is connected to the second sleeve via a bolt.

[0013] Furthermore, the end surface of the first sleeve does not contact the cable head on the steel cable.

[0014] Furthermore, a limit block is provided on the surface of the second sleeve; one end of the tensioning assembly is sleeved on the second sleeve and abuts against the limit block.

[0015] Furthermore, the second sleeve includes a section A and a section B which are symmetrically arranged along its axial direction, and the section A is detachably connected to the section B.

[0016] Furthermore, one side of the section A is connected to the section B via a hinge, and the other side is connected to the section B via a bolt.

[0017] Furthermore, the tensioning component is any one of an electric hoist, a pulley, and a cylinder.

[0018] Beneficial effect: The air film steel cable tensioning clamp provided in this embodiment enables the force of the tensioning component to act on the second sleeve, and transmits the force to the aluminum sleeve through the first sleeve, thereby protecting the PE layer and avoiding damage to the PE layer during the tensioning process; and the first sleeve is sleeved on the aluminum sleeve to limit the shape of the aluminum sleeve, thereby avoiding deformation of the aluminum sleeve due to uneven force. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 It is a structural schematic diagram of the tensioning fixture;

[0021] Figure 2 is an axial cross-sectional view of the first sleeve;

[0022] Figure 3 is a schematic diagram of the end face of the first sleeve;

[0023] Figure 4 is a schematic diagram of the end face of the second sleeve;

[0024] Figure 5 for Figure 1 A magnified schematic diagram of the middle A area;

[0025] Figure 6 This is a schematic diagram of section A.

[0026] Description of reference numerals: 100, steel cable; 200, cable head; 300, aluminum sleeve;

[0027] 1. First casing; 2. Second casing; 3. Tensioning assembly; 4. Anchor point;

[0028] 11. Cylinder; 12. First end plate; 13. Receptacle; 14. Through hole; 15. First sleeve; 16. Second sleeve;

[0029] 21. Limit block; 22. Section A; 23. Section B; 24. Second hinge; 25. Second connecting ear. DETAILED DESCRIPTION

[0030] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0031] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0032] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0033] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0034] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0035] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.

[0036] Example

[0037] The present embodiment discloses an air film steel cable tensioning clamp. It should be noted that the air film steel cable 100 includes a steel wire rope and a PE layer wrapping the steel wire rope. The end of the steel cable 100 is bent to form a heart-shaped cable head 200, and the bent end of the steel cable 100 and the body are connected by an aluminum sleeve 300 to tighten them.

[0038] Reference Figure 1 and Figure 5 As shown, the tensioning fixture includes a first sleeve 1, a second sleeve 2 and a tensioning assembly 3, wherein the first sleeve 1 is sleeved on the aluminum sleeve 300, the second sleeve 2 is sleeved on the steel cable 100, and the second sleeve 2 abuts against the first sleeve 1. One end of the tensioning assembly 3 is connected to the second sleeve 2, and the other end is connected to the anchor point 4.

[0039] In the process of connecting the cable head 200 and the anchor point 4, the cable head 200 is connected to the anchor point 4 after the cable head 200 is in place by the tensioning assembly 3. During the tensioning process, the tensioning force of the tensioning assembly 3 acts on the second sleeve 2. Since the second sleeve 2 and the first sleeve 1 are against each other, the tensioning force is transferred to the first sleeve 1. Since the first sleeve 1 is sleeved on the aluminum sleeve 300, the tensioning force is transferred to the aluminum sleeve 300, which can avoid the tensioning assembly 3 and the PE layer from interacting and causing damage to the PE layer. The first sleeve 1 is sleeved on the aluminum sleeve 300 to limit the shape of the aluminum sleeve 300, thereby preventing the aluminum sleeve 300 from being deformed due to uneven force.

[0040] Specifically, referring to Figure 2 As shown, the first sleeve 1 includes a cylinder 11 and a first end plate 12. A cavity 13 for surrounding the aluminum sleeve 300 is formed in the cylinder 11. The first end plate 12 is located at the end surface of the cylinder 11 and is integrally formed with the cylinder 11. A through hole 14 is provided on the first end plate 12, and the through hole 14 is used to accommodate the steel cable 100 passing through. And the diameter of the through hole 14 is smaller than the outer diameter of the aluminum sleeve 300, so that the first end plate 12 and the end surface of the aluminum sleeve 300 are abutted. Since the first end plate 12 and the aluminum sleeve 300 are abutted, the tension force acting on the first sleeve 1 is transmitted to the aluminum sleeve 300.

[0041] It should be noted that, in other embodiments, the first sleeve 1 may also only include the cylinder 11, and the cylinder 11 clamps the aluminum sleeve 300 to increase the friction between the cylinder 11 and the aluminum sleeve 300, so that the tension force acting on the first sleeve 1 is transmitted to the aluminum sleeve 300.

[0042] Specifically, refer to Figure 3 As shown, the first sleeve 1 includes a first sleeve body 15 and a second sleeve body 16 symmetrically arranged along its axial direction, and the first sleeve body 15 and the second sleeve body 16 are detachably connected. Specifically, one side of the first sleeve body 15 is connected to the second sleeve body 16 through a first hinge, so that the first sleeve body 15 and the second sleeve body 16 can rotate relative to each other. Although not shown in the figure, a first connecting ear can be provided on the side of the first sleeve body 15 and the second sleeve body 16, and the two first connecting ears can be connected by bolts to achieve a detachable connection. It is also possible to respectively provide first connecting ears on both sides of the first sleeve body 15 and the second sleeve body 16, and connect the corresponding first connecting ears by bolts. It should be noted that in other embodiments, structures such as buckles and hoop can also be used to achieve a detachable connection between the first body 15 and the second body 16. It should be noted that in other embodiments, the first sleeve 1 can also be an integral sleeve directly sleeved on the aluminum sleeve 300.

[0043] Specifically, in order to protect the PE layer at the cable head 200 and avoid the PE layer being damaged due to the interaction between the first sleeve 1 and the cable head 200 during the tensioning process, the end surface of the first sleeve 1 is prevented from contacting the cable head 200 on the steel cable 100. Specifically, the length of the first sleeve 1 can be made shorter than the length of the aluminum sleeve 300, so that the first sleeve 1 does not contact the cable head 200.

[0044] Specifically, refer to Figure 1 and Figure 4 As shown, a stopper 21 is provided on the surface of the second sleeve 2. The tensioning rope at one end of the tensioning assembly 3 is sleeved on the surface of the second sleeve 2 and abuts against the stopper 21, and the stopper 21 serves as a force point between the second sleeve 2 and the tensioning assembly 3. This facilitates the tensioning assembly 3 to apply tensioning force to the second sleeve 2. The second sleeve 2 can be provided with a plurality of stopper blocks 21 along its axial direction, and the tensioning rope can be sleeved at different positions as needed during the actual construction process on site, so that the corresponding stopper blocks 21 serve as force points.

[0045] Specifically, continue to refer to Figure 4 As shown, the second sleeve 2 includes a segment A 22 and a segment B 23 symmetrically arranged along its axial direction, and the segment A 22 and the segment B 23 are detachably connected. Specifically, one side of the segment A 22 is connected to the segment B 23 by a second hinge, so that the segment A 22 and the segment B 23 can rotate relative to each other. Although not shown in the figure, a second connecting ear 25 can be respectively provided on the side of the segment A 22 and the segment B 23, and the two second connecting ears 25 are connected by bolts, so as to realize the detachable connection between the segment A 22 and the segment B 23. The second connecting ears 25 can also be respectively provided on both sides of the segment A 22 and the segment B 23, and the corresponding second connecting ears 25 are connected by bolts. It should be noted that in other embodiments, structures such as buckles and hoop can also be used to realize the detachable connection between the segment A 22 and the segment B 23.

[0046] Specifically, in this embodiment, the tensioning assembly 3 may be an electric hoist, and in other embodiments, other tensioning structures such as pulleys and oil cylinders may also be selected.

[0047] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0048] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. An air film steel cable tensioning fixture, wherein one end of the steel cable is sleeved with an aluminum sleeve; characterized in that: The tensioning fixture comprises: A first sleeve is sleeved on the aluminum sleeve; A second sleeve is sleeved on the steel cable and butted against the first sleeve; The tensioning component has one end connected to the second sleeve and the other end connected to the anchor point.

2. The air film steel cable tensioning fixture according to claim 1, characterized in that: The first sleeve includes a cylinder and a first end plate; a cavity for surrounding the aluminum sleeve is formed in the cylinder; the first end plate is located on the end face of the cylinder, and a through hole for accommodating the steel cable is provided on the first end plate; the diameter of the through hole is smaller than the outer diameter of the aluminum sleeve, so that the first end plate abuts against the end face of the aluminum sleeve.

3. The air film steel cable tensioning fixture according to claim 1, characterized in that: The first sleeve includes a cylinder, and the cylinder clamps the aluminum sleeve.

4. The air film steel cable tensioning fixture according to claim 1, characterized in that: The first sleeve comprises a first sleeve body and a second sleeve body which are symmetrically arranged along the axial direction thereof, and the first sleeve body is detachably connected to the second sleeve body.

5. The air film steel cable tensioning fixture according to claim 4, characterized in that: One side of the first sleeve is hinged to the second sleeve through a hinge, and the other side is connected to the second sleeve through a bolt.

6. The air film steel cable tensioning clamp according to any one of claims 1 to 5, characterized in that: The end surface of the first sleeve does not contact the cable head on the steel cable.

7. The air film steel cable tensioning fixture according to claim 1, characterized in that: A limit block is provided on the surface of the second sleeve; one end of the tensioning assembly is sleeved on the second sleeve and abuts against the limit block.

8. The air film steel cable tensioning fixture according to claim 1, characterized in that: The second sleeve includes a section A and a section B which are symmetrically arranged along its axial direction, and the section A is detachably connected to the section B.

9. The air film steel cable tensioning fixture according to claim 8, characterized in that: One side of the A section is connected to the B section via a hinge, and the other side is connected to the B section via a bolt.

10. The air film steel cable tensioning fixture according to claim 1, characterized in that: The tensioning component is any one of a hoist, a pulley and an oil cylinder.