Electric power construction pipeline drilling device

By using a combination of lifting moving mechanism and grinding mechanism on the power construction pipeline, the problem of difficulty in effectively operating the traditional drilling equipment at the construction site and rough edges of the drilling are solved, and efficient and safe drilling and grinding effects are achieved.

CN222610023UActive Publication Date: 2025-03-14CHINA ENERGY ENG GRP NORTHEAST NO 2 ELECTRIC POWER CONSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421264525.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-03-14
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

It is difficult for traditional drilling mechanisms to effectively drill the power construction pipeline at the construction site, and the edges of the holes after the drilling are rough, making it easy to damage the power cables.

Method used

The drilling device is placed at the opening of the power construction pipeline through the lifting moving mechanism, and the edge of the opening is polished by the extension and grinding mechanism to prevent damage to the power cable.

Benefits of technology

Efficient and safe drilling operations on power construction pipelines are achieved, avoiding damage to power cables by the drilling edges and improving the practicality of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222610023U_ABST
    Figure CN222610023U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of drilling devices for construction pipelines, in particular to a drilling device for power construction pipelines, which is characterized in that the drilling device is placed at an opening of a power construction pipeline through a hoisting moving mechanism, a grinding mechanism is stretched to the opening, and the edge of the opening is ground by opening the grinding mechanism. The power cable is prevented from being damaged at the irregular opening edge, the equipment is moved by moving the moving mechanism after coping is completed, and the practicability of the equipment is improved; comprising a moving mechanism; comprising a moving mechanism and further comprises a fixing mechanism, a first rotating mechanism, a drilling mechanism, a second rotating mechanism and a grinding mechanism, the fixing mechanism and the first rotating mechanism are both installed on the moving mechanism, the drilling mechanism and the second rotating mechanism are both installed on the first rotating mechanism, and the grinding mechanism is installed on the second rotating mechanism.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction pipeline drilling devices, in particular to an electric power construction pipeline drilling device. Background Art

[0002] The power construction pipeline is a pipeline specially used for transmitting electricity. It is mainly used in fields such as urban power grids and power engineering. This kind of pipeline needs to fully consider safety factors during the design and construction process to ensure its stable operation, because once a failure occurs, it may endanger the safety of people’s lives and property.

[0003] For example, in a type of prior art represented by the construction pipe drilling device disclosed in the utility model patent with application number 202022599140.9, its main structure includes a drill rod, a push rod, a cement pipe, a jacking pipe body, a fixed frame and a hydraulic rod, etc. The drilling of the construction pipe is achieved through the cooperation of structures such as the drill rod, the push rod, the cement pipe, the jacking pipe body, the fixed frame and the hydraulic rod.

[0004] Drilling holes for power construction pipelines usually takes place at the construction site, which is difficult to accomplish with traditional drilling mechanisms. After drilling, the edges of the holes are relatively rough, which can easily damage power cables. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a drilling device for electric power construction pipeline, which is placed at the opening of the electric power construction pipeline by a hoisting mobile mechanism, and the edge of the opening is ground by extending the grinding mechanism to the opening and opening the grinding mechanism to prevent the power cable from being damaged by the uneven edge of the opening. After the grinding is completed, the device is moved by moving the moving mechanism to improve the practicality of the device.

[0006] The utility model discloses a drilling device for an electric power construction pipeline, comprising a moving mechanism; the moving mechanism also includes a fixing mechanism, a first rotating mechanism, a drilling mechanism, a second rotating mechanism and a grinding mechanism, wherein the fixing mechanism and the first rotating mechanism are both mounted on the moving mechanism, the drilling mechanism and the second rotating mechanism are both mounted on the first rotating mechanism, and the grinding mechanism is mounted on the second rotating mechanism; the drilling device is placed at an opening of the electric power construction pipeline by hoisting the moving mechanism, the electric power construction pipeline is fixed by extending the fixing mechanism, the drilling mechanism is rotated to above the opening position by opening the first rotating mechanism, the electric power construction pipeline is opened by opening the drilling mechanism, the second rotating mechanism is rotated to above the opening position by opening the first rotating mechanism again, the grinding mechanism is rotated to above the opening position by opening the second rotating mechanism, the grinding mechanism is extended to the opening, and the edge of the opening is ground by opening the grinding mechanism to prevent the power cable from being damaged at the uneven edge of the opening, and the device is moved by moving the moving mechanism after the grinding is completed, thereby improving the practicability of the device.

[0007] Preferably, the moving mechanism includes a mounting frame, a lifting ring, multiple handles, multiple first cylinders and multiple rollers, the lifting ring and the bottom ends of the multiple handles are respectively installed on the top of the mounting frame, the multiple handles are respectively located on the front and rear sides of the lifting ring, the top ends of the multiple first cylinders are respectively installed on the bottom end of the mounting frame, and the multiple rollers are respectively installed on the mounting frame; the equipment is lifted to the construction site through the lifting ring by the lifting equipment, the mounting frame is supported by extending the multiple first cylinders respectively, and the multiple rollers are rotated by the staff respectively assisting the multiple handles to move the mounting frame, thereby improving the practicability of the equipment.

[0008] Preferably, the fixing mechanism includes a plurality of second cylinders and a plurality of fixing clips, and the plurality of fixing clips are respectively installed at the bottom ends of the plurality of second cylinders; by respectively extending the plurality of second cylinders and fixing the power cable conduit via the plurality of fixing clips, the practicability of the equipment is improved.

[0009] Preferably, the first rotating mechanism includes a first motor and a rotating rod, and the top end of the rotating rod is installed on the output end of the first motor; by turning on the first motor to rotate the rotating rod, the practicability of the device is improved.

[0010] Preferably, the drilling mechanism includes a third cylinder, a second motor, a mounting rod and a drill, the top end of the second motor is mounted on the bottom end of the third cylinder, and the top end of the drill is mounted on the output end of the second motor via the mounting rod; the drill is made to reach the power construction pipeline by extending the third cylinder, and the mounting rod is rotated by turning on the second motor so that the drill makes a hole in the power construction pipeline, thereby improving the practicability of the equipment.

[0011] Preferably, the second rotating mechanism includes a third motor, a first gear ring, a second gear ring and a bearing, the inner ring of the first gear ring is installed on the output end of the third motor, the outer ring of the first gear ring is meshed with the outer ring of the second gear ring, and the inner ring of the second gear ring is installed on the outer ring of the bearing; by turning on the third motor to rotate the first gear ring, the second gear ring is rotated through the meshing of the first gear ring and the second gear ring, the grinding mechanism is rotated, thereby improving the practicability of the equipment.

[0012] Preferably, the grinding mechanism includes a fourth motor, a fourth cylinder, a fifth cylinder, a fifth motor and a grinding tool, the top end of the fourth cylinder is installed on the output end of the fourth motor, the left end of the fifth cylinder is installed on the lower part of the fourth cylinder, the fifth motor is installed on the right end of the fifth cylinder, and the grinding tool is installed on the output end of the fifth motor; the fourth cylinder is rotated by turning on the fourth motor, the grinding tool reaches the opening by extending the fourth cylinder, the grinding tool contacts the edge of the opening by extending and contracting the fifth cylinder, and the grinding tool grinds the edge of the opening by turning on the fifth motor, thereby improving the practicability of the equipment.

[0013] Compared with the prior art, the utility model has the following beneficial effects: the drilling device is placed at the opening of the power construction pipeline by a hoisting mobile mechanism, the power construction pipeline is fixed by extending the fixing mechanism, the drilling mechanism is rotated to above the opening position by opening the first rotating mechanism, the power construction pipeline is opened by opening the drilling mechanism, the second rotating mechanism is rotated to above the opening position by opening the first rotating mechanism again, the grinding mechanism is rotated to above the opening position by opening the second rotating mechanism, the grinding mechanism is extended to the opening, and the edge of the opening is ground by opening the grinding mechanism to prevent damage to the power cable at the uneven edge of the opening, and the device is moved by moving the moving mechanism after the grinding is completed, thereby improving the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is an axonometric schematic diagram of the utility model;

[0015] Figure 2 It is an axonometric schematic diagram of the mobile mechanism of the utility model;

[0016] Figure 3 It is an axonometric schematic diagram of the fixing mechanism of the utility model;

[0017] Figure 4 It is an axonometric schematic diagram of the first rotating mechanism of the utility model;

[0018] Figure 5 It is an axonometric schematic diagram of the drilling mechanism of the utility model;

[0019] Figure 6 It is an axonometric schematic diagram of the second rotating mechanism of the utility model;

[0020] Figure 7 It is an axonometric schematic diagram of the grinding mechanism of the utility model.

[0021] Markings in the accompanying drawings: 01, moving mechanism; 11, mounting frame; 12, lifting ring; 13, handle; 14, first cylinder; 15, roller; 02, fixing mechanism; 21, second cylinder; 22, fixing clamp; 03, first rotating mechanism; 31, first motor; 32, rotating rod; 04, drilling mechanism; 41, third cylinder; 42, second motor; 43, mounting rod; 44, drill; 05, second rotating mechanism; 51, third motor; 52, first gear ring; 53, second gear ring; 54, bearing; 06, grinding mechanism; 61, fourth motor; 62, fourth cylinder; 63, fifth cylinder; 64, fifth motor; 65, grinding tool. DETAILED DESCRIPTION

[0022] In order to facilitate the understanding of the utility model, the utility model will be described more comprehensively below with reference to the relevant drawings. The utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the utility model more thorough and comprehensive.

[0023] Example 1

[0024] like Figure 1 As shown, it includes a moving mechanism 01; the moving mechanism 01 also includes a fixing mechanism 02, a first rotating mechanism 03, a drilling mechanism 04, a second rotating mechanism 05 and a grinding mechanism 06, the fixing mechanism 02 and the first rotating mechanism 03 are both mounted on the moving mechanism 01, the drilling mechanism 04 and the second rotating mechanism 05 are both mounted on the first rotating mechanism 03, and the grinding mechanism 06 is mounted on the second rotating mechanism 05;

[0025] The drilling device is placed at the opening of the power construction pipeline by hoisting the mobile mechanism 01, the power construction pipeline is fixed by extending the fixing mechanism 02, the drilling mechanism 04 is rotated to above the opening position by opening the first rotating mechanism 03, the power construction pipeline is opened by opening the drilling mechanism 04, the first rotating mechanism 03 is opened again to rotate the second rotating mechanism 05 to above the opening, the grinding mechanism 06 is rotated to above the opening position by opening the second rotating mechanism 05, the grinding mechanism 06 is extended to the opening, and the grinding mechanism 06 is opened to grind the edge of the opening to prevent the power cable from being damaged by the uneven opening edge, and after the grinding is completed, the device is moved by moving the mobile mechanism 01 to improve the practicability of the device;

[0026] like Figure 2As shown, the mobile mechanism 01 includes a mounting frame 11, a lifting ring 12, a plurality of handles 13, a plurality of first cylinders 14 and a plurality of rollers 15, the bottom ends of the lifting ring 12 and the plurality of handles 13 are respectively mounted on the top end of the mounting frame 11, the plurality of handles 13 are respectively located on the front and rear sides of the lifting ring 12, the top ends of the plurality of first cylinders 14 are respectively mounted on the bottom ends of the mounting frame 11, and the plurality of rollers 15 are respectively mounted on the mounting frame 11;

[0027] like Figure 3 As shown, the fixing mechanism 02 includes a plurality of second cylinders 21 and a plurality of fixing clips 22, and the plurality of fixing clips 22 are respectively installed at the bottom ends of the plurality of second cylinders 21;

[0028] like Figure 4 As shown, the first rotating mechanism 03 includes a first motor 31 and a rotating rod 32, and the top end of the rotating rod 32 is installed on the output end of the first motor 31;

[0029] like Figure 5 As shown, the drilling mechanism 04 includes a third cylinder 41, a second motor 42, a mounting rod 43 and a drill 44. The top end of the second motor 42 is mounted on the bottom end of the third cylinder 41, and the top end of the drill 44 is mounted on the output end of the second motor 42 via the mounting rod 43.

[0030] The equipment is hoisted to the construction site through the hoisting equipment via the hoisting ring 12, the mounting frame 11 is supported by extending multiple first cylinders 14 respectively, and the mounting frame 11 is moved by the assistance of multiple handles 13 by workers, and the power cable pipeline is fixed through multiple fixing clamps 22 respectively by extending multiple second cylinders 21 respectively, the rotating rod 32 is rotated by turning on the first motor 31, the drill 44 reaches the power construction pipeline by extending the third cylinder 41, and the mounting rod 43 is rotated by turning on the second motor 42, so that the drill 44 drills a hole in the power construction pipeline, thereby improving the practicability of the equipment.

[0031] Example 2

[0032] like Figure 6 and Figure 7As shown, on the basis of Example 1, it also includes a second rotating mechanism 05 and a grinding mechanism 06, the second rotating mechanism 05 includes a third motor 51, a first gear ring 52, a second gear ring 53 and a bearing 54, the inner ring of the first gear ring 52 is installed on the output end of the third motor 51, the outer ring of the first gear ring 52 is meshed with the outer ring of the second gear ring 53, and the inner ring of the second gear ring 53 is installed on the outer ring of the bearing 54; the grinding mechanism 06 includes a fourth motor 61, a fourth cylinder 62, a fifth cylinder 63, a fifth motor 64 and a grinding tool 65, the top end of the fourth cylinder 62 is installed on the output end of the fourth motor 61, the left end of the fifth cylinder 63 is installed at the bottom of the fourth cylinder 62, the fifth motor 64 is installed at the right end of the fifth cylinder 63, and the grinding tool 65 is installed on the output end of the fifth motor 64;

[0033] The first gear ring 52 is rotated by turning on the third motor 51, and the second gear ring 53 is rotated through the meshing of the first gear ring 52 and the second gear ring 53, so that the grinding mechanism 06 is rotated, and the fourth motor 61 is turned on to rotate the fourth cylinder 62, and the fourth cylinder 62 is extended to make the grinder 65 reach the opening, and the fifth cylinder 63 is extended and contracted to make the grinder 65 contact with the edge of the opening, and the fifth motor 64 is turned on to make the grinder 65 grind the edge of the opening, thereby improving the practicability of the equipment.

[0034] like Figures 1 to 7 As shown, the utility model is a kind of electric power construction pipeline drilling device. When it is working, the device is first hoisted to the construction site through the hoisting equipment via the hoisting ring 12, and the mounting frame 11 is supported by respectively extending a plurality of first cylinders 14, and then the electric power cable pipeline is fixed by respectively extending a plurality of second cylinders 21 via a plurality of fixing clamps 22, and then the first motor 31 is turned on to rotate the rotating rod 32, and then the third cylinder 41 is extended to make the drill 44 reach the electric power construction pipeline, and the second motor 42 is turned on to rotate the mounting rod 43, so that the drill 44 drills a hole in the electric power construction pipeline, and then the third motor 51 is turned on to make the first gear 32 rotate. The ring 52 rotates, and the second gear ring 53 rotates through the meshing of the first gear ring 52 and the second gear ring 53, so that the grinding mechanism 06 rotates, and finally the fourth motor 61 is turned on to rotate the fourth cylinder 62, and the fourth cylinder 62 is extended to make the grinder 65 reach the opening, and the fifth cylinder 63 is extended and contracted to make the grinder 65 contact with the edge of the opening, and the fifth motor 64 is turned on to make the grinder 65 grind the edge of the opening. After the construction is completed, the mounting frame 11 is supported by extending multiple first cylinders 14 respectively, and the multiple rollers 15 are rotated respectively by the staff through the assistance of multiple handles 13, so that the mounting frame 11 is moved, thereby improving the practicability of the equipment.

[0035] The first motor 31, the second motor 42, the third motor 51, the fourth motor 61 and the fifth motor 64 of the utility model are purchased on the market, and technicians in the industry only need to install and operate them according to the accompanying instruction manuals without the need for creative work by technicians in this field.

[0036] The main functions realized by the utility model are: placing the drilling device at the opening of the power construction pipeline by hoisting the mobile mechanism 01, extending the grinding mechanism 06 to the opening, and opening the grinding mechanism 06 to grind the edge of the opening to prevent damage to the power cable at the uneven edge of the opening, and moving the mobile mechanism 01 to move the device after the grinding is completed, thereby improving the practicability of the equipment.

[0037] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. A power construction pipeline drilling device, comprising a moving mechanism (01); characterized in that: The invention comprises a moving mechanism (01), a fixing mechanism (02), a first rotating mechanism (03), a drilling mechanism (04), a second rotating mechanism (05) and a grinding mechanism (06); the fixing mechanism (02) and the first rotating mechanism (03) are both mounted on the moving mechanism (01); the drilling mechanism (04) and the second rotating mechanism (05) are both mounted on the first rotating mechanism (03); and the grinding mechanism (06) is mounted on the second rotating mechanism (05).

2. A power construction pipeline drilling device as claimed in claim 1, characterized in that: The moving mechanism (01) comprises a mounting frame (11), a lifting ring (12), a plurality of handles (13), a plurality of first cylinders (14) and a plurality of rollers (15); the bottom ends of the lifting ring (12) and the plurality of handles (13) are respectively mounted on the top end of the mounting frame (11); the plurality of handles (13) are respectively located on the front and rear sides of the lifting ring (12); the top ends of the plurality of first cylinders (14) are respectively mounted on the bottom end of the mounting frame (11); and the plurality of rollers (15) are respectively mounted on the mounting frame (11).

3. The electric power construction pipeline drilling device according to claim 1, characterized in that: The fixing mechanism (02) comprises a plurality of second cylinders (21) and a plurality of fixing clamps (22), wherein the plurality of fixing clamps (22) are respectively mounted on the bottom ends of the plurality of second cylinders (21).

4. The electric power construction pipeline drilling device according to claim 1, characterized in that: The first rotating mechanism (03) comprises a first motor (31) and a rotating rod (32), wherein the top end of the rotating rod (32) is mounted on the output end of the first motor (31).

5. The electric power construction pipeline drilling device according to claim 1, characterized in that: The drilling mechanism (04) comprises a third cylinder (41), a second motor (42), a mounting rod (43) and a drill (44), wherein the top end of the second motor (42) is mounted on the bottom end of the third cylinder (41), and the top end of the drill (44) is mounted on the output end of the second motor (42) via the mounting rod (43).

6. The electric power construction pipeline drilling device according to claim 1, characterized in that: The second rotating mechanism (05) comprises a third motor (51), a first gear ring (52), a second gear ring (53) and a bearing (54), wherein the inner ring of the first gear ring (52) is mounted on the output end of the third motor (51), the outer ring of the first gear ring (52) is meshed with the outer ring of the second gear ring (53), and the inner ring of the second gear ring (53) is mounted on the outer ring of the bearing (54).

7. The electric power construction pipeline drilling device according to claim 1, characterized in that: The grinding mechanism (06) comprises a fourth motor (61), a fourth cylinder (62), a fifth cylinder (63), a fifth motor (64) and a grinding tool (65), wherein the top end of the fourth cylinder (62) is mounted on the output end of the fourth motor (61), the left end of the fifth cylinder (63) is mounted on the bottom of the fourth cylinder (62), the fifth motor (64) is mounted on the right end of the fifth cylinder (63), and the grinding tool (65) is mounted on the output end of the fifth motor (64).

Citation Information

Patent Citations

  • Efficient underground pipeline drilling device for municipal construction

    CN213627426U